Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
The global of testing approach in ITU
Dmitry Tarasov
Rapporteur Q 8/11 (WP 4/11)Rapporteur Q 8/11 (WP 4/11), ITU, ITU--TT
Director on science questionsDirector on science questions
Central Science Research Central Science Research
Telecommunication Institute (ZNIIS), Telecommunication Institute (ZNIIS),
MoscowMoscow
ITU WORKSHOP ON NGN CONFORMITY AND INTEROPERABILITY TESTING CENTRE (S)
FOR THE AFRICA REGION
Nairobi, Kenya
August 2 - 4, 2010
WSP10_AFR - Nairobi, Kenya - August 2 - 4, 2010
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Contents
Conformance testing on the model networks
Model networks for conformance testing
Project for regional Testing Centre
Increase in the number of manufacturers due to increased share of software in implementing the technical means of telecommunication
Reducing the period of the development and introduction of new technologies and services
lag standardization process from the process of development and implementation, increase the share of corporate regulatory documents
The increasing complexity of the compatibility problems of equipment from different manufacturers
Features of NGN implementation
Conformance testing on the model networks
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Testing procedure play an important role
Changing the testing methodology –creation Model network – as common measurement instrument
Centralization and cooperative activities in the analysis and evaluation of different solutions
(Knowledge DataBase)
Features of NGN implementation
Conformance testing on the model networks
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
The approach of NGN testing
Functional Interop. testing – verification the functionality on TM (EUT) and system-network solutions (NUT) different vendors for compatibility in accordance with basic ITU-T Recs.
Service testing – testing the services on “end-to-end” scenarios including call flow testing and testing with existent provider’s operation systems (Billing, OSS/BSS and etc.)
QoS testing – testing the QoS parameters and RACF functionality
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
Current situation in testing standardization area in ITU-T
Present time
Conformance testingConformance testing which includes which includes protocols and interfaces testing protocols and interfaces testing (TTCN 1 (TTCN 1 (X.292(X.292--1995), TTCN 2 (X.2921995), TTCN 2 (X.292--1998), TTCN 3 (Z.1401998), TTCN 3 (Z.140--2003)2003)
TSS&TPTSS&TP, PICS/PIXIT proformas for different protocols , PICS/PIXIT proformas for different protocols testing)testing)
FutureNGN based on the functional entity which interworks using some protocols
Interoperability testingInteroperability testing
(Q.3901 for NGN, Q.3904 for IMS)WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
Conformance testing or type testing
The purpose of conformance testing is to determine to what extent a single implementation of a particular standard conforms to the individual requirements of that standard
Interoperability testing Interoperability testing is the activity of proving that end-to-end functionality between (at least) two communicating systems is as required by those base systems' standards
*Note: Martin Brand, Test creation principles, International training seminar ‘Testing of System
and Network Solutions’ ZNIIS, Moscow December 10-11 2009
NGN testing methods
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
*
Conformance testing on the model networks
Network Integration Tests/End-to-End Tests
Benchmark/Load Tests
QoS Tests
Security Tests
Roaming Tests
Interconnection Tests
Functional tests/Real Equipment Tests
NGN - Interoperability testing methods
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
Functional TestingReal Equipment Tests
Functional TestingReal Equipment Tests
Load & StressTesting
Load & StressTesting
Type acceptance:Functional testing +Load & stress
Type acceptance:Functional testing +Load & stress
Interconnection TestsInterconnection Tests
Network monitoringQoS surveillance
Network monitoringQoS surveillance
Roaming Tests
Roaming Tests
Multi-Vendor-IntegrationMulti-Vendor-Integration
Testi
ng
meth
od
Supplier‘s business
Operator‘s business
Multi-Vendor-Integration
Multi-Vendor-Integration
Conformance for Interoperability
Conformance for Interoperability
Conformance for
Interoperability
Conformance for
Interoperability
Interoperability Testing
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
