www.shantagold.com New Luika Gold Mine Analysts Visit 5-6 December 2017 NLGM Analysts Visit

New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

www.shantagold.com

New Luika Gold Mine – Analysts Visit

5-6 December 2017

NLGM Analysts Visit

Page 2: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Mission

“To produce superior returns as a responsible mining company”

06/12/2017 NLGM Analysts Visit - 05th December

Vision

“To be a respected mining company that makes a meaningful difference”

➢Protects its people, environment and community from harm

➢Seeks to continually improve

➢Creates opportunities for growth

Page 3: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Values

Shanta has at its heart a set of beliefs that define our behaviour, as Individuals and as a company, at work and beyond:

➢ Safety and Health and protection of the Environment are our first priority

➢ Integrity – in all that we do, we are honest, ethical, law-abiding and transparent

➢ Respect – we are respectful towards one another and we acknowledge and value our diversity

➢ Accountability – we are accountable for our performance and for upholding the policies and values of the Company

➢ Add value to the community – we provide enduring benefits in health, education, training, infrastructure and economic opportunity

06/12/2017 NLGM Analysts Visit - 05th December

Page 4: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

SMCL Board of Directors is majority Tanzanian

406/12/2017 NLGM Analysts Visit - 05th December

Eric ZurrinCEO

Luke LeslieCFO (Interim)

Scott YellandCOO

Philbert RweyemamuGM Singida

Honest MremaGM New Luika

W. Romani UrasaChairman SMCL

Mahesh PatelNon-Executive Director

► Senior Tanzanian representation in key roles

► Recent changes for senior management include an average 15% salary reduction and discretionary remuneration now 100% share-based

Stella Malimi NyawawaCompany Secretary SMCL (non director)

Page 5: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

► Since starting official gold production in 2013, Shanta has made payments to the Tanzanian government totalling US$67 million1 and employed an increasing number of talented Tanzanians

Longstanding commitment to Tanzania including US$67 million of contribution to the Government

Payments to government1 (US$m) Tanzanian employee base (%)

91

92

93

9696

2013 2014 2015 2016 Current

9

13

12

15

18

2013 2014 2015 2016 2017 ²

1. Includes employment taxes, statutory contributions, service levies, taxes, royalties. Excludes VAT receivable

2. H1 actual and H2 management estimate

06/12/2017 NLGM Analysts Visit - 05th December

Page 6: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

606/12/2017 NLGM Analysts Visit - 05th December

Shanta has not enjoyed an MDA (Mine Development Agreement)

No Mine Development Agreement (MDA)

▪ Shanta has never enjoyed preferential taxes given under MDA’s

▪ Shanta has always paid full royalties, duties and levies

▪ Shanta has operated according to the Mining Law and Tanzanian laws

► Shanta does not have a Mine Development Agreement (MDA)

► Shanta has never enjoyed any preferential treatment in Tanzania

Significant investment into Tanzania

▪ Shanta has invested over US$150 million since inception

▪ Long track record of investing in local communities and villages

▪ US$24 million invested in Singida at Ikungi District

Page 7: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

3.64

8.2 7.91

6.145.53 5.26

6.166.85

6.125.52

5.01 4.6

23.57

9.83

6.1

4.463.52

2.94 2.63 2.98 2.75

0

5

10

15

20

25

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Cummulative TIFR 2016 vs 2017

2016 2017

Safety - Total Injury Frequency Rate

Last lost time injury in January ,

over 258 days and 1.74M man -

hours worked injury free

706/12/2017 NLGM Analysts Visit - 05th December

Page 8: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Shanta in Tanzania

Songwe

District

Lupa

Goldfield

New Luika

Gold Mine

Singida Project

• Producing gold at

the New Luika

Gold Mine

• Developing Gold

Project at Singida

806/12/2017 NLGM Analysts Visit - 05th December

Page 9: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

NLGM Operations and Current LOM Reserves (31.12.2016)

906/12/2017 NLGM Analysts Visit - 05th December

Page 10: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Significant Milestones in 2016

