17
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN New instruments for PN-based periodic control: Results of a first measurement campaign 25.06.2014, ETH-Conference Simone Krähenbühl, FOEN Air Pollution Control and Chemicals Division

New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

  • Upload
    hathu

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

Page 1: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

Federal Department of the Environment,Transport, Energy and Communications DETEC

Federal Office for the Environment FOEN

New instruments for PN-based periodic control: Results of a first measurement campaign

25.06.2014, ETH-ConferenceSimone Krähenbühl, FOEN

Air Pollution Control and Chemicals Division

Page 2: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

2New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Overview

• Swiss Regulation• PN-based periodic control of construction machines

• Measuring procedure • Reference value

• Measurement campaign• Results• Conclusions

• Work in Progress

Page 3: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

3New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Swiss Regulation

• The Swiss Ordinance on Air Pollution Control (OAPC) requires a limit value for particle number emission (1×1012 particles/kWh) for non‐road mobile machinery (NRMM) used on construction sites. this limit can only be met with diesel particulate filters (DPF).

• Periodic control of the machine every second year, done by the owner (Construction Guideline Air) .

Page 4: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

4New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

PN-based periodic control of construction machines• Current regulation for the periodic control of

construction machines: opacimeter ineffective for machines with particle filters.

Sensitivity of opacimeters is too low.

• FOEN and METAS defined requirements for «nanoparticle measuring instruments» in the existing Ordinance on Exhaust Measurement Instruments (VAMV).

• In 2012 instrument manufacturers were invited by METAS to develop instruments. under construction

Page 5: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

5New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Measuring procedure for the official measurement

Conditioning of the engine and DPF:• 4 to 6 free accelerations, until engine + DPF are

warm• Stay at maximum speed / high idle speed, until the

engine is constant.

Measuring:• Start measuring by pressing the button of your

instrument.• Read the result and compare with the reference

value

Page 6: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

6New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Measurement, done by the instrument

Duration of the measurement: 40 seconds

• 15 sec waiting period• 5 sec measurement 1 • 5 sec break• 5 sec measurement 2• 5 sec break• 5 sec measurement 3

mean 1

mean 2

mean 3

overall mean

Page 7: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

7New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

The reference value

Reference value of 2.5×105 particles/cm3

(analog to 1×1012 particles/kWh written in the OAPC)

• overall mean < reference value: passed DPF and engine are in good condition.

• overall mean > reference value: failedThe problem has to be solved. Any use of the machine on a construction site is prohibited.

Page 8: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

8New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Measurement campaign

• Measurement campaign at AVESCO, Langenthal in April 2014

• Organization: FOEN, realisation and analysis: Laboratory for IC-Engines and Exhaust Gas Control, Biel

• 3 day-campaign, 15 measurements at construction machines, 4 measurements at stationary engines (compressors)

• 1 reference instrument (CPC 3790 TSI)• 4 prototype instruments• Aims: Testing the reference value and the

measurement procedure.

Page 9: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

9New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Measurement campaignconstruction

machinechassis number. type of engine cylinder

capacitypower emission

levelworkinghours

DPF notes

[-] [-] [-] [lt] [kW] [-] [hours] [-]Caterpillar 305E CAT0305ECXFA03375 C2.4 2.4 31.2 IIIA 4.1 Dinex

