16
NIBE™ F2026 AIR/WATER HEAT PUMP NIBE F2026 NIBE™ F2026 is an air/water heat pump, specially designed for the Nordic climate. F2026 is designed to be docked to water based heating systems. Please visit www.nibe.eu for further information. FRESH AIR’S FREE. Efficient scroll compressor that operates at temperatures down to -20 °C. Automatic 2-step capacity regulator for the fan (not 6kW). Manufactured in three sizes: 6, 8 and 10 kW. Integrated condensation water trough. Prevents icing together with condensation water tube KVR 10. The NIBE F2026 together with NIBE VVM 300/VVM 500 makes a complete heating and domestic hot water solution. NIBE F2026 can work with virtually any heating system that your home already has, such as wood-fired, oil or gas boiler. Made from materials tested to withstand Nordic winter conditions for a long service life. Complete system incorporating NIBE SMO 05 (basic external con- trol module) or NIBE SMO 10 (advanced external control module) together with the air/water heat pump F2026 and accessories (water cylinders). Integrated intelligent control for optimum control of the heat pump. F2026 is started by a start signal from another unit, return sensor or thermostat.

NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

Embed Size (px)

Citation preview

Page 1: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE™ F2026 aIr/watEr hEat pump

NIBE F2026NIBE™ F2026 is an air/water heat pump, specially designed for the Nordic climate. F2026 is designed to be docked to water based heating systems.

please visit www.nibe.eu for further information.

fresh air’s free.

• Efficient scroll compressor that operates at temperatures down to -20 °C.

• automatic 2-step capacity regulator for the fan (not 6kw).

• manufactured in three sizes: 6, 8 and 10 kw.

• Integrated condensation water trough. prevents icing together with condensation water tube KVr 10.

• the NIBE F2026 together with NIBE VVm 300/VVm 500 makes a complete heating and domestic hot water solution.

• NIBE F2026 can work with virtually any heating system that your home already has, such as wood-fired, oil or gas boiler.

• made from materials tested to withstand Nordic winter conditions for a long service life.

• Complete system incorporating NIBE SmO 05 (basic external con-trol module) or NIBE SmO 10 (advanced external control module) together with the air/water heat pump F2026 and accessories (water cylinders).

• Integrated intelligent control for optimum control of the heat pump. F2026 is started by a start signal from another unit, return sensor or thermostat.

Page 2: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

2 NIBE F2026

Good to know about nibe™ f2026

MaintenanceF2026 is equipped with control and monitoring equipment, however some exterior maintenance is still necessary.

make regular checks throughout the year that the grilles are not clogged by leaves, snow or anything else.

Strong wind combined with heavy snowfall can block the intake and exhaust air grilles. make sure that there is no snow on the grilles.

the condensation water trough and drain pipe may require cleaning from leaves or similar during the year.

If necessary the outer casing can be cleaned using a damp cloth. Care must be exercised so that the heat pump is not scratched when cleaning. avoid spraying water into the grille or the sides so that water penetrates into F2026. prevent F2026 coming into contact with alkaline cleaning agents.

Principle of operationthis is a simplified version of how it works. the outdoor air is drawn into the heat pump and meets a closed system. the system contains a refrigerant with the capacity to turn into gas at a very low temperature.

under high pressure, a compressor considerably increases the temperature of the refrigerant, which is now gaseous. then, using a condenser, the heat is transferred to the house’s heating system, while at the same time the refrigerant reverts to liquid form, ready to turn into gas once more and to collect new heat energy.

prevent snow from building up and covering the grille on F2026.

LEK

LEKLEK

LEK

LEK

LEKLEK

LEK

Keep free of snow and/or ice.

Page 3: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE F2026 3

Type F2026-6 F2026-8 F2026-10

Sound power level, according to EN12102

at 7/45

Lw(a) 57 57/62 57/62

Fan speed Low High Low High Low Highmax sound pressure level at 2 m*

dB(a) 54 54 54 59 54 59

max sound pressure level at 6 m*

dB(a) 33.5 33.5 33.5 38.5 33.5 38.5

max sound pressure level at 10 m* dB(a) 29 29 29 34 29 34

* Free field

Transport and storageF2026 should be transported and stored vertically.

