Neutrino Factory Design StudyNeutrino Factory Design Study
• IntroductionIntroduction
• World Design Study statusWorld Design Study status
• EC Framework 6 Design StudiesEC Framework 6 Design Studies
• Neutrino Factory & Superbeam Design StudyNeutrino Factory & Superbeam Design Study
IntroductionIntroduction
Two feasibility studies so far in US:Two feasibility studies so far in US:
• FS 1: FS 1: FNALFNAL performance not good enoughperformance not good enough too expensivetoo expensive
• FS 2:FS 2: BNLBNL performance good enoughperformance good enough still too expensivestill too expensive
• FS 3: FS 3: RAL?RAL? - Take FS2 and reduce cost - Take FS2 and reduce cost - A - A
lot of progress already madelot of progress already made
One feasibility study in JapanOne feasibility study in Japan - - based on FFAG - produced in 2002
Zero feasibility studies in EuropeZero feasibility studies in Europe
IntroductionIntroduction
• Before/during NuFact’03: Before/during NuFact’03: time for “3time for “3rdrd” Design Study” Design Study
• Should be world-wide this timeShould be world-wide this time
• Parallel discussion and plenary talkParallel discussion and plenary talk
• Steering group created:Steering group created:US:US: Steve GeerSteve Geer
Bob PalmerBob PalmerMike ZismanMike Zisman
Japan:Japan: Yoshi KunoYoshi KunoYoshi MoriYoshi MoriKenzo NakamuraKenzo Nakamura
Europe:Europe: Alain BlondelAlain BlondelRob Edgecock Rob Edgecock (chair)(chair)
Helmut HaserothHelmut Haseroth• Three (phone) meetings so farThree (phone) meetings so far
WDS StatusWDS Status
• Propose to “create” “6” “sub-collaborations”Propose to “create” “6” “sub-collaborations”
Sub-collaboration Summary of Task
1 Proton Driver Definition of critical parameters and R&D on components
2 Targetry R&D on solid and liquid targets to prove viability; R&D on pion collection
3 MICE Demonstration and study of ionisation cooling
4 FFAGs Study of FFAG acceleration, proof of principle and R&D on critical components
5 Design and engineering studies
Cost and performance optmised Neutrino Factory Design
6 Physics and detectors Define parameters for accelerator & detector, inc. detector cost
• Steering Groups being proposed (for those without one)
EC FP6 Design Studies EC FP6 Design Studies
FP6 FP6 33 blocks of activities:blocks of activities:
Integrating European Research
Structuring the ERA Strengthening the ERA
Research and Innovation Human resources &
mobility
Research infrastructures
Science and Society
Transnational Access
Integrating Activities
Communication Network Development
Design Studies
Construction of New Infrastructure
Accompanying Measures
CARE
BENE HIPPI
FP6 Design StudiesFP6 Design Studies
• HIPPI – JRA: HIPPI – JRA: improving existing infrastructureimproving existing infrastructure
Design Studies:
• FS and TPW on new infrastructures
• Clear European dimension and interest
• Must “systematically explore EIB and Structural Funds”
• Infrastructure can be outside EU, if EU participates
• Upgrade to existing infrastructure, if replaces new
FP6 Design StudiesFP6 Design Studies
Feasibility Studies:
“will aim at laying the conceptual foundations of a potential new or enhanced infrastructure. This could consist in the basic feasibility study of a specific new
facility or in exploring a new fundamental technology or technique underpinning a whole new concept. Alternatively, a feasibility study could
cover the detailed engineering design of a proposed infrastructure, in particular in relation to its most technologically advanced aspects (i.e. excluding the
detailed design of standard elements of the new infrastructure).“
Technical Preparatory Work:
“will cover the development and testing of components, subsystems, materials or techniques (including dedicated software) that are critical for the future development of a new or enhanced infrastructure. Support will
however not be provided for preparatory work based on existing or proven techniques or technologies, nor when it aims at reproducing available
components or materials.”
NB Contributions to capital investments are excluded
FP6 Design StudiesFP6 Design Studies
• In first call: In first call: 70M€70M€
• EC contribution/DS: EC contribution/DS: 1-10M€1-10M€
• Maximum EC contribution: Maximum EC contribution: 50%50%
• Total cost has to be justified in proposalTotal cost has to be justified in proposal
• Duration of DS: Duration of DS: 24 to 48 months24 to 48 months
Funding:Funding:
Timescale:Timescale:
Call for proposals: 11th November
Submission deadline: 4th March 2004, 5pm
Evaluation/interviews: June 2004
Results: July 2004
Contract negotiations end: September 2004
DS start: end 2004/start 2005
NF FP6 Design StudyNF FP6 Design Study
Proton Driver
Targetry MICE FFAGs Design Study
Physics Studies
Proton Driver
MICE FFAGs Design Study
Physics Studies
Target Collectn
Proton Driver >0.2
GeV
MICE FFAGs? Design Study
Physics Studies
Target Collectn
Two Conveners
Two Conveners
Two Conveners
Two Conveners
Four Conveners
Two Conveners
Steering GroupSteering Group
Director:Director: Ken PeachKen PeachCoordinator:Coordinator: Rob EdgecockRob Edgecock
Japanese representative:Japanese representative: ?? US US representative:representative: Mike ZismanMike Zisman
Proton Driver:Proton Driver: Roland GarobyRoland GarobyChris PriorChris Prior Targetry:Targetry:
Roger BennettRoger Bennett?? MICE:MICE:
Alain BlondelAlain Blondel?? FFAGs:FFAGs: Francois Francois
MeotMeot ??Design & Engineering:Design & Engineering: Helmut HaserothHelmut Haseroth
Vittorio PalladinoVittorio Palladino
Physics:Physics: Pilar HernandezPilar HernandezMauro MezzettoMauro Mezzetto
TimescalesTimescales
Submit proposal: 4th March 2004, 5pm!
Finish proposal: 19th February 2004
Start writing final version: 15th January 2004
Final editing starts: 12th February 2004
Firmed up plans, outline of: 24th December 2003 proposal, 1st cost and schedule
1st plans/WP: 11th December 2003
Work Package teams formed: 28th November 2003
Form Steering Group: TodayToday
Form Work Package teams: TodayToday
Feedback from Brussels
Review of plans: 18th/19th December
Proposal preparation
Final review of proposal 18th February
FundingFunding
• Assume DS will be 4 years end 2008
• Can get 10M€ from EC
• Must find at least the same from existing sources
• Need to check FP6 rules, e.g. MICE beam and inf?
• “Third party” funding?
• Matching funding/Work Package or total?
• Need to check what “capital investments” are
• Within these limits, there are no limits!
Next StepsNext Steps
Get approval of plans from EMCOG - RE
Get approval from ESGARD - RE
Contact with Brussels - RE
Determine requirements at RAL - PRN/RE
Form Steering Groups - RE et al
Form teams - SGs
Develop plans for proposal - All
All must start now!All must start now!