Conformance and Interoperabilityboth important and useful approaches to the testing of standardized protocol implementations
although it is unlikely that one will ever fully replace the other
Conformance testingable to show that a particular system complies with all of the protocol requirements specified in the associated base standard
the different Vendors similar systems which is tested on conformance could not be guarantee to be compatible
Combining Interoperability and Conformance Testing
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
Interoperability testing
can clearly demonstrate that two systems will interact and provide the specified end-to-end functions
the different Vendors similar systems which is tested on interoperability could not be guarantee that the interact protocol is realized on the associated base standard
Combining Interoperability and Conformance Testing
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Conformance testing on the model networks
ITU-T Rec. Q.3900 as a global approach of testing
Purpose – determination of the Model network as a basic solution for NGN testing
Model network – a network which simulates the capabilities similar to those available in present telecommunication networks, has a similar architecture and functionality and uses the same telecommunication equipment
Contents of Q.3900Classification of NGN TM regarding the NGN functionality (Y.2012)
Determination of testing procedures
Requirements to the Model network
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Model networks for conformance testing
Basic Methodology of NGN testing.ITU-T Recommendation Q.3900 (09/2006)
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Model networks for conformance testing
14RDF09_CIS - Chisinau, Moldova -August 24-26, 2009
Classification of NGN Technical Means to be tested
- Call Session Control System
-Media Gateway Controller (MGC)
-Proxy Server SIP (PS)
-IP Multimedia Subsystem (IMS)
- Voice and signaling transmit system
-Media Gateway (GW)
-Signaling Gateway (SG)
-Transport Network Environment
(TNE)
- Application servers
-Application Server (AS)
-Media server (MS)
-Messaging Server (MeS)
- Management and billing
system
-Management System (MS)
-Billing system (BS)
-Access Environment
-NGN Integrated Access Devices (NGN-IAD)
-Media gateway for Legacy Terminal Equipment (GW-LTE)
15RDF09_CIS - Chisinau, Moldova -August 24-26, 2009
Application
Sc op e of N G N
Man
agem
ent f
unct
ions
T -6 :In ter -
co n n ectio n B ord er
G a tew ay F E
S -6 : S .A u th en ticat io n & A u th o r izat io n F E
S -8 : A ccess G WC o n tro l F E
N A C F R A C F
L eg acyT erm in al
R G W
C u stom er N etw or k
N G NT erm in a l
L eg acyT erm in a l
A N IA pplica tio ns
S -1 1 : U ser S ig n a lin g I n terw or kin g F E
E nd -U se r F un ction
S -3 : In terro g at in g C a ll S essio n C o n tro l F E
S -1 4: M ed ia R eso u rce B ro ker F E
T -1 7 : T ra n sp o rtR eso u rce C o n tro l F E
A c ce ss P a cke t T ra nsp ort F u nction s
T -2 : A ccessN o d e F E
T -5 :A ccessB ord er
G atew a yF E
S -1 : S erv in g C a ll S essio n C o n trol F E
T -8 :M ed ia
R esou rceP ro cess in g
F E
T -1 2: T . U ser P rofile F E
T -4: A ccessR e lay F E
S -2: Pro xy C all S essio nC o n tro l F E
T -10 :N etw or k A ccess
C on fig ur a tio n F E
S -4 : S u b scr ip tio n L ocator F E
S -5 : S . U ser P rof ile F E
S -4 : S u b scr ip tio n L ocator F E
S -5 : S . U ser P rof ile F E
T -16 : P o licy D ec isio n F E
S -1 5 : G en eral S ervices C on tr ol F E
N G N U N I
O th er N G N
R A C F
*
T -1 4: A ccess M a na ge m e n t F E
T -15 : H om e G a te W a yC on fig ura t ion F E
T -1 1:T . A ut h en tica tion
& A u th o riza t ion F E
A p p lica tio n S u p p ort Fu n ction s & S erv ice S u p p ort F u n ction s(m ay inc lu d e o w n Au thentication , A u tho riza tion and A cco un tin g)
IPM ultim ed iaN etw o rks
P S T N /IS D N
C o re tra n spo rt
A ccess tran sp o rt
S ervice co ntro l
T -13 : T . L oca tionm a n ag em e n t F E
T -17 : T ra n s p ort R esou rce C on tro l F E
T -1 6 : P o licy D ec isio n F E
T -3 : E d g e N o d e F E
S -7: In terco n n ection B ord er G a tew a y
C on tro l F E
S -13 : M ed ia R eso u rce C o n tro l F E
S -9 : M ed ia G W
C o n tro l F E
T -9 :S ig n a llin gG a tew ay
F E
T -7 :T ru n kin g
M ed iaG a tew ay
F E
S -1 2 : N etw ork S ig n a lin g
In terw or kin g F E
S -1 0 : B rea ko u tG a tew ay C o n tro l
F E
T -1 : A ccessM ed ia
G a tew a yF E C o re P ac ket T ran sp o rt F unc tio ns
