(주)티에스테크노
Index
1. Summary
2. Problem of existing technology
3. New tubular rock bolting system
4. Product differentiation
against existing technology
5. Patent right and business records
(주)티에스테크노
1-1. Principle and history of rock bolt
- 1 -
ROCK BED NURT
ROCK BOLT
MATERIALS PLATE
History of Rock bolt
▶Shotcrete, Secondary support and Primary support
in NATM
▶Located bolt into the rock bed for resisting collapse
▶Firmly fixed around cutting surface of the ground
Absolutely dependent on ground condition and
installation of supporting process
▶ Apply for a patent by Frölich and Klüpfel (Germany) in 1913 (Delayed due to the First World war)
▶ Resisted patent the first for Rock bolt in 1918(No.302909)
▶ One Point holding support system instead of wooden materials in tunnel
(Wood and cable had used for rock bolting in the initial period)
▶ Most of domestic have taken deformed bar with cement mortar and resin owing to cost
(Adjusting the design by considering ground state → use various types of rock bolts )
(Rock Bolt)
(주)티에스테크노
1-2. Effects of rock bolt and application
Effects of rock bolt
Stampling
Internal pressure
Beam forming
Arch forming Ground forming
Application
Digging
1st S/C
ROCK BOLT
2nd S/C
▶Tunnel
▶Ground digging
▶Reinforcement
- 2 -
(주)티에스테크노
1-3. Rock bolts classification and quality standard
Rock bolt classification
Adaptable for
ground and field
construction condition
▶Material symbol
Deformed bar
Steel pipe
Expansibility steel pipe
Fiber Reinforced Plastic
Cable
▶Way of settled
Front adhesive
Fleet settler
Mixed
Cement mortar
Resin
Friction
Rock bolt quality standard
Diameter(mm)
Material symbolYield strength
(MPa)Tensile strength
(MPa)Ductility rate
(%)
Over Φ25 SD350 Over 350 Over 490 Over 18
- 3 -
(주)티에스테크노
2-1. Increase of accident in tunnel construction
건설현장 사망 사고 속출 비상
Date Place Reasonnumber
of people
9/2HO NAMExpress rail road
Rock bed collapse Dead : 1
9/7Route 36Kwang Bi 1 tunnel
Rock bed collapseDead : 3Injury : 3
9/28Kyung BuExpress
Rail road
Rebar structureCollapse
Dead : 1Injury : 2
▶ Latest accident
3 times of accident in September, 2011
Diversification of design
- considering ground state
Ensure safety
- performing rock bed timbering
Through safety management
Prevention
- 4 -
(주)티에스테크노
2-2. Problem of existing technology (1/2)
Lack of effect of rock bed maintaining
Rock bolt(Φ25)
DesignDiameter(38mm)
Rock blot(Φ25)
RealDiameter(45mm)
To reach perfectly firm up after Rock bolting installation, 7~24 hours need for curing
Difference between design and construct
Construct convenience (Jumbo Drill)
Appearing diameter difference
→Increase of material use : about 1.5 times
- 5 -
InsertingDeformed bar
InsertingIn/output pipe
Bore hole sealing
Injecting Mortar
Complete injecting,Cutting entrance
Assembly nut andDistribution plate
Tighten nut,After curing
(주)티에스테크노
Incongruity Rock bolting Environmental pollution
Loss of adhesion by locating rock bolt
Tough to reach same quality situation
Spilled Ground water
→ loss of materials( mortar, resin)
Environmental pollution by chemicals
Rock Bed
Rock bolt Materials
Rock Bed
Rock bolt Materials
Rock Bed
Rock bolt Materials
■ Congruity Rock bolting
■ Incongruity Rock bolting
■ Loss of materials
■ Environmental pollution
- 6 -
2-2. Problem of existing technology (2/2)
(주)티에스테크노- 7 -
2-3. Swellex Bolt(Imported product)
Swellex Bolt
▶ First invented by Atlas Copco, Sweden (1977∼1980)
▶ Approval constructability and safety in mining and tunnel
: : Easy workability and excellent ability to maintain ground
▶ Limited use in domestic( less than 0.5% )
: High cost item, not competitive
: Mostly use in opened cutting surface for coal and mining
[Principle of frictional force in Rock bed ]
Feature of Swellex Bolt
▶ Despite of huge modify, no collapsed just sliding
▶ Strong pressure around rock bed by expansion
: getting combined stress when the bolt push and pull
▶ In purely shear, stay their form without any changed
: flexibility (highly expansibility materials)
(주)티에스테크노- 8 -
2-3. Problem of Swellex Bolt (1/1)
Location and type of fluid inlet
