61
PUBL.IC SERVICE COMMISSION NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF KJ3NTUCKY COUNTYOF f A 6 Before me, a Notary Public, in and for said county and state, this ds"" day of personally known to me, who being duly sworn, states as follows: That she is Advertising Assistant of the Kentucky Press Service, Inc; that she has personal knowledge of the contents of this affidavit; and that the publications included on the attached list published the Legal Notice for Kenergy. Notary Public My commission expires y-/s- /&

NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBL.IC SERVICE COMMISSION

NOTARIZED PROOF OF PIJB1,ICATION

COMMONWEALTH OF KJ3NTUCKY

COUNTYOF f A 6

Before me, a Notary Public, in and for said county and state, this ds"" day of

personally known to me, who being duly sworn, states as follows: That she is

Advertising Assistant of the Kentucky Press Service, Inc; that she has personal

knowledge of the contents of this affidavit; and that the publications included

on the attached list published the Legal Notice for Kenergy.

Notary Public

My commission expires y - / s - /&

Page 2: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Calhoun McLean Co. News-3/3/11,3/10/11,3/17/11

Central City Leader News-3/08/11,3/15/11,3/22/11

Eddyville Herald Ledger-3/2/11,3/9/11,3/16/11

Hardinsburg Herald News- 3/2/11,3/9/11,3/16/11

Hartford Ohio Co. Times-News-3/3/11,3/10/11,3/17/11

Hawesville Hancock Clarion-3/3/11,3/10/11,3/17/11

Henderson Gleaner-3/3/11,3/10/11,3/17/11

Madisonville Messenger-3/3/11,3/10/11,3/17/11

Marion Crittenden Press-3/3/11,3/10/11,3/17/11

Morganfield Union Co. Advocate-3/2/11, 3/9/11,3/16/11

Owensbora Messenger Inquirer-3/3/11,3/10/11,3/17/11

Princeton Times Leader-3/2/11,3/09/11,3/16/11

Providence Journal Enterprise-3/3/11,3/10/11,3/17/11

Smithland Livingston Ledeger-3/8/11,3/15/11,3/22/11

Page 3: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLlC NOTlCE

THE A ~ P ~ I C A T ~ O ~ OF KENERGY C O W FOR AN ADJUSTMENT IN EXISTING RATES

Kenergy Gorp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes ari designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713 which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 ani to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in thi! notice, which are the rates contained in the application, are rates proposed by Kenergy Gorp.; however, thc Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there in.

CASE NO. 2011-00035

The present and proposed rates are as follows:

Residential Service (Single & Three-phase): Present Rate Schedule

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

All Non-Residential Sinsle Phase:

Customer Charge per Delivery Point $16.00 per month ' Energy Charge per KWH $0.060740

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$10.50 per month

$30.00 per month

All KW During Month $4.05

First 200 KWW per KW, per KWH $ 0 0532 Next 200 KWH per KW, per KWH $ 0 0380 All Over 400 KWH per KW, per KWH $ 0 0330

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month $ ' 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250

$ 575.00 per month

All Over 400 KWH per KW, per KWH $ 0,0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWW $ 0.0360

$ 575.00 per month

Prooosed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $3 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Private Outdoor Lighting (per month) Standard (served overhead)

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen F i x h ? upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 20000 LUMEN-400W-MERCURY VAPOR $ 9.98

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 27000 LUMEN-25OW- HPS $ - 9.98 61000 LUMEN-400W-HPS-FLOOD LGT $ 11 39

$ 7.87 $ 9.27 $ 10.91

$ 7.65 $ 10.96 rfi 17 A7

Page 4: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

' ' THE MESSENGER, Thursday, March 3,201 1

Present Rate Schedule

6300 LUMEN-DECOR-7OW-HPS ACORN $ 9.83 6300 LUMEN DECOR-70W-HPS LANTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 2011: 28000 LUMEN - HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installations after Apri! 1, 2011:

BASKETT STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two years, and similarly amortize additional amounts annually thereafter.