ControlF2026 is equipped with an integrated electronic controller that handles all functions necessary for heat pump operations. It controls defrosting, stop at max/min temperature, connection of the compressor heater as well as enabling the heater for the drip pan, monitoring of motor protection and pressure switches. the number of starts and the operating time can also be read.

the integrated controller is set during installation and can be used during a service. under normal operation conditions the home owner does not need to have access to the controller.

F2026 has an integrated electronic return line sensor that limits the return temperature.

F2026 is switched on/off via signals from other control equipment or a thermostat. If F2026 is to be controlled using the accessory SmO 10, VVm 300 or VVm 500 then relevant procedures are described in respective instructions.

SmO 05, SmO 10, VVm 300 and VVm 500 communicate with F2026, which means that all settings and measurement values from F2026 can be adjusted and read on SmO 05/SmO 10 VVm 300/VVm 500.

Sound pressure levelsF2026 is usually positioned next to a house wall, which gives directed sound distribution that should be considered. accordingly, you should always attempt to find a placement on the side that faces the least sound sensitive neighbouring area.

the sound pressure levels are further affected by walls, bricks, differences in ground level, etc and should therefore only be seen as guide values.

F2026 works in summer with a low fan speed and at other times with a high fan speed (does not apply to F2026-6 kw that only has one fan speed).

Page 4: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

4 NIBE F2026

Good to know about nibe™ f2026

Equipment

LE

K

GQ1

XJ5

QN2 Bt14 EB11 Bp1 Bt28 XL20 EB10

Bt17 XL21 QN1 hS1

uB3

Bp2

rm1

Ep2

GQ10

Bt15

uB1

EB13

LE

K

hS1

pF3

XL40 Bt16 wm5

pF1

Bt12

XL1

Bt3

XL2

Bt17 Ep1LEK

aa6

F3

XJ5

X5

X7

aa21

aa10

C2

Ba1

FC1

FB1

X3

X6

X1

uB2

X2

aa21-S4 aa21-SF3 aa21-S1 aa21-S2 aa21-S3

Page 5: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE F2026 5

Good to know about nibe™ f2026

List of componentsPipe connections

XL 1 Connector, heating medium out of F2026, G1 (Ø28 mm)

XL 2 Connector, heating medium in to F2026, G1 (Ø28 mm)

XL 20 Service connection, high pressure

XL 21 Service connection, low pressure

XL 40 Connection, drip tray drain ( Ø40 mm)

HVAC components

QN 2 4-way valve

rm 1 Non-return valve

wm 5 Condensation water seal

Sensors etc.

Bp 1 high pressure pressostat

Bp 2 Low pressure pressostat

Bt 3 temperature sensor, return

Bt 12 temperature sensor, condenser supply line

Bt 14 temperature sensor, hot gas

Bt 15 temperature sensor, fluid pipe

Bt 16 temperature sensor, evaporator

Bt 17 temperature sensor, suction gas

Bt 28 temperature sensor, ambient

Electrical components

EB 10 Compressor heater

EB 11 Drip tray heater

EB 13 Cone heater

GQ 1 Fan

Cooling components

Ep 1 Evaporator

Ep 2 Condenser

GQ 10 Compressor

hS 1 Drying filter

QN 1 Expansion valve

Miscellaneous

pF 1 type plate

pF 3 Serial number

XJ 5 Connections sensors

uB 1 Cable gland, incoming supply

uB 3 Cable gland, sensor

Electrical componentsaa 6 relay card with power supply unit

aa 10 Soft-starter

aa 21 Control card with display

S 1 plus button

S 2 minus button

S 3 Enter button

S 4 reset button

SF 3 Display contrast

Ba 1 phase sequence monitor (3-phase)

C 2 Operating condenser, fan

F 3 Fuse for external heating cable (250 ma), max 45 w.

