New Buildings for IIT Madras Research Park – Phase – II, SH: - Supply, Installation, Testing and Commissioning of Lifts BLOCK - E PASSENGER LIFT#PL- 01/02/03 SERVICE LIFT#SL-01 PASSENGER LIFT#PL-01 PASSENGER LIFT#PL-02 PASSENGER LIFT#PL-04 /05 PASSENGER LIFT PL-07 PASSENGER LIFT PL-01 /02 SERVICE LIFT#SL- 01 PASSENGER LIFT#PL01 /03 1088 @ 1.75 M/C ABOVE 1360 @ 1.5 M/C ABOVE 1600 @ 1.75 M/C ABOVE 1600 @ 1.75 M/C ABOVE 1088 @ 1.6 MRL 1088 @ 1.6 MRL 1088 @ 1.75 M/C ABOVE 1360 @ 1.50 M/C ABOVE 1088 @ 1.75 M/C ABOVE 2x 3 1 x 2 1 1 2 1 2 1 2 A Quote should be net including supply and installation of lifts with scaffolding, minor builders work and all steel materials such as machine beams, bearing plates, buffer support ladder, sill angles, fascias etc., and should be inclusive of all applicable taxes. Rs No. of units Rs 6 2 1 1 2 1 2 1 2 Total Rs Grand Total Rs BLOCK - D BLOCK - C BLOCK - A & B BLOCK NO & NAME Lift Designation Duty (K.G.) & Speed (M.P.S.) No. of Lifts BOQ Summary 1 / 47

New Buildings for IIT Madras Research Park – Phase – II ... - Lift Tender - Section - 4...New Buildings for IIT Madras Research Park ... Supply, Installation, Testing and Commissioning

Embed Size (px)

Citation preview

New Buildings for IIT Madras Research Park – Phase – II,

SH: - Supply, Installation, Testing and Commissioning of Lifts

BLOCK - E

PASSENGER

LIFT#PL-

01/02/03

SERVICE

LIFT#SL-01

PASSENGER

LIFT#PL-01

PASSENGER

LIFT#PL-02

PASSENGER

LIFT#PL-04

/05

PASSENGER

LIFT PL-07

PASSENGER LIFT

PL-01 /02

SERVICE LIFT#SL-

01

PASSENGER

LIFT#PL01 /03

1088 @ 1.75

M/C ABOVE

1360 @ 1.5

M/C ABOVE

1600 @ 1.75

M/C ABOVE

1600 @ 1.75

M/C ABOVE

1088 @ 1.6

MRL

1088 @ 1.6

MRL

1088 @ 1.75 M/C

ABOVE

1360 @ 1.50 M/C

ABOVE

1088 @ 1.75

M/C ABOVE

2x 3 1 x 2 1 1 2 1 2 1 2

A

Quote should be net

including supply and

installation of lifts with

scaffolding, minor builders

work and all steel materials

such as machine beams,

bearing plates, buffer

support ladder, sill angles,

fascias etc., and should be

inclusive of all applicable

taxes.

Rs

No. of units Rs 6 2 1 1 2 1 2 1 2

Total Rs

Grand Total Rs

BLOCK - D BLOCK - C BLOCK - A & BBLOCK NO & NAME

Lift Designation

Duty (K.G.) & Speed (M.P.S.)

No. of Lifts

BOQ Summary 1 / 47

PASSENGER LIFTS

1

2

3

4

5

6

7

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

1 Equipment Source Country of Manufacture

2 No of lifts SIX (6)Three in each Tower

3 Lift designation PL 01/02/03

4 Lift shaft lay out See plan of architectural

drawings5 Capacity 1088 kgs

6 Speed 1.75 mps

7 No of stops Eleven (11)

8 No of opening at front All at front

9 No of opening at rear Nil

10 Floors Served G,1-10 .

11 Travel Height 41.0 Meter

12 Hoist way Size per lift 2200 mm(w) x2500 mm(d)

13 Overhead 5200 mm

14 Pit depth Available 1800 mm

15 Lift cabin size 1700 mm W x 1500 mm D x

2800 mm H 16 Clear entrance size 900 mm x 2400 mm C/Opng

17 Machine Room Above at Terrace Floor

IIT Block A& B Passenger Lifts PL 01/02/03

PRODUCT1.02 Summary – Traction Lift Equipment

Lift specification

Prices should be Firm for the Quoted Delivery / Completion period.

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary forms

etc.

Quote for AMC should be in separate head along with lift BOQ.

GENERAL

1.01 Quality Assurance

All work shall be performed in accordance with the latest edition of the IS -14655, PARTS

1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005, state and local codes as may be

applicable

Following data sheet must be duly filled in along with source of supply. Please do

not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Quoted Prices should be valid for acceptance for 60 days.

Delivery / Completion: Delivery of materials 4 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within 3

months thereafter. Shop drawings to be furnished within two weeks from date of

LOI.

Block A B

Passenger Lifts 2 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital closed

loop velocity encoder

6 Brake system Built in to machine

,electromagnetic ± 3 mm at all load conditions

With Releveling Feature

Advance Door Opening

8 Speed variation ± 1% of rated speed

9 Main controller Microprocessor controller.

10 Group controller Built into main controller with

all features ,refer drawings.

11 Type of operation control Group operation with all

related features,

13 Door motor High speed heavy duty A/C

motor

14 Door drive control Variable Voltage Variable

Frequency control

15 Door controller Programmable microprocessor

based

16 Car doors type 900 mm(w) x2400 mm(h)

C/OPNG

17 Door Protection

Two dimensional Panachrome

Infra red door detector covering

full height &width of entrance

with minimum 150 cross beams

with LEDs on edges & with

variable timing , nudging

,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

18 Landing doors type 900 mm(w) x 2400 mm(h) C/

Opng

19 Car and Landing sills Polished hard aluminum

extrusion with non slip grooves

20 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per manufacturers

standard

21 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

7

Power Characteristics

Leveling accuracy

18

Block A B

Passenger Lifts 3 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

22 Car and cwt guide shoes Spring loaded sliding / swivel

roller type

23 Load compensation Encapsulated chain with pit

guideC Safety Features

1 Emergency manual

release

Provision for manually releasing

of brake and winding

wheel/handle built in to hoist

machine 2 Car safety Flexible guide clamp type

3 Counterweight safety if

required Flexible guide clamp type

4 Over speed protection Over speed governor at

machine room

5 Landing door lock safety Emergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

D Operating &Signal

features

1 no. COP in 3mm thick s/s

plate consists of:-a. Vandal resistant micro press

self illuminating floor markings

using LED’sb. Vandal resistant micro press

door close/open buttonc. Vandal resistant micro press

door alarm buttone .Attendant /Normal with

removable key and switchf. Car ventilator control switchg. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and emergency

display

j, Scrolling type car position

indicator and directional arrows

k. All buttons are to be of

Braille type l. Lockable concealed service

control buttons/switch box

Hall call station 1 riser/ floor( configuration

dependent)

Bottom terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP button

Car

All Pass & Service lifts

except Fireman’s Lift to

be quoted with option

of Conventional COP &

Touch Screen Panels.

