Nevada New Energy Industry Task Force Technical Advisory Committee Presentation
May 2016
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
1. Encourage development of clean energy sources and integrate renewable technologies into Nevada’s energy sector
2. Foster the creation of a modern, resilient, and cost-effective energy grid
3. Support distributed generation and storage, with a specific focus on rooftop solar and net metering
2
S T O R A G E S U P P O R T S T H E T A S K F O R C E ’ S G O A L S
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
E N E R G Y S T O R A G E U S E S
3
SELF CONSUMPTION
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 4
R E S I D E N T A L I N S T A L L A T I O N
3.3 kW / 6.4 kWh
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 5
C O M M E R C I A L B U I L D I N G I N S T A L L A T I O N
250 kW / 1 MWh
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 6
13 MW / 52 MWh
U T I L I T Y - S C A L E I N S T A L L A T I O N
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
Volu
met
ric E
nerg
y D
ensi
ty [W
h/l]
600
500
400
300
200
1985 1990 1995 2000 2005
350330
580
280
General Motors EV1
Tesla Roadster
Tesla Model S
Tesla Model III
2010 2015
Ni/Cd
Ni/MH
Li-Ion
Doubling in 10 years
B A T T E R Y C E L L E N E R G Y D E N S I T Y T R E N D
7
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 8
GWh/
Year
Pro
duct
ion
Copyright©2015-2016/B3 Corporation
500,000 Vehicles + Energy Storage
G L O B A L B A T T E R Y C E L L M A R K E T
Projected Gigafactory Pack ProductionProjected Gigafactory Cell ProductionEnergy Storage / UPSxEVMobile IT
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 9
G I G A F A C T O R Y
* Projected
*
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
Many utility processes and tariffs must be updated to accommodate storage:
• Planning (Generation, Transmission, & Distribution)• Valuation• Procurement• Operations• Rate design• Interconnection
The first energy storage projects in a region have higher development costs because significant utility learning is required
10
B A R R I E R S T O S T O R A G E D E P L O Y M E N T
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
The best way to uncover which detailed processes and tariff language must be updated is to proactively deploy commercial energy storage projects at all points of the grid:
– Customer-connected– Distribution-connected– Transmission-connected
11
L E A R N B Y D O I N G
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 12
Q U E S T I O N S / D I S C U S S I O N