Special Charges:(per trip) Turn on Service Charge $ 30.00 Reconnect Charge - Regular $ 30.00

Terminate Service Charge $ 30.00 Meter Reading Charge $ 30.00 Meter Test Charge $ 45.00

Revenue- Unnecessary Trip- Regular $ 30.00

$0.0363 $0.041285

nla

,

Reconnect Charge -After hours $ 90.00

Revenue - Returned Check Charge $ 10.00

Revenue- Unnecessary Trip- After hours $ 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A)

Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15

Dedicated Delivery Points (Class C) Demand Charge per KW $3 10.15 Energy Charge per KWH 0.016715 Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $ 0.0204

Base Energy Charge per KWH $ 0.0281 98

Energy Charge per KWH 0.01 3881

1.30% per month

Small Power Production or Cogeneration(0ver 100KW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater o f

(1) per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

(2) % of Market Price 110%

The Charges far Off-Peak Maintenance Service shall be: per KW of Scheduled Demand per Week $ 1835 Excess Demand: to Import Energy from a 3rd Party: (1) % of Actual Cost Incurred when Power is not Imported the Greater of: Charge per KW times highest Excess Demand $ 7.37

110%

- - ~ -". -

Prooosed Rate Schedule

10.86

19.18 10.86

20.99

2.73 2.47 3.12

0.037523 0.040115

-0.001005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.00 95.00

0.03041 3 $

$ ' 10.8975 0.01 5051

$ 10.8915 0.017885

1.38% per month

$ 0.0195240

$

2.351 0.01 95240

110%

2.351

110%

Page 5: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

FOR AN A ~ ~ ~ S ~ ~ ~ N ~ IN EXISTING RATES (energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ng rates with the Kentucky Public Service Commission in Case No. 2011 -00035. The proposed changes are jesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, Nhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this iotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the (entucky Public Service Commission may order rates to be charged that differ from the rates contained there- n.

The present and proposed rates are as follows:

Residential Service (Single & Three-Phase):

3stomer Charge per Delivery Point Energy Charge per KWH $0.062327

MI Non-Residential Single Phase:

Present Rate Schedule

$10.50 per month

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

rhree-Phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

$ 4.05 All KW During Month

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-Phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month $ 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0 0250 All Over 400 KWH pei KW, per KWH $ 0.0230

$ 575.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ . 0.0360

$ 575.00 per month

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05'747 $ 0.041 57 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Private Outdoor Lighting (per month) Standard (served overhead)

l o t Available for New Installations after April 1,2011 - Existing fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-I 75W-MERCURY VAPOR $ 7.16 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 20000 LUMEN-400W-MERCURY VAPOR $ 9.98

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 27000 LUMEN-250W- HPS $ 9.98

11.39 61000 LUMEN-40OW.HPS-FLOOD LGT $ A. - -. nnnn I t t n n r h i < n n i n t a n r - ~ n i t t n z r n s - d . . i ~ k

$ 7.87 $ 9.27 $ 10.91

$ 7.65 $ 10.96

12.47 $ - _ _

Page 6: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

I i ; .THE MESSENGER, Thursday, March 10,201 1

Present Rate Schedule

6300 LUMEN-DECOR-70W~HPS ACORN $ 9.83 6300 LUMEN DECOR-70W-HPS LANTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 201 1: 28000 LUMEN - HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installations after April I, 2011:

BASKETT STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two years, and similarly amortize additional amounts annually thereafter.