1

Block A B

Passenger Lifts 4 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

Intermediate landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP and DN buttons

Top terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press DN button

3 Hall position indicator at

terminal floors

Highly visible horizontal digital

or Scrolling type position

indicator combined with hall

lanternsE Finishes

Car

1 Car side panels Stainless Still 304 Grade Brush

finish

2 Car Rear panel Stainless Still 304 Grade Brush

finish

3 Car front return panels Stainless Still 304 Grade Brush

finish

4 Car transom Stainless Still 304 Grade Brush

finish

5 Car door panels Stainless Still 304 Grade Brush

finish

6 Hand rails

45mm dia, Stainless steel Brush

finish on REAR side- min 16

gauge grade 304,

7 Flooring 25 mm recess for granite or

marble

8 Kick plates 3mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling

Selection from vendors options

or as directed by owner /

architect

10 Lighting Indirect CFL fluorescent type

of 400 lux Landing

1 Landing door panels Stainless Still 304 Grade Brush

finish

Landing entrance frames

A. At main lobbywide type (full width of wall) to

match landing door

B. At typical floors Narrow type in to match

landing door F Other Features

1 Number of start per hour Min 180 start/stops

2 Communication system

Three way communication

between car and 24 hours

security desk and lift machine

room

3 Car top inspection control

Located on car top easily

accessible with common

/up/dn/stop buttons

2

2

Block A B

Passenger Lifts 5 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

4 Car top/bottom lightLight fitting with guard and 5

amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

6 Fireman service feature Provide fireman service feature

7 Automatic Rescue Device

To bring car and open door at

slow speed in the event of

power failure (Optional)

8 Emergency car lightBattery pack emergency light

with min of 2 hours charging 9 Alarm Bell Battery Operated Alarm Bell

10 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

11 Over load signalAudio visual signal in car with

door open feature

12 Load non stop featureFully loaded car traveling not to

respond hall calls

13 Anti nuisance featureEmpty car not to respond more

than 2 car calls

14 Car ventilation fan2 no axial blow type with side

vents in false ceiling

15 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically once lift

doors open & passengers enter

car

16 Safe landing

to bring car and open door at

slow speed in the event of any

malfunctioning

17 Next landing

In case doors fail to open

during normal stop, lift should

move to immediate next floor

and open doors

18 Remote wiring

Provide piping and wiring

between lift shaft/machine

room/security room

19 BMS Compatibility

Provide potential free contacts

with RS-485 interface &

modbus protocol

20 Car toe guard Provide as safety standard

21 Landing door facia coverProvide at all landing doors as

safety feature

22 Traveling cable

Provide flame and moisture

resistant flat type traveling

cable

23 Wiring

Provide copper wiring of

suitable type and serial link

system

Block A B

Passenger Lifts 6 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

24 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30 minutes

call reporting

25 As built drawing

Provide as built drawing , wiring

diagram, operating instruction

manual and parts ordering

informationSuppliers confirmation

(MANDATORY)

C Car Stopping Zone: ±4mm under any loading condition.

Comply with applicable codes, manufacturer's instructions,

shop drawings and recommendations. Comply with National

Building Code & relevant IS codes for electrical work required

during construction.

1.04 Installation

D. Door Opening Time: Seconds from start of opening to fully

open;

1 Cars: 2.4 seconds. ---

E Door Closing Time: Seconds from start of closing to fully closed;

2 Cars: 5.3 seconds. ----F Car Ride Quality

3 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 15 mg peak

to peak in the 1 - 10 Hz range.

4 Acceleration and Deceleration: Smooth

constant and not more than 1 meter/second² with an initial ramp

between 0.5 and 0.75 second.

5 Sustained Jerk: Not more than 2.44 meters/second³.

G Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and 60 dBA

inside car under any condition including door operation and car

ventilation exhaust blower on its highest speed.

Supply, transportation, loading and unloading, keep your

material in secure lockable place, installation with all necessary

scaffolding for erecting of lift, builders work and civil work should

be included in the scope of work. Including light points and fittings

and power socket for each floor in the lift shaft for the

maintenance requirement.

EXECUTION

A. Car Speed: ± 1% of contract speed under any loading

condition.

B Car Capacity: Safely lower, stop and hold 125% of rated load.

1.03 CAR PERFORMANCE

Block A B

Passenger Lifts 7 / 47

PASSENGER LIFTS

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

1.07

Quote should be net

including supply and

installation of lifts with

scaffolding, minor

builders work and all

steel materials such as

machine beams,

bearing plates, buffer

support ladder, sill

angles, fascias etc.,

and should be inclusive

of all applicable taxes.

Rs

No. of units 6 Rs

Grand Total Rs

Pro-Active Preventive Maintenance for the equipment to facilitate

the following:

1-Consistent safe operation of equipment

AMC - Requirement.

4-Maximum life cycle of equipment

5- Measurement of maintenance hours is the criteria for

achieving all of the above

1.06 Maintenance Specifications INTENT:

Prices

After warranty period for the next consecutive 5 years.

2-Maximum operational performance of equipment

3-Maximum beneficial usage of equipment

Unit Availability: All lifts shall be available for use an average

of 98.7% of property hours of operation over each three (3)

month period. This includes allowance for equipment out of

service time as the result of call-backs, scheduled preventive

maintenance, and repairs. Each three (3) month period which

indicates less than 98% availability for beneficial usage of an

individual unit or group of lifts shall result in a 20% penalty being

assessed against the quarterly amount due to the Contractor for

that individual unit or group of units for the next three (3) month

period. Penalty shall be assessed for each successive three (3)

month period in which Contractor fails to achieve beneficial usage

criteria, i.e. drop first month's results, and add results of month

just completed to previous two (2) months.

1.05 Final Inspection and Test

Comply with IS 14655-latest edition Inspectors' Manual.

Block A B

Passenger Lifts 8 / 47

SERVICE LIFT

1

2

3

4

5

6

7

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

1 Equipment Source Country of Manufacture

2 No of lifts Two (2) one in each Tower

3 Lift designation SL 01

4 Lift shaft lay outSee plan of architectural

drawings5 Capacity 1360 kgs

6 Speed 1.5 mps

7 No of stops 11

8 No of opening at front All at front

9 No of opening at rear Nil

10 Floors Served G, 1 TO 10 .

11 Travel Height 41.0 Meter

12 Hoist way Size per lift 2200 mm x 3100 mm.

13 Overhead 5200 mm

14 Pit depth Available 1600 mm

15 Lift cabin size 1300 mm W x 2400 mm D

x 2800 mm H

16 Clear entrance sizeTelescopic

1200 mm(w) x 2400 mm(h)

IIT Block A&B SERVICE SL 01

Quoted Prices should be valid for acceptance for 60 days.

PRODUCT1.02 Summary – Traction Lift Equipment

Lift specification

GENERAL

1.01 Quality Assurance

All work shall be performed in accordance with the latest edition of the IS -14655,

PARTS 1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005, state and local codes as

may be applicable

Quote for AMC should be in separate head along with lift BOQ.

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary

forms etc.

Following data sheet must be duly filled in along with source of supply. Please

do not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Delivery / Completion: Delivery of materials 4 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within 3

months thereafter. Shop drawings to be furnished within two weeks from date

of LOI.

Prices should be Firm for the Quoted Delivery / Completion period.

Service Lift

Block A & B 9 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

17 Machine Room Above at Terrace Floor 415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital

closed loop velocity

encoder

6 Brake systemBuilt in to machine

,electromagnetic ± 3 mm at all load

conditionsWith Releveling Feature

Advance Door Opening

8 Speed variation ± 1% of rated speed

9 Main controller Microprocessor controller.

10 Group controllerBuilt into main controller

with all features ,refer

11 Type of operation control Simplex Collective operation

with all related features,

13 Door motorHigh speed heavy duty A/C

motor

14 Door drive controlVariable Voltage Variable

Frequency control

15 Door controllerProgrammable

microprocessor based

16 Car doors type Telescopic

1200mm(w) x 2400 mm(h)

17 Door Protection

Two dimensional

Panachrome Infra red door

detector covering full height

&width of entrance with

minimum 150 cross beams

with LEDs on edges & with

variable timing , nudging

,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

18 Landing doors typeTelescopic

1200mm(w) x 2400 mm(h)

19 Car and Landing sills

Polished hard aluminum

extrusion with non slip

grooves

18 Power Characteristics

Leveling accuracy7

Service Lift

Block A & B 10 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

20 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per

manufacturers standard

21 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

22 Car and cwt guide shoesSpring loaded sliding /

swivel roller type

23 Load compensationEncapsulated chain with pit

guideC Safety Features

1Emergency manual

release

Provision for manually

releasing of brake and

winding wheel/handle built

in to hoist machine 2 Car safety Flexible guide clamp type

3Counterweight safety if

requiredFlexible guide clamp type

4 Over speed protectionOver speed governor at

machine room

5 Landing door lock safetyEmergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

DOperating &Signal

features

1 no. COP in 3mm thick s/s

plate consists of:-a. Vandal resistant micro

press self illuminating floor

markings using LED’sb. Vandal resistant micro

press door close/open

buttonc. Vandal resistant micro

press door alarm buttone .Attendant /Normal with

removable key and switchf. Car ventilator control

switchg. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and

emergency displayj, Scrolling type car

position indicator and

directional arrowsk. All buttons are to be of

Braille type

1

Car

All Pass & Service lifts

except Fireman’s Lift

to be quoted with

option of

Conventional COP &

Touch Screen Panels.

