Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
NATS Fast-Time Modelling
Technical Interchange MeetingCentre d’Etudes de la Navigation
Aerienne (CENA)
Martyn Richards/Carolyn Hobbs4th November 2003
Overview• NATS Capacity & Validation• Fast-time Simulators• Analysis Tools• Metrics• Projects• SMART project• Summary
Capacity & Validation
Capacity & Validation
Research & Innovation
Safety Analysis
Human Factors
Analysis & Research
Airspace Airports
Future Tools
Fast-Time Simulators•HERMES
(Heuristic Runway Movement Event Simulator)
•RAMS Plus(Re-organised ATC Mathematical Simulator)
•TAAM Version 1.3.2(Total Airspace and Airport Modeller)
HERMES Analysis Tools
– Airport radar data collection/analysis/ playback tool (APT)
– Airport visual observations (ANORAC)
– Airport operational database (AMACS)
– HERMES-TAAM Interface (HERMIT)
RAMS/TAAM Analysis Tools
– Traffic Data Pre-Processor• UKFDB - RAMS format - add restrictions• RAMS - TAAM - RAMS• for traffic and sectors
– Model playback facility (ReView)
– Investigating LUCIAD
Analysis ToolsReView
RAMS Analysis Tools
• Workload
• Sector Capacity (OSCAR)
• ATM Analyser (RAMS+)
Metrics
Workload Model (WLPP)
Controller Tasks and Times
Sector specifictask frequencies
Simulation Output
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40
HOURLY OCCUPANCY
TOTA
L W
OR
KLO
AD
AS
% O
F EL
APS
ED T
IME
Capacity Estimate
Workload AnalysisRadar Controller onlyInitial Conflict
Search14%
Routine Strip14%
Secondary Conflict Search
1% RT44%
Routine Radar27%
Example of Metrics
42
9
24
35
40
2927
33
24
41
36
3134 34
20
2624
2225
20
1618
23
0
5
10
15
20
25
30
35
40
45
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00
HOUR ENDING (UTC)
NU
MB
ER O
F A
IRC
RA
FT
Sector Entry
Capacity Estimate forPlannerCapacity Estimate forTactical
HERMES Projects
• Runway Capacity Studies– Heathrow, Gatwick, Birmingham– Stansted and Manchester
• HERMES + TAAM– to study ground movement
infrastructure and airspace capacity
Combined Runway and Ground Movement Studies
Ground Movement -TAAM
Runway Capacity -HERMES
RAMS Projects
• Baseline of UK Airspace• En-route Re-sectorisation
– North Sea, Clacton• En-route Procedures
– Hurn, West End• Sector Capacity
– New En-route Centre
TAAM Projects
• Airport Studies– Manchester, Edinburgh, Dublin– Heathrow, Southampton
• TMA Studies– South East & East of England
Regional Airspace Study (SERAS)– Simulation Modelling and Analysis of
Area Navigation in Terminal Control Area (SMART)
SMART
• Sponsored by ATC Design team at London Terminal Control Centre
• To determine how RNAV can be introduced in the London TMA
• Stage 1 - Design RNAV SIDs• TAAM ideal for designing SIDs
SMART
• Stage 2 - Establish 2020 TC airspace model, incorporating full RNP(x)-RNAV environment
• Re-design of outbound and inbound routes
• Starting with TC North West• Maps provided by design team
EGLLBUR
A1
B16000’
B36000’
B4FL70+
Point B4 must be a minimum of 4nm from the edge of the BNN hold.
C1
C2
C36000’
C46000’
Z1FL80+
Z2FL100+
Z3FL120
Z4Climb
Point Z4 must be a minimum of 4nm from the edge of the LOREL inbound track.
Z5FL70+
Point Z5 must be a minimum of 4nm from the edge of the BNN hold.
Z6 & Z7FL80+
Z8 & Z9FL100+
Z10 & Z11FL120
E12FL120
Z12Climb
FL130+
Point Z12 must be a minimum of 4nm from the edge of the LOREL inbound track.
Z13FL140+
Z14FL160+
Z15FL180+
EGGW
EGSS
Z23FL150
Z24FL130+
Z25FL120+
Point Z24 must be a minimum of 4nm from the LL easterly x2 track.
