Upload
nagiah-tharmar
View
18
Download
1
Embed Size (px)
Citation preview
Projects Technical Report-2012
Prepared By Nagiah.TDoc.No: NT-CR-01
Nival Tech-2012 1
1. Neural System Pvt Ltd.2. Mrs.Neelam Shahani Commercial Complex.3. L.Rabindra House4. Mohan Residence5. C.K Babu Residence6. Trelleborg Sealing Solution Bangalore Factory7. BOSCH R & D workshop.8. BOSCH Chassis dyno Lab ( climatic change Lab)9. Admin office for BK Threshers p Ltd.10. Plumbing Design for BK Threshers Factory11. Bekal Resort ( Globlink Entertainment Group)12. K.R.K Ventures 67 Villas13. Multi Shahaja Group apartment14. Chandra Shekar apartment15. Vdb Projects- HRBR LAYOUT.16. BVL Health care- Chennai Unit17. Smiths Interconnect18. Thai Airways Bangalore office19. ESSIL Software- Jayanagar.20. Ajay Kumar Reddy Apartment HSR LAYOUT.21. SJR PADUKONE PLAZA.22. CPCB LAB BANGALORE
Nival Tech-2012
List Of projects
2
Completed projects = 50 ProjectsTender floated by NT = 56 (MEP)Tender Floated by Client = 20 ( MEP)Project cost handled = …… Crore (Rs)Total build up area = 14.4 Lacs- sqftTotal area External = 4.6 Lacs – sqftAttended Tech seminar = 24Attended Tech Workshop = 12Attended Certificates Course= 8Experiences = 4 years
Nival Tech-2012
Nival Tech Consulting EngineersAchievement still 2012
3
ASHREA YEA-CHAIR 2012-2013
ISHRAE LIFE MEMBER SINCE 2005
ISHRAE INSTUITE OF EXCELLANCE (Core Committee Member)
Indian Pluming Association Life Member
Fire & Security association of India(Core Committee Member)
International Association of Plumbing and Mechanical Officials (tech Steering committee-Member)
Nival Tech-2012
Nagiah.T Principle Consultant Associates with
4
Nival Tech-2012 5
Overview & Site Description• Location: Bangalore. KIADB Industrial Area (INDIA)• Building type(s): Commercial office• New Construction completed on 2010.• 24,000 ft2 (2,230 m2)• Project scope: 3-storey building
Owner & architects• M/s Neural Systems Pvt. Ltd• M/s Acharya Associates, Bangalore.Building ProgramsIndoor Spaces: Office (45% Restrooms (5%), Lobby/reception and common area (50%) Outdoor Spaces: Restored landscape (17%), Drive way +
Carparking(17%), Garden- decorative (1%), Other (5%), Hardscape (5%)
Finance & Cost: ACMV Rs - 24 Lakhs in RsElectrical - 34 Lakhs PHE - 8.6 Lakhs Fire - 1.2 Lakhs
Water Conservation and UseDesigned 5400 LPD, Actual 1200 LPD
Energy 125 KVA
1. Neural System Pvt Ltd
Nival Tech-2012 6
1. Neural System Pvt Ltd
Nival Tech-2012 7
Overview & Site Description• Location: Bangalore. E-City (INDIA)• Building type(s): Commercial office• New Construction type. Started 2009• 60,000 ft2 (5,575 m2)• Project scope: B+G+4-storey building
Owner & architects• Mrs. Neelam Shahani• M/s Dutta Kannan Architects.Building ProgramsIndoor Spaces: Office (75% Restrooms (5%), Lobby/reception and common area (20%) Outdoor Spaces: Restored landscape (17%), Drive way +
Car parking(17%), Garden—decorative (1%), Other (5%), Hardscape (5%)Finance & Cost: MEP - Rs/sqft
ACMV- 24 Lac ( Rs210/sqft)Electrical - 34 Lac (Rs 183/sqft)PHE - 8.6 lac ( Rs 35/sqft)
Water Conservation and UseDesigned 5400 LPD, Actual 1200 LPD
Energy 125 KVA
2. Mrs.Neelam Shahani Commercial Complex.
Nival Tech-2012 8
2. Mrs.Neelam Shahani Commercial Complex.
Nival Tech-2012 9
Overview & Site Description• Location: Bangalore. Basavankudi (INDIA)• Building type(s): Residential• New Construction type. Started 2009• 2,400 ft2 (220 m2)• Project scope: B+G+1-storey building
Owner & architects• Mrs. L.Rabindra • M/s TA Architects.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and UseDesigned 5400 LPD, Actual 1200 LPD
Energy 15 KVA
3. L.Rabindra House
Nival Tech-2012 10
Nival Tech-2012 11
Nival Tech-2012 12
Overview & Site Description• Location: Bangalore. Laggre(INDIA)• Building type(s): Residential• New Construction type. Started 2009• 5,400 ft2 (510 m2)• Project scope: B+G+2 -storey building
Owner & architects• Mrs. Mr. Mohan • M/s Casa-in EX Architects.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use
4. Mr. Mohan Residence
Nival Tech-2012 13
Nival Tech-2012 14
Overview & Site Description• Location: Chittur City. Andhra pradesh (INDIA)• Building type(s): Residential• New Construction type. Started 2009• 15400 ft2 (1430 m2)• Project scope: B+G+1-storey building
Owner & architects• Mrs. C.BABU ( MLA-Chittur) • M/s S.D.S Architects.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and UseDesigned 10500 LPD, Actual 6400 LPD
Energy 85 KVA
5. C.K BABU Residence
Nival Tech-2012 15
Nival Tech-2012 16
Nival Tech-2012 17
Overview & Site Description• Location: Bangalore. Hosur Road (INDIA)• Building type(s): Industrial type Building• New Construction type. Started 2009• 14000 ft2 (13000 m2)• Project scope: B+G+2-storey building
Owner & architects• Mrs. Govindraj • M/s De Zoe Studio Architects.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
