www.fonamperu.org
PROJECT PORTFOLIOSUMMARY
ENERGY
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
"Poechos I" Hydropower Project: Located in Piura, has an installed capacity of 15.4 MW and a projected installed capacity of 58.5 GWh.
"Poechos II" Hydropower Project: Is the second phase of an existing Hydropower plant, and would have an installed capacity of 10 MW and an annual production of energy is 40,5 GWh.
"Tarucani" Hydropower Project: Located in Arequipa, its installed capacity and estimated yearly energy generation is 49 MW and 282.5 GWh, respectively.
"Carhuaquero IV" Hydroelectric Power Plant: Located in Cajamarca, its an small scale project with an installed capacity of 9.7 MW and projected generation of 42 GWh-year.
"Caña Brava" Hydroelectric Power Plant: Located in Cajamarca, is a small scale project with an installed capacity of 5.6 MW and average generation of 38 GWh-year.
“San Diego" Hydroelectric Power Plant: Is going to be located in Ancash. Its installed capacity and projected average energy generation is 3.8 MW and 21 GWh per year, respectively.
"Chancay I" Hydroelectric Power Plant: It will be located in Cajamarca Peru with an installed capacity of 20 MW and a yearly average generation of 114 Gwh.
"La Virgen" Hydropower Plant: The project would be located in Junin, and would have 64 MW of installed capacity and it will produce an average net annual generation of 386.8 Gwh.
"La Joya" Hydroelectric Power Plant : located in Arequipa and it would have an install capacity of 14.96 MW and an annual average generation of 88.53 Gwh.
“El Platanal” Hydropower Project: It will be located in Lima region , The project’s installed and firm capacity is 220 MW. The estimated yearly average generation is 1 063 GWh.
“Centauro I-III” Hydroelectric Project: The purpose of this project is to build a new 30 MW Hydroelectric using run of water from two rivers. The estimated annual production of energy will be 223 GWh which will be delivered to the national grid (SEIN).
“Chaglla” Hydropower Project: will be implemented in Huallaga River, in the central region of Peru. This project would consist in the construction of a new power plant with a power of 360 MW and the estimated annual production of energy would be 2 475 GWh.
Rehabilitation of “Calca Hydropower Plant”: Compañía Electrica Calca S.A.C will rehabilitate the old Hydropower Plant of Calca, by using the same facilities of the old plant. The project will have an installed capacity of 2 MW an a yearly average generation of 14.6 Gwh.
“San Gaban I" Hydroelectric Project: Located in Puno, consists of a seasonal regulated hydroelectric power plant of 150 MW capacity and it will produce an average net annual generation of 932 GWh.
H-1
H-2
H-3
H-4
H-5
H-6
H-7
H-8
H-9
H-10
H-11
H-12
H-13
H-14
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
31 878
23 055
153 958
23 909
21 632
11 954
64 897
220 194
42 848
501 810
126 947
1 408 943
8 311
530 559
16.5
10.5
55.7
6.4
9.5
4
27.3
75.4
11.5
186.3
14.0
283.8
2.4
221.7
YES
YES
YES
YES
YES
NO
NO
YES
YES
NO
NO
NO
NO
NO
Registered
At Validation
Registered
AtValidation
Registered
PIN
PIN
Registered
AtValidation
AtValidation
PIN
PIN
PIN
PIN
ERPA with Prototype Carbon Fund of the World Bank
CERs wil be sold in spot market
Looking for CERs buyers
Comercialization Contract with AHL Carbono
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Closed
Contract withAHL Carbono
Contract with CantorCO2e
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
CDM in Peru
NATIONAL ENVIRONMENTAL FUND - PERU
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
“San Gaban II” Retrofitting Project: This project is part of the initiative of San Gaban to ensure the maximum power of 110 MW f. The project consists of two parts, the regulation of Putumayo River that will generate an increment of 42.26 GWh per year and the use of water form Tupuri that will generate an increment of 26 GWh per year
“San Gaban III Hydroelectric Power Station”: The Project is located in Puno Region , its installed capacity is estimated in 174 MW, and annual electric energy production of 1 189 GWh.
