35
Inspection Date: October 06, 2017 New York State Department of Transportation General Bridge Inspection Report Structure Information Postings Number of Flags Issued New York State Inspection Overview NBI Superstructure Condition: NBI Deck Condition: Federal NBI Ratings NBI Substructure Condition: NBI Channel Condition: NBI Culvert Condition: N 7 6 6 7 Action Items Inspector & Reviewer Signature Information Political Unit: BRONX Number of Spans: Date: 278I 278IX1M54025 Justin Bonaparte, P.E. 091223-1 City of NEW YORK This Bridge is not a Ramp Approximate Year Built: Review Signature: 11 - NEW YORK CITY Feature Carried: General Type Main Span: County: 3 - EAST Region: 3 Eugene T. Grant, P.E. 073380-1 Not Posted 26 Feet 7 Inches December 28, 2017 Inventoried Vertical Clearances: BRONX RIVER Not Posted Inventoried Posted Load: Inspection Signature: General Recommendation: Date: 3 - Steel, 16 - Moveable - Bascule Feature Crossed: 1952 5 December 28, 2017 Orientation: Primary Maintenance Responsibility: Primary Owner: Red PIA: Red: Yellow: Safety PIA: 0 0 0 0 Vulnerability Reviews Recommended: Hydraulic Further Investigation Requested: NO Diving Inspection Requested: NO New York State Department of Transportation New York State Department of Transportation Non-Structural Condition Observations noted: NO BIN: 2066671 Report Printed: February 06, 2018 7:25:20 AM Michael Ruppe, P.E. 083037-1 Date: January 02, 2018 Posted Load Matches Inventory: N/A On: Under: Processed by : Page 1 of 35 Format Version 20171005

New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

Inspection Date: October 06, 2017

New York State Department of TransportationGeneral Bridge Inspection Report

Structure Information

Postings

Number of Flags Issued New York State Inspection Overview

NBI Superstructure Condition:

NBI Deck Condition:

Federal NBI Ratings

NBI Substructure Condition:

NBI Channel Condition:

NBI Culvert Condition: N

7

6

6

7

Action Items

Inspector & Reviewer Signature Information

Political Unit:

BRONX

Number of Spans:

Date:

278I 278IX1M54025

Justin Bonaparte, P.E. 091223-1

City of NEW YORK

This Bridge is not a Ramp

Approximate Year Built:

Review Signature:

11 - NEW YORK CITY

Feature Carried:

General Type Main Span:

County:

3 - EAST

Region:

3

Eugene T. Grant, P.E. 073380-1

Not Posted

26 Feet 7 Inches

December 28, 2017

Inventoried Vertical Clearances:

BRONX RIVER

Not PostedInventoried Posted Load:

Inspection Signature:

General Recommendation:

Date:

3 - Steel, 16 - Moveable - Bascule

Feature Crossed:

1952

5

December 28, 2017

Orientation:

Primary Maintenance Responsibility:

Primary Owner:

Red PIA:

Red:

Yellow:

Safety PIA:

0

0

0

0

Vulnerability Reviews Recommended: Hydraulic

Further Investigation Requested: NO

Diving Inspection Requested: NO

New York State Department of Transportation

New York State Department of Transportation

Non-Structural Condition Observations noted: NO

BIN: 2066671

Report Printed: February 06, 2018 7:25:20 AM

Michael Ruppe, P.E. 083037-1 Date: January 02, 2018

Posted Load Matches Inventory: N/A On:

Under:

Processed by :

Page 1 of 35 Format Version 20171005

Page 2: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

Special Emphasis Detail "Other" Special Emphasis DetailDescription

Hands-On InspPerformed Hands-On Inspection Note

Other (Unique & unusualfeatures)

All four girders of the east andwest bascule leaves

Yes

Complex Bridges Yes 100% hands on inspection on movable bridge trunnions

Movable Bridge Trunnions 100% hands on inspection wasperformed on all four girders ofthe east and west bascule leave

Yes 100% hands on inspection of trunnions in Span 1 and Span 3for the bascule in Span 2

Overloads ObservedNo overload vehicles observed during this inspection.

