Northern Graphite Corp - Largest Battery Grade Graphite Deposit

Embed Size (px)

Citation preview

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    1/34

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    2/34

    This Presentation may contain forward-looking information which may include, but is not limitedto, statements with respect to: timing of the receipt of governmental approvals and/oracceptances; targets, estimates and assumptions in respect of production and prices; amount andtype of future capital expenditures and capital resources; mineral reserves and mineral resources;anticipated grades; recovery rates; future financial or operating performance; costs and timing ofthe development of new deposits; costs, timing and location of future drilling; productiondecisions; costs and timing of construction; operating expenditures; costs and timing of futureexploration; and environmental and reclamation expenses. There can be no assurance that futurerequired regulatory approvals will be obtained or that anticipated transactions or proposed workand construction programmes will be completed satisfactorily. Often, but not always, forward-looking statements can be identified by the use of words such as plans, expects, is expected,

    budget, scheduled, estimates, forecasts, intends, anticipates, or believes or variations(including negative variations) of such words and phrases, or state that certain actions, events orresults may, could, would, might or will be taken, occur or be achieved. Forward-lookingstatements involve known and unknown risks, uncertainties and other factors which may causethe actual results, performance or achievements of the Company and/or its subsidiaries and/or itsaffiliated companies to be materially different from any future results, performance orachievements expressed or implied by the forward-looking statements. Although the Company hasattempted to identify important factors that could cause actual actions, events or results to differmaterially from those described in forward-looking statements, there may be other factors thatcause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of the applicable public recorddocument which the information is derived from and the Company has disclaimed any obligation

    to update any forward-looking statements, whether as a result of new information, future eventsor results or otherwise. There can be no assurance that forward-looking statements will prove tobe accurate, as actual results and future events could differ materially from those anticipated insuch statements. Accordingly, readers should not place undue reliance on forward-lookingstatements due to the inherent uncertainty therein.

    Unless indicated otherwise, all dollar figures are in U.S. dollars.

    Fo rw a rd Look ing St a tem en ts

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    3/34

    This presentation and other information released by the Company uses the terms resources,

    measured resources, indicated resources and inferred resources. United States investors areadvised that, while such terms are recognized and required by Canadian securities laws, the SECdoes not recognize them. Under United States standards, mineralization may not be classified as a

    reserve unless the determination has been made that the mineralization could be economicallyand legally produced or extracted at the time the reserve determination is made. Mineralresources that are not mineral reserves do not have demonstrated economic viability. UnitedStates investors are cautioned not to assume that all or any part of measured or indicatedresources will ever be converted into reserves. Inferred resources are in addition to measured and

    indicated resources. Further, inferred resources have a great amount of uncertainty as to theirexistence and as to whether they can be mined legally or economically. It cannot be assumed thatall or any part of the inferred resources will ever be upgraded to a higher category. Therefore,United States investors are also cautioned not to assume that all or any part of the inferredresources exist, or that they can be mined legally or economically. National Instrument 43-101Standards of Disclosure for Mineral Projects (NI 43-101) is a rule developed by the CanadianSecurities Administrators, which established standards for all public disclosure an issuer makes ofscientific and technical information concerning mineral projects. Unless otherwise indicated, all

    resource estimates contained herein or in other information released by the Company in the pastand in the future, have been or will be prepared in accordance with NI 43-101 and the CanadianInstitute of Mining, Metallurgy and Petroleum Classification System. The requirements of NI 43-101 are not the same as those of the SEC.

    CAUTI ONARY STATEMENT REGARDI NG MI NERAL RESOURCES

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    4/34

    1

    The New est St r a teg i c Mine ra l

    Growing industrial demand from emerging economies

    - Prices have tripled

    Demand growth from new applications

    - Li ion batteries, fuel cells, VRBs, nuclear power

    Chinese supply concerns (70% of world production)

    EU and USA have named graphite a supply critical mineral

    The leading undeveloped graphite deposit

    - Large flake, high purity, scalable

    Located in Canada, close to infrastructure

    Simple mining & metallurgy

    BFS and permitting by 2Q 2012

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    5/34

    1

    One of two natural carbon polymers (diamonds)

    Highest natural strength/stiffness of any material

    Corrosion and heat resistant

    Excellent conductor of heat and electricity

    High lubricity

    Lightest weight of all reinforcements

    Gr aph i t e 101

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    6/34

    1

    5% annual growth rate this decade

    Driven by Asian steel and auto markets Major end uses

    Steel & refractories (41%)

    Carbon brushes and batteries (21%)

    Automotive parts (14%) Lubricants (14%)

    Other (10%)

    W hat i s Gr aph i t e Used For ?