“San Gabán IV” Hydroelectric Power Plant: located in Macusani District, Carabaya Province, Puno Region. The proposed project will have an installed capacity of 130 MW and a yearly average generation of 850 GWh.
"Mancahuara" Hydropower Project :Located in Apurimac, its a small project that consists in a rehabilitation of an old abandoned hydropower plant. The installed capacity will be 2.5MW with a yearly average generation of 15.2 GWh.
"Hercca" Hydropower Project : Is located in the city of Sicuani in Cusco. The hydropower plant will have 6.7 MW of installed capacity and an estimated annual generation of 38.77 Gwh
"Santa Rosa" Hydroelectric Power Plant : Is a bundle of 3 small run-of-river hydroelectric power plants, located in Lima, in the Santa Rosa Irrigation, Sayan District. The installed capacity and projected average generation are 4.1 MW and 30.1 GWh per year.
“Santa Cruz I” Hydroelectric Power Plant:The is a run-of-river hydropower plant, located in the north east of Lima, Department of Ancash, Perú. The plant will have an installed Capacity of 5.9 MW and a yearly average generation of 35.8GWh.
Rehabilitation of Callahuanca hydroelectric power station: Is located in Lima, the plant has a total capacity of 72.7 MW. This refurbishment will increase the plant’s capacity up to 82.5 MW without dam enlargements nor new water inlets are necessary. The generation would be 40.47 GWh.
“Gera II” Hydroelectric Power Plant: is a small project activity, located in San Martin Region. Gera II Hydropower project takes advantage of the water from Gera I project, generating 2 MW.
“Pucara” Hydroelectric power plant: This hydropower project is located in San Pablo district, Cusco Region. The proposed project will have an installed capacity of 191.4 MW and a yearly average generation of 975.9 Gwh.
“Pías I” Hydroelectric Power Plant : Is located in La Libertad Region. The Project installed capacity would be 12.6 MW, from a 245 meters jump.
"Huanza" Hydroelectric Project : The proposed project is located 130 kilometres north east of Lima. It consists of a 90.6 MW run-of-river hydroelectric power plant. The annual average generation is estimated at 369.8 Gwh.
“Marañon” Hydropower Project: This project, a run-of-the-river hydroelectric, will have an installed capacity of 96 MW (two vertical axis Francis turbines and two electrical generator of 48 MW each one) with an average annual energy generation of 415 GWh/year.
“PARIAC CH 2-3” Hydropower Optimization Project : will optimize the operation of four small hydro power plants, concentrating the facilities in only two hydro power plants and increasing the effective power output in 0.7 MW.
“PARIAC CH 5-6” Hydropower Project : Will be built in Ancash, upstream of the existing PARIAC mini hydro facilities The project would have an installed capacity of 7.7 MW and an estimated energy annual production of 53.4 Gwh.
H-15
H-16
H-17
H-18
H-19
H-20
H-21
H-22
H-23
H-24
H-25
H-26
H-27
H-28
H-29
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
38 801
676 862
483 879
8 666
22 070
17 393
20 602
18 213
9 973
555 550
45 611
210 629
236 247
2 846
30 399
8.2
182.1
183.0
2.4
NA
3.7
7.2
13.8
2.0
273.0
16.5
132.5
147.0
0.1
12.0
NO
NO
NO
File under elaboration
NO
YES
YES
YES
NO
File under elaboration
File under elaboration
YES
File under elaboration
NO
NO
PIN
PIN
PIN
PDD under elaboration
PIN
Registered
AtValidation
Registered
PIN
PDD
PIN
PDD under elaboration
PDD under elaboration
PDD underelaboration
PDD underelaboration
Looking for CERs buyers
Looking forCERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
ERPA with Community Development Carbon Fund
Contract with AHL Carbono
CERs will be sold to ENDESA
Looking for CERs buyers
Contractwith AHL
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Hydropower
Transmission Line
Transmission Line
Transmission Line
Transmission Line
Wind Power
H-30
H-31
H-32
H-33
H-34
H-35
H-36
H-37
H-38
H-39
H-40
TL-1
TL-2
TL-3
TL-4
W-1
“COPA” Hydropower Project: Located in Lima, will be built downstream of the RAPAY Project. Is expected to have an installed capacity of 77 MW and an estimated annual energy production of 411 GWh.
