6

North Carolina Department of Transportation - NCDOT Carolina Department of Transportation ... Suite 400 Morrisville, NC ... Section i | Table of Contents i E&SC Manual January 2015

  • Upload
    ngominh

  • View
    215

  • Download
    3

Embed Size (px)

Citation preview

North Carolina Department of Transportation

Erosion and Sediment Control Design and Construction Manual

NCDOT North Carolina Department of Transportation

Roadside Environmental Unit

1557 Mail Service Center

Raleigh, NC 27699-1557

919.707.2920

Designed & Developed by:

URS Corporation – North Carolina 1600 Perimeter Park Drive, Suite 400

Morrisville, NC 27560

919.461.1100

2014 Edition

Section i | Table of Contents i

E&SC Manual January 2015

Table of Contents

Chapter 1 Introduction Managing E&SC on NCDOT Projects ............................................................................... 1-1 How to Use This Manual .................................................................................................. 1-1 An Overview of the Keys to E&SC Planning and Design ................................................ 1-3 Unique Elements of Managing E&SC on Linear Projects ............................................... 1-4 Regulatory Considerations .............................................................................................. 1-5 Threatened and Endangered (T&E) Species Regulations ............................................ 1-14

Chapter 2 E&SC Planning Data Collection and Preliminary Analysis ....................................................................... 2-1 E&SC Plan Strategy ......................................................................................................... 2-3 Water Quality Classifications .......................................................................................... 2-3 HQW and ESAs ................................................................................................................ 2-5 303(d) Listed Waters ...................................................................................................... 2-5 Critical Areas.................................................................................................................... 2-6 Riparian Buffers .............................................................................................................. 2-6 Rainfall Data References ................................................................................................ 2-6 Ten Key Concepts to Effective E&SC Design ................................................................. 2-6 Managing Turbidity ........................................................................................................ 2-10 NCDOT Watershed-Related Special Provisions .............................................................2-11 Falls Lake Watershed ......................................................................................................2-11 Jordan Lake Watershed ................................................................................................. 2-12 The Central Coastal Plain Capacity Use Area (CCPCUA) .............................................. 2-12 Other E&SC Planning Considerations ........................................................................... 2-13 Trout Waters .................................................................................................................. 2-13 Post-Construction BMPs ................................................................................................ 2-16 NCDOT Division-Specific E&SC Preferences ................................................................. 2-18 Low Impact Development (LID) and Green Infrastructure (GI) Considerations ........ 2-19

Chapter 3 Developing the E&SC Plan

Contracted Projects Section 3.1 Bid-Build (BB) Projects .............................................................................. 3-1

BB Work Flow for E&SC Plans ................................................................. 3-3 During Construction ................................................................................. 3-7 Intermediate Phase Design ..................................................................... 3-7 Final Grade Phase Design......................................................................... 3-9 Ground Cover Stabilization Requirements ............................................ 3-11 Reclamation Plans for any Off-Site Borrow or Waste Pits .................... 3-11 Special Provisions .................................................................................... 3-12 Detail Sheets and Notes ......................................................................... 3-12 Title Sheet ................................................................................................ 3-12 Additional Plan Requirements ................................................................ 3-12 Administrative Requirements ................................................................ 3-13

Section i | Table of Contents ii

E&SC Manual January 2015

Table of Contents, cont.

Section 3.2 Design Build Projects .............................................................................. 3-15 DB Work Flow for E&SC Plans ................................................................ 3-17 Vegetation Management Procedure ..................................................... 3-18 C&G Phase Design .................................................................................. 3-20 During Construction ............................................................................... 3-24 Intermediate Phase Design ................................................................... 3-26 Ground Cover Stabilization Requirements ........................................... 3-29 Additional Stabilization Requirements ................................................. 3-30 Reclamation Plans for any Off-site Borrow or Waste Pits ................... 3-32 NCDOT Special Provisions...................................................................... 3-32 Detail Sheets and Notes ........................................................................ 3-33 Title Sheet ............................................................................................... 3-33 Additional Plan Requirements ............................................................... 3-33 Administrative Requirements ............................................................... 3-34 Section 3.3 Low Impact Bridge Projects .................................................................. 3-35

Low Impact Bridge Work Flow for E&SC Plans .................................... 3-37 During Construction ................................................................................ 3-41 Ground Cover Stabilization Requirements ........................................... 3-43 Detail Sheets and Notes ........................................................................ 3-44 Title Sheet ............................................................................................... 3-44 Additional Plan Requirements ............................................................... 3-45 Administrative Requirements ............................................................... 3-45

State Forces Projects

Section 3.4 Operations Projects ............................................................................... 3-47 Operations Projects Work Flow for E&SC Plans ................................... 3-49 Phasing ................................................................................................... 3-49 Phases of E&SC Design for Operations Projects .................................. 3-50 During Construction ............................................................................... 3-58 Intermediate Phase Design ................................................................... 3-58 Final Grade Phase ................................................................................... 3-58 Ground Cover Stabilization Requirements ........................................... 3-60 Additional Stabilization Requirements .................................................. 3-61 Reclamation Plans for any Off-site Borrow or Waste Pits .................... 3-61 Detail Sheets and Notes ......................................................................... 3-61 Title Sheet ................................................................................................ 3-61 Section 3.5 Bridge Management Construction Projects ......................................... 3-63 Bridge Management Construction Operations Work Flow for E&SC Plans ................................................................................. 3-65 Phasing ................................................................................................... 3-65 Phases of E&SC Design for Bridge Management Projects .................. 3-66 During Construction ............................................................................... 3-73 Intermediate Phase Design ................................................................... 3-73 Final Grade Phase ................................................................................... 3-75

Section i | Table of Contents iii

E&SC Manual January 2015

Table of Contents, cont.

