NDG-Westmount
Neighbourhood Committee
January 25, 2016
2
Work update
Requests from members of the Neighbourhood Committee
Feedback on previous questions
Strengthening and diverting of the collector
Redeveloping rues Pullman, Saint-Rémi and Saint-Jacques
Mobility Maintenance Annual Plan 2016
3
Feedback on previous questions
1. When the MTQ will carry out the closure of autoroute 15 ?
(Raising of parapets by the borough)
2. Is it possible to ensure the snow removal of the bicycle paths in
direction of downtown in NDG ?
3. As the escarpment is an ecoterritory, what does it mean in terms
of protection?
4. Update on bus lines 90 and 420
4
Haut Saint-Pierre collector
Work in the existing collector
Existing collector to be abandoned
Diverting the collector
5
Haut Saint-Pierre collector
6
Haut Saint-Pierre collector
Schedule
Diverting the collector : March 2015 to spring 2016
Dismantling and reconstruction of the Saint-Jacques overpass :
summer 2016 to end of 2017
7
Saint-Rémi / Saint-Jacques / Pullman
Exit no 2 – rue Saint-Jacques reopened since December 2
7
OPEN
Mobility Maintenance Annual Plan
2016
9
Presentation outline
Highlights – Central sector
Access ramps A-15 South / A-720 East
and A-720 West / A-15 Nord
Access ramp A-15 North towards A-720
East
Rue Saint-Rémi
Preliminary schedule
Highlights – West sector
Dismantling of railway tunnel
Reconfiguration of Pullman Street /
Sainte-Anne-de-Bellevue Blvd.
Railway retaining wall
Preliminary schedule
Highlights – East sector
Temporary deviation of A-720
Closure of Guy and Atwater exits
Dismantling of A-720
Preliminary schedule
Highlights – South sector
Lachine Canal bridge
Work in De La Vérendrye sector
Rue Saint-Rémi
Preliminary schedule
10
Highlights – Central sector
Construction of access ramp A-15 South towards R-136 East
A-15 fill near Centre sportif Gadbois
Continuing construction of 4 structures of A-20
Dismantling of ramp A-15 North towards A-720 East
Access ramp A-15 South
towards R-136 East
11
Access ramps A-15 / A-720
Reduced to 1 lane on
ramp A-15 South / A-
720 East and ramp A-
720 West / A-15 North
Construction of new A-
15 South towards R-
136 ramps
12
Ramps A-15 North towards A-720 East
Closure of ramp A-15
North towards A-720
East
Dismantling of existing
ramp to begin
construction of the new
ramps and realignment
of Turcot Holding
railway
13
Rue Saint-Rémi
Closure …
Local traffic
Work area
Construction of the
new R-136 eastbound
Complete closure of
rue Saint-Rémi
between rues Saint-
Jacques et Cazelais
14
Preliminary Schedule
Work / Closures Preliminary dates
1 lane reduction:
• A-15 South towards A-720 East
• A-720 West towards A-15 North
Spring 2016 to 2019
Closure of ramp A-15 North towards A-720 East Spring 2016 Opening of new ramp: end of 2017
Closure of rue Saint-Rémi End of february 2016 à to summer
of 2016
15
Highlights – East sector
Construction of first two lanes of R-136
Construction of exit reserved for public transit - Rose-de-Lima
Route 136
Eastbound
16
Temporary deviation of A-720
Necessary for the construction of the first lanes of R-136
Two-lane deviation
Duration: a little over a year (450 days)
Temporary deviation Traffic flow
Existing structure to dismantled and rebuild
17
Temporary deviation of A-720
18
Closure of exit no 3 – Montréal (downtown) / rue Guy
Planning underway – preliminary detour
Duration of closure: 2 to 3 months
Closed …
Exit no 4 -
De La Montagne
Closure …
Detour
Exit no 3 -
Rue Guy
19
Closure of exit no 2 – rue Atwater
Planning underway – preliminary detour
Duration of closure: 2 to 3 months
Closure …
Detour
Exit no 3 -
Rue Guy
Exit no 2 -
Rue Atwater
20
Important change for 2016 – West to east traffic
Use of existing structures, new structures and temporary structures to
implement a new traffic flow during the construction of the Turcot
project.