June 2016 ▪ Completion of the Luika Open Pit over

12.4Mt mined for 85koz

June 2016▪ Commencement of the New Luika

Underground Development

July 2016▪ Commencement of the new

satellite Illunga Open Pit

Sept 2016▪ Completion of the Bauhinia Creek Open

Pit over 25Mt mined at an average grade

of 8.4g/t for 283koz

1006/12/2017 NLGM Analysts Visit - 05th December

Dec 2016▪ First underground development

ore produced

July ▪ Completion of the Ilunga Open Pit

over 3.8Mt mined

May ▪ First underground stope ore

produced

Page 11: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Underground schedule and milestones

Year 2016 2018 2019 2020 2021 2022

Portal construction

Surface construction

Ramp development

Ventilation and Emergency Egress shafts

Access BC orebody

Access Luika orebody

BC production

Luika production

Underground exploration drilling

Mid December 2016 , Access High Grade ore

July

BC Pit – 960mRL Complete

Four 3mø raise bored raises (350m)

06/12/2017 NLGM Analysts Visit - 05th December

100% Complete

Ramping up to 30,000 tpm

Ramping up to 15,000 tpm

Testing down dip extensions at BC East

BC and Luika

Page 12: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

NLGM Production Dash Board – End of September 2017

Page 13: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Processing Plant Flow Chart

GVC 27/11/2017

Mill No 2

Capacity : 37.5 Dtph

25,000 Dtpm

Mill No 1

Capacity : 37.5 Dtph

25,000 Dtpm

Sandvik Crushing Plant

Capacity : 150 Dtph

150,000 Dtpm

Crushed Ore Stockpile

2,000 DtJaw

Crusher

Primary

Cone Crusher

Secondary

Cone

Crusher

Sizing Screen

Mill Feed -9 mm

Tailings Storage Facility 1

Pre-Leach Tanks

10 Hours

Residence Time

Cyanide and

Lime Addition

Loaded Carbon Harvesting

Carbon in Leach

16 Hours Residence Time

Acid

Treatment

Vessel

Elution Column

2t Capacity

Stripping:12-13 hrs

125˚C

Elution Boiler

Gold Sludge Filter Press

Smelting

Furnace

Borax,Soda Ash and Silica

1,215˚C

Doré Bars to Refinery

35% Au

64% Ag

Electrowinning Cells

Carbon Regeneration Kiln

Regenerated Carbon return to Circuit

Drying Oven

Loaded Carbon Tank

Emergency Stockpile

TSF return water

Luika River

Weir Hydrex TankProcess Water Tank Process Water Tank

Strip Solution TankCaustic Soda

Cyanide

Detoxification

Ferrous

New Luika River Dam

:+300,000m3

storage

Page 14: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Smooth Transition to Underground Mining

Mined Out Development

Mined Out Stopes

Future Development

Luika UG Bauhinia Creek UG

Luika Open Pit Bauhinia Creek Open Pit

Return Airways and

Emergency Egress

1000mRL

690mRL

810mRL

Both ore bodies open at depth

06/12/2017 NLGM Analysts Visit - 05th December

Page 15: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Bauhinia Creek : Underground Long Section

06/12/2017 NLGM Analysts Visit - 05th December

Page 16: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Bauhinia Creek Long Section – Reserve/Resource Distribution

1606/12/2017 NLGM Analysts Visit - 05th December

Page 17: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Luika: Underground Long Section

Page 18: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Luika Long Section: Reserve/Resource Distribution

1806/12/2017 NLGM Analysts Visit - 05th December

Page 19: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Illunga Underground

1906/12/2017 NLGM Analysts Visit - 05th December

Ilunga Underground Mine

Main Ramp

Ventilation Raise

Proposed Portal location

Diamond Drilling Stations

Colour Grade

0 - 4

4 - 6

> 6

Page 20: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Ilunga Long Section: Reserve/Resource Distribution

2006/12/2017 NLGM Analysts Visit - 05th December

Page 21: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Investing for the future

New Luika Reservoir : +150,000m3 storage

New Luika River Dam : +300,000m3 storage

Page 22: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Investing for the future