Ground Cover Stabilization Requirements ........................................... 3-76 Additional Stabilization Requirements ................................................. 3-76

Reclamation Plans for any Off-site Borrow or Waste Pits ................... 3-76 Detail Sheets and Notes ........................................................................ 3-77 Title Sheet ............................................................................................... 3-77 Section 3.6 NonLinear Projects................................................................................. 3-79 Section 3.7 Reclamation Plans .................................................................................. 3-83 Applicability ............................................................................................ 3-83 Reclamation Procedures ....................................................................... 3-84 Checklist Overview ................................................................................. 3-85 Initial Reclamation Plan Considerations ............................................... 3-85 Environmental Evaluations .................................................................... 3-85 E&SC for Reclamation Plans .................................................................. 3-87 Plan Implementation During Construction ........................................... 3-88 Final Inspection ...................................................................................... 3-90 Observation Period ................................................................................ 3-90 Section 3.8 Construction Site Pollutants ................................................................... 3-91

Chapter 4 E&SC BMPs

Section 4.1 BMP Symbology ........................................................................................ 4-1 Section 4.2 Site Preparations ...................................................................................... 4-5

4.2.1 Gravel Construction Entrance ................................................. 4-6 4.2.2 Safety Fence & Jurisdictional Flagging .................................. 4-11

Section 4.3 Perimeter Areas and Runoff Conveyance............................................. 4-19 4.3.1 Temporary Silt Fence ............................................................. 4-20 4.3.2 Temporary Diversion ............................................................. 4-27 4.3.3 Temporary Silt Ditch ............................................................... 4-31 4.3.4 Silt Fence Break ...................................................................... 4-35 4.3.5 Temporary Earth Berm .......................................................... 4-45

Section 4.4 Slope Protection .................................................................................... 4-49 4.4.1 Temporary Slope Drain .......................................................... 4-50 4.4.2 Special Sediment Control Fence ........................................... 4-55 4.4.3 Rolled Erosion Control Products ........................................... 4-59 4.4.4 Wattle Barrier ......................................................................... 4-65

Section 4.5 Runoff Conveyance Management......…………………………………4-71 4.5.1 Wattles ................................................................................... 4-72 4.5.2 Temporary Rock Silt Check, Type A………………………...4-79 4.5.3 Temporary Rock Silt Check, Type A

with Excelsior Matting and Flocculant ................................. 4-84 4.5.4 Temporary Rock Silt Check, Type B ...................................... 4-89 4.5.5 Clean Water Diversion ........................................................... 4-93

Section 4.6 Drainage System Protection .................................................................. 4-99 4.6.1 Rock Inlet Sediment Trap, Types A, B, and C...................... 4-100

Section i | Table of Contents iv

E&SC Manual January 2015

Table of Contents, cont.

4.6.2 Rock Pipe Inlet Sediment Trap, Types A and B .................... 4-111 Section 4.7 Sediment Containment ......................................................................... 4-118

4.7.1 Riser Basin ............................................................................. 4-119 4.7.2 Silt Basin Type B .................................................................... 4-125 4.7.3 Skimmer Basin.......................................................................4-130 4.7.4 Tiered Skimmer Basin ...........................................................4-138 4.7.5 Infiltration Basin with Baffles .............................................. 4-146 4.7.6 Temporary Rock Sediment Dam, Types A ........................... 4-154 4.4.7 Temporary Rock Sediment Dam, Type B .............................4-159 4.7.8 Coir Fiber Baffle ................................................................... 4-164 4.7.9 Earthen Dam with Skimmer ................................................. 4-170 4.7.10 Stormwater Basin with Skimmer ......................................... 4-178

Section 4.8 Managing the Watercourse ................................................................. 4-185 4.8.1 Temporary Stream Crossing ................................................ 4-186 4.8.2 Impervious Dikes .................................................................. 4-191 4.8.3 Stilling Basin .......................................................................... 4-197 4.8.4 Special Stilling Basin ............................................................ 4-202

Section 4.9 Soil Stabilization ................................................................................... 4-208 4.9.1 Temporary Seeding ............................................................. 4-209 4.9.2 Temporary Mulching ............................................................ 4-214 4.9.3 Seeding and Mulching .......................................................... 4-218

Chapter 5 E&SC Training and Certification E&SC / Stormwater Certification Program (E&SC/SW) .................................................. 5-1 Levels I, II and III Certification ......................................................................................... 5-1 EnviroCert International, Inc. Certification Programs .................................................. 5-3 Certified Professional in Erosion and Sediment Control (CPESC) ................................ 5-4 NCDOT Erosion Control and Stormwater Certification Provision ................................ 5-4 Recertification ................................................................................................................. 5-5 Other Training ................................................................................................................. 5-5