NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

Embed Size (px)

Citation preview

Page 1: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

NC Flood Plain LIDAR

Use at NCDOT

August 4, 2004

NC LIDAR Workgroup

NCSU

North Carolina Department of Transportation

Page 2: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

NCDOT Photogrammetry Unit

NCDOT Hydraulics Unit

NCDOT Visualization Group

NCDOT GIS Unit

Contact Information

North Carolina Department of TransportationExperience with LIDAR Elevation Data

Page 3: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

2000 - 2001: USDOT funded Technology Application Project with EarthData Documented accuracy and demonstrated potential for LIDAR elevation

data in transportation projects Initial indication of computer technology related issues

2002: Utilized NC Flood Plain LIDAR for 20 projects Validated accuracy and evaluated provided data for application to

standard mapping products Developed Implementation Plan

2003: Utilized NC Flood Plain LIDAR for 30 projects Continued with Implementation Plan

2004: Anticipate Using NC Flood Plain LIDAR for 80 projects Now providing LIDAR elevation data to other NCDOT customers

North Carolina Department of Transportation

Photogrammetry Unit

Page 4: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

Implementation Plan Acquire 20 Foot Gridded LIDAR Elevation Data from NCFMP - currently have

Phase I and waiting for release of Phase II

Implemented a Program to Host, Access, & Reformat 20 Foot Gridded Data to MicroStation DGN Format on NCDOT Photogrammetry Server for Internal Customers

Utilize 20 Foot Gridded LIDAR Elevation Data for Orthorectification, Planning, and Functional and Preliminary Design Mapping Products

Continue to Add Photogrammetric Breaklines to 20 Foot Gridded LIDAR Elevation Data to Produce DTM Data for Functional and Preliminary Design

Will not Utilize NCFMP LIDAR Elevation Data for Final Design DTM Data or Construction Earthwork Pay Quantity Calculations

North Carolina Department of Transportation

Photogrammetry Unit

Page 5: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

Mapping Products that Utilize NC Flood Plain LIDAR Digital Mosaic - used for corridor planning and environmental document

LIDAR used for orthorectification

Orthophotography - used for corridor evaluation and selection LIDAR included as part of terrain data with limited photogrammetric

breaklines LIDAR used for orthorectification

Topographic Mapping - used to establish project footprint and is often base map for Design Public Hearing

LIDAR included as part of terrain data with extensive photogrammetric breaklines

Typical Scale is 1”=200’

North Carolina Department of Transportation

Photogrammetry Unit

Page 6: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

2003 - 2004: Utilized NC Flood Plain LIDAR to clarify and resolve drainage and flooding disputes nearby NCDOT Projects

Disputes can arise during or post construction

Have used NC Flood Plain LIDAR for a few projects to date

NC Flood Plain LIDAR provided by Photogrammetry Unit

North Carolina Department of Transportation

Hydraulics Unit

Page 7: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

2003 - 2004: Utilized NC Flood Plain LIDAR for terrain and model surface for image rendering

Have used NC Flood Plain LIDAR for a few projects to date

NC Flood Plain LIDAR proved by Photogrammetry Unit or obtained directly from NCEM

Sample Rendered Images from Wilmington, NC (Image and building footprints from local governments)

North Carolina Department of Transportation

Visualization Group

Page 8: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

North Carolina Department of Transportation

Visualization Group

Page 9: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

North Carolina Department of Transportation

Visualization Group

Page 10: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

2002 - 2004: Developed and maintaining database and program to retrieve 20 foot gridded LIDAR for use by Photogrammetry Unit (DGN file)

2004: Developing a web site that provides contours or gridded LIDAR for an entire county (output available as State Plane Feet in shapefile or DGN file) currently utilizes NC Flood Plain LIDAR and USGS DEM data

2004: Developing program to use raw LIDAR data to determine building heights for NCDOT Visualization Group projects

North Carolina Department of Transportation

GIS Unit

Page 11: NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation

NCDOT Photogrammetry Unit Mr. Keith Johnston ([email protected])

NCDOT Hydraulics Unit Mr. Dan Duffield ([email protected])

NCDOT Visualization Group Mr. David Hinnant ([email protected])

NCDOT GIS Unit Mr. Bill Miller ([email protected])

North Carolina Department of Transportation

Contact Information