Bulletin Number: OPR111.06 Date Issued: 2011 08 25 Date Revised: 2016 08 16 Date Reviewed: 2019 09 12 Page 1 of 17 New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved By: J. Curran ______________________________________________________________________________ 1.0 Purpose The purpose of this procedure is to give a step-by-step approach for single phase transformer- rated residential metering installation and to briefly explain the hazards associated with the process. 2.0 Scope This procedure applies to single phase transformer-rated residential metering installations utilizing either; an internal CT cabinet and external transformer-rated meter socket c/w test switch an external 400 amp combination meter socket . 3.0 General Newfoundland Power will ensure personnel involved with the use of metering equipment are adequately protected from the hazards associated with the utilization of this equipment. 4.0 Responsibilities 4.1 Supervisor responsible for the work shall: Ensure personnel are aware of the hazards associated with the utilization revenue metering equipment. Ensure Risk Management/Job Planning (RM/JP) process is carried out prior to the start of work. Ensure that all workers are aware of all related procedures. This would include, but not be limited to: OPR104.01- Personal Protective Equipment OPR104.02 Flame Resistant Clothing OPR106.42 Management of Electrical Arc Hazards up to 750 Volts Worker Protection Code (WPC) Risk Management and Job Safety Planning Code

New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 1 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

1.0 Purpose

The purpose of this procedure is to give a step-by-step approach for single phase transformer-

rated residential metering installation and to briefly explain the hazards associated with the

process.

2.0 Scope

This procedure applies to single phase transformer-rated residential metering installations

utilizing either;

• an internal CT cabinet and external transformer-rated meter socket c/w test

switch

• an external 400 amp combination meter socket

.

3.0 General

Newfoundland Power will ensure personnel involved with the use of metering equipment are

adequately protected from the hazards associated with the utilization of this equipment.

4.0 Responsibilities

4.1 Supervisor responsible for the work shall:

• Ensure personnel are aware of the hazards associated with the utilization revenue

metering equipment.

• Ensure Risk Management/Job Planning (RM/JP) process is carried out prior to the

start of work.

• Ensure that all workers are aware of all related procedures. This would include, but

not be limited to:

• OPR104.01- Personal Protective Equipment

• OPR104.02 – Flame Resistant Clothing

• OPR106.42 – Management of Electrical Arc Hazards up to 750 Volts

• Worker Protection Code (WPC)

• Risk Management and Job Safety Planning Code

Page 2: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 2 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

4.2 Worker

• Ensure the outcomes identified by the RM/JP process are in place prior to starting

work.

• Many new installations are done at locations where construction is in progress.

Personnel should pay close attention to their environment and beware of additional

hazards that result from working at these locations.

5.0 Procedure:

Internal CT Cabinet With External Transformer-Rated Meter Socket

Figure 1 – CT cabinet and Disconnect cabinet

5.1 Pre-Installation

5.1.1 The Meter Technician should ensure that all personal protective equipment

(including flame resistant clothing, hard hat with face shield, safety glasses,

Balaclava if required, class “zero” rubber gloves and correct safety boots) is worn

Page 3: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 3 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

before proceeding with installation.

Page 4: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 4 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

5.1.2 Ensure that the main switch blades are in the open position and check the

disconnect for potential reading using the voltmeter. The reading on the

voltmeter should be 0 volts.

Figure 3 – Main Switch blades in open position Figure 4 - Testing for potential on Disconnect

5.1.3 After testing for potential, lock the disconnect cabinet and place the “Do Not

Operate” Lockout tag on the lock as per OPR 300.14 Equipment Lockout.

Page 5: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 5 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 5 - Do Not Operate Lockout Tag

5.2 Metering Installation

5.2.1 Meter Bypass Socket Side

5.2.1.1 Remove the protective cover on the meter holder and pass the

installation cable through the hole in the CT cabinet out the meter

bypass socket.

Figure 6 – Installation cable

Page 6: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 6 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

5.2.1.2 Using duct seal, seal the hole where the installation cable passed through

the meter bypass socket or LB, to prevent water from entering the CT

cabinet.

Figure 7 – Apply duct seal

5.2.1.3 Make the phase connections on the meter bypass side as per the

Newfoundland Power wiring standards.

Figure 8 – Complete phase connections

Page 7: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 7 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

5.2.1.4 Ensure that the connections are tightly secured.

5.2.1.5 Apply Penetrox to the jaws of the meter bypass socket, install the meter

socket cover and slide the meter in place.

Figure 9 – Applying Penetrox

5.2.1.5 Install the meter band and apply the tamper-sensitive seal to the tip of

clamp.