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    7/34

    1

    Nickel 1,276,000

    Graph i t e 1 ,006 ,000

    (40% flake, 60% amorphous)

    Molybdenum 190,000REE (oxides) 124,000

    Cobalt 68,000

    Tungsten 55,000Lithium 23,000

    (tpy)

    La rge and Grow ing I ndu st r i a l Mark et

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    8/34

    1

    Four emerging technologies with potential to use

    multiples of current annual production

    Lithium ion batteries

    Fuel cells

    Pebble bed nuclear reactors

    Vanadium redox batteries

    All have commercial versions now

    Future demand not dependent on one technology

    Gr een En erg y Tech n o log ies

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    9/34

    1

    Li t h i u m I o n Bat t er i es

    Graphite is the anode material - no substitutes

    It takes 20-30 times more graphite than Li (byweight) to make Li ion batteries

    Current Li ion battery demand 30,000 tpy andgrowing 20-30% annually

    - Replacement of traditional battery technologies

    Li ion batteries in cars will lead to rapid demandgrowth (2kg of graphite in HEV, 25-50kg in EV)

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    10/34

    1

    I n c rem en ta l Li Ca rbona t e Dem and i n 202 0

    1% 5% 10% 15% 20%5% 49 109 185 260 33610% 82 143 218 294 37015% 116 176 252 328 40320% 150 210 286 361 43725% 183 244 319 395 470

    EV Marke t Pene t r a t ion

    HEV

    Marke tPene t ra t ion

    (000 tonnes)

    (Canaccord Research)

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    11/34

    1

    Requ i r ed Ann ua l Flake Gr aph i t e Pr odu ct ion

    1% 5% 10% 15% 20%5% 286 637 1,082 1,520 1,96510% 479 836 1,274 1,719 2,16315% 678 1,029 1,473 1,918 2,35620% 877 1,228 1,672 2,111 2,55525% 1,070 1,310 1,865 2,310 2,748

    202 0 EV Mark e t Pene t r a t ion

    202 0 HEV

    Marke tPene t ra t ion

    (000 tonnes)

    -one ton ne o f L i carbonate equa ls 0 .1879 t onnes o f L i meta l

    - one t onne o f L i m e t a l r equ i r es 10 . 375 t onnes o f g raph i t e

    -3 ton nes o f g raph i te f l ake requ i red to m ake 1 tonn e o f spher i ca l g raph i te fo r L i i on ba t te r ies

    Cur r en t annua l f l a ke g r aph i t e p r oduc t i on i s 400 ,000 t onnes

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    12/34

    1

    All major car companies are working on fuel cell vehicles

    (which contain 80kg of graphite)

    Toyota sees a clear path to commercial introduction offuel cell vehicles by 2015

    Fuel cells vehicles, along with EVs, are part of the solutionto reducing dependence on non-renewable energy

    Honeywell, Siemens, Ballard Power and many otherstargeting fuel cell markets for non-transportation uses

    Large-scale fuel-cell applications are being developed thatcould consume as much graphite as all other usescombined USGS, 2009

    Fu el Ce l l Dem an d

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    13/34

    1

    leading energy storage system for renewable energy

    sources such as wind/solar

    virtually unlimited storage capacity, long battery life, low

    maintenance requirements, nominal environmental

    footprint.

    300 tonnes of graphite per

    1,000MW VRB

    Vanad ium Redox Bat t e r i es

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    14/34

    1

    Smaller, safer, less costly to permit, build and operate

    Fuel is uranium embedded in graphite balls

    -3,000t of graphite to start, 600-1,000 tpy per 1,000MW

    China has operating prototype, andstate-owned HuanegGroup is building two pebble-bed reactors of 200MW each

    -One of top 16 priorities in 2006-2020 Plan

    -30 planned by 2020

    Pebb le Bed Nu c lear React or s

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    15/34

    1

    70% of global production from China

    Mainly low carbon, low value powder or small flake

    Near surface, low cost oxide deposits being depleted

    Mines deeper, higher cost, lower quality

    Modernization and consolidation of industry Increasing labor & environmental standards

    Emphasis on value added processing

    Export taxes, VAT and export licenses imposed- Producers ask for rare earth type protection

    Currency appreciation will increase costs/prices

    Ch in ese Pr odu ct i on / Ex po r t s t o Decl i ne

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    16/34

    1

    A Com pe l l ing Supp l y / Dem and St o ry

    Growing demand from traditional uses

    Growing demand from new industrial applications

    Growing demand from green energy technologies

    Market dependence on Chinese

    Chinese supply issues

    Lack of exploration, investment and new projects

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    17/34

    1

    D em a n d g r o w t h co m b i n ed w i t h s u p p l y co n ce r n s h a v eled t o 7 8 % pr i ce i ncrease ove r t he pas t 4 y ea rs

