Upload
aleesha-white
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
GM2 11/2/2010
• The general objective of CoNeT:▫ Update the knowledge and skills of existing employees in
Ethernet-based systems and related areas in the field of
Industrial Automation: Realtime Ethernet in an Industrial environment as
Input/Output fieldbus Industrial Ethernet as communication platform for vertical
integration between production and administration floor▫ produce independent training modules in Industrial
Ethernet based Network Systems
Objective CoNeT (Cooperative Network Training) (1)
2
2
GM2 11/2/2010
• The general aims of this project can be divided into five main areas:▫ To train automation engineers, maintenance engineers,
process workers and under- and postgraduates in modern network technology applied to control operations and automated solutions
▫ To develop hands-on training modules at different levels of complexity aimed at students and company employees
▫ To assemble mobile laboratories▫ To foment mobility between the companies, universities
and other organisations involved in the project▫ To develop the general, vocational and social skills of the
trainees and trainers involved.
Objective CoNeT (Cooperative Network Training) (2)
3
3
GM2 11/2/2010
• CML will be developed and assembled• After the project period, these boxes can be easily
multiplied• The equipment can be very easily extended, depending on
the local needs in future• For the local needs we need to have input of the NRG• Maybe, part of the equipment will be financed by the
participating companies.• The materials will be developed in English and edited by a
native speaker before the first test phase
Practical training CoNeT Mobile Labs (CML)
4
4
GM2 11/2/2010
• CML (=portable boxes equipped with industrial network devices) can be exchanged between the partners as the labs are small
• Laboratories can be brought to the companies where the engineers and technicians can be trained on the floor
• All Laboratories can be brought to one place for training (e.g. Intensive Programme (IP))
Why CoNeT Mobile Labs?
5
5
GM2 11/2/2010
• Some topics in industrial network systems have been identified as areas of need by the Consortium (GM1)▫ We translate these topics in training modules▫ Each of these modules stands alone, meaning that it
does not matter in which order they are followed by the participants of the training programme, as long as they have the right compentences to enroll in the module
▫ In GM1 per module a team leader and team members were assigned
Project position at this moment (1)
6
6
GM2 11/2/2010
• A questionnaire was sent to the industrial partners
interested in trainings in the field (= First Input)▫ Taking into account the comments from the needs▫ Industrial partners can become member of the national
resonance group ▫ The comments from the needs analysis will be taken into
account while tuning the outlines• Next Step: Local partner(s) organize a meeting with the
resonance group to discuss the needs (= Second Input)
Project position at this moment (2)
7
7
GM2 11/2/2010
• Each participating country will install a NRG • NRG adapt the content of the modules in accordance with the
need analysis ▫ provide input to course design ▫ discuss the subjects covered by the training programme, the
training materials and mobile laboratories created • NRG provide facilities for testing and evaluation • The ECTS and competence files will be discussed in the NRG
▫ competence files should reflect the industry’s needs, therefore, information should be obtained using the different NRG
▫ are the competences needed in the industry correctly covered?