$0.0363 $0.041 285

nla

Special Charges:(per trip) Turn on Service Charge Reconnect' Charge ~ Regular Reconnect Charge - After hours Terminate Service Charge Meter Reading Charge Meter Test Charge Revenue - Returned Check Charge Revenue- Unnecessary Trip- Regular Revenue- Unnecessary Trip- After hours

$ 30.00 $ 30.00 $ 90.00 $ 30.00 $ 30.00 $ 45.00 $ 10.00 $ 30.00 $ 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH , $ 0.028198 Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.013881 Dedicated Delivery Points (Class C) Demand Charge per KW $ 10.15 Energy Charge per KWH , Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $ 0.0204

Small Power Production or Cogeneration(0ver IOOKW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater o f

(1) per KW of Scheduled Remand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

0.016715 1.30% per month

(2) % of Market Price 110%

Fhe Charges for Off-peak Maintenance Service shall be: ~ e r KW of Scheduted Demand per Week $ 1.835 Excess Demand: o Import Energy from a 3rd Party:

vhen Power is not Imported the Greater of:

\r % nf ClinhPzt Prira Rwpived for Off-Svstem

1) % of Actual Cost Incurred

:barge per KW times highest Excess Demand $ 7.37

110%

110%

Pronosed Rate Schedule

10.86 10.86 19.18

20.99

2.73 2.47 3.12

0.037523 0.04011 5

-0.001005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.00 95.00

0.03041 3

10.8975 0.015051

10.8975 0.017885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

110%

$ 2.351

110%

$10.1890 110%

Page 7: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLlC NQTICE CASE NO. 2011-00035

THE A ~ ~ ~ ~ C A ~ ~ O ~ OF KENERGY CBRP. FOR AN A ~ J ~ ~ ~ ~ ~ ~ ~ I

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exi ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. l h e proposed changes i designed to flow-through to KenBrgy's customers the wholesale power expense increase of $23,464,71 which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 a to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in tl notice, which are the rates contained in the application, are rates proposed by Kenergy Carp.; however, t Kentucky Public Service Commission may order rates to be charged that differ from the rates contained the1 in.

The present and proposed rates are as follovys:

Residential Service (Single &?A Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

All Won-Residential Single Phase: '

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge: ~

All KW During Month Energy Charge:

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0 0380 All Over 400 KWH per KW, per KWH $ 0.0330

Present Rate Schedule

$70.50 per month

$16.00 per month

$30 00 per month

$ 4.05

Three-Phase Demand Mon-Dedicated Delivery Points (1,001 KW & Over):

Option A ~ High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$ 575.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$ 575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$17,,00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lmen Fixture upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7.16 8 7.87 12000 LUMEN-25OW-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-4OOW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 37nnn I I ifinrwxnini UDC e n nn

$ h

7.65 ..^ ,.-

Page 8: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

~

Present Rate Schedule

6300 LUMEN-DECOR-70W-HPS ACORN $ 9.83 6300 LUMEN DECOR-70W-HPS LANTERN $ 9.83 12600 LUMEN HPS-TOW-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 2011: 28000 LUMEN . HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installations after April 1, 2011:

BASKETT STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two years, and similarly amortize additional amounts annually thereafter.

$0.0363 $0.041285

nla

Special Charges:(per trip) Turn on Service Charge Reconnect Charge ~ Regular Reconnect Charge - After hours Terminate Service Charge Meter Reading Charge Meter Test Charge Revenue - Returned Check Charge pevenue- Unnecessary Trip- Regular Revenue- Unnecessary Trip- After hours

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30.00 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH $ 0.028198 Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.013881 Dedicated Delivery Points (Class C) Demand Charge per KW . $ 10.15 Energy Charge per KWH Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $8 0.0204

Small Power Production or Cogeneration(0ver 100KW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater of:

(1) per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

0.01671 5 1.30% per month

(2) % of Market Price 110%

The Charges for Off-peak Maintenance Service shall be: per KW of Scheduled Demand per Week $ 1.835 Excess Demand: to Import Energy from a 3rd Party:

when Power is not Imparted the Greater of: (1) % of Actual Cost Incurred 110%

Proposed Rate Schedule

$ 10.86 $ 10.86 $ 19.18

$ 20 99

$7 2.'73 $ 2.47 $ 3.12

$ 0.037523 $ 0.040115

-0.001 005024

$ 32.00

$ 95.00 $ 32.00 $ 32.00 $ 50.00 $ 12.00 $ 32.00 $ 95.00

$ 32.010

$ 0:0304 13

$ 10.8975 0.0'15051

$ 10.8975 0.017885

1.38% per month

$ 0.0195240 ,

$ 2.35 1 $ 0.0195240

110%

$ 2.351

110%

Page 9: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

hePrcss

ke vcwint and prqxed rates are as follovls:

Residentiai Service (Single 81 Three-phase):

W m Charge per Delivery paint

All lon-Residential Single Phase:

cX&m Charge per Ddivwy point

- Present Rata Schedule

$10.50 per mnth @ w c h a r g e p e r m $0.062327

$16.M3 per mnth E r w Y m p w m $0.060740

Crstm charge per &livery Point Demcharge: PJI KWtxning M h $4.1)5

mergycharge: First 200 &Wpx KW.! per $ O . m Next 200 Wpr K\R! pe-Kvw1 $ 0 . W All a€r m Kmpa w, p KWH $ 0.ixxl

Three-phase Demand Mon-Dedicated Qeliwefy Points l0 - 1,000 KW): $3o.ooperrronth

ThreePhase Demand Mon-Dedicated Delivery Points (1,001 KW ti Over):

~o~ A v ~ i l ~ ~ i e for New Installations aiter April 1,2011 - Existing Fixture will be Replaced with the,l\learest Equivalent Lumen Fixture upon Failure:

701x1 I"LfRI1B\C175W-NUWVrn $ 7 16 5 7.87 f m L w ~ m R Y v m $ a 4 $ 927 2 M x x 3 L ~ W ~ K Y V A P o R $ 9% $ 10 91

Page 10: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

I .

Thursday, March 3,201 1

30.0 30.00 90.00 3o”oo 30.00 45.00 10.0 3GO 90.00

Prooosed Rate Schedule

$

10.86 1086 19.18

a.99

2.73 247 3.12

0,037523 0.040115

-0 001o[xin24

3200 32.0 95.00 32oQ 32.00 5000 12.00 32.00 %,00

0.0301.13

10.8975 o.oimi

io.8975 0 017885

$ 0.0195240

$ 2351 $ 0.0195240

1 1 P / O

$ 2351

Page 11: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

. . -. . . .. .

I r

PUBklC NOTICE CASE NO. 2011-00035

THE AQPLICAT80RI OF KENERGY CORP. FOR AM A ~ ~ ~ ~ T ~ ~ ~ T IN EXiSflNG RATES

(energy Corp., 6402 c(d Corydorl f3xd, Henders,on, KY 42#, filed an Wicaticn for an adjustrrt3fit in ex& ng ratesmith the Kentucky Wic Wcecomrission in Case No. 'Klll-ooo35. The proposed changes are %gllMi to flow-thrwgh to Kenergy's custorra?rs the wholesale power expwse irwxease of $23,464,773,- nkdch fill result fromthe rate increase Big Fgvers R&nc Capration p r w in c;sSe No. 201 14XXK36 acd o p r c d ~ ~ ? revmues to cover the $2,1333,614 irxxease in Kenerws other costs. The raes contaiA in this wtice, which are the rates contained in the application, are rates proposed by Kenergy Cbp.; however, the <enttk&y public Service Corranisson rmy & ra.tes to be charw that differ from the rates cwrtained there n.

he present and proposed raies are as follows:

iesidentiai Service (Single 81 Three-Phase):

M m Cbtge per Ddivety point %wgy Charge FET MNI-1

411 Non-Residential Single Phase:

=ustomr Charge per Wivey point 3ergymargeperKWH

rhree8hase Demand Non-Qedicated Delivery %m Charge per Ddivery point c)wrand charge: All Kw During MMlth Wgy Charge: Firstm M p e r w per KWH NextmKwHperwperKwH All (3er 4M) Kvwl per W, per Kv\M

