Northwest Northwest Colorado Oil and Colorado Oil and
Gas ForumGas ForumBLM/USFS Update, June 5, BLM/USFS Update, June 5,
20082008
Glenwood Springs Energy Glenwood Springs Energy OfficeOffice
164 APDs in FY 08 to 164 APDs in FY 08 to date:date: WilliamsWilliams 9292 Laramie IILaramie II 66 AnteroAntero 66 EnCanaEnCana 3939 NobleNoble 2121
Glenwood Springs Energy Glenwood Springs Energy Office: Office:
Master Development Plans Master Development Plans (GAPS)(GAPS)
Helmer Gulch, Helmer Gulch, (7 new multi-well (7 new multi-well pads, 5 existing pads, 116 wells) pads, 5 existing pads, 116 wells) Decision in MayDecision in May
Hells Gulch II EAHells Gulch II EA (up to 6 wells (up to 6 wells pads and 45 wells on USFS) Decision pads and 45 wells on USFS) Decision in Mayin May
Orchard II GAP (Orchard II GAP (25 new well pads, 1 25 new well pads, 1 existing, 95 wells) Decision expected existing, 95 wells) Decision expected this summerthis summer
Master Plans of Master Plans of DevelopmentDevelopment
Pre-planning stagePre-planning stage
Gibson Gulch, Gibson Gulch, 15-20 multi-well pads15-20 multi-well pads
Kokopelli, Kokopelli, 15-20 multi-well pads15-20 multi-well pads
Spruce Creek, Spruce Creek, 4 multi-well pads4 multi-well pads
All will have public comment All will have public comment opportunitiesopportunities
Glenwood Springs: Roan Glenwood Springs: Roan PlateauPlateau
Phased DevelopmentPhased Development
Lease all parcels on top at onceLease all parcels on top at once
Federal unit with only one Federal unit with only one operator working on the ground operator working on the ground the entire timethe entire time
Phase development one ridge at Phase development one ridge at a time, never more than 1 a time, never more than 1 percent disturbedpercent disturbed
Glenwood Springs: Roan Glenwood Springs: Roan PlateauPlateau
Phased LeasingPhased Leasing
Lease over timeLease over time
Federal unit?? One operator??Federal unit?? One operator??
Would likely require additional Would likely require additional BLM planning processBLM planning process
Glenwood Glenwood Springs/Kremmling RMP Springs/Kremmling RMP
revisionsrevisions
• Drafts out in Fall 2008 Drafts out in Fall 2008
• 90-day comment period90-day comment period
• Public meetingsPublic meetings
Grand Junction: APDs Grand Junction: APDs
29 APDs to date FY 08Delta 17Black Hills 2 EnCana 1Plains Exp 9
Multiple-well EAsMultiple-well EAs
Black Hills (Horseshoe Canyon, Winter Flats, South Shale Ridge) EA completion in June
Aspen Operating (Whitewater) Scoping in June
Oxy (Bowdish) On-sites this month
Retamco (Roan Creek) Revised MDP
Grand JunctionGrand Junction
Whirlwind Uranium Mine: Whirlwind Uranium Mine: Comment period on Preliminary Comment period on Preliminary EA closes June 20EA closes June 20
CAM/Red Cliff Coal Mine Draft CAM/Red Cliff Coal Mine Draft EIS expected later this summerEIS expected later this summer
Collbran PipelineCollbran Pipeline
22-mile, 30-inch pipeline22-mile, 30-inch pipeline
5 miles west of Collbran to 6 5 miles west of Collbran to 6 miles NE of DeBeque (Orchard miles NE of DeBeque (Orchard Unit compressor site)Unit compressor site)
Preliminary EA expected this Preliminary EA expected this summersummer
White River: APDsWhite River: APDs
109 processed in FY 109 processed in FY 2008 2008 BOPCO 18 C&J Field Services 1 ExxonMobil 42 Williams Production 16 XTO Energy 1 Chevron 2 Genesis 1 Conoco Phillips 28
White River: RMP White River: RMP AmendmentAmendment
Amends 1997 RMPAmends 1997 RMP
Addresses anticipated Addresses anticipated increase in oil and gas increase in oil and gas development development
90 day public review for Draft 90 day public review for Draft EIS early 2009EIS early 2009
Oil ShaleOil Shale
Programmatic EIS Draft on Oil Programmatic EIS Draft on Oil Shale and Tar SandsShale and Tar Sands
83,000 comment submissions83,000 comment submissions
http://ostseis.anl.gov/
Final out by end of the yearFinal out by end of the year
Overland Pass PipelineOverland Pass Pipeline
153-mile pipeline from 153-mile pipeline from southwest of Meeker, Colo., to southwest of Meeker, Colo., to east of Wamsutter, Wyo. east of Wamsutter, Wyo.
