PAGE 1 WHEATLAND WIND PROJECT DECEMBER 2016 • NEWSLETTER #2 WHEATLAND WIND PROJECT Privacy Commitment: WWLP is committed to protecting your privacy. Collected personal information will be protected under the provincial Personal Information Protection Act (PIPA). As part of the regulatory process for new generation projects, WWLP may be required to provide your personal information to Alberta Utilities Commission (AUC). For more information about how WWLP protects your personal information, visit our website at www.wheatlandwind.com or contact us directly via phone toll-free at 1.888.270.5743. Wheatland Wind Project LP, by its general partner Wheatland Wind Project Ltd. Suite #124 #100, 111 – 5 Ave SW Calgary, AB T2P 3Y6 CONTACT US Dan Tocher Stakeholder Relations Manager Email: [email protected] Toll Free: 1.888.270.5743 Web: www.wheatlandwind.com IN THIS NEWSLETTER, YOU WILL FIND INFORMATION ON: • Project Layout uPdates • community Fund and invoLvement • your Questions answered • next stePs in the aLberta utiLities commission (auc) Process INSERT TO THIS NEWSLETTER INCLUDES: • ProPosed Project maP #2 • Project Layout comParison INTRODUCTION Wheatland Wind Project LP (WWLP) would like to thank everyone for your attendance at our open house on October 24, 2016 and for your continued feedback on the Wheatland Wind Project (Project). We greatly value our relationship with the local communities and appreciate your continued interest in the Project. Over the last few weeks, we received a lot of great feedback from stakeholders that we have incorporated into the latest Project design. This newsletter will provide you with an update on these changes and next steps for the Project. COMMUNITY FUND AND INVOLVEMENT WWLP is pleased to announce that it is currently in the process of setting up a community development fund for the Project. Once under construction, WWLP will provide the community with a funding commitment through the Project life, and will work with existing community representatives to support local initiatives and projects. More details on the fund will be shared with the community as the Project progresses. This community development fund will be in addition to the municipal tax revenues generated by the Project. WWLP is also interested in supporting local events and activities in the community. Please let WWLP know if there are any ways that we can support local initiatives in the community. PROJECT LAYOUT UPDATES Seven wind turbine locations have been removed (15, 31, 47, 48, 49, 50 and 51) due to concerns that were expressed by landowners and to accommodate updated constraints. Twelve wind turbine locations (10, 23, 16, 17, 18, 19, 24, 32, 41, 42, 45 and 46) have slightly moved on various quarter sections to accommodate updated constraints. The Project will now include the installation of up to 41 wind turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as an insert to this newsletter. Proposed Project Map #2 shows the updated layout for the wind turbines, Project substation, O&M building, access roads and underground / above ground collector system. december 2016 • newsLetter #2 ABOUT US Wheatland Wind Project LP (WWLP) is a partnership between Potentia Renewables Inc. and Greengate Power Corporation. Potentia Renewables Inc. is an independent power producer focused on developing, managing and operating renewable energy systems. Potentia Renewables Inc. is a wholly owned subsidiary of Power Corporation of Canada, a diversified international management and holding company. Greengate Power Corporation is a leading renewable energy company based in Calgary, Alberta. To date, Greengate has successfully developed 450 MW of operating wind projects in Alberta. These projects represent over 30% of the wind energy generated in Alberta and provide a clean source of energy to approximately 200,000 homes. NEXT STEPS WWLP will continue to engage in public consultation with stakeholders in the surrounding area. WWLP is committed to engaging landowners, public stakeholders and potentially affected Aboriginal communities about the Project. After receiving feedback from stakeholders following this mailout, WWLP intends to file a wind power plant application with the Alberta Utilities Commission (AUC) in early 2017. WWLP is committed to sharing information about the Project and working with the public to ensure that stakeholder input and concerns are heard and addressed. Stakeholders are encouraged to participate throughout this process. We hope you will contact us if you have any questions or concerns or if you would like to meet to discuss the Project. A summary of stakeholder comments will be incorporated into the wind power plant application we submit to the AUC. To learn more about the application and review process, please contact the AUC at: Phone: 780-427-4903 (toll-free by dialing 310-0000 before the number) email: consum[email protected]