Notes to Next Inspector- Access to the interior of Spans 1 and 3 is through the control tower and gatehouse respectively. Access to the towerand gatehouse must be arranged in advance by contacting the NYCDOT Division of Bridges.- Access to Span 2 will require barge with lift.- Girder G1, G2, G3 and G4 in the bascule span (Span 2) extends into Span1 and Span 3 respectively and supports thecounter weight

None

Improvements Observed

Special Emphasis Inspection

Additional Information

Snow FenceNone

Pedestrian Fence HeightNone

Bin Plate ConditionOK

Scour Critical RatingU - No Load Rating; no scour critical data entered.

Page 2 of 35 Format Version 20171005

Page 3: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

Field Notes

Staff Present During Inspection

Name Title Organization

Ordelmoe Peters ATL HAKS

General Equipment Required for Inspection*

Access Type

13 - Walking

20 - 30 to 90 Foot Lift

23 - Barge

24 - Diving

28 - Lane Closure Without Shadow Vehicle

* For span specific equipment requirements refer to the Active Inventory's "Access Needs" tab in BDIS.

Detailed Time & Weather Conditions

Field Date Arrival Departure Temp (F) Weather Conditions

10/02/2017 08:00 AM 12:00 PM 73 SUNNY

10/03/2017 08:00 AM 12:00 PM 73 SUNNY

10/06/2017 08:00 AM 12:00 PM 81 SUNNY

Inspection Times (hours)

242

No

Time required for travel, inspection and report preparationLane closure usageRailroad flagging time

Page 3 of 35 Format Version 20171005

Page 4: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

Element Assessment by Span

Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5Span Number : 1

BA215 - Reinforced Concrete Abutment 70 ft 70 0

BA220 - Reinforced Concrete Pile/Cap Footing 70 ft 70

BA302 - Compression Joint Seal 70 ft 70 0

BA313 - Fixed Bearing 15 each 15 0

BA800 - Erosion or Scour 70 ft 70 0

Element Assessment Summary Table

Element Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-512 - Reinforced Concrete Deck 3920 ft2 3528 392 0

28 - Steel Deck with Open Grid 5596 ft2 5596 0

29 - Steel Deck with Concrete Filled Grid 909 ft2 909 0

107 - Steel Open Girder/Beam 608 ft 554 51 3 0

113 - Steel Stringer 3528 ft 3444 84 0

152 - Steel Floor Beam 980 ft 352 22 606 0

202 - Steel Column 2 each 1 1 0

215 - Reinforced Concrete Abutment 140 ft 140 0

220 - Reinforced Concrete Pile/Cap Footing 140 ft 140

302 - Compression Joint Seal 280 ft 40 238 2 0

313 - Fixed Bearing 81 each 81 0

330 - Metal Bridge Railing 192 ft 192 0

331 - Reinforced Concrete Bridge Railing 112 ft 102 10 0

510 - Wearing Surfaces 1860 ft2 1674 180 6 0

515 - Steel Protective Coating 400 ft2 400 0

800 - Erosion or Scour 140 ft 140 0

810 - Sidewalk 1441 ft2 1441 0

811 - Curb 304 ft 304 0

830 - Secondary Members 3 each 3 0

831 - Steel Beam End 109 each 78 31 0

850 - Backwall 140 ft 140 0

851 - Abutment Pedestal 30 each 30 0

852 - Pier Pedestal 51 each 51 0

853 - Wingwall 320 ft 320 0

Element Quantities

Page 4 of 35 Format Version 20171005

Page 5: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5BA831 - Steel Beam End 15 each 15 0