NGN functional architectureRecommendation of ITU-T Y.2012
16RDF09_CIS - Chisinau, Moldova -August 24-26, 2009
Conformance of NGN Functions to NGN Technical Means to be tested
NGN Technical means NGN Functionality
Call Session Control SystemMedia Gateway Controller (MGC)
S3, S7, S9, S10, S12
T10, T11, T12, T13Proxy Server SIP (PS) S2, S3, S7, S11, S12
T10, T11, T12, T13
IP Multimedia Subsystem (IMS) S1, S3, S6, S7, S8, S10, S12, S13
T10, T11, T12, T13, T14, T15, T16, T17
Voice and signaling transmit systemMedia Gateway (GW) T7, T8Signaling Gateway (SG) T8, T9Transport Network Environment (TNE) T5, T6, T8
Application serversApplication Server (AS) S4, S5, S6, S14, S15Media server (MS) S4, S5, S6, S14, S15Messaging Server (MeS) S4, S5, S6, S14, S15
Management and billing system
Management System (MS) - error processing management- equipment configuration management- billing system management- service management- security management
Billing system (BS)
Access EnvironmentNGN Integrated Access Devices (NGN-AD) T2, T4, T3, T5, T15, T14Media gateway for Legacy Terminal Equipment(GW-LTE)
T1, T2, T3, T4, T5
Architecture of model network
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Model networks for conformance testing
Joint project ITU-ZNIISITTC
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Preparation of ITTC project 1/2Creation of Model network in ZNIIS for interoperability testingMoscow, 2003Lunch of the project for JSC “Svyazinvest”on NGN equipment testingMoscow, 2004
Creation in ITU-T of the new question Q.8 «Testing of NGN protocols»WTSA Brazil, 2004Lunch of the Q.39ххRecommendations series in the scope of Q.8 SG11ITU-T on testing of NGN technical meansSwitzerland, 2004
Termination of the JSC “Svyazinvest” project on NGN interoperability testing for 15 leading vendorsMoscow, 2004-2005
Regional preparation meeting RCC.Approved initiative of Russia on creation of International centre for RCC contribution on WTDC-06 (Doha, Qatar) Moscow, October 2005
Resolution 17 WTDC, approving RCC contribution on creation of International centers of introduction and testing new technologiesDoha, March 2006
RCC operators Council. Presentation of ZNIIS on principles of creation and functioning of International centers.Moscow, March 2006
Project for regional Testing Centre
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Preparation of ITTC project 2/2
Speech on seminars ITU-D/ITU-T on thematic of testing on Model networksITU-ATIS specialists forumUSA , March 2006African region forumTanzania, October 2006ITU-ETSI specialists forumSwitzerland, December 2006Arabian region forumBahrain, May 2007
ETSI-ZNIIS joint project on testing.10 vendors.Moscow, April 2007
Recommendations:Q.3900(in force, 2006)Q.3901(in force, 2007)Q.3902(in force, 2007)Q.3903(in force, 2008)Q.3904(in force, 2010)
ITU Project«International Telecommunication Testing
Centre»Switzerland, November 2007
Approved in project department of ITU-D
Project for regional Testing Centre
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
ITTC project
International Telecommunication UnionTelecommunication Development Bureau
Central scientific-research Institute of Communication
(ZNIIS)Russian Federation
Project Title: International Telecommunication Union – Central Science Research Telecommunication InstituteInternational Telecommunication Testing Centre
Shot project name: ITTC ITU-ZNIIS
Start data: January 2008
Deadline: June 2011
Government agencies, attracted to work: Administration and the Ministry of Communications
Agency implementing the project : International Telecommunication Union
Project location: ITU Regional Representative Office in Moscow
Countries in whose favor a project: CIS and other developing countries
Project for regional Testing Centre
In this project, the ITU and ZNIIS start to cooperate for creation of the International Telecommunication Testing Centre (ITTC), operating in an environment of new technologies, and training for professionals from developing countries in the field of telecommunications. Methodical testing of next-generation networks (NGNs), in particular, planning realized in ITTC through the creation of a model network, through which enables simulation of various network parameters and use a variety manufacturers equipments. The results of these tests will be documented and disseminated.
This project is developed in strict accordance with the recommendations of the 2006 Qatar World Telecommunication Development Conference (WTDC), establishing the International Centre for NGN Testing.