FB 1 automatic protection

FC 1 motor circuit breaker

X 1 terminal block, incoming supply

X 2 terminal block, external control voltage

X 3 terminal block, charge pump, external heating cable

X 5 terminal block, thermostat, communication, compressor blocking

X 6 terminal block, additional, downtime, buzzer alarm

X 7 terminal block, 4-way valve

Miscellaneous

XJ 5 Connections sensors

uB 2 Cable gland, incoming supply

Designations in component locations according to standard IEC 81346-1 and 81346-2.

Page 6: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

6 NIBE F2026

Good to know about nibe™ f2026

Dimensions

there should be a minimum of 350 mm free space behind the heat pump for service work.Leave a space of about 400 mm to the right of the heat pump for servicing.an area of 1000 mm is required in front of and above the heat pump for service work.

465

370

440

1045

315

125

365

70 10751175

1200

30-

50

200

130

130

520

400 mm

Fritt utrymme framför

Fritt utrymme

Min. avståndvid användningav flera F 2026

350

mm

Fritt utrymmebakom

3000

mm

XL1

XL2

75

350

Ø 40

Page 7: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

VVM 500F20XX

F20XX

VVM 300

RC

Gas boiler

NIBE F2015-6, -8, -11

External addition

Room unit

SMO 05Controller

NIBE VPB 200N

Buffel vessel

Electrical addition

NIBE F2026 7

installation

F2026 can be connected in several ways. Below are some of the most common alternatives. Further system solutions are available in respective assembly instructions for the accessories used.

NIBE F2026 + NIBE VVM 300 system solutionF2026, together with VVm 300, creates a complete heating and hot water unit. VVm 300 is equipped with a control box that currently makes it the most economical operator, both for the integrated immersion heaters (max 13.5 kw) and compressor operation in F2026.

VVm 300 comes complete with an automatic by-pass, three way valve, circulation pump, speed controlled charge pump and safety equipment. with VVm 300, pool heating is possible as well as an extra shunt group, i. e . two heating systems with different flow temperatures.

VVm 300 is designed for simple connection to F2026.

NIBE F2026 + NIBE VVM 500 system solutionF2026 and VVm 500 together create a complete heating and hot water unit. VVm 500 is equipped with a control box for the most economical operation, both for integrated immersion heaters (max 9 kw) and the compressor in F2026.

NIBE F2026 + SMO 05 systemSmO 05 is an intelligent control module that, together with the air/water heat pump and existing heating and hot water equipment, creates a complete unit. with the SmO 05, it is possible to position the display unit in a suitable position for the end user. For example, in the hall or kitchen. the controller has full intelligence and is part of a new NIBE generation controller platform. which domestic hot water cylinder to use, you will find in the product leaflet for SmO 05.

F2026

F2026

VVm 300

VVm 500

F2026

Buffer vessel

Page 8: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

SMO 10

Oljepanna alternativt elpanna med shunt

POOL

VP2

VP1

8 NIBE F2026

NIBE F2026 + NIBE SMO 10 systemSmO 10 controls up to nine F2026 (of which one can be used for hot water), additional heat, circulation pumps, shuttle valve, etc. F2026 hp1 prioritises hot water charging via a shuttle valve. If there is no hot water or heating demand, F2026 is available for pool heating. F2026 runs with floating condensing towards the heating system.If F2026 cannot handle the heating demand, additional heat is connected.

the fan works in stage 1 or stage 2 depending on the outdoor air temperature. In cases where the system volume in the radiator circuit is below 20 l/kw (heat pump output at 7/45 °C) and/or the radiator flow is choked uncontrolled, a buffer vessel is installed as a volume and flow increaser.

Hot water control VST 11 (accessory) this accessory allows the heat pump F2026 with SmO 10 to prioritise hot water charging on systems with floating condensing. this also requires a hot water accumulator, for example, NIBE Vpa or NIBE VpB as well as a thermostat. when the hot water sensor for hot water temperature is connected, the control system is automatically activated for the charging functions. when there is a demand for hot water, the heat pump gives this priority and devotes its entire heat pump output to water heating. No room heat is produced in this mode.

Existing boilerthis system set up is often used to back up an existing heating system. the built-in controller in the outdoor unit can work with a thermostat.

this installation make use of existing equipment and thus keep installation costs down. however, the energy savings that can be achieved are not as high as with the three other systems described.

