REV 2019 04 05
NEW PRODUCT REVIEW
Products approved and not yet incorporated into current standards
INDEX
Storm water Products
Porous Pavements
o Pave Drain System……………………………………………………………………. Page A1o Belgard Interlocking Concrete Paver System…………………………….. Page A7
Storm Water Detention/Storage Products
o ACF Environmental R-Tank, R-Tank HD, R-Tank SD……………………………….......... Page B1
o Cultech Cultech Contractor and Recharger Chamber Systems……. Page B3
o Hancor Hancor StorMaster…………………………………………………………. Page B6
o Prinsco HydroStor HS75 and HS180……………………………………………. Page B8
o RainStor System RainStore System…………………………………………………………… Page B11
o Oldcastle Precast StormCapture SC1, SC2 Detention System……………………… Page B13
o Storm Tech Storm Tech MC3500………………………………………………………. Page B17 Storm Tech MC4500………………………………………………………. Page B18
o Storm Trap Storm Trap Concrete Modular Storm Water
Detention System…………………………………………………………… Page B21o ABT, Inc
Permavoid 85 and 150 Systems………………………………………… Page B23o Lane Enterprises
StormKeeper System……………………………………………………… Page B25
Storm Water Conveyance Products
o ADS ADS N-12HP and Sanitite Pipes 12” through 60”…………….. Page C1 ADS Nyloplast Drain Basins, Inline Drains and Ductile Iron
Frames and Grates………………………………………………………….. Page C3o Contech
REV 2019 04 05
A-2000 Storm Water Pipe……………………………………………….. Page C5o Hancor
60” HDPE Pipe…………………………………………………………………. Page C6o Harco Fabricated Drainage Products
Harco Drainage Basins, Inline Drains and Ductile Iron Frames and Grates………………………………………………………….. Page C8
o Prinsco Prinsco ECOFLO 100………………………………………………………… Page C11 Prinsco Gold Flo and Gold Flo WT……………………………………. Page C12
Misc. Storm Water Products
o Sekisui SPR Americas, LLC Sekisui SPR Spiral Wound Pipe………………………………………….. Page D1
Page A 1
Page A 2
Page A 3
Page A 4
Page A 5
Page A 6
Page A 7
Page A 8
Page A 9
Page A 10
Page A 11
Page A 12
November 25, 2015
Christa Petzke, PE, MBA
Engineered Products Manager
D2 Land & Water Resource
2600 Bloyd Avenue
Indianapolis, Indiana 46218
RE: ACF environmental R-Tank Storm Water Systems
Dear Ms. Petzke:
The City of Indianapolis (the City) Department of Public Works (DPW) thanks you for the
information on the ACF environmental R-Tank Storm Water Systems submitted for review and
possible approval in the Indianapolis Stormwater District. The City’s consultant, DLZ Indiana
LLC (DLZ), has completed their review of the information and submitted their report to DPW
(attached). DPW subsequently reviewed DLZ’s report and has made the following
determination.
Based on this conclusion, the DPW is approving the application of the ACF environmental R-
Tank Storm Water Systems Units R-Tank, R-Tank HD, and R-Tank SD for use within the
district for use on private underground detention and will be considered by DPW project
managers in order to identify on a case by case basis where this product may be best suited,
provided the following criteria are met:
All underground detention facilities shall be designed with a positive gravity outfall or a
certification from a licensed geotechnical engineer confirming that:
• The permeability of the surrounding soils will dissipate water at a rate required
for the detention facility designed
• No adverse impact to any subsurface systems (including septic systems) will be
experienced
• The underground detention facility will not be subject to ground water surcharge
during any time of the year
Any facility that allows infiltration within a “Well-Head Protection Area” needs prior
approval from the Department of Public Works Office of Environmental Services.
Page B 1
If the system is designed to use the storage volume of the stone surrounding the structure,
a 40 percent porosity factor shall be utilized for the surrounding washed #8 stone.
All storm water shall be routed through a Storm Water Best Management Practice (BMP)
meeting City Standards prior to the detention area.
No storm water shall be routed through the ACF environmental R-Tank storm water
detention facility until the BMP is installed and fully functional and all erosion control
measures for disturbed areas are installed to ensure that sediment build-up in the
underground detention storage facility is minimized. The erosion control methods and
BMP’s must be inspected after each rain event and repaired or cleaned when necessary.
The O&M Manual for all BMP’s located prior to the underground detention storage
facility requires the BMP’s to be inspected four times per year and cleaned as necessary
to ensure maximum performance relative to sediment removal.
Underground storage vaults shall be constructed of accepted storm sewer pipe materials
(Section 402), manufactured, tested, and installed according to those guidelines set forth
herein.
The sizing of the plastic chamber system should follow the City of Indianapolis’ Storm
Water Design and Construction Specifications Manual. The chamber storage system is
treated in similar fashion to a detention/retention pond as far as sizing, and therefore such
calculations should be made in the same manner. The actual number of chambers and
configuration of the chambers shall be based on engineer’s specifications and
calculations.
The City thanks you for your interest and looks forward to the application of the ACF
environmental R-Tank Storm Water Systems within the district.