NEXT STEPS WHEATLAND WiND ProjEcT iNTroDUcTioN iN THiS ...€¦ · turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NEXT STEPS WHEATLAND WiND ProjEcT iNTroDUcTioN iN THiS ...€¦ · turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as

PAGE 1WHEATLAND WiND ProjEcT DECEMBER 2016 • NEWSLETTER #2

WHEATLAND WiND ProjEcT

Privacy commitment: WWLP is committed to protecting your privacy. Collected personal information will be protected under the provincial Personal Information Protection Act (PIPA). As part of the regulatory process for new generation projects, WWLP may be required to provide your personal information to Alberta Utilities Commission (AUC). For more information about how WWLP protects your personal information, visit our website at www.wheatlandwind.com or contact us directly via phone toll-free at 1.888.270.5743.

Wheatland Wind Project LP, by its general partner Wheatland Wind Project Ltd.

Suite #124 #100, 111 – 5 Ave SWCalgary, AB T2P 3Y6

coNTAcT USDan Tocher Stakeholder Relations ManagerEmail: [email protected] Free: 1.888.270.5743Web: www.wheatlandwind.com

iN THiS NEWSLETTEr,yoU WiLL FiNDiNFormATioN oN:•ProjectLayoutuPdates

•communityFundandinvoLvement

•yourQuestionsanswered

•nextstePsintheaLbertautiLitiescommission(auc)Process

iNSErT To THiS NEWSLETTEr iNcLUDES:•ProPosedProjectmaP#2

•ProjectLayoutcomParison

iNTroDUcTioN Wheatland Wind Project LP (WWLP) would like to thank everyone for your attendance at our open house on October 24, 2016 and for your continued feedback on the Wheatland Wind Project (Project). We greatly value our relationship with the local communities and appreciate your continued interest in the Project.

Over the last few weeks, we received a lot of great feedback from stakeholders that we have incorporated into the latest Project design. This newsletter will provide you with an update on these changes and next steps for the Project.

commUNiTy FUND AND iNVoLVEmENT WWLP is pleased to announce that it is currently in the process of setting up a community development fund for the Project. Once under construction, WWLP will provide the community with a funding commitment through the Project life, and will work with existing community representatives to support local initiatives and projects. More details on the fund will be shared with the community as the Project progresses. This community development fund will be in addition to the municipal tax revenues generated by the Project. WWLP is also interested in supporting local events and activities in the community. Please let WWLP know if there are any ways that we can support local initiatives in the community.

ProjEcT LAyoUT UPDATES Seven wind turbine locations have been removed (15, 31, 47, 48, 49, 50 and 51) due to concerns that were expressed by landowners and to accommodate updated constraints. Twelve wind turbine locations (10, 23, 16, 17, 18, 19, 24, 32, 41, 42, 45 and 46) have slightly moved on various quarter sections to accommodate updated constraints.

The Project will now include the installation of up to 41 wind turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as an insert to this newsletter. Proposed Project Map #2 shows the updated layout for the wind turbines, Project substation, O&M building, access roads and underground / above ground collector system.

december2016•newsLetter#2

ABoUT USWheatland Wind Project LP (WWLP) is a partnership between Potentia Renewables Inc.

and Greengate Power Corporation.

Potentia Renewables Inc. is an independent power producer focused on developing,

managing and operating renewable energy systems. Potentia Renewables Inc. is a wholly

owned subsidiary of Power Corporation of Canada, a diversified international management

and holding company.

Greengate Power Corporation is a leading renewable energy company based in Calgary,

Alberta. To date, Greengate has successfully developed 450 MW of operating wind projects

in Alberta. These projects represent over 30% of the wind energy generated in Alberta and

provide a clean source of energy to approximately 200,000 homes.

NEXT STEPS

WWLP will continue to engage in public consultation with stakeholders in the surrounding area. WWLP is committed to engaging landowners, public stakeholders and potentially affected Aboriginal communities about the Project.

After receiving feedback from stakeholders following this mailout, WWLP intends to file a wind power plant application with the Alberta Utilities Commission (AUC) in early 2017. WWLP is committed to sharing information about the Project and working with the public to ensure that stakeholder input and concerns are heard and addressed.