14-inch pipeline to transport 14-inch pipeline to transport natural gas liquids natural gas liquids
EA anticipated to be out for EA anticipated to be out for public review in Junepublic review in June
Little Snake: 9 APDs in Little Snake: 9 APDs in FY 08FY 08
Wexpro 8 Julander 1
Little Snake: RMP Little Snake: RMP revisionrevision
Working with EPA on air analysisWorking with EPA on air analysis
Expect 45-day public comment Expect 45-day public comment period this fallperiod this fall
Expect Record of Decision in Expect Record of Decision in 20092009
Little Snake: HiawathaLittle Snake: Hiawatha
Questar and WexPro propose up Questar and WexPro propose up to 4,207 new wells in existing to 4,207 new wells in existing fields in CO & WYfields in CO & WY
Expect Draft EIS in August, 90-Expect Draft EIS in August, 90-day comment period with public day comment period with public meetingsmeetings
Kremmling APDsKremmling APDs
4 APDs pending in FY 08 to date 4 APDs pending in FY 08 to date
Jackson CountyJackson County
Uncompahgre Field Uncompahgre Field OfficeOffice
MontroseMontrose
16 APDs to date16 APDs to date
Facilitating solar energy on Facilitating solar energy on public lands and mitigating public lands and mitigating impactsimpacts
BLM lands in Arizona, California, BLM lands in Arizona, California, Colorado, Nevada, New Mexico, Colorado, Nevada, New Mexico, Utah Utah
Solar Energy PEISSolar Energy PEIS
Public scoping comments Public scoping comments through July 7through July 7
8 public meetings throughout 8 public meetings throughout the Westthe West
Denver: June 23, 6 p.m.Denver: June 23, 6 p.m.
Salt Lake City: June 25, 6 p.m.Salt Lake City: June 25, 6 p.m.
Solar Energy PEISSolar Energy PEIS
33
Oil and Gas Lease SalesOil and Gas Lease Sales
May 8 Lease Sale:May 8 Lease Sale: 46 parcels; 28,546 acres46 parcels; 28,546 acres Net $4 million (48% to State)Net $4 million (48% to State) Highest bid: $3,300/acre for 160 acres Highest bid: $3,300/acre for 160 acres
in Weld Co in Weld Co Highest total: $528,000 for same parcelHighest total: $528,000 for same parcel
Next sale Aug 14 (info out next week)Next sale Aug 14 (info out next week)
Lease info on-lineLease info on-line
More infoMore info
www.blm.gov
Wildfire SafetyWildfire Safety
Wildfire SafetyWildfire Safety
Wildfire SafetyWildfire Safety
If you spot a fire, call 911 and If you spot a fire, call 911 and provide:provide:
Fire location Fire location – legal, GPS, access– legal, GPS, access VegetationVegetation – grass, brush, trees – grass, brush, trees TerrainTerrain – canyon, top of hill, etc – canyon, top of hill, etc Approximate size Approximate size (1 tree, 1 football (1 tree, 1 football
field)field) Color and quantity of smokeColor and quantity of smoke Your name, phone, and companyYour name, phone, and company
Wildfire SafetyWildfire Safety
If you start a fire, call 911 If you start a fire, call 911 Provide all info from the last slideProvide all info from the last slide Follow company policy – if the fire is Follow company policy – if the fire is
small you may try to extinguish it, small you may try to extinguish it, but: but: Easy to be overwhelmedEasy to be overwhelmed Safest to let the firefighters to their jobSafest to let the firefighters to their job Better to evacuate or find safe areaBetter to evacuate or find safe area Fire can outrun you, and it doesn’t get Fire can outrun you, and it doesn’t get
tiredtired
Don’t underestimate the Don’t underestimate the fuel type!fuel type!
EvacuationEvacuation
If possible, evacuation from the If possible, evacuation from the fire is bestfire is best
Ensure you have a safe route outEnsure you have a safe route out
Drive slowly going out and expect Drive slowly going out and expect fire traffic coming infire traffic coming in
Safe AreasSafe Areas
Safe AreasSafe Areas
When evacuation is not When evacuation is not possible, go to safe area:possible, go to safe area:
Area free of vegetation, Area free of vegetation, flammable liquids, hazmat, etc.flammable liquids, hazmat, etc.
Irrigated areasIrrigated areas
Old well padsOld well pads
Help FirefightersHelp Firefighters
Help FirefightersHelp Firefighters Do not self-dispatch with equipment Do not self-dispatch with equipment
or trucksor trucks
Keep roads openKeep roads open
Provide incident commander with Provide incident commander with information on your worksite: information on your worksite: Number and location of peopleNumber and location of people FacilitiesFacilities Flammables and hazmatFlammables and hazmat Shut-in, etc.Shut-in, etc.
Everybody comes home!Everybody comes home!