BA850 - Backwall 70 ft 70 0

BA851 - Abutment Pedestal 15 each 15 0

BA853 - Wingwall 160 ft 160 0

PR302 - Compression Joint Seal 70 ft 68 2 0

PR313 - Fixed Bearing 19 each 19 0

PR831 - Steel Beam End 15 each 15 0

PR852 - Pier Pedestal 19 each 19 0

12 - Reinforced Concrete Deck 1960 ft2 1568 392 0

107 - Steel Open Girder/Beam 112 ft 100 9 3 0

113 - Steel Stringer 420 ft 336 84 0

152 - Steel Floor Beam 140 ft 112 22 6 0

331 - Reinforced Concrete Bridge Railing 56 ft 56 0

810 - Sidewalk 266 ft2 266 0

811 - Curb 56 ft 56 0

830 - Secondary Members 1 each 1 0

Span Number : 2

PR202 - Steel Column 2 each 1 1 0

515 - Steel Protective Coating 400 ft2 400 0

PR302 - Compression Joint Seal 70 ft 40 30 0

PR313 - Fixed Bearing 32 each 32 0

PR831 - Steel Beam End 64 each 48 16 0

PR852 - Pier Pedestal 32 each 32 0

28 - Steel Deck with Open Grid 5596 ft2 5596 0

29 - Steel Deck with Concrete Filled Grid 909 ft2 909 0

107 - Steel Open Girder/Beam 384 ft 375 9 0

113 - Steel Stringer 2688 ft 2688 0

152 - Steel Floor Beam 700 ft 100 600 0

330 - Metal Bridge Railing 192 ft 192 0

810 - Sidewalk 909 ft2 909 0

811 - Curb 192 ft 192 0

830 - Secondary Members 1 each 1 0

Span Number : 3

EA215 - Reinforced Concrete Abutment 70 ft 70 0

EA220 - Reinforced Concrete Pile/Cap Footing 70 ft 70

EA302 - Compression Joint Seal 70 ft 70 0

EA313 - Fixed Bearing 15 each 15 0

Page 5 of 35 Format Version 20171005

Page 6: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

General Comments

Element** Total Quantity Unit CS-1 CS-2 CS-3 CS-4 CS-5EA800 - Erosion or Scour 70 ft 70 0

EA831 - Steel Beam End 15 each 15 0

EA850 - Backwall 70 ft 70 0

EA851 - Abutment Pedestal 15 each 15 0

EA853 - Wingwall 160 ft 160 0

12 - Reinforced Concrete Deck 1960 ft2 1960 0

510 - Wearing Surfaces 1860 ft2 1674 180 6 0

107 - Steel Open Girder/Beam 112 ft 79 33 0

113 - Steel Stringer 420 ft 420 0

152 - Steel Floor Beam 140 ft 140 0

331 - Reinforced Concrete Bridge Railing 56 ft 46 10 0

810 - Sidewalk 266 ft2 266 0

811 - Curb 56 ft 56 0

830 - Secondary Members 1 each 1 0

Inspection Notes

- The BIN Plate is located on the end face of Pier 1 below Girder G1 and is in good condition.

- The Girders of double leaf bascule Span 2 received 100% hands-on inspection. These girders are non-redundant as thefailure of one girder would result in the collapse of half the span. The floorbeams are spaced less than 12 ft. apart and aretherefore not fracture critical. See Special Emphasis Sketch attached. This bridge is a Complex Bridge with moveable bridgetrunnions located in Span 1 and Span 3 for the bascule in Span 2.

- 100% of the underside of deck of Spans 1 and 3 (Span 2 is an open deck bascule) was visually inspected andapproximately 10% was sounded. There was no loose/delaminated concrete found.

- At Span 3 inside control tower, drain is clogged with water ponding up to 6'. See Photo 24.

- The steel bascule span superstructure is composed of four non-redundant cantilever girders with transverse floorbeamsbetween them. The floorbeams support stringers which in turn, support the open steel grid deck. The middle third of allfloorbeams are reinforced excluding FB1, FB5 and FB6. The bascule 4 girders adjacent to Pier 1 extend over the trunnioninto Span 1 and supports the counter weight adjacent to the Begin Abutment. The bascule girders adjacent to Pier 2 alsoextends into Pier3 over the trunnion and supports the counter weight in Span 3

- All Standard Photos have been updated.

-Quantities may have changed from the original assessment due to field verification.

-Joint Worksheet is attached.

- Noticeable vibration of the superstructure was observed when heavy trucks are crossing the bridge.

- Hydraulics Form is attached

- In the 2015 Report there was CMR issued for the end approach's light pole at the left sidewalk (light pole had its base

** Elements with a prefix designate the locations of BA-Begin Abutment, BW-Begin Wingwall, EA-End Abutment, EW-EndWingwall, CO-Culvert Outlet, and PR-Pier. No prefix generally indicates the element is part of the superstructure.

Page 6 of 35 Format Version 20171005

Page 7: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

access cover ajar), but this condition is not within the bridge limits, and not critical for the public safety, and therefore noNSCO report is needed.

Element Condition Notes

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: 107 - Steel Open Girder/Beam 112 100 9 3 0 0

Referenced Photo(s): 1Condition State 3 Note

Referenced Sketch(es): None

Span 1 Girder G2 exhibit a corroded hole in the top flange of Girder G2 measuring approximately 3'L x 3"W. This girder israted in Span 1 but is part of the bascule.

