Smart-Sync Bridge 10:10 35 10:10 35 NORR Architects & Engineers Limited 175 Bloor Street East North Tower, 15th Floor Toronto, ON, Canada M4W 3R8 norr.com ARCH D - 24"x36" - 610mmx914mm (rounded) Seal(s) Project Manager Drawn Project Leader Checked Client Drawing Title Check Scale (may be photo reduced) Project No. Drawing No. Project 0 1inch 0 10mm ONBL19-0186 True North DATE ISSUED FOR REV Keyplan North Arrow PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-1 ELECTRICAL LEGEND & DETAILS.DWG PLOTSYLE TABLE: Ingenium-Full Size-A0.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM D.WITALEC M-WING LEVEL 2 HYBRID OPERATING ROOM This drawing has been prepared solely for the use of Sunnybrook Health Sciences Centre and there are no representations of any kind made by NORR Limited Architects and Engineers to any party with whom NORR Limited Architects and Engineers has not entered into a contract. This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Architect or Engineer. M-WING 2075 BAYVIEW AVENUE, TORONTO, ON. M4N 3M5 exp Services Inc. t: +1.905.695.3217 I fx:+1.905.695.0167 220 Commerce Valley Drive West, Suite 110 Markham, ON L3T 0A8 Canada www.exp.com HHAngus & Associates Limited Consulting Engineers 1127 Leslie Street, Toronto, ON, M3C 2J6 Canada www.hhangus.com | T 416 443 8200 | F 416 443 8290 B COSTING SUBMISSION 2020-03-02 A CD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02 C PERMIT 2020-03-23 0 TENDER 2020-07-28 ELECTRICAL LEGEND & DETAILS E-1 N.T.S.

NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

Smart-Sync

Bridge

10:10 35

10:10 35

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-1 ELECTRICAL LEGEND & DETAILS.DWG PLOTSYLE TABLE: Ingenium-Full Size-A0.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

ELECTRICAL LEGEND &

DETAILS

E-1

N.T.S.

Page 2: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

O.R.#14NEUROSURGERY

M2 279O.R.#14

ANTE RMM2 277A

OFFICEM2 233G

O.R.CORRIDOR

M2 281

1

2

3

1 1 1 1 1

2

3

2

3

2

3

2

3

2

3

2

32

3

CC

CB

1314 13

CC

CB

NEUROSURGERY

O.R.#14NEUROSURGERY

M2 279O.R.#14

ANTE RMM2 277A

OFFICEM2 233G

O.R.CORRIDOR

M2 281

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-2 LIGHTING POWER & SYSTEMS DEMOLITION.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

PART PLAN LEVEL 2

LIGHTING, POWER & SYSTEMS

DEMOLITION

E-2

1:50

Page 3: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

OR 15M2291565.37OR 14a

M2281485.94

PDO

CONTROL RM

M2 284

HYBRID ORPROCEDURE

M2 285

EQUIP RM

M2 283

O.R.STERILE CORE

M2 215A

O.R.CORRIDOR

M2 291A

CC

CB

14 13

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-3 LIGHTING POWER & SYSTEMS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:17 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

PART PLAN LEVEL 2

LIGHTING

NEW

E-3

1:50

Page 4: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

OR 15M2291565.37OR 14a

M2281485.94

PDO O.R.CORRIDOR

M2 291A

O.R.STERILE CORE

M2 215A

EQUIP RM

M2 283

CONTROL RM

M2 284

HYBRID ORPROCEDURE

M2 285

CC

CB

14 1314 13

CC

CB

OR 15M2291565.37OR 14a

M2281485.94

PDO O.R.CORRIDOR

M2 291A

O.R.STERILE CORE

M2 215A

EQUIP RM

M2 283

CONTROL RM

M2 284

HYBRID ORPROCEDURE

M2 285

1

2

3

1

2

3

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-4 POWER & SYSTEMS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

