14
Navy Gas Turbine Engine Navy Gas Turbine Engine Remote Monitoring and Remote Monitoring and Diagnostics Diagnostics Dave Weeks GBA 573 Summer 2002

Navy Gas Turbine Engine Remote Monitoring and Diagnostics Dave Weeks GBA 573 Summer 2002

Embed Size (px)

Citation preview

Navy Gas Turbine Engine Remote Navy Gas Turbine Engine Remote Monitoring and DiagnosticsMonitoring and Diagnostics

Dave WeeksGBA 573Summer 2002

SAICSAIC► San Diego HeadquartersSan Diego Headquarters► 40,000 Employees40,000 Employees► $6.1 B FY02 Revenue$6.1 B FY02 Revenue► Fortune 500Fortune 500► 60% DOD – 40% Commercial60% DOD – 40% Commercial► Employee OwnedEmployee Owned► Autonomous UnitsAutonomous Units

Navy Gas TurbinesNavy Gas Turbines

- 2,500 Kilowatts

- 25,000 Horsepower

886 Navy Gas 886 Navy Gas TurbinesTurbines

What’s the Problem?What’s the Problem?►Material readiness unknownMaterial readiness unknown►Condition deterioratingCondition deteriorating►Total cost of ownership inflationTotal cost of ownership inflation►Navy training focuses on operations not repair or Navy training focuses on operations not repair or

diagnosticsdiagnostics►Manning ReductionsManning Reductions►Flood with data vice infoFlood with data vice info►Average tech experience: 10 enginesAverage tech experience: 10 engines

What’s the Solution?What’s the Solution?►Proactive Proactive

Preventative DiagnosticsPreventative Diagnostics Automated trend analysis.Automated trend analysis.

►Remote monitoring capability.Remote monitoring capability. Routine health.Routine health. Real time casualty.Real time casualty.

►Shore based diagnostics from experts.Shore based diagnostics from experts.►Maintenance recommendations to the ship Maintenance recommendations to the ship

and repair yard - real time. and repair yard - real time. ►Average tech experience: 1,000 enginesAverage tech experience: 1,000 engines

Mature TechnologiesMature Technologies► 2,500 Airline Engines2,500 Airline Engines► 200 Commercial Power 200 Commercial Power

StationsStations

► World Wide Satellite World Wide Satellite ConnectivityConnectivity

► Established Diagnostic Established Diagnostic CentersCenters

Teaming Teaming brings brings

specialization specialization

- General Electric

- Lockheed Martin

- Harris

- Globalstar and Iridium

- SAIC

System ArchitectureSystem Architecture

SIMA Pearl Harbor WorkStation

SIMA San Diego WorkStation

NAVSEA Work StationFTCPAC Work Station

Shore SatelliteTransceiver

Communications SatelliteCommunications Satellite Communications Satellite

Remote Diagnostics Processor

Contractor Team WorkStation

GE Engine Remote Diagnostics Center

LongTermData

Storage

Internet

Hub

Shipboard Processor

Shipboard SatelliteTransceiver

Shipboard WorkStation

ShortTermData

Storage

3 Months

CostsCosts► Installation Fixed Installation Fixed

Firm Price $400K Firm Price $400K ► Service $75K yearService $75K year

► 1 engine per 10 ship 1 engine per 10 ship overhaul avoidance. overhaul avoidance. Savings $20M per Savings $20M per yearyear

► ExperienceExperience► ReadinessReadiness

GainGain

AssumptionsAssumptions►Satellite AvailabilitySatellite Availability►Transmit LimitationsTransmit Limitations►Install Team 8 PeopleInstall Team 8 People►Monitoring Team 7 Monitoring Team 7

PeoplePeople►Estimate Based on Estimate Based on

San Diego ShipsSan Diego Ships

Growth PotentialGrowth Potential► Maintenance OrganizationMaintenance Organization► Coast GuardCoast Guard► Commercial shipsCommercial ships► Foreign NaviesForeign Navies► Military aircraftMilitary aircraft► Off shore platforms Off shore platforms ► Remote power stations and Remote power stations and

equipmentequipment► Navy non gas turbine systems Navy non gas turbine systems

Measurement of SuccessMeasurement of Success

►Service renewalService renewal►Additional shipsAdditional ships►Meet timelineMeet timeline►ProfitProfit►Retain the TeamRetain the Team