Page 8: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 8 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 10 - Applying the meter cover and NP tamper-restrictive seal

5.2.2 CT Cabinet Side

5.2.2.1 Make the ground connection to CT cabinet ground.

Page 9: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 9 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 11 – Ground connection

5.2.2.2 Make the polarity connections on the CT side as per the Newfoundland

Power wiring standards (x1 – polarity, x2 – return).

Figure 12 – Polarity connections.

Figure 13 - Showing all connection points.

5.2.2.3 Ensure that the connections are tightly secured.

Page 10: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 10 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

5.2.2.4 Torque the connection points of the CT line and load.

Figure 14 - Torque the connection

5.2.2.5 Cover the CT with the transparent plastic guard and place a tamper-

resistive seal over the top of the guard.

Page 11: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 11 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 15 - Plastic guard and tamper-resistive seal

5.3 Concluding the Job

5.3.1 Record the CT ratio and the current rating of the disconnect.

5.3.2 Record the meter, serial, and seal lock numbers.

5.3.4 Complete Metering Installation Form

5.3.5 Attach the seal sticker and seal lock to the cover of the CT and disconnect

cabinets and record the number printed on the seal lock.

Page 12: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 12 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 16 - Apply the NP seal lock and stickers.

6.0 400 Amp Combination Meter Socket

Page 13: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 13 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 14 – 400 Amp Combination Meter Socket Cabinet

6.1 Pre-Installation

6.1.1 The Meter Technician should ensure that all personal protective

equipment (including flame resistant clothing, hard hat with face

shield, safety glasses, class “zero” rubber gloves, balaclava if

required, and correct safety boots) is worn before proceeding with

installation.

Page 14: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 14 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

6.1.2 Ensure that the main switch blades are in the open position and check the

disconnect for potential reading using the voltmeter. The reading on the

voltmeter should be 0 volts.

Figure 15 – Main Switch blades in open position Figure 16 - Testing for potential on Disconnect

6.1.3 After testing for potential, lock the disconnect cabinet and place the “Do Not

Operate” tag on the lock. Also verify that the service conductors have not been

energized at the line side by NP personnel.

Page 15: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 15 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 17 - Do Not Operate Tag

6.2 Metering Installation

6.2.2 Secondary Wiring

6.2.2.1 Remove the protective covers on the meter socket & lower cabinet and

inspect the factory-installed secondary conductors.

Figure 18 – Secondary Conductors - Test Switch

Figure 19 – Secondary Conductors – CT

Page 16: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 16 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 20 – Secondary Conductors – Meter Socket

6.2.2.2 Verify that all secondary connections are secure and wired as per NP

standards from the CT secondary location to test switch and from test

switch to meter socket.

6.2.2.3 Remove the inspection certificate from the 3-wire CT and note details

for creation of the CT in MES.

6.2.2.4 Apply Penetrox to the jaws of the meter socket, install the meter socket

cover and insert the meter.

6.2.2.5 Place tamper-resistive seals on the transparent plastic guard cover on the

CT and test switch cover.

Page 17: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 17 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

Figure 21 - Plastic guards and tamper-resistive seals

6.2.2.6 Ensure that the manufacturer supplied plastic Flash Sheild is

properly installed between the socket buss bars and the metering

test switch.

Figure 22 – Plastic Flash Shield Placement

Page 18: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 18 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

6.2.2.7 Attach the seal sticker and padlock seal to the lower cabinet door

and record the number printed on the padlock seal

Figure 23 - NP tamper-restrictive seals – Meter Band & Cabinet

6.3 Concluding the Job

6.3.1 Record the current rating of the disconnect.

6.3.2 Record the meter, serial, and seal lock numbers.

6.3.4 Complete Metering Installation Form

6.3.5 Attach the seal sticker and seal lock to the disconnect cabinet and record the

number printed on the padlock seal.

Page 19: New Transformer-Rated Metering Installation... · New Transformer-Rated Metering Installation Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch Revised By: B. Styles Approved

Bulletin Number: OPR111.06

Date Issued: 2011 08 25

Date Revised: 2016 08 16

Date Reviewed: 2019 09 12

Page 19 of 17

New Transformer-Rated Metering Installation

Created By: B. Chubbs /B. Styles Reviewed By: R. Murdoch

Revised By: B. Styles Approved By: J. Curran

______________________________________________________________________________

7.0 Reference

7.1 Reference Documents

• OPR104.01- Personal Protective Equipment

• OPR104.02 – Flame Resistant Clothing

• OPR106.42 – Management of Electrical Arc Hazards up to 750 Volts

• OPR 300.14 Equipment Lockout

• Worker Protection Code (WPC)

• Risk Management and Job Safety Planning Code

7.2 Related Hazards

7.3 Legal and Other Requirements

• Occupational Health and Safety Regulations

8.0 Records

• No records

9.0 Glossary

• RM/JP – Risk Management/Job Planning

• CT – Current Transformer

• LB – L Shaped 90 degree conduit with access point