26
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR I Planning, Waiting for the Results? H.H. Hesselink ([email protected]) R.R. Seljée ([email protected]) 2nd Gap-Bridging Seminar PLANSIG 2002 TU Delft 21 November 2002

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink ([email protected]) R.R

Embed Size (px)

Citation preview

Page 1: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

AI Planning, Waiting for the Results?

H.H. Hesselink ([email protected])

R.R. Seljée ([email protected])

2nd Gap-Bridging SeminarPLANSIG 2002

TU Delft21 November 2002

Page 2: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

• NLR is a non-profit foundation since 1937/1919• NLR provides technical and scientific contributions to activities in aerospace related areas• NLR will independently serve public and private organisations

NLR

Education– Universities– Technical Colleges

GovernmentMinistries– Transport

– Defence– Environment

Operators

Industries– Aircraft

– Space– Other, incl.

Electronics,Remote Sensing

– Royal NL Air Force– Royal NL Navy– KLM– Air Traffic Control– Amsterdam Airport

Schiphol

NLR

Page 3: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

NLR

- Civil aerospace: 65% - Military aerospace: 35%

- Aeronautics: 85% - Space: 15%

- Operations: 60% - Development: 40%

(non-aerospace: < 2%)

Turn over: 70 MEuro.

Page 4: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

NLR

• Large Wind Tunnels (2 low speed, 2 transonic, 1 supersonic, 50% shared in DNW)• Simulators (flight, air traffic control, tower)

• Aircraft (Fairchild Metro II, Cessna Citation II)

• Computing environments (supercomputer, Network, middleware)

Page 5: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

NLR

• NLR undertakes studies and implementations for Schiphol• Safety cases• Policy studies• Simulator trials• Implementations

• Co-operation with Dutch Industry (HITT)• TCM (Taxiway Collision Monitoring)• Triple-I: Intelligence Instead of Infrastructure

• Co-operation with Eurocontrol

Page 6: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

• MADS:Departure Planning Decision Support at Airports• Runway Use Advisory and Inspection Systems: BGAS & BGCS• Tools for Route Planning and Manoeuvre Planning • Crew Assistant is a decision support system for a pilot • Mission Support System Campal (MSS/C) is a powerful tool

for military mission planning

Planning in Air Traffic Management (ATM): the Big Picture

Projects with AI Planning and Scheduling

Page 7: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

5

1997 2000

2010 2020

DIVISION DED 4 - 4/11/97

7.0 Mio Flights 8.0 Mio Flights

11.9 Mio Flights 15.8 Mio Flights

Flights 150 or more

Flights 100 to 150

Flights 50 to 100

Traffic Growth

ATM Planning: the Problem

Page 8: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Artificial Intelligence and Planning

• The traffic increase gives the operational need• Problem not recognised by controllers (the end users)

• Academia wants to experiment new techniques• Academia wants complex methods for operator modelling• Side effects:

• Establishing better collaboration• Acceptance of new technology in an organisation• Studying other solutions, e.g. use trains in case of Air Traffic Growth

Page 9: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

The Problem: Division of ATM

• Arrival management• Departure management• Surface movement• Stand allocation• Flight management

Page 10: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

The Problem: Many Actors

Many actors involved:• Airlines/AOC• Pilots• Air Traffic Controllers

• En-route ATC• Approach ATC• ATC Departure/Tower• Other Airports ATC

• Apron Controllers• Ground Movement Controllers• CFMU• Meteo Service Providers

Page 11: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Each airport is different but the same

Page 12: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Airport traffic management control loop

Guidance

control

surveillance

aircraft

planning

Page 13: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Collaborate Decision Making (CDM)

Page 14: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

How from FCFS to planning

RESEARCH• planning• more advanced technology• talk to operators• increase efficiency

OPERATORS• first heard first served• conservative (safety)• no time / no interest• one aircraft vs cowboys

The GAP

Page 15: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

How to bridge this gap?

• Start with foundations of the bridge• Finances• Interest from operators• prototypes

Page 16: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Foundation: finances

• Contributions from research (NLR itself)• Contributions from subsidiary projects (EC)• Contributions from Eurocontrol

• Where is industry to subsidise this work?

Page 17: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Foundation: interest

• Make operators aware of their problem• Make operators aware of solutions• Convince operators that they will not be replaced (by automation)

• Convince operators of new challenges• Convince airport managers of the need

Page 18: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Foundation: prototypes

• Build realistic prototypes• Give operators the possibility to interact• Large simulators, with controller-n-the-loop

Page 19: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

The bridge

• Integration projects• Demonstrations • Emotional response to new things must be broken => give the operator a “positive feeling” about our work

Page 20: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Where is industry?

• Industry is waiting for results (to sell)

• Operators are waiting (if at all) ...

Page 21: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

NLR work to demonstrate to planners

• Introduce a planning and scheduling function at airports for scheduling traffic and assist traffic controllers• Evaluate the use and benefit of the tool• We build a planner with constraint reasoning (ILOG Solver and Scheduler)• Symbolic representation of the problem based on the “flight”abject• Constraints: separation, meteo, runway length, traffic distribution, ...

Page 22: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Simplified model

• runway assignment

runway

SID

structure

2 min.

5 min.

exit

A

runway

holding

A2 min.

5 min.

• intersection take-off• take-off time (sequences)• SID allocation

Page 23: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

HMI

EFS

AC T IVE

CALLSIGN STND CTOT EOBT TYPE/W DEST RWY SID SSR ALERT TAXIROUTE REMARK STAT CLR

TVS338 N26 1947 B734/M LEPA 24 BANAS2A 0234

BCS916 N5 1945 1940 B722/M EDDF 24 KADNO 0237

TAR8861 N22 1940 1928 B732/M DTTA 31 KADNO 0344

TAR229 N27 1930 1924 A30B/M DTTA 31 RAK 0332

CSA978 N20 1910 1904 AT72/M LZKZ 24 RATIS 0336 J-H-B

FFR8105 N1 1920 1915 B733/M LDDU 24 BANAS2A 0232

CSA270 N9 1916 1909 B735/M HECA 24 RATIS 0331 NO PUSH

Active Departures

Delete Edit TWR/APP

_ X-5 0 +5 +15+10

Page 24: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

The result of our work

• Operators start to understand the idea of planning• Operators are willing to express their knowledge• Industry has been invited to participate and show their operational products (radars and HMIs)• Industry was invited for a “picnic day”

=> We brought industry in contact with end users

Page 25: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

And further ...

• More experiments in our tower simulator• More demonstrations in real control towers• Bring results to airport decision makers (presentations)• Bring results to industry (software and design) … and sell it!

Page 26: Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink (hessel@nlr.nl) R.R

Nationaal Lucht- en RuimtevaartlaboratoriumNational Aerospace Laboratory NLR

Questions ?