Stakeholders are encouraged to participate throughout this process. We hope you will contact us if you have any questions or concerns or if you would like to meet to discuss the Project. A summary of stakeholder comments will be incorporated into the wind power plant application we submit to the AUC.

To learn more about the application and review process, please contact the AUC at: Phone:780-427-4903(toll-freebydialing310-0000beforethenumber)email:[email protected]

Page 2: NEXT STEPS WHEATLAND WiND ProjEcT iNTroDUcTioN iN THiS ...€¦ · turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as

PAGE 3WHEATLAND WiND ProjEcT DECEMBER 2016 • NEWSLETTER #2PAGE 2 WHEATLAND WiND ProjEcTDECEMBER 2016 • NEWSLETTER #2

Q: howdowindturbineswork?A: Wind turbines work on the same principle that allows airplanes to fly. The wind doesn’t push the blades, but passes

over them. The resulting pressure difference between the upper and lower surfaces creates lift, which causes the rotor to turn. As the blades of a wind turbine turn, the kinetic energy of the wind is converted into mechanical energy, which is transmitted through a drive shaft to an electrical generator in the nacelle. The resulting electrical current travels via underground and overhead cables to a substation, where it is converted to a higher voltage for the larger electricity transmission or distribution grid. From there, it’s delivered to the electric utility and customers. Continuous innovation and reduction in costs has made wind energy one of the most economic sources of large-scale electricity generation.

Q: wheredoestheelectricitygo?A: The electricity from the Project will be sent to the Alberta Interconnected Electric System (AIES) via a new

138 kilovolt (kV) overhead transmission line built from the proposed Project substation to the existing ATCO Electric 7L85 located within the Project boundary. The interconnection from the proposed Project substation to the AIES will be managed by ATCO Electric. The Alberta Electric System Operator (AESO) manages the AIES.

Q: dowindturbinesproducesound?A: Yes, wind turbines produce sound. The Project is designed so that any sound generated by the wind turbines is

within regulations set out by the AUC. The night-time permissible sound level to a residence in a quiet rural area is defined by AUC Rule 012 as 40 dBA of cumulative sound including the Project, ambient sound levels and adjacent energy industry facilities.

Forreference:

50 dBA is the sound level inside an average urban home. 40 dBA is similar to the typical sound in a library 35 dBA is the average background sound level in rural Alberta

Q: whatconstraintsdidyouconsiderwhendesigningtheProject?A: WWLP considered numerous constraints in the design of the Project such as setbacks from roads, land boundaries

and environmental features. We also accounted for noise, shadow flicker and landowner preferences. The Project was designed to comply with all regulations and rules in Alberta for wind energy development.

Q: howlongistheconstructionphaseandhowwillwwLPmanageextranoise,trafficanddust?A: The construction period is expected to last twelve months. During this time, there will be an increase in construction

traffic. Access to the Project will be through Highway 56 and existing local roads. We will work closely with the Wheatland County to ensure dust mitigation measures are in place and impact on local residences is kept to a minimum.

Q: howwillthisimpactPropertyvalues?A: Multiple studies have consistently found that wind energy projects do not negatively impact property values. In fact,

wind energy projects provide new sources of stable revenue for municipalities and landowners in the form of taxes and lease payments. Pleasevisitourwebsite:www.wheatlandwind.comandcanwea’swebsite:www.canwea.caforalinktostudiesonpropertyvalues.

yoUr QUESTioNS ANSWErEDQ: dowindturbineshaveahealthimpact?A: Numerous independent reviews and studies conclude that wind turbines are not harmful to human health – in fact,

wind energy reduces harmful air emissions and creates no harmful waste products when compared with other sources of electricity.

Forfurtherinformation,pleasevisit:www.canwea.ca/wind-facts/your-health

Q: whathappensafter20+years?A: Most wind energy projects are designed to last at least 25 years and it’s entirely possible that the equipment could

be replaced at the end of its design life and the Project could be re-energized. However, if at the time it makes sense to decommission the Project, the salvage value of materials typically offsets the costs of decommissioning. WWLP will be responsible for decommissioning the Project.