“RAPAY” Hydropower Project :The project plans to have an installed capacity of 89 MW and an estimated annual energy production of 428 Gwh.
“Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per year, respectively.
Rehabilitation of the Hydroelectric of Machupicchu : The project is located in Cusco and would have an installed capacity of 75 MW with 518 GWh of annually energy production.
"Santa Teresa" Hydropower Project : will be located in Cusco, its installed capacity would be 87.57 MW that will deliver 679 GWh per year to the National Interconnected Grid (SEIN).
"Yuncan" Hydropower Project: Located in Pasco, it has an installed capacity of 136 MW, and the estimated electric generation is 901 GWh per year.
“Chirhuain” Hydropower Project : Will be located in Cerro de Pasco. The installed capacity is planned to be around 5 MW and is estimated an average of 33 GWh of electric generation.
"Santa Rita" Hydropower Project : Located in La Libertad and would have an installed capacity of 173 MW and will have 1 100 GWh of annual energy production.
"Central Graton" Hydropower Project : Located in Lima, is a small scale project with an installed capacity and projected average generation of 5 MW and 34.6 GWh, respectively.
“Yaupi” Hydropower Expansion Project : Located in Junin, the project would increase the plant’s generating capacity by approximately 35 MW and the production is set to increase by 189 GWh per year.
“Substitution of fuel generators by small scale 0.8 MW hydropower in Pasto Bueno”: The main objective of the project is the production of hydroelectric energy to replace the diesel fuel-generated energy. The power plant will generate 800 kW, which will be fed to the Pasto Bueno mine “Huaura” belonging to Minera Dynacor del Perú S.A.C.
"Grid Connection of isolated electricity systems San Gabán - Puerto Maldonado": The project consist in the implementation of a Transmission Line named “San Gaban Puerto – Maldonado”, that would bring energy from the interconnected grid to Puerto Maldonado City, contributing in rural electrification.
"138 kV Transmission Line Majes – Camana”: The project extends 65.83 km of the 138 KV transmission line, from Majes to Camana, constructs 1 substation, and supplies electrical energy to the Camana province.
“138 kV Transmission Line Tayabamba – Llacuabamba”: The project prolongs 31.5 km, the government 138 KV transmission line from Tayabamba to Llacuabamba, and constructs 5 substations and 11.5 km of primary 22.9 kV lines towards Retamas and San Andrés.
60 kV Transmission Line “Constante – Bayovar” Project: The project consists of the construction of 35 km of the 60 kV transmission line from Constante to Bayovar, a new 7 MVA substation in Bayovar and a new line bay in substation of Constante.
“Los Perros / Bayovar” Wind Energy Project: Located in Sechura - Piura, this wind energy project of 20 MW of installed capacity will replace energy generated by the oil fired thermo-electrical power plants, mainly operating in the northern part of Peru’s national grid system.