1 lane reduction
2 lanes reduction
New permanent road
Temporary road
Dismantling
21
Dismantling A-720
Construction of R-136 Eastbound
Dismantling
22
Preliminary Schedule
Work / Closures Preliminary dates
Construction of temporary deviation of A-720 Fall 2015 to Fall 2016
Closure of exit no 3 – rue Guy Spring 2016 / Fall 2016
(2 to 3 months)
Closure of exit no 2 – rue Atwater Fall 2016 / End of 2016
(2 to 3 months)
New west to east traffic flow Fall 2016 to 2018
23
Highlights – West sector
Construction of A-20
Construction of service road
Construction of retaining walls
Start of CN work
24
Reconfiguration of rue Pullman / boul. Ste-
Anne-de-Bellevue Commissioning of
service road
Change to
contraflow lane
on Sainte-Anne-
de-Bellevue: 1 lane in each
direction
Nouvelle structure
1 voie direction ouest
1 voie direction est
New structure
1 lane westbound
1 lane eastbound
25
Preliminary Schedule
Work / Closures Preliminary dates
Closure of Montreal-West interchange December 2015 to 2019
Dismantling railway tunnel Winter 2016
Reconfiguration of rue Pullman / boul. Ste-Anne-
de-Bellevue
Spring 2016 to 2019
26
Highlights – South sector
Lachine Canal Bridge Foundations
Deck
Work in De La Vérendrye sector
27
Rue Saint-Patrick and Chemin de la Côte
Saint-Paul Detours:
Rue Saint-Patrick
Chemin de la Côte Saint-Paul
Bike path
Approximate work areas
Street detours
Bike path
Closed
28
Temporary arrangement - De la Vérendrye
Connexion of new
De La Vérendrye
exit
Construction of
temporary structures
(2)
Detour
Temporary arrangements
Extension of boul. De La Vérendrye
29
Deviation
Current bike path
Closure
Deviation of bike path
Use of bike path
on the extension
of boul. De La
Vérendrye
Extension of boul. De La Vérendrye
30
Rue Saint-Rémi
Construction of A-15
Work between Cabot
and de l’Église
1 lane remains open in
each direction
Sidewalk on North side
closed, South side
deviated
1 lane in each direction
Sidewalk closed
31
Preliminary Schedule
Work / Closures Preliminary dates
Lachine Canal Bridge
• Deviation of rue Saint-Patrick
• Deviation of chemin de la Côte-Saint-Paul
Winter 2016 to 2019
Opening Temporary arrangement of De la
Vérendrye
Spring 2016 to 2018
Deviation of boul. De La Vérendrye bike path Spring 2016 to 2018
Rue Saint-Rémi
• Drainage work
• Structure of A-15
• Spring 2016 to summer of 2016
• Summer/Fall 2016 to 2017
32
Photos of 2015
A-20 structures
November 17, 2015
33
November 17, 2015
Photos of 2015
A-20 structures
34
November 17, 2015
Photos of 2015
End of dismantling 780, rue Saint-Rémi
35
November 26, 2015
Photos of 2015
A-20 structures
36
December 4, 2015
Photos of 2015
Temporary exit – West Sector
37
December 4, 2015
Photos of 2015
Columns of boul. de Sainte-Anne-de-
Bellevue bridge
38
December 11, 2015
Photos of 2015
Retaining wall – South of rue Pullman
39
November 17, 2015
Photos of 2015
Boul. Angrignon deviation
40
NDG-Westmount neighbourhood committee
March 21, 2016
Sud-Ouest neighbourhood committee
February 9, 2016
Website dedicated to the project: www.turcot.gouv.qc.ca
Twitter @MTQ_Turcot
Monthly electronic bulletins (subscribe via the Turcot website)
Dedicated telephone line: 514 873-1372
Turcot email: [email protected]
For More Information
41
www.turcot.gouv.qc.ca