Q: howwillthisimpacttheenvironment?A: All wind energy projects must follow Alberta Environment and Parks (AEP) guidelines, “Wildlife Guidelines for Alberta

Wind Energy Projects – Government of Alberta – Fish and Wildlife Division – Sustainable Resource Development, September 19, 2011”. The guidelines outline requirements to avoid and mitigate environmental impacts. We are completing environmental studies to ensure we minimize the potential impacts of our Project and meet setbacks from environmental features wherever possible.

Pleasevisitourwebsite:www.wheatlandwind.comforlinkstostudiesaboutwindenergyandwildlife.

Q: howmanyjobswillbecreatedduringconstruction?A: During peak construction, there will be over 100 jobs created.

Q: willthewindturbineshavelights?A: In general, met towers, cell phone towers and wind turbines may be difficult for pilots to see if they are unmarked.

Transport Canada and NAV Canada require lighting on tall structures including wind turbines. The Project will be lit according to the Transport Canada and Nav Canada rules.

Pleasevisitourwebsite:www.wheatlandwind.comforalinktotherules.oralternativelytheycanbefoundonthetransportcanadawebsite:www.tc.gc.ca.

Q: howwillcropsprayingbeimpacted?A: Spray planes can operate near and around wind energy projects. Spray planes typically operate in low wind or calm

conditions. We will work to ensure reasonable arrangements can be made when spraying is scheduled.

Q: howwillthewindturbinesimpactmyview?A: We understand the visual impact of wind turbines is a concern to some stakeholders. We have sited wind turbines

with the intent of reducing noise and visual impacts to residences in the area. A series of visual simulations of the Project were shown at the open house to show what the Project will look like from various locations.

Pleasevisitourwebsite:www.wheatlandwind.comforalinktothesevisualsimulations.

Page 3: NEXT STEPS WHEATLAND WiND ProjEcT iNTroDUcTioN iN THiS ...€¦ · turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as

41 Turbine

ProPosed Project MaP #2

")

!(

!(!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!( !(!(

!(!( !(

!(!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

")

")

")

")")

")

") ")

")

")

")

")")

") ")

")")")

")

")")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")

")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

17

20

7 8

17

3133 35

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

1

12

19

24

9 11

19

34 36

13

36

16

26

31

36

8

1316

20

26

29

6

32

22

2

18

29

18

18

5

18

27

25

28

10

30

32

29

25

17

25

30

21

32

23

3634

24

15

14

31

24

20

25

7

17

19

28

32

31

29

1

13

1

2 3 45 6 7

8 910 11

12

13

14

16

17

1819

2021

23

24 25

26

27

28

29 30

32

35

36

37

3839

40

41 4243

44

45 46

ÃÆ

564

ÃÆ

848

Ran

ge R

oad

184

Highway 564

Ran

ge R

oad

175

Ran

ge R

oad

182

Township Road 260

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Hig

hway

848

Ran

ge R

oad

180

Township Road 262

Township Road 263

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

")Proposed Project Substationand Proposed O&M Building

Potential Underground or Above Ground Collector (34 kV)

Potential New Road

") Residence

!(Existing Turbine (WinteringHills)

Minor Highway

Paved Road

Unpaved Road

Township Line

Section Line

T.25

T.26

R.18 R.17 W4M

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

0 1 20.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProposed Project Map #2

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:70,000

")

!(

!(!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!( !(!(

!(!( !(

!(!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

")

")

")

")")

")

") ")

")

")

")

")")

") ")

")")")

")

")")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")

")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

17

20

7 8

17

3133 35

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

1

12

19

24

9 11

19

34 36

13

36

16

26

31

36

8

1316

20

26

29

6

32

22

2

18

29

18

18

5

18

27

25

28

10

30

32

29

25

17

25

30

21

32

23

3634

24

15

14

31

24

20

25

7

17

19

28

32

31

29

1

13

1

2 3 45 6 7

8 910 11

12

13

14

16

17

1819

2021

23

24 25

26

27

28

29 30

32

35

36

37

3839

40

41 4243

44

45 46ÃÆ

564

ÃÆ

848

Ran

ge R

oad

184

Highway 564

Ran

ge R

oad

175

Ran

ge R

oad

182

Township Road 260

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Hig

hway

848

Ran

ge R

oad

180

Township Road 262

Township Road 263

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

")Proposed Project Substationand Proposed O&M Building

Potential Underground or Above Ground Collector (34 kV)

