New NAAQS Review Process. Briefing for EPA Staff Kevin Teichman, ORD and Lydia Wegman, OAQPS April 5, 2007. Overview of Today’s Discussion. Purpose of today’s briefing EPA’s review of the NAAQS review process Key steps in new NAAQS review process Role of CASAC in new NAAQS review process - PowerPoint PPT Presentation

Citation preview

Page 1: New NAAQS Review Process

1

New NAAQS Review Process

Briefing for EPA StaffKevin Teichman, ORD and Lydia Wegman, OAQPS

April 5, 2007

Page 2: New NAAQS Review Process

2

Overview of Today’s Discussion

Purpose of today’s briefing EPA’s review of the NAAQS review process Key steps in new NAAQS review process Role of CASAC in new NAAQS review process Plans for transition to new NAAQS review process

Page 3: New NAAQS Review Process

3

Review of the NAAQS review process

“Top-to-bottom” review of the process by which NAAQS are reviewed and revised was requested by EPA Deputy Administrator Marcus Peacock in Dec. 15, 2005 memo to Bill Wehrum and George Gray

Internal EPA workgroup formed to address key issues and make recommendations on the standard-setting process Timeliness (i.e., how to complete NAAQS reviews on a 5-year cycle as required by Clean Air

Act) Consideration of the most up-to-date scientific information Distinctions between scientific and policy judgments Characterization of uncertainties in scientific and technical information

Meetings held with CASAC, stakeholders, and congressional staff April 3, 2006 Workgroup report and cover memo from Bill Wehrum and George

Gray (http://www.epa.gov/ttn/naaqs/naaqs_process_report_march2006.pdf) Additional meetings with CASAC and the public in June 2006 Peacock memo outlining revised process on December 7, 2006 (

http://www.epa.gov/ttn/naaqs/memo_process_for_reviewing_naaqs.pdf) Further modifications to address CASAC concerns outlined in March 2007 Peacock

memo

Page 4: New NAAQS Review Process

4

New NAAQS review process: Key steps

Planning: Early in the process, NCEA/OAQPS will develop one integrated plan to guide the entire review Plan will outline schedule, process, and key policy-relevant science issues

Science Assessment: The Criteria Document will be replaced by a more concise evaluation and synthesis of the most policy-relevant science Science Assessment Support Document (SASD): NCEA’s compilation and characterization of new

scientific studies Integrated Science Assessment (ISA): Drawing from detailed SASD, provides concise evaluation

and synthesis of the most policy-relevant science ORD working to develop and implement process (state-of-the-art electronic database) to identify,

compile, characterize, and prioritize new studies

Risk/Exposure Assessment: OAQPS will develop a more concise document, informed by the ISA, that focuses on key results, observations and uncertainties

Policy Assessment/Rulemaking: The Staff Paper will be replaced with an advance notice of proposed rulemaking (ANPR) containing a policy assessment that reflects Agency views, rather than staff views ANPR will present a range of policy options for standard setting, and will include a description of the

underlying interpretation of the scientific evidence and risk/exposure information that might support each option

Page 5: New NAAQS Review Process

5

New NAAQS review process

Integrated Plan: timeline and key policy-

relevant scientific questions

Integrated Science Assessment: concise evaluation and synthesis of most

policy-relevant studies

Risk/Exposure Assessment: concise, quantitative assessment

focused on key results, observations and uncertainties

Workshop on science-policy

issues

Public hearings and comments on

proposal

EPA final decision on standards

Interagency review

Interagency review

Agency decision making and draft proposal notice

Agency decision making and draft final

notice

Review by CASAC and the public

CASAC review and public comment Draft ANPR: policy assessment reflecting

Agency views on range of policy options and

rationales

Interagency reviewPublic comment period and CASAC review

EPA proposed decision on standards

EPA advance notice of

proposed rulemaking

Peer-reviewed scientific studies

Science Assessment Support Document

Page 6: New NAAQS Review Process

6

Planning Phase Historically, NCEA prepared an Air Quality Criteria Document development plan early in the

process and OAQPS prepared a NAAQS review development plan later in process (including development plans for the Staff Paper and risk/exposure assessment)

Under the new process, NCEA/OAQPS will begin joint planning for next review immediately following completion of each NAAQS review

NCEA/OAQPS will hold early “kickoff” workshop with external scientists and the public to discuss key policy-relevant science issues (either remaining from last review or newly emerging) that should be the focus of the current review

Following this workshop, NCEA/OAQPS will develop a draft integrated plan to guide the entire review process: Schedule for review that links the components to ensure effective coordination between

NCEA/OAQPS Key policy-relevant science issues to be focused on in science assessment, risk/exposure

assessment, and policy assessment Criteria for identifying key policy-relevant studies and approach for assessing the weight of

the evidence Approach for considering the evidence and risk/exposure information as basis for assessing

policy options Final integrated plan will reflect input from Agency management, consultation with CASAC, and

consideration of public comment

Page 7: New NAAQS Review Process

7

Science Assessment

Historically, NCEA prepared a very extensive Air Quality Criteria Document (AQCD), including discipline-specific chapters and an integrative synthesis chapter; OAQPS drew from AQCD to prepare summary of most policy-relevant science in Staff Paper chapters on air quality and health and environmental effects

Under the new process, NCEA will prepare an Integrated Science Assessment (ISA) to provide a more concise evaluation, integration, and interpretation of the most policy-relevant science, including key science judgments that will be used in the risk assessment ISA will focus on more clearly characterizing the strengths and uncertainties of the

available scientific evidence CASAC will review and the public will have opportunity to comment on two drafts of the