New Luika TSF2 Phase1 – 4.0Mt

Page 23: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Investing for the future

Page 24: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

Investing for the future

Page 25: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

NLGM Underground – The Future

06/12/2017 NLGM Analysts Visit - 05th December

Page 26: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

NLGM Analysts Visit - 05th December

NLGM Environmental

06/12/2017

Page 27: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

NLGM Analysts Visit - 05th December

Community Relations

06/12/2017

Page 28: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Employment

▪ NLGM has grown to be a major source of new employment

▪ 44% of workforce at NLGM currently employed from surrounding villages

▪ Growth of local business ventures dealing with poultry and farm products

Education

▪ Construction of 6 classrooms and 8 offices at Mbangala

▪ Built 2 Classrooms and 1 office in Patamela

▪ 600 desks donated

▪ 120 scholarships awarded

▪ 3 labs constructed for SazaSecondary school

▪ 20k liter rain water harvesting

Health

▪ Provision of the site ambulance to transport patients from Mbangala to hospital in Mkwajuni

▪ Bore hole drilling for water supply

▪ Installation of solar panel at Mbangala

▪ Assistance with medicine

Community

▪ Ongoing re-settlement program at Singida to conditions with sustainable land use

▪ Shamba resettlement complete and Elizabeth Hill resettlement on track

▪ Livelihood Improvement Programme

Shanta’s Ongoing Commitment to CSR

06/12/2017 NLGM Analysts Visit - 05th December

Page 29: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Q1 ‘17 Q2 ‘17 Q3 ‘17 Q4 ‘17 Q1 ‘18

New Luika underground development:

• First production of stope ore ✓

New Luika Planning:

• Update to Base Case Mine Plan to incorporate new Indicated

Resources at Elizabeth Hill and Ilunga ✓

Projects

• HFO power commissioning ✓

• TSF 2 commissioning

• Solar power project ✓

Positioned for growth – upcoming milestones

2906/12/2017 NLGM Analysts Visit - 05th December

Page 30: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

Upcoming catalysts (as stated in Sept 2017)

3006/12/2017 NLGM Analysts Visit - 05th December

September 2017 December 2018

SingidaProject update

Announced new senior management team

Continue to de-lever balance sheet

Realign management incentives with shareholders

Exploration update:on-mine trenching results

Ramp-up Luika UG mine

January 2018 Guidance of 80,000oz gold production 2017 at $800/oz AISC

Continue execution of cost initiatives (2018)

Singida update—internal FS

Implement cost saving initiatives

Discussions with the Government of Tanzania around the current US$13.5 million VAT receivable are ongoing. US$3.4 million VAT refund was received in November 2017

Exploration strategic update

Debt re-financing update

Page 31: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

VAT Receivable – for discussion

Cumulative VAT paid by Shanta (US$m)

1.1

2.4

3.7

4.9

6.06.7

7.78.7

9.4

10.5

11.712.5

13.514.1

14.615.2

15.916.9

13.5

May

-16

Jun

-16

Jul-

16

Au

g-1

6

Sep

-16

Oct

-16

No

v-1

6

Dec

-16

Jan

-17

Feb

-17

Mar

-17

Ap

r-1

7

May

-17

Jun

-17

Jul-

17

Au

g-1

7

Sep

-17

Oct

-17

No

v-1

7

VAT refunded of US$3.4 million was received in November but $13.5 million remains outstanding

Recent discussions held with various Ministries in Dodoma

06/12/2017 NLGM Analysts Visit - 05th December

Page 32: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts

06/12/2017 NLGM Analysts Visit - 05th December

New Luika Gold Mine Summary

• Strong record of operational delivery

• Smarts built into mine design and plans

• Expertise in development projects

• A team with capability to perform and grow

• Transition to underground firmly on track

• Continued low cost operations on the back of high grade resources

• Substantial contributor to cash generation

Page 33: New Luika Gold Mine Analysts Visit 5-6 December 2017 · Completion of the Bauhinia Creek Open Pit over 25Mt mined at an average grade of 8.4g/t for 283koz 06/12/2017 NLGM Analysts