Caterpillar TH414C YC5A1789CKEK00298 C3.4B 3.4 75 IIIA 15 OEM

Caterpillar 308E2 CAT0308ELTMX00810 C3.3BT 3.3 49 IIIA 6.9 OEM

Caterpillar M313D CATM313DCK3D00240 C4.4 4.4 102 IIIB 59 OEM

Caterpillar 908H CAT0908HJLMD00476 C3.4T 3.3 59 IIIA 2291 HJS

Caterpillar 259B CAT0259BKYYZ00955 C3.4 3.4 55 IIIB 354 Mobiclean

Caterpillar CC34 CAT0CC34C34600176 C2.2 2.2 34.1 IIIA 1462 HJS

Caterpillar CS56 CAT0CS56CFCS00489 C6.6 6.6 108 IIIA 1311 HJS 3 x

Caterpillar 303C CAT0303CJBXT04518 S3Q2-Y3SCM 1.9 23.2 IIIA 2501 HJS DPF broken

Caterpillar 308C CAT0308CEKCX01901 4M40-E1 2.835 40.5 II 5682 HJS

Kaeser M200 WKA0F3500D4929321 CAT. C6.6 6.6 205 IIIA 3 Dinex

Kaeser M43 WKA0F085162343073 Kubota V1505-T 1.5 33 II 1007 HJS DPF broken

Kaeser M45-G WKA0F1200E4985793 Kubota V2203-M 2.197 34 IIIA 1.4 HJS 2x

Thwaites Mach 474 SLCM474Z1309C5145 Yanmar 4TNV88-XWA2 2.19 33.3 IIIA 5.9 Dinex

Thwaites Mach 474

w/o DPFSLCM474Z1409C7418 Yanmar 4TNV88-

XWA2 2.19 33.3 IIIA 1.1 -

Thwaites Mach 580 SLCM580Z1306C5895 Yanmar 3TNV88-XWA2 1.642 24.8 IIIA 2.3 Dinex

Page 10: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

10New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Results (1/3)

0.00E+00

2.25E+04

4.50E+04

6.75E+04

9.00E+04

MG 1 MG 2 MG 3 MG 4 Ref (CPC)

conc

entr

atio

n [#

/cm

3 ]

1. Mes. 2. Mes. 3. Mes.

Caterpillar 305E CR

0.0E+001.6E+033.2E+034.8E+036.4E+03

0 300 600 900conc

entr

atio

n [#

/cm

3 ]

time [s]

CPC

Measurement instruments (prototypes)

Page 11: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

11New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Results (2/3)

Thwaites Mach 474- with DPF- without DPF

Reference value

with DPF

without DPF

0.0E+00

2.0E+07

4.0E+07

0 250 500 750 time [s]0.0E+001.0E+022.0E+023.0E+02

0 125 250 375 500

concentration[#/cm3]

concentration[#/cm3]

CPC

Page 12: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

12New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Results (3/3)

0.0E+00

1.0E+04

2.0E+04

3.0E+04

0 250 500 750

conc

entr

atio

n [#

/cm

3 ]

time [s]

Caterpillar CS56

0.0E+002.5E+025.0E+027.5E+021.0E+03

0 250 500 750

conc

entr

atio

n [#

/cm

3 ]

time [s]

Caterpillar 308C

0.0E+005.0E+021.0E+031.5E+032.0E+03

0 300 600 900

conc

entr

atio

n [#

/cm

3 ]

time [s]

Caterpillar 308E2

CPC

Page 13: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

13New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Conclusion of the measurement campaign• The reference value of 2.5×105 particles/cm3 was

well suited to make a distinction between good working and faulty DPF.

• The measuring procedure was appropriate, no problems appeared.

• The particle number emissions decreased over time conditioning of the engine + DPF

• It was no problem for the engines to stay at maximum speed for about 15 minutes.

Page 14: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

14New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Work in Progress:

• An addition of the Construction Guideline Air with the measurement procedure and the reference value is planned.• For the periodic inspections of construction

machines by the operator the new type of particle counters shall replace the opacimeters after a transition period.

• Switzerland’s PN-based periodic control as a model for other applications with PN-limits.

Page 15: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

15New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

Thanks

• to Pierre Comte, Bern University of Applied Sciences, Laboratory for IC-Engines and Exhaust Gas Control, Biel.

• to Ruedi Ammann and Peter Baumann,AVESCO Langenthal.

• to the contributors of the prototype instruments.

Page 16: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

16New instruments for PN-based periodic control - Results of a first measurement campaign

Simone Krähenbühl, FOEN

In case of questions:

Simone Krähenbühl

Scientific OfficerFederal Office for the Environment FOENAir Pollution Control and Chemicals DivisionTraffic Section

E-Mail: [email protected]: +41 58 465 31 86

Page 17: New instruments for PN-based periodic control - · PDF filechassis number. type of engine cylinder capacity power emission ... New instruments for PN-based periodic control - Results

Index

Contents