Oil/Gas/Electrical boiler

SmO 10

Vpa 300/200

F2026

F2026

installation

Page 9: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE F2026 9

Pipe installationpipe installation must be carried out in accordance with current norms and directives.

F2026 works up to a return temperature of approximately 50 °C and an outgoing temperature from the heat pump of approximately 58 °C. when F2026 is not equipped with shutoff valves on the water side these must be fitted to facilitate future service.

Pipe connection (heating medium)F2026 can be connected to the heating system see the section “Docking” or according to one of the system solutions that can be downloaded from NIBE’s website www.nibe.eu.

the heat pump must be vented by the upper connection (70, VB-out) using the venting nipple on the enclosed flexible hose. the supplied particle filter must be installed before the inlet, i.e. the lower connection (71, VB-in) on F2026.

All outdoor pipes must be thermally insulated with at least 19 mm thick pipe insulation. The charge pump must be operational, even if F2026 is not running, to prevent damage due to freezing.

alternatively, the heat pump is connected to an intermediate circuit with a heat exchanger, pump and water with anti-freeze. Shutoff and drain valves are fitted so that F2026 can be emptied in the event of prolonged power failures. the supplied flexible hoses act as vibration dampers. the flexible hoses are fitted so a slight bend is created, thus acting as vibration damping.

0

1

2

3

4

5

6

7

8

9

0 0,10 0,20 0,30 0,40 0,50 0,60 0,70

F2026 -6, 8, -10

kPaTryckfall

6 kW 8, 10 kW

Flödel/s

pressure drop

Flow

F2026 -6, -8, -10

installation

Inspection of the installationCurrent regulations require the heating installation to be inspec-ted before it is commissioned. the inspection must be carried out by a suitably qualified person and should be documented. the above applies to closed heating systems. If the heat pump is replaced, the installation must be inspected again.

Installation and positioningposition F2026 outdoors on a firm and level surface that can take the weight, preferably a concrete foundation. If concrete slabs are used these should lie on tarmac or gravel.

• the concrete foundation or slabs must be positioned so that the lower edge of the evaporator is at the level of the aver-age local snow depth, although a minimum of 300 mm above ground level.

• F2026 should not be positioned next to sensitive walls, for example, next to a bedroom.

• also ensure that the placement does not inconvenience the neighbours.

• F2026 must not be placed so that recirculation of outdoor air can occur. this causes lower output and impaired efficiency.

• position F2026 so that the evaporator is sheltered from direct wind.

• Large amounts of condensation water as well as melt water from defrosting can be produced. Condensation water must be led off to a drain or similar.

• Care must be exercised so that the heat pump is not scratched during installation.

• Do not place F2026 directly on the lawn or other non solid surface.

If there is a risk of roof slides a protective roof or similar should be instal-led over the heat pump, pipes and wiring.

Page 10: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

Recommended alternativesStone caisson

If the house has a cellar the stone caisson must be positioned so that condensation water does not affect the house. Otherwise the stone cais-son can be positioned directly under the heat pump.

the outlet of the condensation water pipe must be at frost free depth.

LEK

Frostfrittdjup

Frost free depth

Drain indoors

the condensation water is lead to an indoor drain (subject to local rules and regulations).

route the pipe downward from F2026.

the condensation water pipe must have a water seal to prevent air circulation in the pipe.

LEK

Frostfrittdjup

Frost free depth

Gutter drainage

the outlet of the condensation water pipe must be at frost free depth.

route the pipe downward from F2026. the condensation water pipe must have a water seal to prevent air circulation in the pipe.

10 NIBE F2026

installation

Condensation water collectionthe integrated condensation water trough is used to collect and lead away most of the condensation water from the heat pump.

• the condensation water (up to 50 litres/24 hrs) collected in the trough should be routed via a pipe (KVr 10) to an appropriate drain, it is recommended that the shortest outdoor stretch possible is used.

• the KVr 10 accessory should be used to guarantee function.

• that part of the pipe (KVr 10) that is not frost protected must be heated by the heating cable to prevent freezing.

• route the pipe (KVr 10) downward from F2026.