PART PLAN LEVEL 2

POWER & SYSTEMS

NEW

E-4

1:50

Page 5: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

OR 15M2291565.37OR 14a

M2281485.94

PDO O.R.CORRIDOR

M2 291A

O.R.STERILE CORE

M2 215A

EQUIP RM

M2 283

CONTROL RM

M2 284

HYBRID ORPROCEDURE

M2 285

CC

CB

14 13

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-5 XRAY WIRING PLAN & DETAILS2.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

LEVEL 2 PART PLAN

XRAY WIRING PLAN & DETAILS

E-5

1:50

Page 6: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-6 - XRAY WIRING SCHEDULES & DETAILS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

XRAY WIRING SCHEDULES &

DETAILS

E-6

1:50

Page 7: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-7 - XRAY UPS SYSTEM PLAN & DETAILS.DWG PLOTSYLE TABLE: Ingenium-Full Size-A0.ctb PLOT DATE: July 27, 2020 TIME: 3:18 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

XRAY UPS SYSTEM PLAN &

DETAILS

E-7

N.T.S.

Page 8: NorthTrue · HYBRID OR PROCEDURE M2 285 EQUIP RM M2 283 O.R. STERILE CORE M2 215A O.R. CORRIDOR M2 291A CC CB 14 13 NORR Architects & Engineers Limited 175 Bloor Street East North

M2256A8.23

M227445.31

M227273.85

M2E1161.45

M2277216.46

M227931.50

M2301101.09

M226630.34

M226248.60 M2263

81.02M226181.57

M229265.31

M2290116.45

M225854.08

M2254631.32

M226558.12

M226958.12

M2267208.78

M2264465.35

M227350.61

OR 12M2275509.59

OR 11M2271489.22

M2211138.04

M2217201.41

M229452.39 M2E09

59.87

M2295548.95

M229350.61

OR 15M2291565.37

OR 14aM2281485.94

M29212513.88

M29203507.87

M22156004.69

M2260538.38

M2256B55.79

M225683.17

M2E1079.05

M221869.06

CC

CB

O.R.CORRIDOR

M2 291A

O.R.STERILE CORE

M2 215A

EQUIP RM

M2 283

CONTROL RM

M2 284

HYBRID ORPROCEDURE

M2 285

NORR Architects & Engineers Limited

175 Bloor Street EastNorth Tower, 15th FloorToronto, ON, Canada M4W 3R8norr.com

AR

CH

D -

24

"x3

6"

- 6

10

mm

x9

14

mm

(ro

unded

)

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

ONBL19-0186

Tru

e

Nort

h

DATE ISSUED FOR REV

Keyplan

North Arrow

PATH AND FILENAME: Q:\PROJECTS\TOR\219\1327 - SHSC HYBRID OR#14\DWG\ELEC\E-DWG V2\E-8 - ELECTRICAL SCHEMATICS.DWG PLOTSYLE TABLE: HHA-Full Size.ctb PLOT DATE: July 27, 2020 TIME: 3:19 PM

D.WITALEC

M-WING LEVEL 2

HYBRID OPERATING ROOM

This drawing has been prepared solely for the useof Sunnybrook Health Sciences Centre and there areno representations of any kind made by NORRLimited Architects and Engineers to any party withwhom NORR Limited Architects and Engineers hasnot entered into a contract.

This drawing shall not be used for constructionpurposes until the seal appearing hereon is signedand dated by the Architect or Engineer.

M-WING

FRIDGE

MICROWAVE

SINK

2075 BAYVIEW AVENUE, TORONTO, ON.M4N 3M5

exp Services Inc.

t: +1.905.695.3217 I fx:+1.905.695.0167

220 Commerce Valley Drive West, Suite 110

Markham, ON L3T 0A8

Canada

www.exp.com

HHAngus & Associates Limited Consulting Engineers1127 Lesl ie Street, Toronto, ON, M3C 2J6 Canadawww.hhangus.com | T 416 443 8200 | F 416 443 8290

BCOSTING SUBMISSION 2020-03-02

ACD PHASE-STAKEHOLDER SIGN-OFF 2020-03-02

CPERMIT 2020-03-23

0TENDER 2020-07-28

ELECTRICAL SCHEMATICS

E-8

N.T.S.