    Source : I ndus t r i a l M ine ra l s Magaz ine

    Gr aph i t e Pr ices on t h e Rise

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    18/34

    1

    8 0 - 85 % C 9 0 % C 9 4 - 97 % C

    Ext ra La rge (+50) - - + $ 3 , 0 0 0

    Large (-50 +80) - $2,000-2,500 $2 ,500 -3 ,000

    Med ium (-80 +100) - $1,500-2,000 $2 ,200 -2 ,500

    Fin e ( -100) - $1,400-1,800 $2,000-2,400

    A m o r p h o u s p o w d e r $600-800 - -

    Source : I ndus t r ia l M inera ls Magaz ine Pr i ces , Rosk i l l I ndus t r y Repor t

    Pr e m i u m Pr i ce f or Si ze/ Pu r i t y ( US$ / t o n n e)

    Bisset t Creek

    Concent ra t e Pur i t y

    FlakeSize

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    19/34

    1

    Eva lu a t ion o f Gr aph i t e Deposi t s

    What is percentage of flakes vs -150 mesh fines?

    - Flake is high growth, high value market- -150 is low growth, low price market

    - -150 is unsuitable for new applications and sometimes not salable

    What is distribution of flake sizes?- Large, medium and fine

    What is carbon content of concentrates- Higher carbon content equals higher price (90-98%)

    These questions can only be answered bymetallurgical testing

    - Must be production, not in situ values

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    20/34

    1

    Even if some mines increase their production, this will not solvethe persist ing supply problem for large flake crystalline graphite.Technog r aph i t , Feb / 200 9

    Consum pt ion of flake graphite is growing at the expense ofamorphous graphite and there is a potential m ismatch between

    supply and demand for flake graphite .Ro sk i l l A u g / 2 0 0 9

    Presently, large flake graphite supply is very t ight due todecreased production capacity of Chinese minesTechn ogr aph i t , Mar . 20 10

    The days of cheap, abundant graphite from China are over.I ndu s t r i a l M ine ra l s Magazine May , 20 11

    Lar ge Flak e , H igh Pu r i t y Depos i t

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    21/34

    1

    Used to make the anodes in Li ion batteries

    Made from concentrate produced by mine

    Concentrate must be micronized, rounded and purified to99.95%C

    Bissett Creek graphite has been successfully upgraded tospherical graphite

    Sells for $7-8,000 per tonne

    Provide Li ion battery manufacturers with a stable, secure sourceof supply that is produced in an environmentally acceptablemanner

    Sph er ica l Gr aph i t e Va lue Add ed Pr ocess ing

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    22/34

    1

    100km east of North Bay,

    Ontario

    Easily accessible, 17kmfrom Trans-Canada hwy,close to infrastructure

    Close proximity to majorNorth American steel andautomotive markets

    Freight cost advantage

    100 km

    Bisset t Cr eek Pro j ect

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    23/34

    1

    Full feasibility study in 1989 (including P&P reserve*)

    2010 NI 43-101 Preliminary Assessment Report

    Lar ge Sca lab le Gr aph i t e Resour ce

    * H is to r i ca l i n fo rm at ion i s p resented fo r in fo r mat ion purposes on ly . The Feas ib i l i t y Study and Reserve es t imatesw ere no t c om p l e t ed i n acc o rdanc e w i t h N I 43 -101 and t he re f o re shou l d no t be r e l i ed upon .* * M i nera l r es ou rces a re no t m i ne ra l r ese r v es and do no t h av e dem ons t ra t ed econom i c v i ab i li t y .* * * The 43-1 01 Pre l im inary Assessm ent inc ludes in fe r red m inera l resources w h ich are cons idered too specu la t i vegeo log ica l ly t o have econom ic cons idera t ions app l ied to them tha t w ou ld enab le them t o be ca tegor i zed as m inera lreserves . Fur t herm ore , t here i s no cer ta in t y tha t t h e resu l t s p ro jec ted in the Pre l im in ary Assessmen tw i l l be rea l i zed and ac tua l resu l t s may v ary subs tan t ia l l y .

    2011 Updated Mineral Resources (Diluted)Indicated Inferred

    %Cg

    Cut-offTonnage*

    (metric tons)Cg(%)

    by LECOIn Situ Graphite**

    (metric tons)Tonnage*

    (metric tons)Cg(%)

    by LECOIn Situ Graphite**

    (metric tons)0.986 25,983,000 1.81 470,300 55,038,000 1.57 864,1001.227 24,588,000 1.85 454,900 50,472,000 1.62 817,600

    1.50 19,954,000 1.99 397,100 33,672,000 1.81 609,5001.75 16,031,000 2.34 375,100 21,417,000 2.21 473,300

