Upload
reid-satchell
View
221
Download
7
Tags:
Embed Size (px)
Citation preview
NM USER FORUM 2014
Etienne De MuelenaereNetwork Strategy & Development
30 January 2014
NM 2014/2015 functional improvements
NM User Forum 2014 - NM 2014/2015 functional improvements 2
Functional Improvements
New NM Projects • Cooperative Traffic Management
SESAR R&D• Demand-Capacity Balancing• Optimized AU Operations• Dynamic Airspace Management
2
Releases timeline
2015
NM18.0 NM19.0NM18.5
Mar Mar Oct
20142013
NM19.5
Oct May
NM18.NOP
NM Projects• Free Route Airspace• Advanced Flexible Use of Airspace• NOP Information Services
NM User Forum 2014 - NM 2014/2015 functional improvements 33
NM Project - Free Route Airspace
Avoid Boundary DCT
0.1% Rule for route substitution
0.1%
October 2014
NM Achievements Oct 2011 - Initial Deployment of NM systems In 2013, 10 ACCs have either fully or partially
implemented FRA (with one X-border) End of 2013, 5 additional ACCs planned
NM User Forum 2014 - NM 2014/2015 functional improvements 44
NM Project - Advanced Flexible Use of Airspace
TACT
NMC / MILO
Network Impact Assessment
CACD
PREDICT
SIMEX
NM operations
ASM interoperability
level 1&2
Dynamic Updates
Test Airspace not published
Export NAT Tracks in AIXM 5.1. Format
OperationalStatic Data
eAMI
eRAD
Interoperability withlocal ASM Tools
October 2
014
ASMTools
AOs, ANSPs
NM User Forum 2014 - NM 2014/2015 functional improvements 55
NM Project - NOP Information Services
Cooperative ATFCM Services
Cooperative Flight Management
FPL submission via the NOP
(FB559 – NM18.NOP)
PREDICT
Scenario editor
Via the NOP
(FB587 – NM18.0)
SIMEX
TACT
Trial in
Spring 2014
before ops
Summer 2014
NM User Forum 2014 - NM 2014/2015 functional improvements 66
NM Project - NOP Information Services
All UsersEVITA Phase II – enhanced
interface(FB538 - 2014)
EACCC Crisis Management Pack
(FB562 – Mar 2015)
All Users
All Users
NOP access to event info
(FB591 – NM17.5.2 – Internal Prototype)
(FB630 – 2014)
NetworkEvents
Repository
Updating the CFMU URLs(incl B2B)
(FB592 - NM18.0)
Q1 2014
Mid-2014
Mid-2014
Mar 2015
NM User Forum 2014 - NM 2014/2015 functional improvements 7
2013
SESAR Research & Development - Planning
2014 2015 2016
Release NM18 Release NM19 Release NM20 Release NM21
DC
B
STAM1. Edition, What-If2. Coordination
STAM1. Interops INAP Tools
Extended TTO/TTA
AMAN Integration
V3
V3
V3
V2 V3
Release NM18.5
OAT FPL
Slot Swapping
ASM Real-Time
AU
Op
sD
yna
mic
AS
FOS
Extended FPLV2
V3
V3
V3
NM User Forum 2014 - NM 2014/2015 functional improvements 8
SESAR – DCB (Demand-Capacity Balancing)
CDM Updates of the Plans (STAM)
NetworkMgnt
Airspace
Users
• Occupancy counts• Hot Spot Detection• Network View• Support to CDM
FMP
CDM Updates of the Plans (STAM)
NetworkMgnt
NetworkMgnt
Airspace
Users
Airspace
Users
Airspace
Users
• Occupancy counts• Hot Spot Detection• Network View• Support to CDM
FMP
Operational Validations
STAM Ops Trial 2015
Scope: Interoperability with local ATC Planning tools
STAM Ops Trial 2014
Scope:• Hotspot management• STAM proposal definition• STAM collaboration and implementation• Implementation monitoring
Airborne flight trajectories (Newbridge)
Scope: Improved predictability when post-dep trajectories received by the AUs from their airborne flights, are sent to the NM.
Sep 2014
May 2014
May 2015
NM User Forum 2014 - NM 2014/2015 functional improvements 9
SESAR – Optimized AU Operations
AFR941H A320
VLM325 F50
KLM897 B747
SAS1550 MD87
Operational Validations
Military (OAT) FPL
Validation of military flight plan by IFPS
Summer 2014
Q4 2015
Slot Swapping (UDPP)
Scope: Enhance Slot Swapping capabilities and check benefits:
• Slot swapping partners display + swap in one click• Reconcile CDM airport delay and ATFCM delay• Priority adaptation for swapped flights
NM User Forum 2014 - NM 2014/2015 functional improvements 10
SESAR – Dynamic Airspace Management
TACT
CACD
PREDICT
SIMEX
NM systems
ASMTools
Operational Validations
Interoperability with ASM Tools for real-time
Scope: ASM/ATFCM coordination until the real-time activation of airspaces or routes (with local ASM tools)
Q4 2014
NM User Forum 2014 - NM 2014/2015 functional improvements 11
2014
Future NM Project - Cooperative Traffic Management
2015 2016 2017
Release NM18 Release NM19 Release NM20 Release NM21 Release NM22
Co
op
erat
ive
Tra
ffic
Man
agem
ent
STAM1. Edition, What-If2. Coordination3. Scenario Mgnt4. Post-Ops
STAM1. Interops INAP Tools2. Scenario Mgnt3. Post-Ops
Adherence1. Intruders surveil.2. Late updates3. Predictability monitor
TTA/AMAN Integration1.D/E/A MAN reconciliation
TTA/AMAN Integration1. Metring Fix Mgnt
SE
SA
R
STAM1. Edition, What-If2. Coordination
STAM1. Interops INAP Tools
Extended TTO/TTA
AMAN Integration
V3
V3
V3
V2 V3
NM User Forum 2014 - NM 2014/2015 functional improvements 1212
Promotion on Communication about Releases:
• Release Noteshttp://www.eurocontrol.int/publications
• Webex http://www.eurocontrol.int/publications
• Others
NM User Forum 2014 - NM 2014/2015 functional improvements 1313
Questions?