Potential New Road

") Residence

!(Existing Turbine (WinteringHills)

Minor Highway

Paved Road

Unpaved Road

Township Line

Section Line

T.25

T.26

R.18 R.17 W4M

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

0 1 20.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProposed Project Map #2

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:70,000

")

!(

!(!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!( !(!(

!(!( !(

!(!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

")

")

")

")")

")

") ")

")

")

")

")")

") ")

")")")

")

")")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")

")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

17

20

7 8

17

3133 35

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

1

12

19

24

9 11

19

34 36

13

36

16

26

31

36

8

1316

20

26

29

6

32

22

2

18

29

18

18

5

18

27

25

28

10

30

32

29

25

17

25

30

21

32

23

3634

24

15

14

31

24

20

25

7

17

19

28

32

31

29

1

13

1

2 3 45 6 7

8 910 11

12

13

14

16

17

1819

2021

23

24 25

26

27

28

29 30

32

35

36

37

3839

40

41 4243

44

45 46ÃÆ

564

ÃÆ

848

Ran

ge R

oad

184

Highway 564

Ran

ge R

oad

175

Ran

ge R

oad

182

Township Road 260

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Hig

hway

848

Ran

ge R

oad

180

Township Road 262

Township Road 263

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

")Proposed Project Substationand Proposed O&M Building

Potential Underground or Above Ground Collector (34 kV)

Potential New Road

") Residence

!(Existing Turbine (WinteringHills)

Minor Highway

Paved Road

Unpaved Road

Township Line

Section Line

T.25

T.26

R.18 R.17 W4M

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

0 1 20.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProposed Project Map #2

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:70,000

Note: turbine numbers are not in sequential order

Date: 2016-11-29

Page 4: NEXT STEPS WHEATLAND WiND ProjEcT iNTroDUcTioN iN THiS ...€¦ · turbines instead of 48 wind turbines. These changes are outlined on the Project Layout Comparison Map included as

Project Layout coMParison MaP

")

!(

!(

!( !(

!(!(

!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(!(

!(

!( !(!(

!( !( !(

!( !(!( !(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

!(D

!(D

!(D

!(D!(D

!(D!(D

")

")")

")")")

") ")

")

")

")

")")

") ")

")")")

")

") ")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

7 8

22 23

26

33 35

2

17

20 23

26

34

4

7 8

1617

21 23

31 33

1

33 35

236

812

15

19

252730

34 35

135

8 10

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

26

33

24

10

1415

23

26

34

14

12

22

27

34 35

13

12

15

22 23

34

3

11

2

19

9

32

7 9

24

9 11

19

2

19

22

28

9

2

34 36

4

7

13

20 23

27

11

1316

21

35

3

16

21

6

9

1416

24

26

36

10

24

2629

33 36

6

16

26

31

36

8

1316

20

26

30

10

15

22

29

33

36

22

28

32 35

22

2

18

29

11

21

9

18

2

2

18

18

28

5

15

18

27

25

28

36

7

35

28

1011

30

32

29

5

11

33

27

3

3

25

28

4

34

20

4

17

6

14

10

26

13

34

12

25

11

30

10

21

32

23

35

36

29

5

34

21

1

24

31

8

16

27

12

17

31

11 12

15

1

22

25

27

14

27

32

28

14

31

1417

24

24

10

28

5

11

14

20

15

25

7

17

10

19 21

9

4

18

28

32

13

9

31

29

1

16

131415

23

33

1

2 3 4 56 7

8 9 10 1112 13 14

16

17

1819

2021

23

24

25

26

27

28

2930

32

35

36

37

38

39

40

41 4243

44

45

46

15

31

47

48 49

50

51

ÃÆ

564

ÃÆ

848

Township Road 260Highway 564

Ran

ge R

oad

191

Township Road 263

Ran

ge R

oad

175

Ran

ge R

oad

174

Ran

ge R

oad

182

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Township Road 270

Ran

ge R

oad

180

Township Road 262

Hig

hway

848

Red Deer River

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

!( Previous Location *

!(D Removed Turbine *Previous Project Boundary *

")Proposed Project Substationand Proposed O&M Building

") Residence

!(Existing Turbine (WinteringHills)Minor HighwayPaved RoadUnpaved RoadTownship Line

