NEW YORK STATE DEPARTMENT OF TRANSPORTATION
NY Gateway Connection Improvements to the US Peace Bridge Plaza
City of Buffalo, Erie County
Design-Build Project
Request for Qualifications
Informational Meeting
September 5, 2013
1
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build ProjectAgenda
Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers
2
Peter RussellAttn: NY Gateway Connection Improvements
Office of Contracts ManagementNew York State Department of Transportation
50 Wolf Road, 6th FloorAlbany, New York [email protected]
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Contact
3
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build ProjectProject Status
Project is on an Accelerated Procurement ScheduleSimultaneous Tasks
Design ReportSpecific Scope of WorkEnvironmental Impact Studies (Draft EIS by mid Nov.)Site InvestigationsPLA Due DiligenceUtility and other Third Party AgreementsDesign-Build Procurement
Final Scope will be in Draft RFP
4
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda
Introductions and Opening RemarksProject StatusProject Overview
General LocationGoalsGeneral Scope of Work
Quality Control & Quality AssuranceProcurementQuestions and Answers
5
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Location
6
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Existing Conditions Plan
7
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Concept Plan
8
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)
1) Construction of a new Ramp D from Plaza to I-190 Northbound; Widening of the I-190 Northbound bridge, over the existing combined Riverwalk and the access driveway to the Massachusetts Pumping Station
2) Removal of Baird Drive from Front Park between the Plaza and Porter Avenue, and restoration of the street area to park land; Minor landscaping and pathway restoration
9
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)
2) Relocation of the park entrance for vehicles to the Porter Avenue/Lakeview Avenue Intersection
3) Construction of a new Ramp PN from Porter Avenue to Ramp N
4) Minor modifications of portions of existing Ramps A, C, N and P
5) Construction of new access from Porter Avenue to Ramps P & PN by either:a new signalized intersection on Porter Avenue; ora new roundabout on Porter Avenue.
10
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)
6) Possible replacement of the Porter Avenue Bridge over I-190 and CSX Railroad
7) Possible Relocation of the Riverwalkpedestrian/bicycle bridge crossing over CSX Railroad, the access driveway to Massachusetts Pumping Station, and I-190 to an area between I-190 and the Black Rock Canal. Work would include reconstruction of a portion of the Riverwalk
11
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)
8) Reconstruction and widening of the sidewalk along the south side of Porter Avenue from Lakeview Avenue to LaSalle Park and Riverwalk for use as a pathway for both pedestrians and bicycles
12
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Goals
Ensure a long-service life for all Project ElementsEnsure the safety of the traveling publicMaximize the impact of the public investment in the Project by:
Providing cost-effective design and construction solutions;Sequencing construction to minimize effects on vehicular traffic operations;Reducing future maintenance requirements; and Minimizing impacts on the environment.
13
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Goals (Continued)
Deliver the Project safely, on schedule and within budgetEnsure coordination with all utility owners, third parties and Project stakeholders and any adjacent construction projectsProvide best value to the Department
14
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda
Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers
15
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Quality Control (QC)
QC is Design-Builder’s Responsibility
Design-Builder shall be required to develop a QC Plan covering both Design QC and Construction QC
Design-Builder shall appoint a QC Manager responsible for Project QC
Design QC shall be by the Designer in accordance with the QC Plan
Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)
Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)
The Independent Testing Firm shall report to the Construction Inspection Firm
Offsite Plant Quality Control will be performed by the Department
16
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Quality Assurance (QA)
QA is Department’s ResponsibilityThe Department may perform QA on any of the Design-Builder’s Design and Construction ActivitiesThe Department may utilize an independent Consultant to perform QA of the Design-Builder’s DesignsDepartment Staff will perform Construction QARFQ Section 1.9 covers QA/QCRFP will describe in detail the Department’s QA Role for the Project
17
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda
Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurement
ScheduleContract InformationSOQ Evaluation and SelectionAdditional Information and Website
Questions and Answers
18
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Procurement Schedule
Activity Due DatePre-RFQ Informational Meeting September 5, 2013Final RFQ Released September 19, 2013Final Date for receipt of Proposer’s questions September 25, 2013Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions September 30, 2013SOQ Due Date October 8, 2013Shortlisted DB Teams Announced (3 to 5 Teams) November 7, 2013Draft RFP Issued November 20, 2013Draft RFP Informational Meeting December 4, 2013Final RFP to Shortlisted Firms December 20, 2013Proposals Due February 20, 2014Selection / Award March, 2014Execute Contract April, 2014Notice to Proceed May, 2014
19
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Contract Information
Lump Sum Design-Build Contract
Two Step Design-Build Procurement ProcessProject Schedule
Total Duration 24 Months +/- (under review)There will be a Payment Schedule provided in the RFPStipend Amount is Under Consideration by NYSDOTLiquidated Damages may be imposed for missed milestones and final completionROW by NYSDOT
Environmental Permits by the DepartmentConstruction Related Permits by Design-Builder
20
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project SOQ Evaluation and Selection
Pass/Fail Evaluation FactorsLegal; Financial; Backlog Capacity; Vendor Responsibility; andProposal Responsiveness.
Quality Evaluation FactorsOrganization and Key Personnel (20%)Experience of the Firms (25%)Project Understanding (30%)Past Performance (25%)
21
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Additional Information
Responses to Proposer Questions will be posted on the Project Web Site
Final Addendum to the RFQ will be issued by Monday, Sept. 30, 2013 Reference Information has been Posted on the Project Web Site:
NY Gateway Concept PlanProject Scoping Report
There will be a Buy America ClauseThere will be a DBE Participation GoalRFQ Section 1.10 covers Insurance & Bonding
22
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Website
https://www.dot.ny.gov/main/business-center/designbuildproject3
23
Peter RussellAttn: NY Gateway Connection Improvements
Office of Contracts ManagementNew York State Department of Transportation
50 Wolf Road, 6th FloorAlbany, New York [email protected]
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Contact
24
NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Questions and Answers
Questions??