Service Lift

Block A & B 11 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

l. Lockable concealed

service control

buttons/switch box

Hall call station1 riser/ floor( configuration

dependent)

Bottom terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP button

Intermediate landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP and DN

buttons

Top terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press DN button

3Hall position indicator at

terminal floors

Highly visible horizontal

digital or Scrolling type

position indicator combined

with hall lanterns

E Finishes

Car

1 Car side panels Stainless Still 304 Grade

Hair Line finish

2 Car Rear panel Stainless Still 304 Grade

Hair Line finish

3 Car front return panels Stainless Still 304 Grade

Hair Line finish

4 Car transom Stainless Still 304 Grade

Hair Line finish

5 Car door panels Stainless Still 304 Grade

Hair Line finish

6 Hand rails

45mm dia, Stainless steel

on REAR side- min 16 gauge

grade 304,

7 Flooring25 mm recess for granite or

marble

8 Kick plates3mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling

Selection from vendors

options or as directed by

owner / architect

10 LightingIndirect CFL fluorescent

type of 400 lux Landing

1 Landing door panels Stainless Still 304 Grade

Hair Line finish

Landing entrance frames

A. At main lobbywide type (full width of wall)

to match landing door

2

2

Service Lift

Block A & B 12 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

B. At typical

floors

Narrow type in to match

landing door F Other Features

1 Number of start per hour Min 180 start/stops

2 Communication system

Three way communication

between car and 24 hours

security desk and lift

machine room

3Car top inspection

control

Located on car top easily

accessible with common

/up/dn/stop buttons

4 Car top/bottom lightLight fitting with guard and

5 amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

6 Fireman service featureProvide fireman service

feature

7 Automatic Rescue Device

To bring car and open door

at slow speed in the event

of power failure (Optional)

8 Emergency car light

Battery pack emergency

light with min of 2 hours

charging

9 Alarm Bell Battery Operated Alarm Bell

10 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

11 Over load signalAudio visual signal in car

with door open feature

12 Load non stop featureFully loaded car traveling

not to respond hall calls

13 Anti nuisance featureEmpty car not to respond

more than 2 car calls

14 Car ventilation fan2 no axial blow type with

side vents in false ceiling

15 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically

once lift doors open &

passengers enter car

16 Safe landing

to bring car and open door

at slow speed in the event

of any malfunctioning

Service Lift

Block A & B 13 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

17 Next landing

In case doors fail to open

during normal stop, lift

should move to immediate

next floor and open doors

18 Remote wiring

Provide piping and wiring

between lift shaft/machine

room/security room

19 BMS Compatibility

Provide potential free

contacts with RS-485

interface & modbus protocol

20 Car toe guard Provide as safety standard

21 Landing door facia coverProvide at all landing doors

as safety feature

22 Traveling cable

Provide flame and moisture

resistant flat type traveling

cable

23 Wiring

Provide copper wiring of

suitable type and serial link

system

24 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30

minutes call reporting

25 As built drawing

Provide as built drawing ,

wiring diagram, operating

instruction manual and parts

ordering informationSuppliers confirmation

(MANDATORY)

F Car Ride Quality

3 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 15 mg

peak to peak in the 1 - 10 Hz range.

4 Acceleration and Deceleration: Smooth

constant and not more than 1 meter/second² with an initial

ramp between 0.5 and 0.75 second.

5 Sustained Jerk: Not more than 2.44 meters/second³.

1.03 CAR PERFORMANCE

A. Car Speed: ± 1% of contract speed under any loading

condition.

B Car Capacity: Safely lower, stop and hold 125% of rated

load.

2 Cars: 3.9 seconds. ----

E Door Closing Time: Seconds from start of closing to fully closed;1 Cars: 2.0 seconds. ---

C Car Stopping Zone: ±4mm under any loading condition.

D Door Opening Time: Seconds from start of opening to fully

open;

Service Lift

Block A & B 14 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

2-Maximum operational performance of equipment

4-Maximum life cycle of equipment

5- Measurement of maintenance hours is the criteria for

achieving all of the above

1.05 Final Inspection and Test

Comply with IS 14655-latest edition Inspectors' Manual.

1.06 Maintenance Specifications INTENT:

3-Maximum beneficial usage of equipment

Unit Availability: All lifts shall be available for use an

average of 98.7% of property hours of operation over each

three (3) month period. This includes allowance for

equipment out of service time as the result of call-backs,

scheduled preventive maintenance, and repairs. Each three

(3) month period which indicates less than 98% availability

for beneficial usage of an individual unit or group of lifts shall

result in a 20% penalty being assessed against the quarterly

amount due to the Contractor for that individual unit or group

of units for the next three (3) month period. Penalty shall be

assessed for each successive three (3) month period in which

Contractor fails to achieve beneficial usage criteria, i.e. drop

first month's results, and add results of month just completed

to previous two (2) months.

AMC - Requirement.

Pro-Active Preventive Maintenance for the equipment to

facilitate the following:

After warranty period for the next consecutive 5 years.

1-Consistent safe operation of equipment

Supply, transportation, loading and unloading, keep your

material in secure lockable place, installation with all

necessary scaffolding for erecting of lift, builders work and

civil work should be included in the scope of work. Including

light points and fittings and power socket for each floor in the

lift shaft for the maintenance requirement.

G Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and

60 dBA inside car under any condition including door

operation and car ventilation exhaust blower on its highest

speed.

Comply with applicable codes, manufacturer's instructions,

shop drawings and recommendations. Comply with National

Building Code & relevant IS codes for electrical work required

during construction.

EXECUTION

1.04 Installation

Service Lift

Block A & B 15 / 47

SERVICE LIFT

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

Lift specification

1.07

Quote should be net

including supply and

installation of lifts

with scaffolding,

minor builders work

and all steel materials

such as machine

beams, bearing

plates, buffer support

ladder, sill angles,

fascias etc., and

should be inclusive of

all applicable taxes.

Rs

No. of units 2 Rs

Grand Total Rs

Prices

Service Lift

Block A & B 16 / 47

PASSENGER LIFTS - BLOCK C

1

2

3

4

5

6

7

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

1 Equipment Source Country of Manufacture

2 No of lifts Two (2)

3 Lift designation PL 01 to PL 02

4 Lift shaft lay outSee plan of architectural

drawings5 Capacity 1600 kgs

6 Speed 1.75 mps

7 No of stops

Twelve (12) for PLO1.

Eleven (11) for PL02 &

PL03. 8 No of opening at front All at front

9 No of opening at rear Nil

10 Floors ServedPL01- G,1-10, T(terrace)

PL02 -- G,1- 10.

11 Travel Height 45.0 Meter; 41 Meter.

12 Hoist way Size per lift 2500 mm(w) x2500 mm(d)

13 Overhead 5200 mm

14 Pit depth Available 1800 mm

15 Lift cabin size 2000 mm W x 1750 mm D x

2800 mm H

IIT Block C Passenger Lifts PL 01 to PL 02

Quoted Prices should be valid for acceptance for 60 days.

PRODUCT1.02 Summary – Traction Lift Equipment

Lift specification

1.01 Quality Assurance

All work shall be performed in accordance with the latest edition of the IS -14655,

PARTS 1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005, state and local codes as

may be applicable

Quote for AMC should be in separate head along with lift BOQ.

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary

forms etc.

Following data sheet must be duly filled in along with source of supply. Please

do not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Delivery / Completion: Delivery of materials 4 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within 3

months thereafter. Shop drawings to be furnished within two weeks from date

of LOI.

Prices should be Firm for the Quoted Delivery / Completion period.

