1
C-C-01 NE 51st Street 148th Avenue NE Microsoft Redwest Road (Private) C-C-03 C-C-04 C-C-06 C-C-05 C-C-02 (NOT SHOWN) 150th Avenue NE ARTIFICIAL TURF PLAYFIELD (1.59 AC = 69,260 SF) EQUIVALENT PERMEABLE PAVEMENT SIDEWALK C-C-07 State Route 520 Off Ramp SAND VOLLEYBALL COURT (0.09 AC = 3,811 SF) ADA RAMP WITH HANDRAILS 20' ASPHALT ACCESS ROAD EXISTING GRAVEL ACCESS ROAD TO REMAIN EXISTING WETLAND D (CATEGORY IV) EXISTING WETLAND F (CATEGORY IV) EXISTING WETLAND B (CATEGORY III) EXISTING WETLAND K (CATEGORY IV) EXISTING ASPHALT PARKING LOT TO REMAIN EXISTING DETENTION AND WATER QUALITY POND EXISTING WETLAND J (CATEGORY III) ASPHALT BASKETBALL COURT (0.11 AC = 4,661 SF) ARTIFICIAL TURF PLAYFIELD (2.86 AC = 124,582 SF) REGRADE AND RESTORE GRAVEL ACCESS ROAD 148th Ave NE & NE 51st St Redmond, WA 98052 RED WEST SOUTH FIELDS MIKE BEHN 33708 S T A T E O F W A S H I N G T O N R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C O R B . B Y H T O M I T Y A W K Sheet Title/Number Senior Project Manager Development Manager Project Manager Quality Control Reviewer Quality Control FF&E No. Date Revisions Description M.S. Project No. CPL Project No. Microsoft Mechanical Engineer Microsoft Cable Engineeer Microsoft Electrical Engineer Engineering Manager Security Manager Project Planner Project Manager FF&E CUSTOMER Checked Date Design Drawn Key Plan Registration Date Date Date 02/12/2019 BSB Approvals OPERATIONS PROJECT MANAGEMENT Design Team P18BSB-001 JRT BSB O U O U N R G D T H E E L E R I N N C L P 801 SECOND AVENUE, SUITE 900 (206) 343-0460 SEATTLE, WA 98104 www.cplinc.com THIS DEVELOPMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF REDMOND STANDARD SPECIFICATIONS AND DETAILS, CURRENT EDITION. This approval is for the design concept only. These plans appear to be in conformance with the City Of Redmond design standards for construction. This approval shall not be construed as authorizing construction not in accordance with applicable City standards. The City reserves the right to require revisions to the approved plans to assure conformance with City of Redmond design standards for construction at any time that it is discovered that the proposed construction does not otherwise meet the applicable construction standards. The owner is required to provide designs and plans in accordance with applicable City standards and assures that construction is accomplished in accordance with those standards. The owner and/or design engineer and/or developer may be required to make necessary approved field revisions to correct any errors or omissions found on the approved plan. APPROVED FOR CONSTRUCTION FOR: Director of Public Works City of Redmond Date: Plan Check Engineer: Planning: Trans / Engr: Fire: Utility: Storm: Section 14, Township 25 N, Range 5 E, W.M. 02/12/2019 PREP REVISION 01 Transportation Plan Overall C-C-00

(NOT SHOWN) State Route 520 OffRamp 148th Avenue NE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (NOT SHOWN) State Route 520 OffRamp 148th Avenue NE

C-C-01

N

E

5

1

s

t S

tre

e

t

148th A

venue N

E

Microsoft Redwest Road (Private)

C-C-03 C-C-04

C-C-06C-C-05

C-C-02

(NOT SHOWN)

150th A

venue

NE

ARTIFICIAL TURFPLAYFIELD(1.59 AC = 69,260 SF)

EQUIVALENTPERMEABLEPAVEMENT SIDEWALK

C-C-07

S

t

a

t

e

R

o

u

t

e

5

2

0

O

f

f

R

a

m

p

SAND VOLLEYBALL COURT(0.09 AC = 3,811 SF)

ADA RAMP WITHHANDRAILS

20' ASPHALTACCESS ROAD

EXISTING GRAVELACCESS ROAD TOREMAIN

EXISTINGWETLAND D(CATEGORY IV)

EXISTING WETLAND F(CATEGORY IV)

EXISTING WETLANDB (CATEGORY III)

EXISTING WETLAND K(CATEGORY IV)

EXISTING ASPHALTPARKING LOT TOREMAIN

EXISTING DETENTIONAND WATER QUALITYPOND

EXISTING WETLAND J(CATEGORY III)

ASPHALT BASKETBALL COURT(0.11 AC = 4,661 SF)

ARTIFICIAL TURF PLAYFIELD(2.86 AC = 124,582 SF)

REGRADE AND RESTOREGRAVEL ACCESS ROAD

148th Ave NE & NE 51st St

Redmond, WA 98052

RED WEST

SOUTH FIELDS

MIKE BEHN

33708

STAT

E OF WASHINGTON

R E G I S T E R E D

PROFESSIONAL ENGINEE

R

CORB.BYHTOMIT YAWK

Sheet Title/Number

Senior Project Manager

Development Manager

Project Manager

Quality Control Reviewer

Quality Control FF&E

No. Date

Revisions

Description

M.S. Project No.

CPL Project No.

Microsoft Mechanical Engineer

Microsoft Cable Engineeer

Microsoft Electrical Engineer

Engineering Manager

Security Manager

Project Planner

Project Manager

FF&E

CUSTOMER

Checked

Date

Design

Drawn

Key Plan

Registration

Date

Date

Date

02/12/2019

BSB

Approvals

OPERATIONS

PROJECT MANAGEMENT

Design Team

P18BSB-001

JRT

BSB

O

UO

U

NRG

DTH

EEL

ER

I

N

NC

LP

801 SECOND AVENUE, SUITE 900

(206) 343-0460

SEATTLE, WA 98104

www.cplinc.com

THIS DEVELOPMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITYOF REDMOND STANDARD SPECIFICATIONS AND DETAILS, CURRENT EDITION.

This approval is for the design concept only. These plans appear to be in conformancewith the City Of Redmond design standardsfor construction.  This approval shall not beconstrued as authorizing construction not inaccordance with applicable City standards. The City reserves the right to requirerevisions to the approved plans to assureconformance with City of Redmond designstandards for construction at any time that itis discovered that the proposed constructiondoes not otherwise meet the applicableconstruction standards.  The owner isrequired to provide designs and plans inaccordance with applicable City standardsand assures that construction isaccomplished in accordance with thosestandards.  The owner and/or designengineer and/or developer may be requiredto make necessary approved field revisionsto correct any errors or omissions found onthe approved plan.

APPROVED FOR CONSTRUCTION

FOR: Director of Public WorksCity of Redmond

Date:

Plan Check Engineer:

Planning:

Trans / Engr:

Fire:

Utility:

Storm:

Section 14, Township 25 N, Range 5 E, W.M.

02/12/2019 PREP REVISION01

Transportation

Plan Overall

C-C-00