NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-1 ELECTRICAL LEGEND & DETAILS.DWG PLOTSYLE TABLE: Ingenium-Full Size-A0.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
ELECTRICAL LEGEND &
DETAILS
E-1
N.T.S.
O.R.#14NEUROSURGERY
M2 279O.R.#14
ANTE RMM2 277A
OFFICEM2 233G
O.R.CORRIDOR
M2 281
1
2
3
1 1 1 1 1
2
3
2
3
2
3
2
3
2
3
2
32
3
CC
CB
1314 13
CC
CB
NEUROSURGERY
O.R.#14NEUROSURGERY
M2 279O.R.#14
ANTE RMM2 277A
OFFICEM2 233G
O.R.CORRIDOR
M2 281
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-2 LIGHTING POWER & SYSTEMS DEMOLITION.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
PART PLAN LEVEL 2
LIGHTING, POWER & SYSTEMS
DEMOLITION
E-2
1:50
OR 15M2291565.37OR 14a
M2281485.94
PDO
CONTROL RM
M2 284
HYBRID ORPROCEDURE
M2 285
EQUIP RM
M2 283
O.R.STERILE CORE
M2 215A
O.R.CORRIDOR
M2 291A
CC
CB
14 13
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-3 LIGHTING POWER & SYSTEMS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
PART PLAN LEVEL 2
LIGHTING
NEW
E-3
1:50
OR 15M2291565.37OR 14a
M2281485.94
PDO O.R.CORRIDOR
M2 291A
O.R.STERILE CORE
M2 215A
EQUIP RM
M2 283
CONTROL RM
M2 284
HYBRID ORPROCEDURE
M2 285
CC
CB
14 1314 13
CC
CB
OR 15M2291565.37OR 14a
M2281485.94
PDO O.R.CORRIDOR
M2 291A
O.R.STERILE CORE
M2 215A
EQUIP RM
M2 283
CONTROL RM
M2 284
HYBRID ORPROCEDURE
M2 285
1
2
3
1
2
3
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-4 POWER & SYSTEMS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
PART PLAN LEVEL 2
POWER & SYSTEMS
NEW
E-4
1:50
OR 15M2291565.37OR 14a
M2281485.94
PDO O.R.CORRIDOR
M2 291A
O.R.STERILE CORE
M2 215A
EQUIP RM
M2 283
CONTROL RM
M2 284
HYBRID ORPROCEDURE
M2 285
CC
CB
14 13
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-5 XRAY WIRING PLAN & DETAILS2.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
LEVEL 2 PART PLAN
XRAY WIRING PLAN & DETAILS
E-5
1:50
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-6 - XRAY WIRING SCHEDULES & DETAILS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
XRAY WIRING SCHEDULES &
DETAILS
E-6
1:50
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-7 - XRAY UPS SYSTEM PLAN & DETAILS.DWG PLOTSYLE TABLE: Ingenium-Full Size-A0.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
XRAY UPS SYSTEM PLAN &
DETAILS
E-7
N.T.S.
M2256A8.23
M227445.31
M227273.85
M2E1161.45
M2277216.46
M227931.50
M2301101.09
M226630.34
M226248.60 M2263
81.02M226181.57
M229265.31
M2290116.45
M225854.08
M2254631.32
M226558.12
M226958.12
M2267208.78
M2264465.35
M227350.61
OR 12M2275509.59
OR 11M2271489.22
M2211138.04
M2217201.41
M229452.39 M2E09
59.87
M2295548.95
M229350.61
OR 15M2291565.37
OR 14aM2281485.94
M29212513.88
M29203507.87
M22156004.69
M2260538.38
M2256B55.79
M225683.17
M2E1079.05
M221869.06
CC
CB
O.R.CORRIDOR
M2 291A
O.R.STERILE CORE
M2 215A
EQUIP RM
M2 283
CONTROL RM
M2 284
HYBRID ORPROCEDURE
M2 285
NORR Architects & Engineers Limited
175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com
AR
CH
D -
24
"x3
6"
- 6
10
mm
x9
14
mm
(ro
unded
)
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
ONBL19-0186
Tru
e
Nort
h
DATE ISSUED FOR REV
Keyplan
North Arrow
PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-8 - ELECTRICAL SCHEMATICS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:19 PM
D.WITALEC
M-WING LEVEL 2
HYBRID OPERATING ROOM
This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.
This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.
M-WING
FRIDGE
MICROWAVE
SINK
2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5
exp Services Inc.
t: +1.905.695.3217 I fx:+1.905.695.0167
220 Commerce Valley Drive West, Suite 110
Markham, ON L3T 0A8
Canada
www.exp.com
HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290
BCOSTING SUBMISSION 2020-03-02
ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02
CPERMIT 2020-03-23
0TENDER 2020-07-28
ELECTRICAL SCHEMATICS
E-8
N.T.S.