Passenger Lift

Block C 17 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

16 Clear entrance size 1100 mm W x 2400 mm H

C/Opng17 Machine Room Above at Terrace Floor

415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital

closed loop velocity

encoder

6 Brake systemBuilt in to machine

,electromagnetic ± 3 mm at all load

conditionsWith Releveling Feature

Advance Door Opening

8 Speed variation ± 1% of rated speed

9 Main controller Microprocessor controller.

10 Group controllerBuilt into main controller

with all features ,refer

11 Type of operation control Group operation with all

related features,

13 Door motorHigh speed heavy duty A/C

motor

14 Door drive controlVariable Voltage Variable

Frequency control

15 Door controllerProgrammable

microprocessor based

16 Car doors type 1100 mm(w) x 2400

mm(h) C/Opng

17 Door Protection

Two dimensional

Panachrome Infra red door

detector covering full height

&width of entrance with

minimum 150 cross beams

with LEDs on edges & with

variable timing , nudging

,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

18 Landing doors type 1100 mm(w) x 2400

mm(h) C/ Opng

19 Car and Landing sills

Polished hard aluminum

extrusion with non slip

grooves

7 Leveling accuracy

18 Power Characteristics

Passenger Lift

Block C 18 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

20 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per

manufacturers standard

21 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

22 Car and cwt guide shoesSpring loaded sliding /

swivel roller type

23 Load compensationEncapsulated chain with pit

guideC Safety Features

1Emergency manual

release

Provision for manually

releasing of brake and

winding wheel/handle built

in to hoist machine 2 Car safety Flexible guide clamp type

3Counterweight safety if

requiredFlexible guide clamp type

4 Over speed protectionOver speed governor at

machine room

5 Landing door lock safetyEmergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

DOperating &Signal

features

1 no. COP in 3mm thick s/s

plate consists of:-a. Vandal resistant micro

press self illuminating floor

markings using LED’sb. Vandal resistant micro

press door close/open

buttonc. Vandal resistant micro

press door alarm buttone .Attendant /Normal with

removable key and switchf. Car ventilator control

switchg. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and

emergency displayj, Scrolling type car

position indicator and

directional arrowsk. All buttons are to be of

Braille type

1

Car

All Pass & Service lifts

except Fireman’s Lift

to be quoted with

option of

Conventional COP &

Touch Screen Panels.

Passenger Lift

Block C 19 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

l. Lockable concealed

service control

buttons/switch box

Hall call station1 riser/ floor( configuration

dependent)

Bottom terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP button

Intermediate landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP and DN

buttons

Top terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press DN button

3Hall position indicator at

terminal floors

Highly visible horizontal

digital or Scrolling type

position indicator combined

with hall lanterns

E Finishes

Car

1 Car side panels Stainless Still 304 Grade

Brush finish

2 Car Rear panel Stainless Still 304 Grade

Brush finish

3 Car front return panels Stainless Still 304 Grade

Brush finish

4 Car transom Stainless Still 304 Grade

Brush finish

5 Car door panels Stainless Still 304 Grade

Brush finish

6 Hand rails

45mm dia, Stainless steel

on REAR side- min 16 gauge

grade 304,

7 Flooring25 mm recess for granite or

marble

8 Kick plates3mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling

Selection from vendors

options or as directed by

owner / architect

10 LightingIndirect CFL fluorescent

type of 400 lux Landing

1 Landing door panels Stainless Still 304 Grade

Brush finish

Landing entrance frames

A. At main lobbywide type (full width of wall)

to match landing door 2

2

Passenger Lift

Block C 20 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

B. At typical

floors

Narrow type in to match

landing door F Other Features

1 Number of start per hour Min 180 start/stops

2 Communication system

Three way communication

between car and 24 hours

security desk and lift

machine room

3Car top inspection

control

Located on car top easily

accessible with common

/up/dn/stop buttons

4 Car top/bottom lightLight fitting with guard and

5 amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

6 Fireman service featureProvide fireman service

feature

7 Automatic Rescue Device

To bring car and open door

at slow speed in the event

of power failure (Optional)

8 Emergency car light

Battery pack emergency

light with min of 2 hours

charging

9 Alarm Bell Battery Operated Alarm Bell

10 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

11 Over load signalAudio visual signal in car

with door open feature

12 Load non stop featureFully loaded car traveling

not to respond hall calls

13 Anti nuisance featureEmpty car not to respond

more than 2 car calls

14 Car ventilation fan2 no axial blow type with

side vents in false ceiling

15 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically

once lift doors open &

passengers enter car

16 Safe landing

to bring car and open door

at slow speed in the event

of any malfunctioning

Passenger Lift

Block C 21 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

17 Next landing

In case doors fail to open

during normal stop, lift

should move to immediate

next floor and open doors

18 Remote wiring

Provide piping and wiring

between lift shaft/machine

room/security room

19 BMS Compatibility

Provide potential free

contacts with RS-485

interface & modbus protocol

20 Car toe guard Provide as safety standard

21 Landing door facia coverProvide at all landing doors

as safety feature

22 Traveling cable

Provide flame and moisture

resistant flat type traveling

cable

23 Wiring

Provide copper wiring of

suitable type and serial link

system

24 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30

minutes call reporting

25 As built drawing

Provide as built drawing ,

wiring diagram, operating

instruction manual and parts

ordering informationSuppliers confirmation

(MANDATORY)1.03 CAR PERFORMANCE

5 Sustained Jerk: Not more than 2.44 meters/second³.

C Car Stopping Zone: ±4mm under any loading condition.

D Door Opening Time: Seconds from start of opening to fully

open;

1 Cars: 2.4 seconds. --- E Door Closing Time: Seconds from start of closing to fully closed;

2 Cars: 5.3 seconds. ----F Car Ride Quality

3 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 15 mg

peak to peak in the 1 - 10 Hz range.

4 Acceleration and Deceleration: Smooth

constant and not more than 1 meter/second² with an initial

ramp between 0.5 and 0.75 second.

A. Car Speed: ± 1% of contract speed under any loading

condition.

B Car Capacity: Safely lower, stop and hold 125% of rated

load.

Passenger Lift

Block C 22 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

4-Maximum life cycle of equipment

5- Measurement of maintenance hours is the criteria for

achieving all of the above

Comply with applicable codes, manufacturer's

instructions, shop drawings and recommendations. Comply

with National Building Code & relevant IS codes for electrical

work required during construction.

Supply, transportation, loading and unloading, keep your

material in secure lockable place, installation with all

necessary scaffolding for erecting of lift, builders work and

civil work should be included in the scope of work. Including

light points and fittings and power socket for each floor in the

lift shaft for the maintenance requirement.

2-Maximum operational performance of equipment

3-Maximum beneficial usage of equipment

1.06 Maintenance Specifications INTENT:

Unit Availability: All lifts shall be available for use an

average of 98.7% of property hours of operation over each

three (3) month period. This includes allowance for

equipment out of service time as the result of call-backs,

scheduled preventive maintenance, and repairs. Each three

(3) month period which indicates less than 98% availability

for beneficial usage of an individual unit or group of lifts shall

result in a 20% penalty being assessed against the quarterly

amount due to the Contractor for that individual unit or group

of units for the next three (3) month period. Penalty shall be

assessed for each successive three (3) month period in which

Contractor fails to achieve beneficial usage criteria, i.e. drop

first month's results, and add results of month just completed

to previous two (2) months.

1-Consistent safe operation of equipment

Pro-Active Preventive Maintenance for the equipment to

facilitate the following:

EXECUTION

1.04 Installation

G Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and

60 dBA inside car under any condition including door

operation and car ventilation exhaust blower on its highest

speed.

1.05 Final Inspection and Test

Comply with IS 14655-latest edition Inspectors' Manual.

Passenger Lift

Block C 23 / 47

PASSENGER LIFTS - BLOCK C

Project RequirementSuppliers confirmation

(MANDATORY)Lift specification

1.07

Quote should be net

including supply and

installation of lifts

with scaffolding,

minor builders work

and all steel materials

such as machine

beams, bearing

plates, buffer support

ladder, sill angles,

fascias etc., and

should be inclusive of

all applicable taxes.

Rs

No. of units 2 Rs

Grand Total Rs

AMC - Requirement.

Prices

After warranty period for the next consecutive 5 years.

Passenger Lift

Block C 24 / 47

MRL LIFTS

1

2

3

4

5

6

7

Suppliers confirmation

MANDATORY

A Basic

1 No of lifts Three (3)

2 Lift designationMRL Lift PL 04 to 05 & PL

07

3 Lift shaft lay outSee plan of architectural

drawings1088 KG.