233 969
243 647
74 005
294 881
386 534
497 009
18 785
626 197
20 272
107 592
5 326
14 346
2 482
18 000
3 502
95 000
76.6
100.0
17.3
57.5
77.9
127.8
NA
183.0
5.8
33.5
2.7
20.1
3.5
9.3
4.1
95.3
NO
NO
NO
YES
NO
NO
NO
YES
YES
NO
YES
YES
NO
NO
NO
NO
PDD underelaboration
PDD underelaboration
PIN
PDD underelaboration
PIN
At validation
PIN
PDD
PDD under elaboration
PDD under elaboration
Atvalidation
Atvalidation
PIN
PIN
PIN
PIN
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking forCERs buyers
Looking forCERs buyers
Contract withAHL Carbono
Looking forCERs buyers
ERPA withEEA Fund
Looking forCERS buyers
Looking forCERS buyers
Looking forCERs buyers
Looking forCERs buyers
Looking forCERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
Wind Power
Wind Power
Solid Waste Management
Solid WasteManagement
Solid WasteManagement
Solid Waste Management
Solid WasteManagement
Solid Waste Management}
Solid Waste Management
WastewaterManagement
Transportation
Transportation
Transportation
Transportation
W-2
W-3
SWM-1
SWM-2
SWM-3
SWM-4
SWM-5
SWM-6
SWM-7
WM-1
T-1
T-2
T-3
T-4
"Nordwind" Wind Farm Project : The project will be located in Paita - Piura, and would have an installed power capacity of 105 MW comprised of either 70 wind turbines of 1.5 MW each or 42 wind turbines of 2.5 MW each.
“Malabrigo" Wind Energy Project : The project will be located at the northern coast of Peru, District of Razuri, Province of Ascope, at La Libertad Region, and would have an installed power capacity of 60MW.
“Portillo Grande" Landfill Gas Recovery Project : Is located in the south part of Lima City. This landfill is 15 years old and has accumulated 4.2 million tons of MSW. This landfill has the capacity to receive 2000 tons for the next 30 years.
“El Zapallal” Landfill Gas Recovery Project : located in the north zone of Lima City. This landfill is 17 years old, has accumulated 3 million tons of MSW and has the capacity to receive 2000 tons per day for the next years.
“Ancon – EcoMethane Landfill Gas Project” : Located in the north part of Lima, the objective is to replace the existing ineffective passive venting system by an active gas collection and flaring system in order to destroy the methane contained in the LFG.
“Huaycoloro” Landfill Gas Recovery Project: The project is located in Huarochiri - Lima and it consists of the active capture of the biogas generated in 160 vertical extraction wells connected via a HDPE pipeline of more than 10 km. with the blower and the flaring station.
“Calca”– Reduce Methane Emissions through Compost Plant and Manual Landfill Project : The project is located in Calca province, Cusco and it consists of reduced the methane gas at atmosphere and controlled the leachate.
"Sechura" - Compost Plant and Mechanized Landfill Project : The project is located in Sechura Province to 54 km2 of Piura’s center. The Project includes a composting and recovery of recyclable waste and a landfill.
CDM Program for the Integrated Solid Waste Management in Municipalities of Peru: The Program is based on the implementation of integrated systems for solid waste management, which can be made of Segregation and Composting plant to reduce the waste that go to landfills and clandestine dumps.
Biogas Recovery at Carapongo Wastewater Treatment Plant: The project consists of implementing the biogas recovery through Aerobic-anaerobic system for the wastewater treatment from East Zone of Lima; Chosica, Chaclacayo and towns on the banks of the Rimac river.
Rapid Bus Transport System based on High Capacity Buses using Exclusive Roads : The project aims to develop a massive public transportation system in the city of Lima, which will be more economic, faster, and more ordered than the current system.
Electric Mass Transit System Project for Lima and Callao : The project aims to endow an electric mass transit system, for peripheral zones in the Cities of Lima and Callao with high population density.
Integrated Transport System in Lima /GTU : The project aims to develop a massive public transportation system, for low income population, which will be more economic, faster, and more orderly than the current system.
“Renewal Program of Automotive Fleet to Promote Change of Energy Matrix”: This Activities Program is established by means of the Presidential Decree. 213-2007-EF "Temporary Regime for the Change of Automotive Fleet of diesel vehicles," which consists in promoting renewal of the automotive fleet to new light vehicles that consume gasoline and/or vehicular natural gas (VNG).
