27
NATS Fast-Time Modelling Technical Interchange Meeting Centre d’Etudes de la Navigation Aerienne (CENA) Martyn Richards/Carolyn Hobbs 4th November 2003

NATS Fast-Time Modelling · 2006. 11. 6. · Flight Details ANZ2 B744 60N EGLL RAMS - TAAM RAMS TAAM Flight Level Time Change in Navaid Time Flight Level Navaid Time Flight Level

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • NATS Fast-Time Modelling

    Technical Interchange MeetingCentre d’Etudes de la Navigation

    Aerienne (CENA)

    Martyn Richards/Carolyn Hobbs4th November 2003

  • Overview• NATS Capacity & Validation• Fast-time Simulators• Analysis Tools• Metrics• Projects• SMART project• Summary

  • Capacity & Validation

    Capacity & Validation

    Research & Innovation

    Safety Analysis

    Human Factors

    Analysis & Research

    Airspace Airports

    Future Tools

  • Fast-Time Simulators•HERMES

    (Heuristic Runway Movement Event Simulator)

    •RAMS Plus(Re-organised ATC Mathematical Simulator)

    •TAAM Version 1.3.2(Total Airspace and Airport Modeller)

  • HERMES Analysis Tools

    – Airport radar data collection/analysis/ playback tool (APT)

    – Airport visual observations (ANORAC)

    – Airport operational database (AMACS)

    – HERMES-TAAM Interface (HERMIT)

  • RAMS/TAAM Analysis Tools

    – Traffic Data Pre-Processor• UKFDB - RAMS format - add restrictions• RAMS - TAAM - RAMS• for traffic and sectors

    – Model playback facility (ReView)

    – Investigating LUCIAD

  • Analysis ToolsReView

  • RAMS Analysis Tools

    • Workload

    • Sector Capacity (OSCAR)

    • ATM Analyser (RAMS+)

  • Metrics

    Workload Model (WLPP)

    Controller Tasks and Times

    Sector specifictask frequencies

    Simulation Output

    -20

    0

    20

    40

    60

    80

    100

    120

    0 5 10 15 20 25 30 35 40

    HOURLY OCCUPANCY

    TOTA

    L W

    OR

    KLO

    AD

    AS

    % O

    F EL

    APS

    ED T

    IME

    Capacity Estimate

    Workload AnalysisRadar Controller onlyInitial Conflict

    Search14%

    Routine Strip14%

    Secondary Conflict Search

    1% RT44%

    Routine Radar27%

  • Example of Metrics

    42

    9

    24

    35

    40

    2927

    33

    24

    41

    36

    3134 34

    20

    2624

    2225

    20

    1618

    23

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00

    HOUR ENDING (UTC)

    NU

    MB

    ER O

    F A

    IRC

    RA

    FT

    Sector Entry

    Capacity Estimate forPlannerCapacity Estimate forTactical

  • HERMES Projects

    • Runway Capacity Studies– Heathrow, Gatwick, Birmingham– Stansted and Manchester

    • HERMES + TAAM– to study ground movement

    infrastructure and airspace capacity

  • Combined Runway and Ground Movement Studies

    Ground Movement -TAAM

    Runway Capacity -HERMES

  • RAMS Projects

    • Baseline of UK Airspace• En-route Re-sectorisation

    – North Sea, Clacton• En-route Procedures

    – Hurn, West End• Sector Capacity

    – New En-route Centre

  • TAAM Projects

    • Airport Studies– Manchester, Edinburgh, Dublin– Heathrow, Southampton

    • TMA Studies– South East & East of England

    Regional Airspace Study (SERAS)– Simulation Modelling and Analysis of

    Area Navigation in Terminal Control Area (SMART)

  • SMART

    • Sponsored by ATC Design team at London Terminal Control Centre

    • To determine how RNAV can be introduced in the London TMA

    • Stage 1 - Design RNAV SIDs• TAAM ideal for designing SIDs

  • SMART

    • Stage 2 - Establish 2020 TC airspace model, incorporating full RNP(x)-RNAV environment

    • Re-design of outbound and inbound routes

    • Starting with TC North West• Maps provided by design team

  • EGLLBUR

    A1

    B16000’

    B36000’

    B4FL70+

    Point B4 must be a minimum of 4nm from the edge of the BNN hold.

    C1

    C2

    C36000’

    C46000’

    Z1FL80+

    Z2FL100+

    Z3FL120

    Z4Climb

    Point Z4 must be a minimum of 4nm from the edge of the LOREL inbound track.

    Z5FL70+

    Point Z5 must be a minimum of 4nm from the edge of the BNN hold.

    Z6 & Z7FL80+

    Z8 & Z9FL100+

    Z10 & Z11FL120

    E12FL120

    Z12Climb

    FL130+

    Point Z12 must be a minimum of 4nm from the edge of the LOREL inbound track.