Objectives National Resonance Group (NRG)
8
8
GM2 11/2/2010
• 1. Ethernet based IO systems• 2. Profinet on Siemens platform• 3. Profinet on Phoenix-Contact platform• 4. Beckhoff EtherCat• 5. Allen Bradley Ethernet IP• 6. Realtime processes• 7. Wireless
Proposal of modules
9
9
GM2 11/2/2010
• Objective: Basis principles (Theory) of ethernet based IO systems in a practical context
▫ Industrial Ethernet Based network standards▫ Basis principles of Ethernet and the difference between
an ‘Office LAN’ and an ‘Industrial LAN’▫ Switching, routing etc.▫ TCP/UDP /IP Items and text
Module 1: Ethernet based IO systems
10
10
Teamleader:Yildiz (Galip Cansever)
Members:AGH (Wojciech Grega)TEI Crete(Giorgos Papadourakis) FHD(Reinhard Langmann)ENOSAD (Sedat Ömeroglu)KdG (Dominique Daens) (reserve list)
GM2 11/2/2010
• Objective: Practical implementation of Profinet IO systems (multi vendor) on a Siemens PLC
▫ PLC: Simatic S7 (Simatic S7 Manager)▫ Implementation of Profinet IO (Phoenix Contact, Wago,
Beckhoff…) on Siemens PLC ▫ Profinet CBA▫ Study of different Gateways
Profinet/Profibus Profinet/Interbus Other
Module 2: Profinet on Siemens Platform
11
Teamleader:Rousse (Maria Gerasimova Popova, Antoaneta Dobreva))
Members:LIMTEC (Benny Siemons)FHD (Reinhard Langmann)ENOSAD (Sedat Ömeroglu) (reserve)
GM2 11/2/2010
• Objective: Practical implementation of Profinet IO systems (multi vendor) on a Phoenix Contact PLC▫ PLC: Phoenix Contact (PC Worx) ▫ Implementation of Profinet IO Siemens / Wago / Beckhoff …. in
PC Worx ▫ Profinet CBA???▫ Study of different Gateways
Profinet/Profibus Profinet/Interbus other
Module 3: Profinet on Phoenix Contact Platform
12
12
Teamleader:FHD (Reinhard Langmann)
Members:Yildiz (Galip Cansever)KdG (Dominique Daens)LIMTEC (Benny Siemons)Phoenix Contact (Antje Guese)
GM2 11/2/2010
• Objective: Practical implementation of EtherCat IO on a Beckhoff PLC▫ PLC: Beckhoff Controllers (TWIN CAT) ▫ Implementation of EtherCat IO (Beckhoff or other) in TWIN CAT▫ Study of different Gateways
EtherCat/Profibus EtherCat/Modbus TCP/IP other
Module 4: EtherCat on a TwinCat platform
13
13
Teamleader:LIMTEC (Benny Siemons)
Members:KdG (Dominique Daens)
GM2 11/2/2010
• Objective: Practical implementation of Ethernet IP Input Output on an Allen Bradley PLC ▫ Allen Bradley ▫ Implementation of Ethernet IP in Allen Bradley ▫ Study of different Gateways
EthernetIP/Device Net (Allen Bradley/Wago/Beckhoff) other
Module 5: Ethernet IP on Allen Bradley platform
14
14
Teamleader:AGH (Wojciech Grega)
Members:Industrial partner Poland???TEI Crete (Giorgos Papadourakis)??LIMTEC (Benny Siemons) (reserve)
GM2 11/2/2010
• Objective: Develop of little realtime processes in witch the several Ethernet IO and fieldbusses could be integrated Developing of practical exercises Processes will be connected to the PLC modules by using
several fieldbusses and Ethernet based IO by simple replacement of the fieldbus module.
Examples processes: Level Control, Temperature Control, mechatronics laboratory
models, pneumatic manipulators…
Module 6: Real Time processes
15
15
Teamleader:TEI Crete (Giorgos Papadourakis)
Members:AGH (Wojciech Grega)FHD (Reinhard Langmann)
GM2 11/2/2010
• Objective: Practical implementation of Wireless communication concepts in an industrial environment▫ Wireless Ethernet, Access Point, Access Client▫ Bluetooth based wireless▫ Security: WEP, WAP, MAC filters etc.▫ GPRS???
Module 7: Wireless Communication
16
16
Teamleader:KdG (Dominique Daens)
Members:TEI Crete (Giorgos Papadourakis)Phoenix Contact (Antje Guese)
GM2 11/2/2010
• As soon as the outlines of the modules are adapted to the requirements of the local industry the development of the training materials and the mobile laboratories can start
• The NRG collaborating with the academic partners will provide input to course design and content
• NRG provide facilities for testing and evaluation of the modules
• Each module will be tested and evaluated in work situations and feedback of the NRG will be incorporated into the materials
Conclusion
17
17