ISA ISA will be supported by comprehensive Science Assessment Support Document (SASD),

which will eventually be linked to an electronic database of key studies Independent panels will review chapters of the SASD

ORD is working toward a continuous process of identifying, compiling and evaluating new scientific studies, supported by this comprehensive database, to ensure that policy decisions are informed by the best and most up-to-date science possible

As appropriate, NCEA may conduct a provisional assessment of new science following publication by OAR of a NAAQS proposal notice

Page 8: New NAAQS Review Process

8

Risk/Exposure Assessment Historically, OAQPS conducted risk and/or exposure assessments based on science in AQCD,

consulting with CASAC on a scope/methods plan, presenting key results and uncertainties in Staff Paper chapter(s), with comprehensive documentation in separate technical support document(s)

Under the new process, OAQPS will develop a more concise risk/exposure assessment report focused on key results, observations, and uncertainties

Detailed scope/methods plan will be developed by OAQPS through a coordinated, consultative process with ORD in conjunction with ORD’s preparation of the first draft of the ISA

This approach facilitates concurrent CASAC and public review of: Underlying scientific judgments and assessment models presented in the first draft ISA Scope and methods plan that projects how such science judgments would be incorporated

into the risk/exposure assessment, how the assessment models would be applied, and how uncertainties would be characterized

Second draft risk/exposure assessment report, including assessment of alternative standard levels, will be informed by and concurrently reviewed with second draft ISA; final assessment will be informed by final ISA

To ensure transparency, risk/exposure assessment report will be supported by comprehensive annexes that include all relevant background information, assumptions, results, and assessments of variability and uncertainty

EPA’s Science Advisory Board staff will strengthen the risk/exposure expertise on CASAC panels

Page 9: New NAAQS Review Process

9

Policy Assessment/Rulemaking

Historically, OAQPS prepared policy assessment, reflecting staff views, based on air quality analyses, scientific evidence, and risk/exposure assessments, as Staff Paper chapters on primary and secondary standards

Under the new process, based on final ISA and risk/exposure assessment report, OAQPS will prepare a policy assessment that reflects the Agency’s views, and publish that assessment as an ANPR, which will: “Bridge the gap” between the Agency’s scientific assessment and the judgments required

of the Administrator in determining whether it is appropriate to retain or revise the standards

Identify evidence- and risk-based considerations for reaching policy judgments about the adequacy of current standards, and a range of potential alternative standards that may be appropriate to consider

Describe range of options for standard setting -- including indicator, averaging time, form, and range of levels for any alternative standards -- along with description of alternative underlying interpretations of the scientific evidence and risk/exposure information that could support such alternative standards

CASAC review and advice and public comment on ANPR will inform Agency decision making for proposed rulemaking

Final decision will reflect public comments and any additional CASAC comment/advice on proposed rule

Page 10: New NAAQS Review Process

10

Page 11: New NAAQS Review Process

11

Key Collaborative Elements: OAR and ORD

Planning and facilitating kickoff workshop on key policy-relevant scientific issues Preparing integrated plan Coordinating risk/exposure assessment scope/methods plan with first draft ISA Coordinating deliverables to ensure simultaneous CASAC review of overlapping

components (ISA drafts and risk/exposure assessment drafts) Characterizing most policy-relevant science in draft ANPR based on information

in ISA If needed, structuring provisional assessment of new science following notice of

proposed NAAQS decision

Page 12: New NAAQS Review Process

12

Role of CASAC in new NAAQS review process

CASAC will continue to advise the Administrator on all key elements of the NAAQS review: planning, integrated science assessment, risk/exposure assessment, and policy assessment

In addition, at CASAC’s recommendation, NCEA/OAQPS will hold initial “kickoff” workshop to receive input from experts, including CASAC members, to help the Agency formulate the draft integrated plan which will guide the entire NAAQS review

Each NAAQS review will continue to involve a number of CASAC consultations and reviews, with these reviews involving evaluation of overlapping elements of the review (rather than a somewhat more sequential approach taken in past): CASAC consultation on draft integrated NAAQS review plan CASAC review of 1st draft ISA and draft risk/exposure assessment scope/methods plan CASAC review of 2nd draft ISA and 1st draft risk/exposure assessment CASAC review and comment on 2nd draft risk/exposure assessment CASAC review and comment on ANPR CASAC may also choose to provide additional comments/advice on final documents and

on the proposed NAAQS decision

Page 13: New NAAQS Review Process

13

Transition to New NAAQS Review Process

Current ozone NAAQS review will not be affected by the new process Final Staff Paper released January 31, 2007, with staff recommendations Proposal: June 20, 2007 Final Rule: March 12, 2008

Transition to new process has begun with Pb NAAQS review Final Pb Criteria Document issued September 2006 1st draft Staff Paper and Health/Environmental Assessment issued December 2006 No 2nd draft SP: instead, ANPR to be issued late November 2007 Proposal: March 2008 Final Rule: September 1, 2008

NOx/SOx reviews: workshops in Feb. 2007 (health effects/primary standards) and June 2007 (environmental effects/secondary standards) to discuss key issues and initial draft SASD chapters; followed by ISA, risk/exposure assessment report, policy assessment/ANPR (2009), notice of proposed rule (2009-2010) and notice of final rule (2010)

Next PM NAAQS review: first to fully implement new process (workshop to be held July 2007 to inform development of draft plan)