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: 152 - Steel Floor Beam 140 112 22 6 0 0

Referenced Photo(s): 2, 3, 4, 5, 6Condition State 3 Note

Referenced Sketch(es): None

Floorbeam 1, at Span 1 right side looking back at 3" x 2" hole in the bottom of the web (Photo 2).Floorbeam 2, at Span 1 between Girder 1 and Girder 2, near bearing under Stringer 8, exhibits 2 holes (4” x 3” and 3” x 2”) inthe web. Bearing under Stringer S8 exhibits 20% loss of bearing area (Photos 4, 5).Floorbeam 2, at Span 1 between Girder 1 and Girder 2, under Stringer 3, exhibits 1 hole in the web. Web was reinforced(Photo 3).Floorbeam 2, at Span 1 between Girder 4 and right side looking ahead at hole in the web (Photo 6)

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: BA302 - Compression Joint Seal 70 0 70 0 0 0

Referenced Photo(s): 8, 10Condition State 2 Note

Referenced Sketch(es): None

Begin Abutment joint sealant is shredded throughout the entire joint on both sides of the roadway (Photo 8). The underside ofthe joint shows no signs of leakage (Photo 10).Since there is no signs of leakage, the joint is functioning as design. The jointis therefore rated CS-2.

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: PR302 - Compression Joint Seal 70 0 68 2 0 0

Referenced Photo(s): 8Condition State 3 Note

Referenced Sketch(es): None

The left side of Pier 1 armor angle exhibit a 2' missing section on the begin side of the joint. The concrete header on bothsides of the angle is in ralatively good condition.

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 1: BA800 - Erosion or Scour 70 70 0 0 0 0

Referenced Photo(s): NoneCondition State 3 Note

Referenced Sketch(es): None

The Begin Abutment joint sealant for the steel armor angle is shredded on both sides of theroadway. Underdeck below joint does not exhibit any signs of water leakage.

Page 7 of 35 Format Version 20171005

Page 8: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 2: 107 - Steel Open Girder/Beam 384 375 9 0 0 0

Referenced Photo(s): 20Condition State 2 Note

Referenced Sketch(es): None

The bottom portion of the web plate for G3 exhibits pitting up to 1/4" D adjacent to Piers 1 and 2 (Photo 5). This is a typicalcondition at the begin and end portions of the girders for Span 2.

Additionally, above the G3 to FB2 gusset plate connection, there is up to 1/8" D pitting loss. This pitting above the gussetplate is typical for all the web plates for all girders in Span 2 (Photo 20).

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 2: 152 - Steel Floor Beam 700 100 0 600 0 0

Referenced Photo(s): 13, 14, 15, 16, 17, 18, 19Condition State 3 Note

Referenced Sketch(es): None

The steel bascule span superstructure is composed of four non-redundant cantilever girders with transverse floorbeamsbetween them. The floorbeams support stringers which in turn, support the open steel grid deck.

The middle third of all floorbeams are reinforced excluding FB1, FB5 and FB6.

The bottom flange of Floorbeam 5 adjacent to the connection to Girder G1 exhibits a 10" x 4" through hole on the begin sideof the flange angle (Photo 4). Also, one of two stiffeners for Floorbeam 5, near Girder 1, exhibits 100% section loss (Seephoto 16).

Connection plate for Girder 4 to Floorbeam 5 exhibits hole approximately 3” diameter (See photos 18 & 19).

Three out of six intermediate stiffeners at the begin side of Floorbeam 6, between Girders 3 and 4, exhibit 100% section loss(See photo 17). One out of six intermediate stiffeners at the end side of Floorbeam 6 exhibits 100% section loss.

FB 8's right cantilever web exhibits perforated through holes, ½” and 1 ½”, which carries the sidewalk above (Photo 21).

FB 1 and FB10 along Pier 1 and Pier 2 respectively, the bottom flange exhibit several corrosion holes and section loss along80% of the floorbeam (Photo )

FB10's right cantilever web exhibits perforated through holes (two 3” diameter) and, section loss at the connection to thefascia stringer, which carries the sidewalk above (Photo 20).

The bottom portion of the web plate for G3 exhibits pitting up to 1/4" D adjacent to Piers 1 and 2 (Photo 5). This is a typicalcondition at the begin and end portions of the girders for Span 2.

Additionally, above the G3 to FB2 gusset plate connection, there is up to 1/8" D pitting loss. This pitting above the gussetplate is typical for all the web plates for all girders in Span 2 (Photo 8).