5 Speed 1.6 mps

6 No of stops PL 04 -05 -Four (4); PL 07 -

Five (5)7 No of opening at front All at front

8 No of opening at rear Nil

9 Floor served PL 04-05 & PL07 -G,1-4

10 Travel Height 17.0 M

11 Hoist way Size lift 2500 mm(W)x 2500 mm(D)

12 Overhead ht5000mm See plan of

architectural drawings

13 Pit depth1800mm See plan of

architectural drawings

14 Lift cabin size1700 mm W x 1500 mm D x

2800 mm H

15 Clear entrance size1100 mm (w) x 2400 mm (h)

C/Opng

IIT Block C Passenger Lifts-MRL PL 04 to 05 & PL 07

1.02 Summary – Traction Lift Equipment

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary

forms etc.

Project RequirementLift specification

1.01 Quality Assurance

All work shall be performed in accordance with the latest edition of the IS -

14655, PARTS 1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332, and such state and local

codes as may be applicable

Following data sheet must be duly filled in along with source of supply. Please

do not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Delivery / Completion: Delivery of materials 3 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within

2 months thereafter. Shop drawings to be furnished within one weeks from

date of LOI.

Prices should be Firm for the Quoted Delivery / Completion period.

4 Capacity

Quoted Prices should be valid for acceptance for 60 days.

Quote for AMC should be in separate head along with lift BOQ.

PRODUCT

MRL LIFTS

Block C 25 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

16 Machine RoomAbove: Within the Lift shaft

(MRL)415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Geared / Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital closed

loop velocity encoder

6 Brake systemBuilt in to machine

,electromagnetic 7 Leveling accuracy ± 3 mm at all load conditions

8 Speed variation ± 1% of rated speed

9 Main controller Built into main controller

9 Group controllerBuilt into main controller with

all features ,refer drawings

10 Type of operation control Duplex Full Collective/simplex

Full Collective( as applicable)

11 Door motorHigh speed heavy duty A/C

motor

12 Door drive controlVariable Voltage Variable

Frequency control

13 Door controllerProgrammable microprocessor

basedTwo panel Center Opening

1100mm x2400mm Maximum 10 kg Weight for

Interior Decor

15 Door Protection

Two dimensional Panachrome

Infra red door detector

covering full height &width of

entrance wit minimum 150

cross beams with LEDs on

edges & with variable timing ,

nudging ,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

Two panel Center Opening

1100mm x2400mm

17 Car and Landing sillsPolished hard aluminum

extrusion with non slip grooves

Power Characteristics

16 Landing doors type

14 Car doors type

17

MRL LIFTS

Block C 26 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

18 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per manufacturers

standard

19 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

20 Car and cwt guide shoes Sliding type

21Load compensation ( If

required )

Encapsulated chain with pit

guideC Safety Features

1Emergency manual

release

Provision for manually

releasing of brake and winding

wheel/handle built in to hoist

machine 2 Car safety Flexible guide clamp type

3Counterweight Safety If

RequitrdFlexible guide clamp type

4 Over speed protectionOver speed governor at

machine room

5 Landing door lock safetyEmergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

DOperating &Signal

features1 no. FULL HEIGHT COPs in

hairline St / St 3mm thick

plate consists of:-a. Vandal resistant micro press

self illuminating floor buttons

using LED’sb. Vandal resistant micro press

door close/open buttonc. Vandal resistant micro press

door alarm buttone .Attendant /Normal with

removable key and switch

f. Car ventilator control switch

g. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and

emergency displayj, Scrolling type car position

indicator and directional arrowsk. All buttons are to be of

Braille type

l. Digital Temperature Indicator

1 Car

MRL LIFTS

Block C 27 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

m. Lockable concealed service

control buttons/switch box

2 Hall call station

# riser floor( configuration

dependent)-minimum 1# per

each lift

Bottom terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP button

Intermediate landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP and DN buttons

Top terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press DN button

3Hall position indicator at

Terminal floors

Highly visible horizontal digital

or Scrolling type position

indicator combined with hall

lanterns

4Hall lanterns and chimes

at all intermediate floors

St / St 2mm thick cover plate

with hall lantern arrows and

volume adjustable electronic

chime for each lift at every E Finishes

Car

1 Car side panels Stainless Still 304 Grade Brush

finish

2 Car Rear panel Stainless Still 304 Grade Brush

finish

3 Car front return panels Stainless Still 304 Brush finish

4 Car transom Stainless Still 304 Grade Brush

finish

5 Car door panels Stainless Still 304 Grade Brush

finish

6 Hand rails

45mm dia, Stainless steel on

REAR side- min 16 gauge

grade 304,

7 Flooring25 mm recess for granite or

marble

8 Kick plates3 mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling Selection form vendors options

10 LightingIndirect fluorescent type of

400 lux lightingLanding

1 Landing door panels Stainless Still 304 Grade Brush

finish

Landing entrance frames

MRL LIFTS

Block C 28 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

A. At main lobby

B. At typical floors

wide type (full width of wall) to

match landing door Narrow

type to match landing door

F Other Features

1 Number of start per hour Min 180 start/stops

2 Communication system

Three way communication

between car and 24 hours

security desk and lift machine

room

3Car top inspection

control

Located on car top easily

accessible with common

/up/dn/stop buttons

4 Car top/bottom lightLight fitting with guard and 5

amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

6 Fireman service feature Provide fireman service feature

7 Automatic Rescue Device

To bring car and open door at

slow speed in the event of

power failure

8 Emergency car lightBattery pack emergency light

with min of 2 hours charging

9Emergency Power

Supply

Provision to operate the Lift on

Emergency / Alternate Power

Supply10 Alarm Bell Battery Operated Alarm Bell

11 MUSIC Provision for Music inside Car

12 Automatic Rescue DeviceTo bring lift to nearest landing

in case of power failure

13 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

14 Over load signalAudio visual signal in car with

door open feature

15 Load non stop featureFully loaded car traveling not

to respond hall calls

16 Anti nuisance featureEmpty car not to respond more

than 2 car calls

17 Car ventilation fan2 no axial blow type with side

vents in false ceiling

18 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically once

lift doors open & passengers

enter car

19 Safe landing

to bring car and open door at

slow speed in the event of any

malfunctioning

2

MRL LIFTS

Block C 29 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

20 Next landing

In case doors fail to open

during normal stop, lift should

move to immediate next floor

and open doors

21 CCTV provisionProvide CCTV provision for all

cars

22 Fireman’s service featureProvide fireman’s service

feature

23 BMS Compatibility

Provide potential free contacts

with RS-485 & modbus

protocol

24 Car toe guard Provide as safety standard

25Landing door fascia

cover

Provide at all landing doors as

safety feature

26 Traveling cable

Provide flame and moisture

proof resistance flat type

traveling cable

27 Wiring

Provide copper wiring of

suitable type and serial link

system

28 Steel Material

Steel Items such as M/C

Beams, Buffer support

Channels, Ladder in pit, Fascia

Plates etc to be included.

29 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30

minutes call reporting

30 As built drawing

Provide as built drawing ,

wiring diagram, operating

instruction manual and parts

ordering informationSuppliers confirmation

(MANDATORY)

A- Car Speed: ± 1% of contract speed under any loading

condition.

Cars: 1.4 seconds.

E- Door Closing Time: Seconds from start of closing to fully

closed;

Cars: 2.0 seconds.

F- Car Ride Quality

1 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 20 mg

peak to peak in the 1 - 10 Hz range.

B- Car Capacity: Safely lower, stop and hold 125% of rated

load.

C- Car Stopping Zone: ±4mm under any loading condition.

D- Door Opening Time: Seconds from start of opening to fully

open;

1.03 CAR PERFORMANCE

MRL LIFTS

Block C 30 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

EXECUTION

1.06 Maintenance Specifications INTENT:

Pro-Active Preventive Maintenance for the equipment to

facilitate the following:

G- Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and 60

dBA inside car under any condition including door operation and

car ventilation exhaust blower on its highest speed.