    2.0 11,921,000 2.50 298,000 14,584,000 2.37 345,600

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    24/34

    1

    Ex pans ion Po ten t ia l

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    25/34

    1

    Deposit at surface, no overburden

    Continuously mineralized throughout Low waste-to-ore ratio

    Conventional open pit mining

    Typical cross-section of Bissett Creek orebody

    Sim p le M in in g

    1 0 0 m

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    26/34

    1

    Bulk sampling, pilot plant testing, and extensive labwork previously completed by Cominco/Kilborn/BD

    Conventional flotation processing (92-95% recoveries)

    Confirmed by independent tests in 2007 and 2011

    Additional pilot plant testing 4Q 2011

    Sim p le Met a l lu r gy

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    27/34

    1

    Pr i ce / t o n n e

    2 0 % + 3 2 m e sh su p er f la k e 9 8 % C + $ 3 ,0 0 0

    3 5 % + 5 0 m e sh j u m b o f lak e 9 7 % C + $ 3 ,0 0 0

    3 5 % + 8 0 m e sh l ar g e f l ak e 9 6 % C + $ 2 ,7 5 0

    1 0 % + 1 5 0 m esh m e d iu m / f in e f lak e 9 4 % C + $ 2 ,0 0 0

    We igh ted ave r age r evenue pe r t onn e $2 ,800

    Larg e Flake , H igh Pur i t y Concen t r a t e

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    28/34

    1

    C$70-80 MM capital cost

    2,500 tpd processing rate

    19,000 tonnes of graphite produced per year

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    29/34

    1

    Completion of Bankable Feasibility Study 2Q-2012

    Approval of Mine Closure Plan 2Q-2012

    Start Construction 3Q-2012

    Commercial Production 3Q-2013

    Tim e li ne to Pr odu ct i on

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    30/34

    1

    Conservative 43-101* Current

    ( $ CDN / t o n n e )

    Average p r i ce $1,300 $1,700 $2,500

    Costs 1,000 1,000 1,000

    Marg in $300 $700 $1,500

    ($CDN)

    N et ca sh f l o w ( $ M) $108.3 $371.5 $937.0

    NPV ( $M @10% ) $3.9 $75.6 $180.4

    I RR ( % ) 10.6 24.0 42.0

    Ann ua l cash f low $3.9 $9.3 $28.7

    High Pr ice Lever age

    * The 43-101 Pre l im in ary Assessm ent inc ludes in fe r red m inera l resources w h ich are cons idered toospecu la t i ve geo log ica ll y t o have economic cons idera t ions app l ied to them tha t w ou ld enab le them to becategor i zed as m in era l reserves . Fur t herm ore , t here i s no cer ta in t y tha t t h e resu l t s p ro jec ted in thePre l im inary Assessment w i l l be rea l i zed and ac tua l resu l t s may v ary subs tan t ia l l y .

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    31/34

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    32/34

    1

    Gregor y Bow es B.Sc (g eo logy ) , MBA CEO and DirectorFormerly Senior VP, Orezone Gold Corporation

    Don Bax t er P . Eng PresidentFormerly President, Ontario Graphite Corporation

    St ephen Thom pson CA CPA (Illinois) Chief Financial OfficerFormerly Vice President Finance, Ottawa Hydro Limited

    Ron L i t t le P . Eng DirectorPresident and CEO, Orezone Gold Corporation (ORE:TSX)

    I a in Scar r B .Sc (g eo logy ) , MBA DirectorFormer Commercial Director, Rio Tinto industrial minerals division, VP Corporate Development, Lithium One

    Jay Chm elausk as MBA DirectorPresident/Director, Westerm Lithium Corp.

    K. Se thu Ram an PhD DirectorIndependent Mining Consultant

    Don Chr is t ie CA DirectorFormer CFO, Continental Gold

    George Haw ley Technical Advisor40 years of experience in industrial minerals R&D, market analysis and development

    Ex per ienced Managem en t & Boa rd

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    33/34

    1

    Large, growing industrial market

    Demand growth from emerging applications Supply concerns with China

    Highest percentage of large flake production

    Highest revenue & margin/tonne of concentrate Only mine with 4-5x scalable production

    Close to infrastructure/markets/transportation

    Simple mining & metallurgy

    Bankable feasibility, full permitting 2Q-2012

    One year to build mine

    S u m m a r y

  • 8/2/2019 Northern Graphite Corp - Largest Battery Grade Graphite Deposit

    34/34

    1

    Variability testing 1 month

    File Mine Closure Plan 1 month

    Complete bankable feasibility study - 2 months

    Negotiate financing/offtake with strategic partners

    Initiate detailed engineering, site preparation,order long lead time equipment (subject to FS results)

    Major permits in 2Q 2012

    Mine Financing (1-3 months)

    Construction of mine 1 year

    Nex t St eps