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 2: PR202 - Steel Column 2 1 1 0 0 0

Referenced Photo(s): 11, 12Condition State 2 Note

Referenced Sketch(es): None

Pier 2 built up steel column behind the concrete stem on Span 3 side (End/right column) exhibits up to 1/4" D pitting on itsright flange face with a corroded through hole approximately 18" down from the top of the column. No distress is visible.

Page 8 of 35 Format Version 20171005

Page 9: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 3: 12 - Reinforced Concrete Deck-510 - Wearing Surfaces 1860 1674 180 6 0 0

Referenced Photo(s): 21, 22, 23Condition State 3 Note

Referenced Sketch(es): None

Span 3 wearing surface on the right side of the NB roadway median exhibits 4 shallow 1SF potholes and uneven patchedasphalt pavement. The wearing surface on the left side of the NB roadway median exhibit 2 SF shallow pothole. The remainder of the pavement is in fair to good condition.

TQ CS-1 CS-2 CS-3 CS-4 CS-5Span 3: EA302 - Compression Joint Seal 70 0 70 0 0 0

Referenced Photo(s): 21, 23, 25Condition State 2 Note

Referenced Sketch(es): None

The End Abutment joint sealant for the steel armor angle is shredded on both sides of the roadway. Underdeck below jointdoes not exhibit any signs of water leakage.

Page 9 of 35 Format Version 20171005

Page 10: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671- (02).JPGPhoto Number: 1 Photo Filename:

Attachment Description:Span 1 looking back atdeteriorated bottom flangeof Girder G2

2066671- (04).JPGPhoto Number: 2 Photo Filename:

Attachment Description:Span 1 right side lookingback at corrosion hole in thebottom web of FloorbeamFB1 adjacent to the stiffener

Inspection Photographs

Page 10 of 35 Format Version 20171005

Page 11: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671- (06).JPGPhoto Number: 3 Photo Filename:

Attachment Description:Span 1 left side lookingahead at corrosion hole inthe bottom web ofFloorbeam FB2

2066671- (07).JPGPhoto Number: 4 Photo Filename:

Attachment Description:Span 1 looking ahead atcorrosion hole FloorbeamFB2 adjacent to Girder G2

Page 11 of 35 Format Version 20171005

Page 12: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671- (08).JPGPhoto Number: 5 Photo Filename:

Attachment Description:Span 1 left side betweenFloorbeams FB1 and FB2looking right

2066671- (11).JPGPhoto Number: 6 Photo Filename:

Attachment Description:Span 1 right cantileversection looking ahead atsection loss and corrosionhole at the bottom ofFloorbeam FB2 web

Page 12 of 35 Format Version 20171005

Page 13: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671- (13).JPGPhoto Number: 7 Photo Filename:

Attachment Description:Span 1 behind Pier 1between Girder G3 and G4looking right at hole in thegusset plate of the basculelift mechanism

IMG_0013.JPGPhoto Number: 8 Photo Filename:

Attachment Description:Begin Abutment jointlooking right at shreddedjoint seal throughout entirejoint

Page 13 of 35 Format Version 20171005

Page 14: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0015.JPGPhoto Number: 9 Photo Filename:

Attachment Description:Pier 1 joint looking right atbroken and missing sectionof armor angle on left sideof the span

2066671- (01).JPGPhoto Number: 10 Photo Filename:

Attachment Description:Begin Abutment looking leftshowing no signs of leakagefrom joint above

Page 14 of 35 Format Version 20171005

Page 15: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0140.JPGPhoto Number: 11 Photo Filename:

Attachment Description:Span 2 right column lookingup and left at 1.5" dia holein the top section of the builtup steel column

IMG_0139.JPGPhoto Number: 12 Photo Filename:

Attachment Description:Span 2 right column lookingup and left at 1.5" dia holein the top section of the builtup steel column (Close upview).

Page 15 of 35 Format Version 20171005

Page 16: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0105.JPGPhoto Number: 13 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB5 adjacent toGirder G1 looking at hole inthe bottom flange

IMG_0107.JPGPhoto Number: 14 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB5 adjacent toGirder G1 looking at hole inthe bottom flange (Close upview).