• the drain of the condensation water pipe must be positioned at frost free depth or indoors (subject to local rules and regulations).

• the installation must be equipped with a water seal where air circulation can occur in the condensation water pipe.

LEK

Condensation water pipe KVr 10 (accessory)

Page 11: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE F2026 11

installation

Electrical installationthe routing of cables for heavy current should be made out through the cable glands on the heat pump’s left-hand side, seen from the front (100) and signal cables from the rear (102)

F2026 does not include an isolator switch on the incoming electrical supply. the heat pump’s supply cable must be connected to a circuit-breaker with at least a 3 mm breaking gap. when the building is equipped with an earth-fault breaker the heat pump should be equipped with a separate one. Incoming supply must be 400 V 3NaC 50hz via distribution boards with fuses.

the terminal blocks can be accessed by removing the 2 screws for the plastic covers and electrical box screws.

NOTE! the electrical installation and service must be carried out under the supervision of a qualified electrician. Electrical installation and wiring must be carried out in accordance with the stipulations in force.

LEK

Inkommande matning

Incoming supply

Page 12: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

12 NIBE F2026

technical specificationsIP 21

3x400V F2026 -6 F2026 -8 F2026 -10

Output data at nominal flow 1)

15/55 Delivered power / Supplied power /COp kw / kw / - 7,35/2,30/3,20 9,80/3,04/3,22 11,52/3,58/3,22

7/35 Delivered power / Supplied power /COp kw / kw / - 6,78/1,53/4,43 9,30/2,23/4,17 10,90/2,65/4,11

7/55 Delivered power / Supplied power /COp kw / kw / - 6,07/2,26/2,69 8,32/2,96/2,81 9,89/3,47/2,85

2/35 Delivered power / Supplied power /COp kw / kw / - 5,90/1,55/3,81 8,11/2,14/3,78 9,40/2,54/3,71

2/45 Delivered power / Supplied power /COp kw / kw / - 5,56/1,81/3,07 7,68/2,47/3,11 9,08/2,92/3,11

2/55 Delivered power / Supplied power /COp kw / kw / - 5,23/2,26/2,31 7,11/2,86/2,48 8,70/3,37/2,58

-7/35 Delivered power / Supplied power /COp kw / kw / - 4,34/1,56/2,78 6,02/1,98/3,04 7,31/2,37/3,08

-7/45 Delivered power / Supplied power /COp kw / kw / - 4,25/1,77/2,40 5,81/2,30/2,52 7,05/2,74/2,58

-7/55 Delivered power / Supplied power /COp kw / kw / - 3,94/2,16/1,82 5,55/2,66/2,09 6,70/3,12/2,15

-15/35 Delivered power / Supplied power /COp kw / kw / - 3,60/1,47/2,44 4,88/1,87/2,61 5,77/2,22/2,60

-15/45 Delivered power / Supplied power /COp kw / kw / - 3,50/1,94/1,80 4,22/2,47/1,71 5,69/3,01/1,89

Output data according to EN14511

7/35 Delivered power / Supplied power / COpEN14511 kw / kw / - 6,24/1,50/4,16 8,57/2,21/3,87 9,80/2,62/3,74

7/45 Delivered power / Supplied power / COpEN14511 kw / kw / - 5,95/1,75/3,40 8,30/2,55/3,26 9,60/2,99/3,21

Electrical data

rated voltage 400V 3NaC 50 hz

max operating current heat pump arms 4,9 6,4 7,6

max operating current, compressor arms 4,3 5,9 6,9

Start current arms 18 24 27

max permitted impedance at connection point 2) ohm - - -

Nominal output, fan (low/high) w 70 90/130 90/130

Fuse arms 10 10 10

Refrigerant circuit

type of refrigerant r404a

type of compressor Scroll

Volume kg 2,0 2,2 2,2

Heating medium

min/max system pressure heating medium mpa 0.05/0.3 (0.5/3 bar)

Nominal flow (min flow during defrost) l / s 0,16 0,20 0,25

Internal pressure drop at nominal flow kpa 1,3 1,5 2,2

max/min heating medium temp continuous operation °C 58/20

Connection heating medium male thread mm G1 (Ø28mm)

Page 13: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

we reserve the right to make changes in design and dimensions without prior notice.

