  • 7/29/2019 NCR's Status

    1/4

    Sl no NCR No

    37 SEPL/BVIL/PH-2/M-037

  • 7/29/2019 NCR's Status

    2/4

    Description of NCR NCR in Area

    Boiler-III Rear Water wall tube damage Boiler III

    Phase-II BVIL Mechanical Total NCR's

  • 7/29/2019 NCR's Status

    3/4

    Raised Date Status Remarks

    18/1/13 Open Undertaking Letter from MPL still pending

    tatus as on 04/09/13

  • 7/29/2019 NCR's Status

    4/4

    Sl no NCR No Description of NCR NCR in Area Raised Date Status Remarks

    1 SEPL/BVIL/PH-2/M-010 Boiler III Structure joints rusting due to no painting. Boiler III 24-Jan-12 Open Report issued to MPL for necessaryrectification.

    2 SEPL/BVIL/PH-2/M-022 Re Heater coils wear poof covers Boiler III 1-Aug-12 Open Inspection to be offered

    3 SEPL/BVIL/PH-2/M-025 Boiler III - 3rd pass coils alignment Boiler III 3-Aug-12 OpenSEL Officials advised for China

    Engineers and GPSPL clearance

    4 SEPL/BVIL/PH-2/M-035Third pass refractory application with out carrying hydro

    testBoiler III 15-Dec-12 Open

    Will be concluded in Final Hydro

    test

    5 SEPL/BVIL/PH-2/M-036L.H.S C.O.D refractory application with out mechanical

    clearanceBoiler III 15-Dec-12 Open MPL to Offer Inspection

    6 SEPL/BVIL/PH-2/M-037 Boiler-III Rear Water wall tube damage Boiler III 18/1/13 Re-Opened As Undertaking Letter from MPLstill pending

    7 SEPL/BVIL/PH-2/M-039 Boiler III and IV furnace bed nozzels Boiler III 2-Sep-13 Open DP Test to be done

    8 SEPL/BVIL/PH-2/M-42 Buck Stay's Boiler III 21-Jun-13 Open

    9 SEPL/BVIL/PH-2/M-46 Secondry Air Loop Duct Boiler III 2-Aug-13 Open

    10 SEPL/BVIL/PH-2/M-011 Boiler IV Structure joints rusting due to no painting. Boiler IV 24-Jan-12 Open MPL to Offer Inspection

    11 SEPL/BVIL/PH-2/M-009Boiler IV Main structure bolts are not provided,not

    tightened & some are found short boltsBoiler IV 24-Jan-12 Open Work in progress

    12 SEPL/BVIL/PH-2/M-45 Incorrect Bolts for Vertcal Bracings Boiler IV17-Jul-13

    Open

    13 SEPL/BVIL/PH-2/M-005 Wear Proof covers of Lower Econamiser coils Boiler III & IV 2-Dec-11 Open

    GPSPL Should supply additional

    SS Sheet at top side to avoid

    unburnt particle entry.

    14 SEPL/BVIL/PH-2/M-024 Welding Quality in Boiler III & IV Boiler III & IV 2-Aug-12 Re-OpenedAs Undertaking from MPL still

    pending

    15 SEPL/BVIL/PH-2/M-033 Welding of Dissimilar materials at Main stem headers Boiler III&IV 11-Jun-12 Re-Opened

    Undertaking Letter from MPL still

    pending

    16 SEPL/BVIL/PH-2/M-028Boiler III & IV loop seal duct Expansion Bellows welding

    qualityBoiler III & IV 10-Aug-12 Open

    GPSPL Should arrange needful

    rectification (1 out of 3 completed)

    17 SEPL/BVIL/PH-2/M-43 APH to ESP Slant Ducting Connection Boiler III&IV29-Jun-13

    OpenRevised Drawing required from

    GPSPL

    18 SEPL/BVIL/PH-2/M-020 Rail Alignment of EOT crane. TG building21-Apr-12

    Open Rail to be replaced by MPL

    19 SEPL/BVIL/PH-2/M-047 Hydro-Test Carried without Mechanical & NDT Clearance TG & Boiler-III14-Aug-13

    Open

    20 SEPL/BVIL/PH-2/M-40 Coal handling extension structure alignment CHP 15-Dec-12 Open MPL to Offer Inspection21 SEPL/BVIL/PH-2/M-44 Coal Storage Yard BOP 16-Jul-13 Open

    Total Pending NCR's: 21 NCR's

    Phase-II BVIL Mechanical Pending NCR's as on 04/09/13

    Boiler-III

    Boiler-IV

    Boiler-III&IV

    BOP

    TG

    Summary of Pending NCR's Package wise:

    Boiler-III: 09 NCR's

    Boiler-IV: 03 NCR's

    Boiler III&IV: 05 NCR's

    TG: 02 NCR's

    BOP: 02 NCR's