If you have any questions regarding this matter, please contact me at 317-633-4120 or via email
Sincerely,
Rachel Wilson, PE
Senior Project Manager
Attachment
cc: Stefan Wolfla, DCE
Allen Sparks, DPW
DPW and DPR, 1200 Madison, Suite 200
File: P:\Projects\New Products Committee\NPC 2011\New Products Files\S W\S W
Detention\R-Tank\Final Report and Letter to Vendor
Page B 2
Page B 3
Page B 4
Page B 5
Page B 6
Page B 7
August 31, 2015
Mr. Monty Storms
Prinsco, Inc.
15221 Laurel Ridge Place
Leo, Indiana 46765
RE: New Product Review\ HydroStor HS75 and HS180 Chamber Subsurface Stormwater
Strorage Chamber
Dear Mr. Storms:
You have requested formal review of your products “HydroStor HS75 and HS180 Chamber” for
underground storm water detention. The New Products Committee of the Department of Public
Works has recommended approval the HydroStor HS75 and HS180 Chamber. Therefore, these
products have been approved by for use on private development and public projects for
underground storm water detention, provided the following criteria are met:
High Impact Polypropylene or High-Density Polyethylene Plastic Facilities
The chambers’ plastic shall be resistant to environmental stress cracking and maintain
adequate stiffness through the higher temperatures experienced during installation and
service. The chambers shall be designed to exceed the American Association of State
Highway and Transportation Officials (AASHTO) recommended Load and Resistance
Factor Design (LRFD) for earth loads and HS-20 live loads, with consideration for
impact and multiple presences when installed per the manufacturer’s minimum
requirements. The plastic chambers shall have a design life of 75 years, Class 1 and Class
3 Storm Water System.
All underground detention facilities shall be designed with a positive gravity outfall or a
certification from a licensed geotechnical engineer that:
The permeability of the surrounding soils will dissipate water at a rate required
for the detention facility designed
No adverse impact to any subsurface systems (including septic systems) will be
experienced
Page B 8
August 31, 2015
Mr. Monty Storms
Page 2
The underground detention facility will not be subject to ground water surcharge
during any time of the year
Any facility that allows infiltration within a “Well-Head Protection Area” needs prior
approval from the Department of Public Works Office of Environmental Services.
If the system is designed to use the storage volume of the stone surrounding the structure,
a 40 percent porosity factor shall be utilized for the surrounding washed #8 stone.
All storm water shall be routed through a Storm Water Best Management Practice (BMP)
meeting City Standards prior to the detention area.
No storm water shall be routed through the HydroStor HS75 or HS180 Chamber facility
until the BMP is installed and fully functional and all erosion control measures for
disturbed areas are installed to ensure that sediment build-up in the underground
detention storage facility is minimized. The erosion control methods and BMP’s must be
inspected after each rain event and repaired or cleaned when necessary. The O&M
Manual for all BMP’s located prior to the underground detention storage facility requires
the BMP’s to be inspected four times per year and cleaned as necessary to ensure
maximum performance relative to sediment removal.
Underground storage vaults shall be constructed of accepted storm sewer pipe materials
(Section 402), manufactured, tested, and installed according to those guidelines set forth
herein.
The sizing of the plastic chamber system should follow the City of Indianapolis’ Storm
Water Design and Construction Specifications Manual. The chamber storage system is
treated in similar fashion to a detention/retention pond as far as sizing, and therefore such
calculations should be made in the same manner. The actual number of chambers and
configuration of the chambers shall be based on engineer’s specifications and
calculations.
Page B 9
August 31, 2015
Mr. Monty Storms
Page 3
A maintenance system shall be set up for the chamber storage system. At a minimum,
the system shall be inspected for sediment and debris every three to six months until an
understanding of the operation of the system is obtained. To facilitate cleaning and
inspection, adequate access ports shall be provided into the chamber system.
The HydroStor HS75 and HS180 Chambers have been approved for H20 loads, but may
have limits for heavier loading such as fire truck stations around buildings. Specific
considerations must be part of the engineering design for locations.
If you have any other questions on this issue, please feel free to contact Bill Bowman at
[email protected]. Bill is spearheading the New Products Committee and will be glad to
help you.
Sincerely,
Rachel Wilson, P.E.
Project Engineer
DPW Engineering, City of Indianapolis
New Products Committee Storm Water Chair
cc: Melody P.E., Deputy Director
Larry Jones, Deputy Director, DPW Engineering
New Products Committee
Department of Code Compliance
File: P:\Projects\New Products Committee\NPC 2011\New Products Files\S W\S W
Detention \Approval Letter_20150824(F).docx
Page B 10
Page B 11
Page B 12
������������������
����������������� Page B 13
������������������
����������������� Page B 14
������������������
�����������������
�
Page B 15
Page B 16
Page B 17
Page B 18
Page B 19
Page B 20
Page B 21
Page B 22
Page B 23
Page B 24
Page B 25
Page B 26
Page B 27
Page C 1
Page C 2
Page C 3
Page C 4
Page C 5
Page C 6
Page C 7
Page C 8
Page C 9
Page C 10
Page C 11
Page C 12
Page D 1