209 445
83 683
151 64
54 213
69 012
298 996
360
2 101
369 359
78 840
199 743
725 585
436 543
73 563
218.3
102.0
1.6
1.6
3.6
2.0
0.2
4.9
520.0
1.6
214.5
408.0
333.1
50.2
NO
NO
File underelaboration
NO
YES
YES
NO
NO
File underelaboration
NO
NO
NO
NO
File underelaboration
PIN
PIN
PIN
PIN
At validation
Registered
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Contract with Ecosecurities
ERPA with NetherlandsClean DevelopmentMechanism Facility
Looking for CERs buyers
Looking forCERs buyers
Looking for CERs buyers
Looking forCERs buyers
Looking forCERs buyers
Looking forCERs buyers
Looking forCERs buyers
Looking forCERs buyers
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Biomass
Fuel Switching
Fuel Switching
Fuel Switching
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8
B-9
B-10
B-11
B-12
FS-1
FS-2
FS-3
Cogeneration with Biomass at "Complejo Agroindustrial Cartavio SAA” : Is located in La Libertad. The Project consist in replace the current energy generation system to another modern system with more efficient combustion that will use bagasse instead of residual oil.
Avoid methane emissions using biodigester for Vinasse Treatment at Cartavio S.A.A. :Consists in a vinasse treatment facility as well as a cogenerating facility, it involves the design, construction, installation, start-up and operation of biodigesters and co-generating facility. It’s expected to generate 6 400 MWh per year.
“Paramonga” CDM Bagasse Boiler Project : It will replace the existing boilers with a new bagasse one, displacing the use of residual fuel oil with renewable energy and zero net greenhouse gas emissions.
"HEAVEN" Biodiesel Production and Distribution for Automobile Transportation : This project will take place in Lurín - Lima; it consists in the construction of a plant for a production of 120 000 gallons of biodiesel per day.
"Garodi" Biodiesel Plant : Located in Lima, the project consists in the construction of a Biodiesel plant for a production of 10 000 000 liters per year.
“COMISA” Sugar cane ethanol project : The project is going to be located in Sullana Province, Piura Region and consists in the implementation of 12 000 hectares of sugar cane crops with the propose to generate ethanol.
“Palmas del Espino – Biogas recovery and heat generation from Palm Oil Mill Effluent” : The project involves a biogas recovery system which covers lagoons with floating plastic membranes. .
“Boiler Optimization in Agroindustrial Laredo” : The project is located in La Libertad, consists in the optimization and repotentiation of an old boiler, displacing the use of residual fuel oil through the use of bagasse to feed this boiler.
Chiclayo Rice Hull Power Plant : The objective of the Chiclayo Rice-Hull Fired Cogeneration Project is to generate electricity by burning rice hulls, a biomass fuel. The initial stated aggregate power output from the plant will be 9.2 MW.
Sugar Cane Foliage for Steam and Green Power Generation : Based on Swedish technology, whole cane harvesting and subsequent separation and use of cane foliage will facilitate a fossil fuel free production of sugar, paper (from bagasse), ethanol (from molasses) and other products.
Rice-Hull Energy Generation Project in San Martin : The purpose of the Project is to use the rice-hull as input for the electric power generation, with capacity of 1.84 MW, and to avoid the generation risks of CH4 (methane), and N2O (nitrous oxide) emissions.
“Chira’s” Bioenergy Project : Electricity cogeneration Project (20 MW) with the use of biomass residues from the sugarcane harvesting process of the ethanol project “Caña Brava”, in the north coast of Peru (Piura)
Fuel Switching at Atocongo Cement Plant and Natural Gas Pipeline Extension - Cementos Lima : The project considers the construction of a 3.5 km natural gas pipeline and the installation of new natural gas burners.
"REX S.A." Fuel Switching Project : contemplates fuel switching from coal to natural gas in brickworks furnaces through the installation of new burners for natural gas.
“Peruvian Fuel-Switching Project” : the project is located in Lima, and consists in the substitution of fuel that consists in investment in order to replace the use of liquid fuels of petroleum for natural gas.