    Z13FL140+

    Z14FL160+

    Z15FL180+

  • EGGW

    EGSS

    Z23FL150

    Z24FL130+

    Z25FL120+

    Point Z24 must be a minimum of 4nm from the LL easterly x2 track.

    Z29FL120

    Point Z29 must be a minimum of 4nm from the ALKIN arrival track.

    Z30Descend

    R1FL190

    Z31FL160

    R3FL120

    Z32FL120

    Point Z32 must be a minimum of 4nm from the ALKIN arrival track.

  • Project Progress

    • Modelled in TAAM• ReView created and sent to the

    design team• Produce Conflict Analysis• Meet to discuss project progress

    and investigate conflicts

  • Conflict AnalysisConflict AnalysisCriteria 3.9 nms 950ft above 2500'SMART WP2a Phase 2TC North WestScenario 1 TimedSample All Westerly

    Time Callsigns route Flight Level Closest Point of Approach07:12 EZY357 Luton Departure 65 3.2 nms

    BAW18Y Heathrow Departure 60

    Time Callsigns route FL Closest Point of Approach07:24 EZY171 Luton Departure 70 1.7 nms

    EIN151 Heathrow Departure 70

    Time Callsigns route FL Closest Point of Approach07:27 EZY085 Luton Departure 60 2.1 nms

    EIN149 Heathrow Departure 60

    Time Callsigns route FL Closest Point of Approach07:39 CRX89N London City Departure 50 3.0 nms

    XJT3 Luton Departure 50

  • SMART re-host to RAMS?

    • Problems with Holding and Sequencing in TAAM

    • C&V running several projects on TAAM with only one license

    • RAMS plus has TMA rules with holding.

    • Can we run SMART on RAMS?

  • Process for SMART re-host

    • For the TMA baseline scenario convert SMART from TAAM to RAMS

    • Re-format traffic files• Sectorisation as in the RAMS

    baseline• Run RAMS and compare with

    TAAM

  • Comparing RAMS/TAAM

    • Flight details for a sample flight on each route

    • Holding in RAMS/TAAM

    • Conflict Analyses

  • Flight DetailsANZ2 B744 60N EGLL

    RAMS - TAAMRAMS TAAM Flight Level Time Change in

    Navaid Time Flight Level Navaid Time Flight Level Difference Difference Time(secs) Difference

    1 60N 06:10:00 390 60N 06:10:01 390 0 -1 02 STN 06:30:26 390 STN 06:30:17 390 0 9 103 GOW 06:49:49 390 GOW 06:49:29 390 0 20 214 FENIK 06:51:11 390 FENIK 06:50:40 390 0 31 325 NGY 06:55:21 390 NGY 06:55:36 390 0 -15 -146 DCS 07:00:25 390 DCS 07:00:35 390 0 -10 -97 LAKEY 07:04:28 390 LAKEY 07:04:36 390 0 -8 -78 CALDA 07:08:21 390 CALDA 07:08:27 390 0 -6 -59 CROFT 07:09:35 390 CROFT 07:09:40 390 0 -5 -410 BARTN 07:10:54 390 BARTN 07:10:58 390 0 -4 -311 LOVEL 07:12:44 387 LOVEL 07:12:46 390 -3 -2 -112 CONGA 07:13:40 370 CONGA 07:13:40 390 -20 0 113 HON 07:20:31 230 HON 07:20:42 229 1 -11 -1014 WCO 07:27:45 150 WCO 07:33:59 125 25 -374 -37315 BNN 07:31:10 80 BNN 07:37:11 80 0 -361 -360

  • RAMS Holding

    • Conflict Resolution needed to incorporate holding

    • Introduced for Heathrow and Stansted with Holdstack Rules only

    • Resolution sometimes causes vectoring

  • Next Steps

    • Can we stop a/c being vectored• Produce Conflict Analyses • Has anybody else re-hosted a

    project from TAAM to RAMS?• Would welcome any advice, help,

    or suggestions.

  • Summary•Fast-time simulation forms a very useful tool within C&V covering all ATC operational environments.

    •The team has developed tools for processing data, and analysis of results.

    •Current work includes modelling Ground, Terminal and Area operations

    •The team is always looking to improve and investigate new technology.

    NATS Fast-Time ModellingOverviewCapacity & ValidationFast-Time SimulatorsAnalysis Tools�ReViewRAMS Analysis ToolsHERMES Projects RAMS ProjectsTAAM Projects SMART SMARTProject ProgressConflict AnalysisSMART re-host to RAMS?Process for SMART re-hostComparing RAMS/TAAMFlight DetailsRAMS HoldingNext StepsSummary