▶ Injecting through small inlet
: 3~4min for expansion (4m)
: after expansion, still stay fluid in tube
: possibility of corrosion by incomplete
drainage system
Non economic efficiency
▶ Limited use in local tunnel
: incomparable due to high price
: problem in purchasing and application
: some of mining use in domestic
Description Unit price Remark
Mn16(Φ54mm, t=2mm) KRW 72,000
4m Mn24
(Φ54mm, t=3mm) KRW 100,000
Swellex Bolt(Imported)
Deformed bar(Normal
rock bolt)
KRW 72,000 ~
KRW 35,800(Including materials)
(주)티에스테크노
3-1. Summary of technology development
Principle of technology development
Tubular steel pipe rock bolt : Injecting fluid into the pipe in
high pressure (250~300 bar) for expanding and strongly fixed in
rock bed
- Mechanical gearing and frictional force
- Ground reinforcement technology for quick firm up
[Tubular steel pipe rock bolt]
[Comparing expanded or not]
[All completing Rock bolt]
BeforeAfter
① Inserting Rock bolt
② Expanding ③ Holing in rock bed
※ Sharing same principle but improved shape of inlet, producing
process, cost and so on.
- 9 -
(주)티에스테크노
3-2. New technology performance
Properties of material
▶Carbon steel for machine structural use for good ductility
▶Implementing agency : SGS Construction laboratory
Division Unit Measure Result (max)
Chemicalproperty
C %
KS D 1652 - `07
0.20Si % 0.02
Mn % 0.44P % 0.10S % 0.003
Division Unit Measure Result
Mechanical
property
Yield strength
MPa
KS B 0802 - `03
431 (over 350 )
Tensile strength
MPa 529 (over 490 )
Ductility % 30 (over 18)
A Type B Type C Type
t = 2.0mm t = 2.3mm t = 2.3mm (zinc galvanizing)
Type of product
- 10 -
(주)티에스테크노
3-3. Method of manufacture
- 11 -
Circle steel pipe
Attach Cap and Injecting inlet
Processing
Internally fold the pipe
Attach adhesive member
(주)티에스테크노
3-4. Component and feature
Top Body Bottom
1. Top
2. Body
3. Bottom
▶ Top (Fluid inlet)
- to inject fluid into the body, connected steel pipe
- Front inlet : smoothly injecting and drainage
▶ Body (Folded steel tube type)- part of expanding by hydraulic pressure: shape of folded steel tube
: Diameter : normal : 34mm → after expanding : 48mm
▶ Bottom- perfectly sealed to protect leaking water when the body expanding
- 12 -
(주)티에스테크노
3-5. Effect
Quick firmed up
Efficiency
Adaptable
Eco-friendly
Easy workability
Expand tubular pipe, strongly settled on rock bed
Mechanical gearing and frictional force between rock
bed and Rock bolt
Lightweight product, improved the operation speed
Identical quality using hydraulic system
Not include cement mortar and resin
Harmlessness in human and nature(underground water)
Crushed zone : strong frictional force in crushed rock
radial expanding
Water zone : construct without fixedness materials
Localization and systematization of mass production
Cost efficiency and importing substitution effect
- 13 -
(주)티에스테크노
3-6. Construct procedure
① Preparing Rock bolt and pump ② Drilling for rock bolting③ Insert Rock bolt around
drilled area
⑥ Result conformation④ Rock bolting (pipe expanding) ⑤ Done (within 2 min)
Tubular steel pipe rock bolt
Pump
Hydraulic pressure machine
Connecting
hose
- 14 -
(주)티에스테크노
4-1. Product differentiation against existing rock bolting
Improved safety Excellent in !!!
▶ Exhibit frictional force immediately on rock bolting area
▶ Prevent the accident which is able to happen in tunneling such as rock falling
Division Tubular pipe Rock bolt Existing Rock bolt (Deformed bar)
Method High pressureCement mortar
Resin and so on
Time ofFirmed up
Immediately after
installation
Curing period
(7~ 24hours)
Feature
■ Quickly fixed
rock bolt
■ Prevention of
rock falling and
displacement spread
from relaxation
■ Early strength
insufficiency
■ Possibility of
rock falling
during their curing
- 15 -
Insert deformed bar
Insert In/Out pipe
Seal the bore hole
Injecting mortar
Bending the inlet
Install the nut and distribution plate
Tighten nut
Done
strongly stick with rock bed
High pressure expanding
Insert Rock bolt
(주)티에스테크노
①
②
4-1. Product differentiation against deformed bar
Efficient in time and space Great work in air compression !!!