Page 16 of 35 Format Version 20171005

Page 17: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0103.JPGPhoto Number: 15 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB5 betweenGirders G2 and G3 lookingback at holes in the bottomof the built up stiffener

IMG_0102.JPGPhoto Number: 16 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB6 adjacent toGirder G2 looking ahead athole in the bottom built upstiffener

Page 17 of 35 Format Version 20171005

Page 18: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0104.JPGPhoto Number: 17 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB6 betweenGirders G2 and G4 lookingright at hole in the bottombuilt up stiffener

IMG_0115.JPGPhoto Number: 18 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB10 betweenGirders G1 and G4 lookingahead and left at hole in thebottom flange built upstiffener

Page 18 of 35 Format Version 20171005

Page 19: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0129.JPGPhoto Number: 19 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Floorbeam FB10 rightcantilever looking ahead athole in the bottom of theweb.

IMG_0123.JPGPhoto Number: 20 Photo Filename:

Attachment Description:Span 2 (Bascule Span)Girder G3 looking aheadand left at section lossadjacent to the connectionplate

Page 19 of 35 Format Version 20171005

Page 20: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0020a.JPGPhoto Number: 21 Photo Filename:

Attachment Description:Span 3 wearing surfacelooking back at 2 potholeson left side of the SBroadway median.

IMG_0021a.JPGPhoto Number: 22 Photo Filename:

Attachment Description:Span 3 wearing surfacelooking back and right at 2uneven asphalt patches andshallow potholes on rightside of the SB roadwaymedian.

Page 20 of 35 Format Version 20171005

Page 21: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

IMG_0016.JPGPhoto Number: 23 Photo Filename:

Attachment Description:End Abutment joint andwearing surface lookingright at shallow potholes

2066671- (24).JPGPhoto Number: 24 Photo Filename:

Attachment Description:Span 3 looking back and leftinside the enclosed spanshowing approximately 6'deep water

Page 21 of 35 Format Version 20171005

Page 22: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671- (20).JPGPhoto Number: 25 Photo Filename:

Attachment Description:End Abutment looking leftshowing no signs of leakagefrom joint above

2066671- (19).JPGPhoto Number: 26 Photo Filename:

Attachment Description:Span 1 looking ahead andleft at solid stem concretePier 1 and the columnssupporting the trunnion forthe bascule

Page 22 of 35 Format Version 20171005

Page 23: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671-PhotoLocPlan.jpgSketch Filename:1Sketch Number:

Sketch Description: Photo Location Sketch

Inspection Sketches

Page 23 of 35 Format Version 20171005

Page 24: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671-SpecialEmphasisSketch.jpgSketch Filename:2Sketch Number:

Sketch Description: Special Emphasis Sketch

Page 24 of 35 Format Version 20171005

Page 25: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671_Page_1.jpgSketch Filename:3Sketch Number:

Sketch Description: Joint Report 1

Page 25 of 35 Format Version 20171005

Page 26: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671_Page_2.jpgSketch Filename:4Sketch Number:

Sketch Description: Joint Report 2

Page 26 of 35 Format Version 20171005

Page 27: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671 Stream Hydraulics Defect History.jpgSketch Filename:5Sketch Number:

Sketch Description: Steam Hydraulic Defects

Page 27 of 35 Format Version 20171005

Page 28: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

2066671_LOCATION_MAP.JPG

2066671_QUAD_MAP.JPG

Standard Photographs

Page 28 of 35 Format Version 20171005

Page 29: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

AbutmentBegin.JPG

AbutmentEnd.JPG

Page 29 of 35 Format Version 20171005

Page 30: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

ApproachBegin.JPG

ApproachEnd.JPG

Page 30 of 35 Format Version 20171005

Page 31: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

ElevationLeft.JPG

ElevationRight.JPG

Page 31 of 35 Format Version 20171005

Page 32: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

F2CrossedSpan2Left.JPG

F2CrossedSpan2Right.JPG

Page 32 of 35 Format Version 20171005

Page 33: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

FramingSpan2.JPG

Pier1.JPG

Page 33 of 35 Format Version 20171005

Page 34: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

Pier1Trunnion.JPG

Pier2.JPG

Page 34 of 35 Format Version 20171005

Page 35: New York State Department of Transportation General Bridge ... · 10/6/2017  · 10/02/2017 08:00 AM 12:00 PM 73 SUNNY ... PM 73 SUNNY 10/06/2017 08:00 AM 12:00 PM 81 SUNNY Inspection

BIN: 2066671 Bridge Inspection ReportInspection Date: October 06, 2017

VCF2CrossedNB.JPG

WingwallBeginLeft.JPG

Page 35 of 35 Format Version 20171005