Upload
lecong
View
218
Download
5
Embed Size (px)
Citation preview
23 maart 2013 Thema dag Nationaal SC Cigré
Topics:
1. Leden Studie Nationaal Comité B3 2. Actieve werkgroepen 3. Brochures 4. Tutorials 5. Strategic plan B3 6. Thema dag B3 “Het onderstation de
betrouwbare Hub” 7. Activiteiten nationaal comité 2013/2014 8. Opmerkingen
23 maart 2013 Thema dag Nationaal SC Cigré
Leden Studie Nationaal Comité B3
K.P. Knol ( voorzitter) Liandon B.V.
F.L. Baldinger Locamation Control Systems B.V.
H. Eleveld (secretaris) KEMA CONSULTING
D. Boender Stedin Netbeheer B.V.
T van Rijn Alliander N.V.
A.J.P.M Geraerds Essent Energie
E.C. (Bert) Wervers TenneT
J.J.M. Langedijk Siemens Nederland N.V.
M. van Meggelen Alstom Grid Nederland
E de Meulemeester KEMA CONSULTING
M.T. Rienks TenneT
T.G. Spriensma Eurovolt Consultancy BV.
S. J. Rotsteeg ABB Energie B.V.
A. Visser SBI Connectors Espana S.A
J.A. Wiersma Stedin Netbeheer BV.
J.J Smit TU Delft
23 maart 2013 Thema dag Nationaal SC Cigré
Actieve werkgroepen
B3.35 Substation earthing system design
optimisation through the application of risk analysis
B3.25 SF6 analysis for AIS, GIS and MTS
condition assessment
B3.30 Guide to minimize the use of SF6 during
routine testing of electrical equipment
B3.29 Field test technology on UHV substation
construction and operation
B1/B3.33 Feasability of a common dry type
interface for GIS and Power cables of 52 kV and above
WG B3.24 Benefits of PD diagnosis on GIS
condition assessment
B3.23 Guidelines for uprating and upgrading
of substations
B3.36 AC Collector Systems and Substations associated with HVDC connected Wind
Powers Plants
B3.34 Expected impact of future grid concept
on substation management
B3.31 Air insulated substations design for
severe climate condition
B3.32 Saving through optimized maintenance
of Air insulated Substations
B3.13 Reducing replacement time of HV
Equipment
B3/C1/C2.14 Circuit Configuration Optimisation
JWG B3/B1.27 Factors for investment decision GIL vs.
Cables for AC Transmission
Internal arc effects in medium voltage switchgear
B3.XX
B3:36 Sidney Wijnbergen Piet Knol
B3:32 Theo van Rijn B3:XX Yvette Peterman-Gunther
B3:34 Johan Smit
Actieve werkgroepen Area 2
WG Nr. WG Title2013 20142012
JulJul Jul
1 Residual Life Aspects Applied to HV GIS Switchgear
2 SF6 -analysis for AIS/GIS and MTS Condition Assessment
3Guide to minimize the use of SFduring routine testing of electrical equipment
10
JanFebMar AprMayJun AugSepOctNovDecJanFebMar AprMayJun AugSepOctNovDecJanFebMar AprMayJun AugSepOctNovDec
7
5
4
6
B3.17
8
B3.25
B3.30
B3.29
B1. 33 /B3. 33B1.27/B3.27
B3.24
Field Tests Technology on UHV Substation during construction and operationCommon dry type interfaces for GIS connections above 52 kV for Extruded AC cablesFactors for investment decision GIL vs. Cables for AC TransmissionBenefit for Partial Discharge diagnosis on GIS condition assessment
WG TitleWG Nr.
9
Area 2 meetings
Internal arc defects in MV switchgears (1 – 52 kV) – mitigation technicsBased on CIGRÈ brochure No. 499 residual life HV GIS
B3.37
Tutorial
6
WG disbanded, Brochure No. 499
Approval on publication
Tutorial available, see B3.17
Brochure distributed for approval
1)
Legend
WG-meeting Area-meeting 1) Next meeting in Berlin/ Germany 04/2014
Final meeting Draft
Publication
Actieve werkgroepen Area 3
Legend
WG-meeting Area-meeting 1) Next meeting in Berlin/ Germany 04/2014
Final meeting Draft
Publication
JanFebMar AprMayJun OctNovDecJanFebMar Jun OctNovDecJanFebMar Jun
AugSepOctNovDecWG TitleWG Nr.