▶ Reduce Rock bolting time and immediately confirm the stats
▶ Able to manage identical quality
Division Tubular pipe Rock bolt Existing Rock bolt(Deformed bar)
Operation Hour Within 2 minutes
More than 10 minutes
(7~24hr for curing )
Workers 1∼2 people 2∼3 people
Around Water Available Depends on the site
Confirm Immediately Takes longer
[Step for deformed bar]
[Step for tubular pipe]
- 16 -
(주)티에스테크노
4-1. Product differentiation against deformed bar
Eco-friendly No pollutant!!
▶ Harmlessness in human and nature
▶ Available in groundwater flow sector
DivisionTubular steel pipe
Rock boltDeformed bar
overview
FeatureHarmlessness in human
and enviroment 無
Harmful for human and
(use industrial materials)
[Example of environment pollution]
[Loss of material in existing Rock bolt]
[Cement mortar]
[resin]
- 17 -
(주)티에스테크노
4-2. Product difference against Swellex Bolt
시공효율 향상
▶ Inject fluid through the wide Top part
▶ Faster (10∼20 seconds per 4M for expanding time)
Division Tubular pipe Rock bolt Swellex Bolt
Outline
time Within 2 minutes 4 ~ 5 minutes
Feature■ Expanding by hydraulic pressure
■ Wide injecting area
■Expanding by hydraulic pressure
■Narrow injecting area
- 18 -
Shorter construction time!!!
Injecting areaInjecting area
(주)티에스테크노- 19 -
5-1. Industrial property and achievement
Industrial property
Advertisement
▶ NETA No.581 : Wide injecting area in Top part
▶ Patent registration No. 10-0972357 : Expandable tubular Rock bolt
▶ Patent registration No.10-1038472 : Rock bolt and supporting method
▶ Patent registration No.10-1038476 :Rock bolt and supporting method
▶ Patent application No. 2010-0106891 : Rock bolt, hydraulic pressure and
other six difference applications.
NETA 1time, Patent registration 3 time, Patent application 7times
▶ Best thesis award at Korean Society of Civil
Engineers (KSCE) 2011
▶ Hold a 30th Anniversary symposium for Korean
Society for Rock Mechanics (KSRM) 2011
▶ Hold a conference for Korean Society for Railway
▶ Report to Korean Tunneling Association
“ Applicability of tubular pipe Rock bolt ”
(주)티에스테크노- 20 -
5-2. Site test(1-1)
Site outline
Test of expanding
숏크리트
[Before the expanding] [After the expanding]
▶ Location : In-cheon subway 212 sector (T/K)
▶ Rock bolt testing during the ventilating opening
excavation work(Depth=26m, Type: Banded gneiss)
▶ 3times of testing (L=4m)
(주)티에스테크노- 21 -
Construction sequence
Endure in 18tons loading (Reference : SGS Korea Co,Ltd)
① Drilling for Rock bolt ② Insert the Rock bolt ③ Rock bolting (pipe expanding)
④ Done ⑤ Pull out test
5-2. Site test(1-2)
(주)티에스테크노- 22 -
5-2. Site test(2-1)
Site outline
Site situation
▶ Location : Busan subway Line No.1 and 4 Sector(T/K)
▶ Horizontal and vertical drilling mostly Sedimentary rock around
▶ 3 times of testing (L=3m, 4m)
[Situation of underground ] [Rock bolting plan]
(주)티에스테크노
Construction sequence
Endure in 18tons loading (Reference : SGS Korea Co.Ltd)
① Inspection ② Testing Rock bolt ③ Insert Rock bolt
④ Rock bolting (pipe expanding) ⑤ Pull out test
5-2. Site test(2-2)
- 23 -
(주)티에스테크노
Address : 7F 190-15 Bangi Dong Songpa Gu Seoul Korea
Mobile : +82-10-3792-0411 / Kyle Lee ( Director )
Tel : +82-2-3432-0411 Fax : +82-2-3432-0413
E-mail : [email protected]