1) power statements refer to compressor, fan and control at nominal heating me-dium flow. Operation that requires defrosting reduces the relationship between delivered and supplied power by about 10 %.2) max. permitted impedance in the mains connected point in accordance with EN 61000-3-11. Start current can cause short voltage dips that could affect other equipment in unfavourable conditions. If the impedance in the mains connection point is higher than that stated it is possible that interference will occur. Check with the power supplier before purchasing the equipment whether the impedance in the mains connection point is higher than that stated.

technical specifications

NIBE F2026 13

3x400V F2026 -6 F2026 -8 F2026 -10

Dimensions and weight

width mm 1200

Depth mm 520

height with stand mm 1095

weight (excl packaging) kg 146 148 149

part no. 064 084 064 085 064 086

Page 14: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

0

10

20

30

40

50

60

70

-20-30 -10 0 10 20 30 40

14 NIBE F2026

technical specifications

Working area

water temperature °C

Outdoor air temperature °C

return temperature

Flow temperature

Page 15: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

system accessories

other accessories

Varmtvandstemp.

Brauchwassertemp

Hotwatertemperature

13.431.0

13.431.0

13.431.0

13.431.0

13.431.0

tyska

NIBE SMO 10Advanced controllerpart no. 089 638

NIBE SMO 05Basic controllerpart no. by display language.part no. 067 175 English

LEK

LEK

NIBE VPADouble-jacketed hot water cylinderVpa 300/200 Cu part no. 088 710Vpa 300/200 Enamel part no. 088 700 Vpa 450/300 Cu part no. 088 660Vpa 450/300 Enamel part no. 088 670 VpaS 300/450 Cu part no. 087 720VpaS 300/450 Enamel part no. 087 710

LE

K

LEK

+20-2

A B A B A BI II III I II I II

VVM 300

APH

NIBE VVM 300 Indoor modulepart no. 069 010

LEK

HR 10Auxiliary relaypart no. 089 423

LEK

10

15 20

2530ϒC

RT 10Room thermostatpart no. 418 366

VST 11Hot water controlShuttle valve, Cu-pipe Ø28.part no. 089 152

NIBE VPBWater heaterVpB 500 Cu part no. 083 220VpB 750 Cu part no. 083 230VpB 1000 Cu part no. 083 240

LEK

LEK

LEK

NIBE UKVBuffer vessel for heating systemsuKV 100 part no. 088 207uKV 200 part no. 080 321uKV 300 part no. 080 330

ELK 15Electric heater (3x400V)Step. 5, 10, 15 (3x400V)part no. 069 022

LEK

VT 10Heating thermostatpart no. 418 801

aJ

Installer handbook user handbook2 flexible hoses (r25) with 4 seals particle filter r25

the enclosed kit is located on the packaging for the heat pump.

LEK

supplied components

NIBE VVM 500 Flexible indoor modulepart no. 069 400

NIBE F2026 15

KVR 10Condensation water tubemax installation length is shown within brackets. KVr 10-10, 1m (1m)part no. 067 171KVr 10-30, 3 m (2.5 m)part no. 067 172KVr10-60, 6 m (5 m)part no. 067 173

LEK

Page 16: NIBE™ F2026 aIr/watEr hEat pump - · PDF fileIEC 81346-1 and 81346-2. 6 NIBE F2026 Good to know about nibe™ f2026 Dimensions there should be a minimum of 350 mm free space behind

NIBE Energy Systems aBBox 14285 21 markarydSwEDENtel. +46 433 - 73 000www.nibe.eu 63

9395

tec

hnic

al p

BD G

B N

IBE

F202

6 12

37-2

MILJÖMÄRKT

307–005

this brochure is a publication from NIBE. all product illustrations, facts and specifications are based on current information at the time of the publication’s approval. NIBE makes reservations for any factual or printing errors in this brochure. photos: www.benfoto.se. ©NIBE 2012.

NIBE is ISO-certified: SS-EN ISO 9001:2000SS-EN ISO 14001:2004