6. Trelleborg Sealing Solution P Ltd.
Nival Tech-2012 18
Nival Tech-2012 19
Nival Tech-2012 20
Overview & Site Description• Location: Singaraya Konda. Andhra Pradesh(INDIA)• Building type(s): Industrial + Commercial Building• New Construction type. Started 2010• 30000 ft2 (2787 m2)• Project scope: B+G+1-storey building
Owner & architects• Mrs. BK Threshers P Ltd • M/s Eterno Design Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
9. B.K Threshers Admin Office
Nival Tech-2012 21
Nival Tech-2012 22
Nival Tech-2012 23
Overview & Site Description• Location: Singaraya Konda. Andhra Pradesh(INDIA)• Building type(s): Industrial Building• New Construction type. Started 2010• 13 Acres• Project scope: Plumbing Only
Owner & architects• Mrs. BK Threshers P Ltd • M/s Eterno Design Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
10. B.K Threshers Plant
Nival Tech-2012 24
Nival Tech-2012 25
Site Plumbing work Photos.
Nival Tech-2012 26
Overview & Site Description• Location: Singaraya Konda. Andhra Pradesh(INDIA)• Building type(s): Industrial Building• New Construction type. Started 2009• 8 Acres• Project scope: MEP DESIGN
Owner & architects• Mrs. Globlink Entertainment Group • M/s D K A P ltd.Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
11. Bekal Resort ()
Nival Tech-2012 27
Nival Tech-2012 28
Overview & Site Description• Location: Singaraya Konda. Andhra Pradesh(INDIA)• Building type(s): Industrial Building• New Construction type. Started 2009• 3.5 Acres• Project scope: MEP Design.
Owner & architects• Mrs. BK Threshers P Ltd • M/s Eterno Design Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
12. K.R.K Urban ville
Nival Tech-2012 29
Nival Tech-2012 30
Nival Tech-2012 31
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Residential-Multi Dwelling Building• New Construction type. Started 2011• 70 apartment• Project scope: MEP Design
Owner & architects• Mrs. YMR Group. • M/s Jeetu pratiba Associates Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
13. YMR-GROUP apartment
Nival Tech-2012 32
Nival Tech-2012 33
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Residential-Multi Dwelling Building• New Construction type. Started 2011• 4 apartment• Project scope: MEP Design
Owner & architects• Mrs. Mr. Chandra shekar. • M/s Jeetu pratiba Associates Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
14. Mr.Chandrashekar Apartment
Nival Tech-2012 34
Nival Tech-2012 35
Overview & Site Description• Location: HRBR Layout-Bangalore(INDIA)• Building type(s): Residential-Multi Dwelling Building• New Construction type. Started 2011• 4 apartment• Project scope: MEP Design
Owner & architects• Mrs. Living Walls P ltd. • M/s D K A P ltd.Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
15. Living Walls apartment
Nival Tech-2012 36
Nival Tech-2012 37
Overview & Site Description• Location: T.Nagar Chennai INDIA)• Building type(s): Hospital-Building• Renovation type Started 2012• 25 bed Hospital• Project scope: MEP Design
Owner & architects• Mrs. BVL Group. • M/s eterno Design Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
16. Brain & Spine Hospital
Nival Tech-2012 38
Nival Tech-2012 39
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Industrial Type Building• New Construction type. Started 2011• 70 apartment• Project scope: MEP Design
Owner & architects• M/s Smiths interconnects. • M/s Experience Design Studio-Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
17. Smith Interconnects
Nival Tech-2012 40
Nival Tech-2012 41
Nival Tech-2012 42
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Administrative Office• Interior renovation only• 3000 sqft.• Project scope: MEP Design
Owner & architects• M/s Thai Airwasy.Thailand • M/s Experiences Design Studio Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
18. Thai Airways
Nival Tech-2012 43
Nival Tech-2012 44
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Software office• Interior only Completed 2012• 3500 SQFT• Project scope: MEP Design
Owner & architects• M/s ESSL LTD.• M/s IRIS GLOBALBangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
19. ESSL Softwre-jayanagar
Nival Tech-2012 45
Nival Tech-2012 46
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Residential-Multi Dwelling Building• New Construction type. Started 2010• 4 apartment• Project scope: MEP Design
Owner & architects• Mr. Ajaykumar Reddy. • M/s R Square Design P ltd.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
20. Mr.Ajaykumar Reddy apartment
Nival Tech-2012 47
Nival Tech-2012 48
Overview & Site Description• Location: Bangalore(INDIA)• Building type(s): Residential-Multi Dwelling Building• New Construction type. Started 2011• 70 apartment• Project scope: MEP Design
Owner & architects• M/s. SJR Enterprises P ltd. • M/s Kabir & Hira Architects - Bangalore.Building ProgramsIndoor Spaces: Toilet(5%), outdoor space ( 25%) Garden ( 3%) and car parking (17%) Outdoor Spaces:Finance & Cost: MEP - Rs/sqft
ACMV- Lac ( Rs /sqft)Electrical - 34 Lac (Rs /sqft)PHE - 8.6 lac ( Rs /sqft)
Water Conservation and Use…..LPD
Energy …… KVA
21. SJR Padukone Plaza.
Nival Tech-2012 49
Nival Tech-2012 50
Our heartiest THANKS For your supports and to Achieve This.