2 Acceleration and Deceleration: Smooth constant

and not more than 1 meter/second² with an initial ramp 3 Sustained Jerk: Not more than 2.44 meters/second³.

1- Consistent safe operation of equipment

2-Maximum operational performance of equipment

3- Maximum beneficial usage of equipment

4- Maximum life cycle of equipment

5- Measurement of maintenance hours is the criteria for

achieving all of the above

1.04 Installation

Comply with applicable codes, manufacturer's instructions,

shop drawings and recommendations. Comply with National

Building Code & relevant IS codes for electrical work required

during construction.

Supply, transportation, loading and unloading, keep your

material in secure lockable place. Installation with all necessary

(1)Scaffolding for erecting of lift

(2) Necessary minor builders work and civil work for erection of

lifts

(3) Steel materials such as m/c beams , bearing plates, buffer

support chanels,sill angles, pit laader etc.

(4) Light points and fittings and power socket for each floor in

the lift shaft for the maintenance requirement should be

included in the scope of work..

Comply with IS 14655-latest edition Inspectors' Manual.

1.05 Final Inspection and Test

MRL LIFTS

Block C 31 / 47

MRL LIFTS

Suppliers confirmation

MANDATORYProject RequirementLift specification

1.07

Quote should be net

including supply and

installation of lifts

with scaffolding,

minor builders work

and all steel materials

such as machine

beams, bearing

plates, buffer support

ladder, sill angles,

fascias etc., and

should be inclusive of

all applicable taxes.

Rs

No. of units 3 Rs

Grand Total Rs

Prices

AMC - Requirement.After warranty period for the next consecutive 5 years.

Unit Availability: All lifts shall be available for use an

average of 98.7% of property hours of operation over each

three (3) month period. This includes allowance for equipment

out of service time as the result of call-backs, scheduled

preventive maintenance, and repairs. Each three (3) month

period which indicates less than 98% availability for beneficial

usage of an individual unit or group of lifts shall result in a 20%

penalty being assessed against the quarterly amount due to the

Contractor for that individual unit or group of units for the next

three (3) month period. Penalty shall be assessed for each

successive three (3) month period in which Contractor fails to

achieve beneficial usage criteria, i.e. drop first month's results,

and add results of month just completed to previous two (2)

months.

MRL LIFTS

Block C 32 / 47

PASSENGER LIFT - BLOCK D & E

1

2

3

4

5

6

7

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

1 Equipment Source Country of Manufacture

2 No of lifts Four (4) Two in each tower

3 Lift designation D PL 01/02 & E PL0 1/03

4 Lift shaft lay outSee plan of architectural

drawings5 Capacity 1088 kgs

6 Speed 1.75 mps

7 No of stops Block D --Nine (9). Block E -

- Seven(7).8 No of opening at front All at front

9 No of opening at rear Nil

10 Floors ServedBlock D PL- 01/02 - B1,G,1-7

.& Block E PL 01/03 - G-7.

11 Travel Height 34.5 Meter & 20.1 Meter

respectively.12 Hoist way Size per lift 2200 mm(w) x2500 mm(d)

13 Overhead 5200 mm

14 Pit depth Available 1800 mm

15 Lift cabin size 1700 mm W x 1500 mm D x

2800 mm H 16 Clear entrance size 900 mm x 2400 mm C/Opng

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary

forms etc.

Quoted Prices should be valid for acceptance for 60 days.

Quote for AMC should be in separate head along with lift BOQ.

PRODUCT1.02 Summary – Traction Lift Equipment

Lift specification

All work shall be performed in accordance with the latest edition of the IS -14655,

PARTS 1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005,state and local codes as may

be applicable

BLOCK D & E PASSENGER LIFTS PL-01/03

GENERAL

1.01 Quality Assurance

Following data sheet must be duly filled in along with source of supply. Please do

not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Delivery / Completion: Delivery of materials 4 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within 3

months thereafter. Shop drawings to be furnished within two weeks from date of

LOI.

Prices should be Firm for the Quoted Delivery / Completion period.

PASSENGER LIFT

BLOCK D & E 33 / 47

PASSENGER LIFT - BLOCK D & E

17 Machine Room Above at Terrace Floor 415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital closed

loop velocity encoder

6 Brake systemBuilt in to machine

,electromagnetic ± 3 mm at all load conditions

With Releveling Feature

Advance Door Opening

8 Speed variation ± 1% of rated speed

9 Main controller Microprocessor controller.

10 Group controllerBuilt into main controller with

all features ,refer drawings.

11 Type of operation control Group operation with all

related features,

13 Door motorHigh speed heavy duty A/C

motor

14 Door drive controlVariable Voltage Variable

Frequency control

15 Door controllerProgrammable microprocessor

based

16 Car doors type 900 mm(w) x2400 mm(h)

C/OPNG

17 Door Protection

Two dimensional Panachrome

Infra red door detector covering

full height &width of entrance

with minimum 150 cross beams

with LEDs on edges & with

variable timing , nudging

,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

18 Landing doors type 900 mm(w) x 2400 mm(h) C/

Opng

19 Car and Landing sillsPolished hard aluminum

extrusion with non slip grooves

20 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per manufacturers

standard

21 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

18 Power Characteristics

7 Leveling accuracy

PASSENGER LIFT

BLOCK D & E 34 / 47

PASSENGER LIFT - BLOCK D & E

22 Car and cwt guide shoesSpring loaded sliding / swivel

roller type

23 Load compensationEncapsulated chain with pit

guideC Safety Features

1Emergency manual

release

Provision for manually releasing

of brake and winding

wheel/handle built in to hoist

machine 2 Car safety Flexible guide clamp type

3Counterweight safety if

requiredFlexible guide clamp type

4 Over speed protectionOver speed governor at

machine room

5 Landing door lock safetyEmergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

DOperating &Signal

features

1 no. COP in 3mm thick s/s

plate consists of:-a. Vandal resistant micro press

self illuminating floor markings

using LED’sb. Vandal resistant micro press

door close/open buttonc. Vandal resistant micro press

door alarm buttone .Attendant /Normal with

removable key and switchf. Car ventilator control switchg. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and emergency

display

j, Scrolling type car position

indicator and directional arrows

k. All buttons are to be of

Braille type l. Lockable concealed service

control buttons/switch box

Hall call station1 riser/ floor( configuration

dependent)

Bottom terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP button

Intermediate landing

St / St 2mm thick cover plate

with Vandal resistant micro

press UP and DN buttons

1

2

Car

All Pass & Service lifts

except Fireman’s Lift

to be quoted with

option of

Conventional COP &

Touch Screen Panels.

PASSENGER LIFT

BLOCK D & E 35 / 47

PASSENGER LIFT - BLOCK D & E

Top terminal landing

St / St 2mm thick cover plate

with Vandal resistant micro

press DN button

3Hall position indicator at

terminal floors

Highly visible horizontal digital

or Scrolling type position

indicator combined with hall

lanternsE Finishes

Car

1 Car side panels Stainless Still 304 Grade Brush

finish

2 Car Rear panel Stainless Still 304 Grade Brush

finish

3 Car front return panels Stainless Still 304 Grade Brush

finish

4 Car transom Stainless Still 304 Grade Brush

finish

5 Car door panels Stainless Still 304 Grade Brush

finish

6 Hand rails

45mm dia, Stainless steel Brush

finish on REAR side- min 16

gauge grade 304,

7 Flooring25 mm recess for granite or

marble

8 Kick plates3mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling

Selection from vendors options

or as directed by owner /

architect

10 LightingIndirect CFL fluorescent type

of 400 lux Landing

1 Landing door panels Stainless Still 304 Grade Brush

finish

Landing entrance frames

A. At main lobbywide type (full width of wall) to

match landing door B. At typical

floors

Narrow type in to match

landing door F Other Features

1 Number of start per hour Min 180 start/stops

2 Communication system

Three way communication

between car and 24 hours

security desk and lift machine

room

3Car top inspection

control

Located on car top easily

accessible with common

/up/dn/stop buttons

4 Car top/bottom lightLight fitting with guard and 5

amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

2

PASSENGER LIFT

BLOCK D & E 36 / 47

PASSENGER LIFT - BLOCK D & E

6 Fireman service feature Provide fireman service feature

7 Automatic Rescue Device

To bring car and open door at

slow speed in the event of

power failure (Optional)