2. SecretaryWG Nr. WG Title
2012 2013 2014
Jul Jul Jul Jul
1
2
3
4
5
6
Guidelines for uprating and upgrading of substationsAir insulated substations design for severe climate condition
Saving trough optimized maintenance of Air insulated Substations
AugSepOctNovDecJanFebMar AprMayJun AugSepOctNovDecAugSepOctNovDecJanFebMar AprMayJunJanFebMar AprMayJun
B3.23
B3.31
Area 3 meetings
B3.32
1. Convener 2. Secretary
1. Hiroshi Imagawa, Japan 2. Gilles Tremouille, France 1. Mark Mcvey, US 2. John Nixon, UK 1. Hugh Cunningham, Ireland 2. Romain Migné, France
2) (WG has been disbanded)
7 Progress of work AA4 | xx Study Committee B3
AA4
B3.06.01 “Maintenance and organisation”-contracting
• Part of overview paper at Brisbane B3/D1 Colloquium • “Integrated Substation Life management and Asset Information Strategy”
• A guide is finalized, however now waits for completion with two or
more sample contracts to make it a TB • “Practical Guide for the Outsourcing of Asset Management Services”
8 Progress of work AA4 | xx Study Committee B3
AA4
• B3.06.05 “Practical application of AM information strategies”,
convener S. Läderach (CH)
• Part of overview paper at Brisbane B3/D1 Colloquium • “Integrated Substation Life management and Asset Information Strategy”
• TB submitted to SC,
• “Practical application of asset management information strategies”
• Closing TF5
10 Progress of work AA4 | xx Study Committee B3
AA4
• B3.34 Expected impact of future grid concept on substation mgt • future grid impact on substation subsystem and component management
• practical feasibility including reliability/availability
• Evaluate technical, economical and environmental aspects
• identify implications and requirements on e.g. ratings, functionality, location
• impact of providing future grid intelligence, requirements on ICT
• Members from 15 countries, internationally well distributed • Part of overview paper at Brisbane B3/D1 Colloquium
• “Integrated Substation Life management and Asset Information Strategy”
• EPRI document on grid transformation serves as guide • Members appointed to write sections • The survey is ready for processing
11 Progress of work AA4 | xx Study Committee B3
Tutorials Studie Comité B3
1. Residual life aspects on GIS (Peter Glaubitz, WG B3.17)
2. Upgrading and uprating of substations (Akira Okada, WG 3.23)
3. Obtaining value from on-line monitoring (Arthur Mackrell, WG B3.12)
4. Standardisation vs. innovation in substation design (Terry Krieg, B3.11)
5. Application Guidelines for Turn-Key Projects (Akira Okada, Gilles Tremouille)
6. Circuit Configuration Optimization (Gerd Lingner)
7. Responsible Use of SF6- Challenges and Options (Peter Glaubitz)
8. High Voltage Off Shore substations (John Finn, WG B3:26)
9. Special Considerations for AC Collector Systems and Substations associated with HVDC connected Wind Power (Douglas Ramsay B3:36)
12 Progress of work AA4 | xx Study Committee B3
Brochures Studie Comité B3
B3.11 Combining Innovation with Standardisation 389 B3.12 Obtaining value from Substation Condition Monitoring 462 B3.15 Cost Reductions of Air Insulated Substations 354
B3.10 Primary /Secondary system interface modelling for total asset performance optimization 472
B3.17 Residual Life Concepts Applied to HV GIS 499 B3.20 Mixed Technologies Switchgear MTS 390 B3.18 SF6 Tightness Guide 430 B3.21 Turnkey Substations 439 B3.22 Tech. requirements for substations exceeding 800kV 400 B3.23 Guidelines for uprating and upgrading of substations 532
B3.26 Guidelines For The Design And Construction Of AC Offshore Substations For Wind Farms
483
B3.29 Field Tests for UHV Substations (with CIGRE) B3.25 SF6 Analysis for AIS, GIS and MTS Condition Assessment
B3-C1-C2.14 Circuit Configuration Optimisation (JWG) B3.06 IT Strategies for AM of Substations-General principles
International Situation on SF6 - Regional Issues
SC B3 and SC D1 Colloquium
Brisbane Australia 9-11 September 2013
© Cigre Australia Slide 13
Peter Glaubitz SC B3 AA2 GIS, GIL, SF6
[email protected] September 11, 2013
14 Progress of work AA4 | xx Study Committee B3
Kyoto target, worldwide (issue 1997): Reduction of greenhouse gas emissions
by 5.2% in the period 2008-2012*
Kyoto target, Europe (issue 1997): Reduction of greenhouse gas emissions in the EU by 20% in the period 2013-2020** and 80-95% until 2050 Kyoto target extended to 2020 (“provisional”) Next (19th) Conference of the Parties (COP) in Warsaw/ Poland in 2013 Till 2015 (21st) COP decision about targets starting 2020
Greenhouse Gases
Reduction
Increase
Emissions from greenhouse gases* in [%]
Luxembourg
Denmark
Germany
Austria
United Kingdom
Belgium
Italy
Netherlands
Finland
France
Sweden
Ireland
Spain
Greece
Portugal
EU -8
* 28 substances including SF6 ** Based on the emission level of 1990
15 Progress of work AA4 | xx Study Committee B3
1661
1655
2144
655
591
659
1044
665
375
505