Section Line

T.25

T.26

R.18 R.17 W4MR.19

T.27

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

* Changes compared to Proposed Project Mapdated 2016-10-05

0 1 2 30.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProject Layout Comparison

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:80,000

")

!(

!(

!( !(

!(!(

!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(!(

!(

!( !(!(

!( !( !(

!( !(!( !(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

!(D

!(D

!(D

!(D!(D

!(D!(D

")

")")

")")")

") ")

")

")

")

")")

") ")

")")")

")

") ")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

7 8

22 23

26

33 35

2

17

20 23

26

34

4

7 8

1617

21 23

31 33

1

33 35

236

812

15

19

252730

34 35

135

8 10

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

26

33

24

10

1415

23

26

34

14

12

22

27

34 35

13

12

15

22 23

34

3

11

2

19

9

32

7 9

24

9 11

19

2

19

22

28

9

2

34 36

4

7

13

20 23

27

11

1316

21

35

3

16

21

6

9

1416

24

26

36

10

24

2629

33 36

6

16

26

31

36

8

1316

20

26

30

10

15

22

29

33

36

22

28

32 35

22

2

18

29

11

21

9

18

2

2

18

18

28

5

15

18

27

25

28

36

7

35

28

1011

30

32

29

5

11

33

27

3

3

25

28

4

34

20

4

17

6

14

10

26

13

34

12

25

11

30

10

21

32

23

35

36

29

5

34

21

1

24

31

8

16

27

12

17

31

11 12

15

1

22

25

27

14

27

32

28

14

31

1417

24

24

10

28

5

11

14

20

15

25

7

17

10

19 21

9

4

18

28

32

13

9

31

29

1

16

131415

23

33

1

2 3 4 56 7

8 9 10 1112 13 14

16

17

1819

2021

23

24

25

26

27

28

2930

32

35

36

37

38

39

40

41 4243

44

45

46

15

31

47

48 49

50

51

ÃÆ

564

ÃÆ

848

Township Road 260Highway 564

Ran

ge R

oad

191

Township Road 263

Ran

ge R

oad

175

Ran

ge R

oad

174

Ran

ge R

oad

182

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Township Road 270

Ran

ge R

oad

180

Township Road 262

Hig

hway

848

Red Deer River

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

!( Previous Location *

!(D Removed Turbine *Previous Project Boundary *

")Proposed Project Substationand Proposed O&M Building

") Residence

!(Existing Turbine (WinteringHills)Minor HighwayPaved RoadUnpaved RoadTownship Line

Section Line

T.25

T.26

R.18 R.17 W4MR.19

T.27

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

* Changes compared to Proposed Project Mapdated 2016-10-05

0 1 2 30.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProject Layout Comparison

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:80,000

turBines cHanGed

cHanGe WHen

10, 16, 17, 18, 19, 23, 24, 41, 42,

45, 46

MovedAfter Newsletter 1

and Before Open House

15 RemovedAfter Newsletter 1

and Before Open House

32 Moved After Open House

31, 47, 48, 49, 50, 51 Removed After Open House

")

!(

!(

!( !(

!(!(

!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(!(

!(

!( !(!(

!( !( !(

!( !(!( !(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

!(D

!(D

!(D

!(D!(D

!(D!(D

")

")")

")")")

") ")

")

")

")

")")

") ")

")")")

")