8 Emergency car lightBattery pack emergency light

with min of 2 hours charging 9 Alarm Bell Battery Operated Alarm Bell

10 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

11 Over load signalAudio visual signal in car with

door open feature

12 Load non stop featureFully loaded car traveling not to

respond hall calls

13 Anti nuisance featureEmpty car not to respond more

than 2 car calls

14 Car ventilation fan2 no axial blow type with side

vents in false ceiling

15 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically once lift

doors open & passengers enter

car

16 Safe landing

to bring car and open door at

slow speed in the event of any

malfunctioning

17 Next landing

In case doors fail to open

during normal stop, lift should

move to immediate next floor

and open doors

18 Remote wiring

Provide piping and wiring

between lift shaft/machine

room/security room

19 BMS Compatibility

Provide potential free contacts

with RS-485 interface &

modbus protocol

20 Car toe guard Provide as safety standard

21 Landing door facia coverProvide at all landing doors as

safety feature

22 Traveling cable

Provide flame and moisture

resistant flat type traveling

cable

23 Wiring

Provide copper wiring of

suitable type and serial link

system

24 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30 minutes

call reporting

25 As built drawing

Provide as built drawing , wiring

diagram, operating instruction

manual and parts ordering

information

PASSENGER LIFT

BLOCK D & E 37 / 47

PASSENGER LIFT - BLOCK D & E

Suppliers confirmation

(MANDATORY)

Comply with applicable codes, manufacturer's instructions,

shop drawings and recommendations. Comply with National

Building Code & relevant IS codes for electrical work required

during construction.

Supply, transportation, loading and unloading, keep your

material in secure lockable place, installation with all necessary

scaffolding for erecting of lift, builders work and civil work should

be included in the scope of work. Including light point

C Car Stopping Zone: ±4mm under any loading condition.

D. Door Opening Time: Seconds from start of opening to fully

open;

1.05 Final Inspection and Test

Comply with IS 14655-latest edition Inspectors' Manual.

5 Sustained Jerk: Not more than 2.44 meters/second³.

G Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and 60

dBA inside car under any condition including door operation and

car ventilation exhaust blower on its highest speed.

EXECUTION

1.04 Installation

3 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 15 mg

peak to peak in the 1 - 10 Hz range.

4 Acceleration and Deceleration: Smooth

constant and not more than 1 meter/second² with an initial ramp

between 0.5 and 0.75 second.

1.03 CAR PERFORMANCE

A. Car Speed: ± 1% of contract speed under any loading

condition.

B Car Capacity: Safely lower, stop and hold 125% of rated load.

2 Cars: 5.3 seconds. ----F Car Ride Quality

1 Cars: 2.4 seconds. ---

E Door Closing Time: Seconds from start of closing to fully

closed;

PASSENGER LIFT

BLOCK D & E 38 / 47

PASSENGER LIFT - BLOCK D & E

1.07

Quote should be net

including supply and

installation of lifts

with scaffolding,

minor builders work

and all steel materials

such as machine

beams, bearing

plates, buffer support

ladder, sill angles,

fascias etc., and

should be inclusive of

all applicable taxes.

Rs

No. of units 4 Rs

Grand Total Rs

Pro-Active Preventive Maintenance for the equipment to facilitate

the following:

3-Maximum beneficial usage of equipment

4-Maximum life cycle of equipment

1-Consistent safe operation of equipment

2-Maximum operational performance of equipment

1.06 Maintenance Specifications INTENT:

Prices

5- Measurement of maintenance hours is the criteria for

achieving all of the above

Unit Availability: All lifts shall be available for use an

average of 98.7% of property hours of operation over each three

(3) month period. This includes allowance for equipment out of

service time as the result of call-backs, scheduled preventive

maintenance, and repairs. Each three (3) month period which

indicates less than 98% availability for beneficial usage of an

individual unit or group of lifts shall result in a 20% penalty

being assessed against the quarterly amount due to the

Contractor for that individual unit or group of units for the next

three (3) month period. Penalty shall be assessed for each

successive three (3) month period in which Contractor fails to

achieve beneficial usage criteria, i.e. drop first month's results,

and add results of month just completed to previous two (2)

months.

AMC - Requirement.After warranty period for the next consecutive 5 years.

PASSENGER LIFT

BLOCK D & E 39 / 47

SERVICE LIFTS

BLOCK D

1

2

3

4

5

6

7

Project RequirementSuppliers confirmation

(MANDATORY)

A Basic

1 Equipment Source Country of Manufacture

2 No of lifts One(1)

3 Lift designation SL 01

4 Lift shaft lay outSee plan of architectural

drawings5 Capacity 1360 kgs

6 Speed 1.5 mps

7 No of stops 11

8 No of opening at front All at front

9 No of opening at rear Nil

10 Floors Served G, 1 TO 10 .

11 Travel Height 41.0 Meter

12 Hoist way Size per lift 2200 mm x 3100 mm.

13 Overhead 5200 mm

14 Pit depth Available 1600 mm

15 Lift cabin size 1300 mm W x 2400 mm D

x 2800 mm H

16 Clear entrance sizeTelescopic

1200 mm(w) x 2400 mm(h)

17 Machine Room Above at Terrace Floor

All formalities in arranging the Lift License shall be the responsibility of the lift

contractor. Owner shall extend all co operation such as signing the necessary

forms etc.

Quoted Prices should be valid for acceptance for 60 days.

Quote for AMC should be in separate head along with lift BOQ.

PRODUCT1.02 Summary – Traction Lift Equipment

Lift specification

All work shall be performed in accordance with the latest edition of the IS -14655,

PARTS 1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005, State and local codes as

may be applicable

Block D SERVICE LIFTS SL-01

GENERAL

1.01 Quality Assurance

Following data sheet must be duly filled in along with source of supply. Please

do not indicate as “Standard” the standard must be specified under Suppliers

Confirmation.

Prices should be inclusive of all Taxes & Duties at the prevailing rate.

Delivery / Completion: Delivery of materials 4 months from approval of shop

drawings. Lift to be erected and handed over after inspection & testing within 3

months thereafter. Shop drawings to be furnished within two weeks from date

of LOI.

Prices should be Firm for the Quoted Delivery / Completion period.

SERVICE LIFTS

BLOCK D 40 / 47

SERVICE LIFTS

BLOCK D

415 Volts, 3Phase, 50 Hertz,

±10%230 Volts, I Phase , 50 Hertz

±10%B Equipment

1 Hoist Machine AC Gearless Traction

2 Roping type 1:1 or 2:1

3 Hoist Motor Permanent Magnet

synchronous motor4 Hoist motor insulation Class ‘F’

5 Hoist motor drive control

Variable Voltage Variable

Frequency with digital

closed loop velocity

encoder

6 Brake systemBuilt in to machine

,electromagnetic ± 3 mm at all load

conditionsWith Releveling Feature

Advance Door Opening

8 Speed variation ± 1% of rated speed

9 Main controller Microprocessor controller.

10 Group controller

Built into main controller

with all features ,refer

drawings.

11 Type of operation control Simplex Collective operation

with all related features,

13 Door motorHigh speed heavy duty A/C

motor

14 Door drive controlVariable Voltage Variable

Frequency control

15 Door controllerProgrammable

microprocessor based

16 Car doors type Telescopic

1200mm(w) x 2400 mm(h)

17 Door Protection

Two dimensional

Panachrome Infra red door

detector covering full height

&width of entrance with

minimum 150 cross beams

with LEDs on edges & with

variable timing , nudging

,limited door reversal,,

recommended Panachrome

manufactured by TL Jones.