6.1
5.0
5.4
15.0
0.6
81.0
1.3
2.0
16.6
20.0
1.9
11.3
6.6
0.6
0.7
32 887
30 859
85 300
412 759
24 897
192 000
26 719
75 979
14 717
296 000
11 712
87 000
243 882
32 000
25 577
YES
NO
YES
NO
NO
NO
YES
YES
NO
NO
NO
NO
YES
YES
NO
PDD underelaboration
PIN
At Validation
PDD underelaboration
PDD underelaboration
PIN
Registered
PIN
PIN
PIN
PIN
PIN
At Validation
PDD underelaboration
Registered
Looking forCERs buyers
Looking for CERs buyers
Contract withCAEMA
ComercializationContract with AHL Carbono
Comercialization Contract with AHL Carbono
Looking for CERs buyers
Contract with Ecofys
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Looking for CERs buyers
Working with One Carboncompany
Contract with DEUMAN
Contract with A2G
Contract with MGM Int.
Cogeneration
Cogeneration
Cogeneration
Cogeneratio
EnergyEfficiency
EnergyEfficiency
EnergyEfficiency
GeothermalPower
GeothermalPower
14 289 069TOTAL
CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION
REDUCTION (TCO2E/YEAR)
DNA APPROVAL
(LOA)
INVESTMENTIN MILLIONS
US$STATUS SALE SITUATION
5 820.0
C-1
C-2
C-3
C-4
EE-1
EE-2
EE-3
G-1
G-2
Natural Gas Cogeneration Plant in Nuevo Mundo Industrial Company : The project will implement a cogeneration plant, which consists of a 6.34 MW turbine, covering much of the thermal energy supply, all the electric power demand from the two plants and the sale of excess of electric power to the National Grid.
Natural Gas Cogeneration at San Miguel Industrial Company : The Project will totally cover the demand of steam and part of electric power demand, which will be completed by purchasing electricity from the National Grid.
590 MW Natural gas based grid connected Combined cycle power plant – Electroperu S.A. : The project will be located in the District of Chilca, province of Cañete, region of Lima. The plant is based on efficient combined cycle technology and can use natural gas from Camisea field as fuel.
Ventanilla Conversion from Single-cycle to Combined-cycle Power Generation Project : The project activity converts two open-cycle gas turbine of 160 MW each into a combined-cycle facility that adds approximately 179 MW of generating capacity to Peru’s electric power grid.
CDM Program to replace incandescent lamps with compact fluorescent lamps-CFL : The objective project is to replace one million of incandescent lamps of 60 W and 500 000 incandescent lamps of 100 W with CFL for compacts fluorescent lamps in two years 2008-2009.
CDM Program to replace fluorescent lamps T12 with fluorescent lamps T8 at Public and Private Buildings : The objective project is to replace one million of fluorescent lamps T12 for fluorescent lamps T8 at Government buildings; and to achieve by multiplying effect the replacement of 4 millions of fluorescent lamps T12 for T8 in the Private sector.
Electricity production from waste heat gases in sponge iron production: the project involves the generation of electrical power through the installation of 4 waste heat recovery boilers and a 35 MW steam turbine generator.
“Aguas Calientes” Geothermal Project : The project consists in the construction of a 50 MW geothermal power plant in the field of Aguas Calientes Candarave and in the south of the country in the department of Tacna.
“Borateras” Geothermal Project : The project consists in the construction of a 50 MW geothermal power plant in the field of Aguas Calientes Candarave and in the south of the country in the department of Tacna.
13 361
4 348
730 791
375 051
34 800
2 784
143 562
224 406
224 406
4.2
1.5
570.0
156.0
0.1
0.1
45.0
140.0
140.0
NO
NO
NO
File under elaboration
NO
NO
NO
NO
NO
PIN
NO
PIN
At Validation
PIN
PIN
PIN
PIN
PIN
Looking for CERSs buyers
Looking for CERSs buyers
Looking for CERSs buyers
CERs will besold to ENDESA
Looking for CERSs buyers
Looking for CERSs buyers
Looking for CERSs buyers
Looking for CERSs buyers
Looking for CERSs buyers