") ")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

7 8

22 23

26

33 35

2

17

20 23

26

34

4

7 8

1617

21 23

31 33

1

33 35

236

812

15

19

252730

34 35

135

8 10

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

26

33

24

10

1415

23

26

34

14

12

22

27

34 35

13

12

15

22 23

34

3

11

2

19

9

32

7 9

24

9 11

19

2

19

22

28

9

2

34 36

4

7

13

20 23

27

11

1316

21

35

3

16

21

6

9

1416

24

26

36

10

24

2629

33 36

6

16

26

31

36

8

1316

20

26

30

10

15

22

29

33

36

22

28

32 35

22

2

18

29

11

21

9

18

2

2

18

18

28

5

15

18

27

25

28

36

7

35

28

1011

30

32

29

5

11

33

27

3

3

25

28

4

34

20

4

17

6

14

10

26

13

34

12

25

11

30

10

21

32

23

35

36

29

5

34

21

1

24

31

8

16

27

12

17

31

11 12

15

1

22

25

27

14

27

32

28

14

31

1417

24

24

10

28

5

11

14

20

15

25

7

17

10

19 21

9

4

18

28

32

13

9

31

29

1

16

131415

23

33

1

2 3 4 56 7

8 9 10 1112 13 14

16

17

1819

2021

23

24

25

26

27

28

2930

32

35

36

37

38

39

40

41 4243

44

45

46

15

31

47

48 49

50

51

ÃÆ

564

ÃÆ

848

Township Road 260Highway 564

Ran

ge R

oad

191

Township Road 263

Ran

ge R

oad

175

Ran

ge R

oad

174

Ran

ge R

oad

182

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Township Road 270

Ran

ge R

oad

180

Township Road 262

Hig

hway

848

Red Deer River

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

!( Previous Location *

!(D Removed Turbine *Previous Project Boundary *

")Proposed Project Substationand Proposed O&M Building

") Residence

!(Existing Turbine (WinteringHills)Minor HighwayPaved RoadUnpaved RoadTownship Line

Section Line

T.25

T.26

R.18 R.17 W4MR.19

T.27

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

* Changes compared to Proposed Project Mapdated 2016-10-05

0 1 2 30.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProject Layout Comparison

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:80,000

Taber

Brooks

Cardston Milk River

Lethbridge

Claresholm

Fort Macleod

Pincher Creek

")

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(!(

!(

!(

!(D !(D!(D

!(D!(D

!(D!(D

!(D

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")

")")")")")")

")

")

") ")

")

")

")")")

")

")

")

")") ")

")")

")

")

")

")

")

")

")") ") ")

")")

")

")

")")

")")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")")")")

")

")")")

")

") ")

")")

")

")

")

")")

")

")")")")

")")

")")

")

")")")

")")

")

")

")")

")")")

")

")

")")

")

")")

")

")

")

")

")

")

")

")

")

")")")")")")

") ") ")

")

")

")

")

")

")

")

") ")

")")")")

")

")

")

")")

")

")

L e t h b r i d g e C o u n t y

C o u n t y o f W a r n e r N o . 5

32 34

3

33

14

7

14

23

2530

36

7 8 10

17

21 23

2627

33 35

1256

8 11

1416

36

23

9

131418

23 24

2830

32 34

145

9 11

1418

19 24

30

33 34

4

8 10 12

15

19 23

27

31 35

3

8 12

15

6

9 10 12

1518

20 24

30

46

11

15

19 22

2629

31 33 36

24

8 12

15

31

13

8 10 11

1315

24

2830

31 33 34 36

4

11

13

25

12

36

25

36

13

6

20

6

7

35

35

1

12

17

20 22

27

35

7

18

24

7

22

35

1

9

17

1

18

17

27

2

11

33

7

28

32

2

17

1

11

3

31 34

14

8 11

15

19

2529

36

3

8 10

34

9 12

14

19

29

21

29

36

1416

21

2629

33

32 35

2

33

2

8

15

19 23

29

31

35

13

4

11

1416

19

26

31

12

15

20 22

25

32 36

4

7 10

8

19 21

2529

12

26

36

13

13

31 34

16

32 34

6

11

1316

33

12

35

34

16

26

1

9

22

27

7

18

7

18

35

9

9

22

28

9

18

1

11

34

12

12

17

17

21

13

5

11

12

20

28

18

16

23

32

13

20

8

14

10

14

30

32

6

23

33 36

23

35

4

23

1

10

30

31

31

5

15

26

5

20

2

20

17

25

12

4

6

15

5

22

25

36

28

25

16

27

16

1

20

26

21

24

32 35

5

15

25

32

10

2

24

2730

7

2

8

34

4

15

36

11

6

13

3

13

5

7

2728

3

17

14

24

31

6

16

22 24

29

9

2

2

10

26

35

36

24

18

21

10

29

14

13

7

26

33

34

2

32

14

32

6

2223

1

17

33

9

13

19

10

31

13

30

18

35

3

27

28

9

17

25

1416

35

35

161817

12

21

28

36

5

2124

7 85 6

1

2

3

4

5

22 23

24

Judson

NewRockport

Stirling

ÃÆ

846

ÃÆ

61

ÃÆ

4

ChinLakes

67

89

10

1112

13

14

1516

17

18

19

20

21

2526

27

2829 30

3132

33

34

35

36

3738

3940

41

42

43

444546

0 1 2 30.5

Kilometers

Current Project Boundary!( Proposed Turbine Location

Previous Project Boundary *!( Previous Turbine Location *!(D Removed Turbine Location *

