We are Different By Design
Modelling and Savings
NIA Decommissioning and Existing Generation Group Meeting
26th September 2019
What it typically might look like
Intr
oduc
tion:
a N
ucle
arSi
teIntroduction: a Nuclear Site
2
What actually makes the site run?
A D
iffer
entP
ersp
ectiv
eA Different Perspective
StrategicPlan
Budget and
Finances
Operational Priorities
People
Plant
Primavera P6
Past Performance
Contractual Milestones
Regulatory Constraints
Hazards
Hotel Costs
NUCLEARSITE
Annual Funding Limits
Procurement Strategy
Risk and Opportunity
Waste Processing
Asset Management
Utilities
Flask Movements
Human Resources
Cost Estimates
Project Management
3
Introducing POM and ORM
How
we
Inte
grat
e th
e Si
te P
lan
thro
ugh
Mod
ellin
g How we Integrate the Site Plan through Modelling
StrategicPlan
Prioritization Criteria
Budget and
Finances
Staffing Data
Plant Data
Operational Research Model
Programme Optimisation Model
StartIntegrated
Performance Plan
OptimisedPerformance
Plan
Strategic Enablers
Operational Enablers
4
Using Primavera P6 Data to Optimise the Plan to Interim End-State
The
Prog
ram
me
Opt
imis
atio
n M
odel
The Programme Optimisation Model
5
Start - FY19Decontamination & Decommissioning
240 days
Demolish
300 days
Reactor Building
High Level Security
5 years
Intermediate Level Security6 years
Infrastructure
Operations
5 years
Decontamination & Decommissioning
2 years
Reprocessing Facility
Using Primavera P6 Data to Optimise the Plan to Interim End-State
The
Prog
ram
me
Opt
imis
atio
n M
odel
The Programme Optimisation Model
6
Start - FY19Decontamination & Decommissioning
240 days
Demolish
300 days
Reactor Building
High Level Security
5 years
Intermediate Level Security6 years
Infrastructure
Operations
5 years
Decontamination & Decommissioning
2 years
Reprocessing FacilityResources
Using Primavera P6 Data to Optimise the Plan to Interim End-State
The
Prog
ram
me
Opt
imis
atio
n M
odel
The Programme Optimisation Model
7
Using Primavera P6 Data to Optimise the Plan to Interim End-State
The
Prog
ram
me
Opt
imis
atio
n M
odel
The Programme Optimisation Model
8
Analysing Plant Data to Calculate Throughput in Changing Conditions
The
Ope
ratio
nal R
esea
rch
Mod
elThe Operational Research Model
Throughput
9
Analysing Plant Data to Calculate Throughput in Changing Conditions
The
Ope
ratio
nal R
esea
rch
Mod
elThe Operational Research Model
EngineeringUnit Operations
10
Analysing Plant Data to Calculate Throughput in Changing Conditions
The
Ope
ratio
nal R
esea
rch
Mod
elThe Operational Research Model
Regulatory andSupport Operations
Resources
11
Results that Go Beyond What Is Already Known
Out
com
es: D
ashb
oard
s an
d In
sight
sOutcomes: Dashboards and Insights
12
Results that Go Beyond What Is Already Known
Out
com
es: D
ashb
oard
s an
d In
sight
sOutcomes: Dashboards and Insights
13
Where Asking the Hard Questions Leads To
Out
com
es: W
ider
Impa
cts
Outcomes: Wider Impacts
14
Preparatory Dismantling Demolition
Regulatory Safety basis
Licensing/Permits
Base Operations
Management Integrations
Dedicated team
Lean management
Incentivisation
Workforce optimisation
Waste Route Waste form
End state redefinitionInput/output optimisation
Technical [Project Specific]
Contractual Make/buy decision
We are Different By Design