North Coast Wind Farm
Tolano Environmental Consulting
Project Scope
• Offshore wind farm proposed by Wind Energy Group.
• 110 wind turbine generators with a plant capacity of 396 megawatts (MW).
• Electricity will power 38,000 homes.
Project Scope
• On-site construction works will take place over three summers from 2012 to 2014.
• Towers embedded in sea floor.• 20 metre water depth at site.• 2 days installation time per
tower.
Our Role
• TEC contracted to monitor effect of construction on sea life
• 2 senior biologists assigned to project
• $500,000 revenue for TEC• Field work: 50% of time• Our first wind farm contract!