")Proposed Project Substationand Proposed O&M Building

") ResidenceMajor HighwayMinor HighwayPaved RoadOther RoadMunicipal District and CountyBoundaryTownship Lines

Section Lines

T.6

T.7

R.18 R.17 W4MR.19

Stirling Wind ProjectProject Layout Comparison

(Subject to Change)

´

Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AEX, Getmapping, Aerogrid, IGN, IGP,swisstopo, and the GIS User Community

T.8

* Changes compared to Proposed Project Mapdated 2016-10-05 (Layout 20160929)

Version: 10Date: 2016-11-25Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000

")

!(

!(

!( !(

!(!(

!(

!(

!(

!(

!( !( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(!(

!(

!( !(!(

!( !( !(

!( !(!( !(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!(

!(!(

!(D

!(D

!(D

!(D!(D

!(D!(D

")

")")

")")")

") ")

")

")

")

")")

") ")

")")")

")

") ")

")

")")

")")")")

")

")

")

")")

") ")")

")")")")

")")

")")")")")

")

")

")")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

7 8

22 23

26

33 35

2

17

20 23

26

34

4

7 8

1617

21 23

31 33

1

33 35

236

812

15

19

252730

34 35

135

8 10

1315

19 20 23

30

33 35 36

45

12

14

21 22 24

2730

26

33

24

10

1415

23

26

34

14

12

22

27

34 35

13

12

15

22 23

34

3

11

2

19

9

32

7 9

24

9 11

19

2

19

22

28

9

2

34 36

4

7

13

20 23

27

11

1316

21

35

3

16

21

6

9

1416

24

26

36

10

24

2629

33 36

6

16

26

31

36

8

1316

20

26

30

10

15

22

29

33

36

22

28

32 35

22

2

18

29

11

21

9

18

2

2

18

18

28

5

15

18

27

25

28

36

7

35

28

1011

30

32

29

5

11

33

27

3

3

25

28

4

34

20

4

17

6

14

10

26

13

34

12

25

11

30

10

21

32

23

35

36

29

5

34

21

1

24

31

8

16

27

12

17

31

11 12

15

1

22

25

27

14

27

32

28

14

31

1417

24

24

10

28

5

11

14

20

15

25

7

17

10

19 21

9

4

18

28

32

13

9

31

29

1

16

131415

23

33

1

2 3 4 56 7

8 9 10 1112 13 14

16

17

1819

2021

23

24

25

26

27

28

2930

32

35

36

37

38

39

40

41 4243

44

45

46

15

31

47

48 49

50

51

ÃÆ

564ÃÆ

848

Township Road 260Highway 564

Ran

ge R

oad

191

Township Road 263

Ran

ge R

oad

175

Ran

ge R

oad

174

Ran

ge R

oad

182

Township Road 264

Township Road 254

Township Road 254A

Ran

ge R

oad

185

Ran

ge R

oad

190

Township Road 270

Ran

ge R

oad

180

Township Road 262

Hig

hway

848

Red Deer River

SeiuLake

Current Project Boundary

!( Proposed Turbine Location

!( Previous Location *

!(D Removed Turbine *Previous Project Boundary *

")Proposed Project Substationand Proposed O&M Building

") Residence

!(Existing Turbine (WinteringHills)Minor HighwayPaved RoadUnpaved RoadTownship Line

Section Line

T.25

T.26

R.18 R.17 W4MR.19

T.27

Hanna

Brooks

Calgary

Airdrie

High River

Drumheller

* Changes compared to Proposed Project Mapdated 2016-10-05

0 1 2 30.5

Kilometers ´

Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity

Wheatland Wind ProjectProject Layout Comparison

(Subject to Change)

Version: 9Date: 2016-11-29Layout: 20161104Prepared By: WSP

Datum: NAD 83Projection: UTM Zone 12NScale: 1:80,000

Date: 2016-11-29