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
0
50000
100000
150000
200000
250000
300000
350000
400000
03 04 05 06 07 08 09 10 11 12
Emis
sion
rat
e (%
)
YearPurchase Emission Emission rate
0.9
0.8
0.7
0.6
0.5 0.4
0.3
0.2
0.1
0.0
0.15%
Switzerland SF6 bank and emission
Source: SF6 balance of SwissMEM
SF 6
ban
ked
(kg)
16 Progress of work AA4 | xx Study Committee B3
324 323358 364 380 383
124 127
128 129132 132
0,0%
0,5%
1,0%
1,5%
2,0%
0
100
200
300
400
500
600
2007 2008 2009 2010 2011 2012
Inst
alle
d am
ount
of S
F 6 (t
)
GIS Circuit Breakers GIS Circuit Breakers
France SF6 bank and emission (2)
1.1%
0.8%
Source: SF6 balance of the French TSO
Emis
sion
rate
17 Progress of work AA4 | xx Study Committee B3
Japan SF6 bank and emission (2)
Emis
sion
rate
(%)
0.17%
SF6 Gas Emission during operating stage in Electrical industry (Japan)
Quoted from METI data concernig SF6 Gas emission in Electrical Industry in 2012
SF6
stor
age
in fi
eld,
Em
issi
on (t
on)
23 maart 2013 Thema dag Nationaal SC Cigré
Strategic plan B3
Review processes: • Strategic Plan 2005 - 2014 • Annually reviewed by SAG, last formal revision in 2009 • SC members invited to identify issues in February 2013 • SAG final review in April 2013 Introduction to revisions: • Introduction of grid UHV AC and DC for substation design • Smart Grids and increased grid automation impacts • Higher awareness of risk of ownership, issues. • New Materials and technologies • On-going issues with existing assets: uprating, extensions
23 maart 2013 Thema dag Nationaal SC Cigré
Strategic plan B3
New Technical Directions: • Impact of new materials & plant technologies • UHV experience – operations and design • Safety, security, risk and environment • Constructability and maintainability, economic aspects
New Organisational Directions: • Maximising international profile, venue selection for meetings • Maximise Distribution involvement in WG • Maximise use and features of SC B3 website • Increasing communication opportunities using new technologies • Two green book projects: Substations and Guidebook to SF6
• Using the two Green book projects to identify missing study areas. • Enhancing the business value of CIGRE for customers go
23 maart 2013 Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub”
5 10 15 20 25 30 162
TenneT / Alliander / Enexis / Stedin / DNWB / WEI / Netbeheer NL
Netbeheerders 29
ABB / Alstom / Siemens / Hapam / Eaton / Elspec / SBI / ELEQ / MetaCom-SBC / VSL / Jazo
Leveranciers 26
Joulz / Liandon / Spie / Cofely / Cegelec / BAM /
Service Providers 26
DNV Kema/ Eurovolt/ Ensol/ Movares/ HaskoningDHV/ Fluor/ Ecofy /D-Cision/ TNO/ Mott MacDonald/ Jacobs/ Arcadis/ ReimElekt
Ingenieurs-/adviesbureau's 26
Essent Energie Prod/ ProRail / NEN / Cigré /
Diversen 10
Haagsche Hogeschool (Power Minor) 19
TU Delft / studenten 13
TU Delft / Eindhoven 13
5 10 15 20 25 30
23 maart 2013 Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub”
Top dag. ik zou zeggen ga maar lekker mee door. Goede locatie, goede verzorging en prima tijdstip. Duidelijke en bondige presentaties. Locatie, gekozen sprekers, gekozen onderwerpen, voedsel Strak programma met interessante onderwerpen en sprekers. Programma van een middag. Lunch en diner uitstekend. Locatie hoogspanningslab perfect; collegazaal iets minder confortabel. Inhoud en opzet van de presentaties prima.
De combinatie van lezingen, demonstratie gelegenheid om elkaar te ontmoeten.
Het bij elkaar zetten van een aantal producenten van HS componenten -Duur presentaties (3x 25 min presentaties achter elkaar) -Mogelijkheid om als deelnemer vragen te mogen stellen (met microfoon) -Lunch/avondeten Als ontwerper van MS netten zeker bruikbare raakvlakken
23 maart 2013 Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub”
Powerpoint presentatie korter kunnen. "Graag zou ik de presentaties bij aanvang lezing digitaal of op papier beschikbaar willen. PDF voldoet Vragen via de microfoon is wat traag. Misschien gewoon vraag stellen zonder Meer ruimte voor vragen en discussie met de zaal. Teveel presentaties in het programma, waardoor iets teveel uitloop. De presentaties waren in het algemeen erg oppervlakkig. Meer diepgang is m.i. gewenst. Voorstellen voor toekomstvaste concepten (30 jaar) aangaande E-infra's en de daarop af te stemmmen inrichtingen / configuraties van onderstations. "Ik miste technische diepgang in de onderwerpen. Veel van de onderwerpen zijn z.g. open deuren, Ik miste echte oplossingen of een path foreward om problemen aan te pakken. De gedachte achter CIGRE is het uitwisselen van kennis om samen tot een hoger niveau te komen.
Activiteiten nationaal comité 2013/2014
• SAC/CAG/TAG Meeting 7 t/m 9 may 2014 Holland evt. Workshop//Tutorial • Voorbereidingsdag // Evaluatie dag Paris session • Participanten comités // commitment management • Certificaten workshops • Cigre promotie => industrie