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project descriptionProject for regional Testing Centre
Education to test and introduce new technologies for RCC and the developing countries specialists (3 workshops, 3 methodical course of training)
Methodical equipment testing on a model network for RCC and developing countries
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
The project purpose
Project for regional Testing Centre
Knowledge DataBase in according with of Q.3903 ITU-T recommendation
Testing manuals
Methodology for NGN testing
New technologies introduction examples on the operators network
Results archive of technology and communication services testing
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Expected results
Project for regional Testing Centre
International Seminar on the system-network solutions testing with the participation of specialists in 10 RCC countries and Europe professionals (November 2008)
The test methodologies for system-network solutions testing (Softswitch, IMS, Wireline Broad Band Access)(March 2009)
Functionality and interconnection testing of system-network solutions of different vendors, installed on a model network (test results in agreement with the vendors will be provided in the ITU, in a centralized ITU database). Conducted a training course to the principles of NGN testing (June 2009)
International Seminar "Testing for compliance with international standards" with the participation of specialists in 10 RCC countries, the ITU administration , ITU-T developers and experts from leading European operators (DT, AT). Designed and launched the first version of the Knowledge Base. At the moment Knowledge Base is filled(November 2009)
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Current resultsProject for regional Testing Centre
Testing QoS parameters for different network solutions and equipment from different vendors (November - December 2010)
Develop training materials to ensure QoS testing (November 2010)
International Workshop on the results of QoS testing (February 2011)
Final version of the Knowledge Base in accordance with the existing ITU-T recommendation Q.3903 (April 2011)
International Workshop on the testing results of the ITTC project (July 2011)
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Planning events
Project for regional Testing Centre
Development of recommendations on telecommunications development strategy with national strategies for RCC operators networks
Develop standards for system-network solutions, protocols and services for operators of RCC operators networks
Develop recommendations to ensure quality of service and principles of formation of service level agreements on RCC operators networks
Research of NGN Information Security for RCC operators
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
The common directions of the ITTC development
Project for regional Testing Centre
Joint research
Provision of model network and knowledge base resources for testing
Development of analytical reports
Organization of seminars
Development of contribution, generalizing and systematizing ITTCexperience
Testing for compliance with standards
Realized of projects on issues of equipment interoperability
Assistance in the formation of technical policy
Accompanying the introduction of new technologies
Development of basic requirements for equipment
Development of Service Level Agreement
Works on adapting equipment
Consultations on the issue of terms of use of equipment
Analysis and recommendations on the interaction of equipment from different manufacturers
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Main ITTC activities
Project for regional Testing Centre
ITTC practical Model network
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
Physical Architecture Model of Communication Network
linearly cabling infrastructure
optical transport infrastructure based on xWDM and SDH technology
transport infrastructure based on IP/MPLS packet-switched
infrastructure subscriber access, including: MSAN, xPON, xDSL, FTTx, WiFi, WiMax, Ethernet
Infrastructure of gateways and switched controls
infrastructure of application servers
infrastructure support systems, operations and business (OSS / BSS)
infrastructure of terminal equipment, including wired and wireless types of terminal endings
infrastructure of remote access, including specialized mobile workplaces
infrastructure of centralized database of test results, including the storage, processing and reporting
infrastructure network providing operational processes MN
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
The composition of the measuring equipment MN
computer-aided testing specialized software based on TTCN-3scripts that implement the generated test procedures for compliance with local and international standards and recommendations
generation system invariant payload (telephone networks, data networks and supplementary telecommunications services)
system emulation network fragments (virtual hardware) emulation scenarios passes network traffic data
system testing parameters and procedures for quality management services, including the possibility of generating traffic
transmission and analysis of knowingly incorrect messages
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
Formalization and availability of testing results
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
FORMAT REPRESENTAVE TESTING RESULTS
ZNIIS.RU
NGS.RUWSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
ITU-Т Recommendation Q.3903Project for regional Testing Centre
Virtual repository
Possibility for creation of dedicated area with restricted access to Knowledge Database for storing of different information of Administrations and operators (methodologies, testing reports, network schemes, normative documents and etc.)
Existence of virtual constructor of testing methodic, for development of these documents in the automatic mode using powerful set of libraries of tests of functionalities, conformance and interworking of different technical means, system and network solutions, protocols and services of NGN
Collection and distribution of testing results in the worldwide mode
Project for regional Testing Centre
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Reducing of digital gap by sharing experience of introduction and maintenance of new technologies, implemented on the operators networks from developed countries, on the worldwide telecommunication market
Using ITTC as the effective mean of gathering experienceand consolidation of high-level specialists and experts in the field of introductions, testing, standardization and maintenance of new telecommunication technologies
Performance of regional initiatives and private initiative projects for network operators in part of development qualifying standards, which determine entire approaches and rules in part of introduction of new technologies on the operator networks
Resume on implementing ITTC activities
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Project for regional Testing Centre
Dmitry Tarasov
Rapporteur Q 8/11 (WP 4/11)Rapporteur Q 8/11 (WP 4/11), ITU, ITU--TT
Director on science questionsDirector on science questions
Central Science Research Telecommunication Institute Central Science Research Telecommunication Institute
(ZNIIS), Moscow(ZNIIS), Moscow
Tel: +7Tel: +7--495495--368368--93119311
Fax: +7Fax: +7--495495--368368--91059105
Email: Email: [email protected]@zniis.ru
WSP10_AFR - Nairobi, Kenya -August 2 -4, 2010
Thank you for attention