18 Landing doors typeTelescopic

1200mm(w) x 2400 mm(h)

19 Car and Landing sills

Polished hard aluminum

extrusion with non slip

grooves

18 Power Characteristics

7 Leveling accuracy

SERVICE LIFTS

BLOCK D 41 / 47

SERVICE LIFTS

BLOCK D

20 Counter weight

Cast iron fillers fitted in steel

channel frame of size and

numbers as per

manufacturers standard

21 Car and cwt guide rails Machined guide rails of

suitable size and fish plates

22 Car and cwt guide shoesSpring loaded sliding /

swivel roller type

23 Load compensationEncapsulated chain with pit

guideC Safety Features

1Emergency manual

release

Provision for manually

releasing of brake and

winding wheel/handle built

in to hoist machine 2 Car safety Flexible guide clamp type

3Counterweight safety if

requiredFlexible guide clamp type

4 Over speed protectionOver speed governor at

machine room

5 Landing door lock safetyEmergency door unlocking

device with key6 Landing door lock Electromechanical

7 Door fire protection One(1) hour

8 Safety buffers Spring / Oil buffers

DOperating &Signal

features

1 no. COP in 3mm thick s/s

plate consists of:-a. Vandal resistant micro

press self illuminating floor

markings using LED’sb. Vandal resistant micro

press door close/open

buttonc. Vandal resistant micro

press door alarm buttone .Attendant /Normal with

removable key and switchf. Car ventilator control

switchg. Inter communication

switch/buttonh. Inbuilt speaker and

microphonei. Capacity plate and

emergency displayj, Scrolling type car

position indicator and

directional arrowsk. All buttons are to be of

Braille type l. Lockable concealed

service control

buttons/switch box

1

Car

All Pass & Service lifts

except Fireman’s Lift

to be quoted with

option of

Conventional COP &

Touch Screen Panels.

SERVICE LIFTS

BLOCK D 42 / 47

SERVICE LIFTS

BLOCK D

Hall call station1 riser/ floor( configuration

dependent)

Bottom terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP button

Intermediate landing

St / St 2mm thick cover

plate with Vandal resistant

micro press UP and DN

buttons

Top terminal landing

St / St 2mm thick cover

plate with Vandal resistant

micro press DN button

3Hall position indicator at

terminal floors

Highly visible horizontal

digital or Scrolling type

position indicator combined

with hall lanterns

E Finishes

Car

1 Car side panels Stainless Still 304 Grade

Hair Line finish

2 Car Rear panel Stainless Still 304 Grade

Hair Line finish

3 Car front return panels Stainless Still 304 Grade

Hair Line finish

4 Car transom Stainless Still 304 Grade

Hair Line finish

5 Car door panels Stainless Still 304 Grade

Hair Line finish

6 Hand rails

45mm dia, Stainless steel

on REAR side- min 16 gauge

grade 304,

7 Flooring25 mm recess for granite or

marble

8 Kick plates3mm(thick) x120mm( w) in

stainless steel on all sides

9 False ceiling

Selection from vendors

options or as directed by

owner / architect

10 LightingIndirect CFL fluorescent

type of 400 lux Landing

1 Landing door panels Stainless Still 304 Grade

Hair Line finish

Landing entrance frames

A. At main lobbywide type (full width of wall)

to match landing door

B. At typical

floors

Narrow type in to match

landing door F Other Features

1 Number of start per hour Min 180 start/stops

2

2

SERVICE LIFTS

BLOCK D 43 / 47

SERVICE LIFTS

BLOCK D

2 Communication system

Three way communication

between car and 24 hours

security desk and lift

machine room

3Car top inspection

control

Located on car top easily

accessible with common

/up/dn/stop buttons

4 Car top/bottom lightLight fitting with guard and

5 amps socket with switch

5 Car top safety barrier

On three sides of car top to

height of 800mm to as

protection

6 Fireman service featureProvide fireman service

feature

7 Automatic Rescue Device

To bring car and open door

at slow speed in the event

of power failure (Optional)

8 Emergency car light

Battery pack emergency

light with min of 2 hours

charging

9 Alarm Bell Battery Operated Alarm Bell

10 Emergency Exits

Provide exit landing doors at

every 3rd floor or at every

11meter as applicable

11 Over load signalAudio visual signal in car

with door open feature

12 Load non stop featureFully loaded car traveling

not to respond hall calls

13 Anti nuisance featureEmpty car not to respond

more than 2 car calls

14 Car ventilation fan2 no axial blow type with

side vents in false ceiling

15 Auto Fan On / Off

Auto Fan Off after 5 minutes

when no load in car. Fan to

switch on automatically

once lift doors open &

passengers enter car

16 Safe landing

to bring car and open door

at slow speed in the event

of any malfunctioning

17 Next landing

In case doors fail to open

during normal stop, lift

should move to immediate

next floor and open doors

18 Remote wiring

Provide piping and wiring

between lift shaft/machine

room/security room

SERVICE LIFTS

BLOCK D 44 / 47

SERVICE LIFTS

BLOCK D

19 BMS Compatibility

Provide potential free

contacts with RS-485

interface & modbus protocol

20 Car toe guard Provide as safety standard

21 Landing door facia coverProvide at all landing doors

as safety feature

22 Traveling cable

Provide flame and moisture

resistant flat type traveling

cable

23 Wiring

Provide copper wiring of

suitable type and serial link

system

24 Warranty

24 month warranty

maintenance with 24x7 call

back service with in 30

minutes call reporting

25 As built drawing

Provide as built drawing ,

wiring diagram, operating

instruction manual and parts

ordering information

Suppliers confirmation

(MANDATORY)

C Car Stopping Zone: ±4mm under any loading condition.

D Door Opening Time: Seconds from start of opening to fully

open;

5 Sustained Jerk: Not more than 2.44 meters/second³.

G Airborne Noise: Measured noise level of lift equipment

during operation shall not exceed 50 dBA in lift lobbies and

60 dBA inside car under any condition including door

operation and car ventilation exhaust blower on its highest

speed.

3 Horizontal acceleration within car during all

riding and door operating conditions. Not more than 15 mg

peak to peak in the 1 - 10 Hz range.

4 Acceleration and Deceleration: Smooth

constant and not more than 1 meter/second² with an initial

ramp between 0.5 and 0.75 second.

1.03 CAR PERFORMANCE

A. Car Speed: ± 1% of contract speed under any loading

condition.

B Car Capacity: Safely lower, stop and hold 125% of rated

load.

2 Cars: 3.9 seconds. ----F Car Ride Quality

1 Cars: 2.0 seconds. --- E Door Closing Time: Seconds from start of closing to fully closed;

SERVICE LIFTS

BLOCK D 45 / 47

SERVICE LIFTS

BLOCK D

Pro-Active Preventive Maintenance for the equipment to

facilitate the following:

3-Maximum beneficial usage of equipment

4-Maximum life cycle of equipment

1-Consistent safe operation of equipment

2-Maximum operational performance of equipment

1.06 Maintenance Specifications INTENT:

Comply with applicable codes, manufacturer's

instructions, shop drawings and recommendations. Comply

with National Building Code & relevant IS codes for electrical

work required during construction.

Supply, transportation, loading and unloading, keep your

material in secure lockable place, installation with all

necessary scaffolding for erecting of lift, builders work and

civil work should be included in the scope of work. Including

light point

1.05 Final Inspection and Test

Comply with IS 14655-latest edition Inspectors' Manual.

5- Measurement of maintenance hours is the criteria for

achieving all of the above

Unit Availability: All lifts shall be available for use

an average of 98.7% of property hours of operation over

each three (3) month period. This includes allowance for

equipment out of service time as the result of call-backs,

scheduled preventive maintenance, and repairs. Each three

(3) month period which indicates less than 98% availability

for beneficial usage of an individual unit or group of lifts shall

result in a 20% penalty being assessed against the quarterly

amount due to the Contractor for that individual unit or group

of units for the next three (3) month period. Penalty shall be

assessed for each successive three (3) month period in which

Contractor fails to achieve beneficial usage criteria, i.e. drop

first month's results, and add results of month just completed

to previous two (2) months.AMC - Requirement.After warranty period for the next consecutive 5 years.

EXECUTION

1.04 Installation

SERVICE LIFTS

BLOCK D 46 / 47

SERVICE LIFTS

BLOCK D

1.07

Quote should be net

including supply and

installation of lifts

with scaffolding,

minor builders work

and all steel materials

such as machine

beams, bearing

plates, buffer support

ladder, sill angles,

fascias etc., and

should be inclusive of

all applicable taxes.

Rs

No. of units 1 Rs

Grand Total Rs

Prices

SERVICE LIFTS

BLOCK D 47 / 47