Z29FL120
Point Z29 must be a minimum of 4nm from the ALKIN arrival track.
Z30Descend
R1FL190
Z31FL160
R3FL120
Z32FL120
Point Z32 must be a minimum of 4nm from the ALKIN arrival track.
Project Progress
• Modelled in TAAM• ReView created and sent to the
design team• Produce Conflict Analysis• Meet to discuss project progress
and investigate conflicts
Conflict AnalysisConflict AnalysisCriteria 3.9 nms 950ft above 2500'SMART WP2a Phase 2TC North WestScenario 1 TimedSample All Westerly
Time Callsigns route Flight Level Closest Point of Approach07:12 EZY357 Luton Departure 65 3.2 nms
BAW18Y Heathrow Departure 60
Time Callsigns route FL Closest Point of Approach07:24 EZY171 Luton Departure 70 1.7 nms
EIN151 Heathrow Departure 70
Time Callsigns route FL Closest Point of Approach07:27 EZY085 Luton Departure 60 2.1 nms
EIN149 Heathrow Departure 60
Time Callsigns route FL Closest Point of Approach07:39 CRX89N London City Departure 50 3.0 nms
XJT3 Luton Departure 50
SMART re-host to RAMS?
• Problems with Holding and Sequencing in TAAM
• C&V running several projects on TAAM with only one license
• RAMS plus has TMA rules with holding.
• Can we run SMART on RAMS?
Process for SMART re-host
• For the TMA baseline scenario convert SMART from TAAM to RAMS
• Re-format traffic files• Sectorisation as in the RAMS
baseline• Run RAMS and compare with
TAAM
Comparing RAMS/TAAM
• Flight details for a sample flight on each route
• Holding in RAMS/TAAM
• Conflict Analyses
Flight DetailsANZ2 B744 60N EGLL
RAMS - TAAMRAMS TAAM Flight Level Time Change in
Navaid Time Flight Level Navaid Time Flight Level Difference Difference Time(secs) Difference
1 60N 06:10:00 390 60N 06:10:01 390 0 -1 02 STN 06:30:26 390 STN 06:30:17 390 0 9 103 GOW 06:49:49 390 GOW 06:49:29 390 0 20 214 FENIK 06:51:11 390 FENIK 06:50:40 390 0 31 325 NGY 06:55:21 390 NGY 06:55:36 390 0 -15 -146 DCS 07:00:25 390 DCS 07:00:35 390 0 -10 -97 LAKEY 07:04:28 390 LAKEY 07:04:36 390 0 -8 -78 CALDA 07:08:21 390 CALDA 07:08:27 390 0 -6 -59 CROFT 07:09:35 390 CROFT 07:09:40 390 0 -5 -410 BARTN 07:10:54 390 BARTN 07:10:58 390 0 -4 -311 LOVEL 07:12:44 387 LOVEL 07:12:46 390 -3 -2 -112 CONGA 07:13:40 370 CONGA 07:13:40 390 -20 0 113 HON 07:20:31 230 HON 07:20:42 229 1 -11 -1014 WCO 07:27:45 150 WCO 07:33:59 125 25 -374 -37315 BNN 07:31:10 80 BNN 07:37:11 80 0 -361 -360
RAMS Holding
• Conflict Resolution needed to incorporate holding
• Introduced for Heathrow and Stansted with Holdstack Rules only
• Resolution sometimes causes vectoring
Next Steps
• Can we stop a/c being vectored• Produce Conflict Analyses • Has anybody else re-hosted a
project from TAAM to RAMS?• Would welcome any advice, help,
or suggestions.
Summary•Fast-time simulation forms a very useful tool within C&V covering all ATC operational environments.
•The team has developed tools for processing data, and analysis of results.
•Current work includes modelling Ground, Terminal and Area operations
•The team is always looking to improve and investigate new technology.
NATS Fast-Time ModellingOverviewCapacity & ValidationFast-Time SimulatorsAnalysis Tools�ReViewRAMS Analysis ToolsHERMES Projects RAMS ProjectsTAAM Projects SMART SMARTProject ProgressConflict AnalysisSMART re-host to RAMS?Process for SMART re-hostComparing RAMS/TAAMFlight DetailsRAMS HoldingNext StepsSummary