Present Rate Schedule Prooosed Rate Schedule

$10.50 pw mnth $13.00 p3'tTGnth $0.- $O.m80

$16.M) per mnth $0.083740 4%-

$1 7.00 per mnth

lints (0 - 1,000 KW): $30.00 per rm-lth $35.00 pwrnwRh

$4.05 $4.50

$ 0.0532 $ 0.05747 $ 0 . W $ 0.04157 $ 0 . r n $ 0 . m

Wee-Phase Demand Non-Dedicated Delivery Points (1,001 KW 81 Over):

Eptinn A- Hgh LDad W a r (&me W/i) ct!stom c"narge per Delivery Point

DerrrvKjcharge: All Kwmring Montt7 $ 8.65

%wgy W g e : Firstm KwHper Kw'paKwH $ 0.0275 NextmKwHperKw:pKKwH $ 0.029 AI mer 4&0 M p e r Kw, FEy M $ 0023

$575.00 per mnth

C@i~n B - LOWW Factor (belo~5oD/o) Custom W g e per Delivey pcint oerrandcharge: AI Whring lvbnth

Energy Charge:

$ R5.00 per m#lth

$ 4.80

First 150 M per w per W4-i $ 0.wa mer 150 KWH p H w, p3 w-1 $ 0.w60

Private Outdoor Lighting (per month) Standard (served overhead)

$750.00 per mi-ith

$ 9.3

$ 0.04% $ 0 . m

Not Available for New Installations after April 1,2011 - Existing Fixture will &e Repiaced with the Mearest Equivalent lumen Fixture upon Failure:

7000 L l m 1 . 7 V m $ 7.16 $ 7 87 1XXXlL~mwIVIERCUR/vm $ 845 $ 9 27 2 E C O L - W m V ! $ 998 $ 1091

Availahlefar NewlrstalationsafterPQnl1.2011:

Page 12: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Thursday, March 10,201 1

Present Rate Schedule

Ivailzhlefor New InstallatirionsafterApnll. 2011: ?EfXXlLUWmV-HPSACCANGt14FT’PClE $ 18.98

3o.w 30.00 s0.m 3.00 30.w 45.m 1o.m 30.00 !Kl00

Proposed Rate Schedule

10.86 10 86 19.18

20%

273 2 47 3.12

0,037523 0.0401 15

-O.(X)1005M4

- 32.00 32m 95.m 32.90 32.00 !Boa 12.m 3200 95.03

0.woI.13

10.8975 0.015051

10.8975 0.017885

$ 2351 $ 0.0195240

$ 2351

Page 13: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

s I

lhe present and p r o w rates %e as fdlw:

Residentia! Service (Single ik Three-Phase): Present Rate Schedule

LUstorm (3arc.p ET Delivery pnint $10.50 psr rmrltt-i Energy Charge per WH $3.062327

Ail Non-Residential Single Phase:

Lustom %ye per &livery point $16.0 per m#ith Energy Charge per KwI-1 $0.0m740

fhrse-Phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Custmer W y e per lklivery Point l3etm-d @me: All wcuring mnth $4.05

Er~rgy Charge: First X X I KWki p e KV4 per KWH $ 0.0532

All Qerrn M p e r t<v\/, per w $ 0 . m

$30.co per rmm

Next xx) Klr\Frlper KW per KWH $ 0.0380

Three-Phase Demand rU2n-Dedicated Celivery Points f l ,QOl KW s! Over):

qitim A - Hyh Laad Factor ( W e 5.0%)

M U1arp:

f31~gy Charge:

W m Charge p+r Relivery Point $575.0 per mx7th

All KW Otiring I\/h?nth $ 8.65

First Xn Kvki FEY W per Wki $ 0.0275 Next 2OG NAH per KW p r KVLH 16 0.022 All 0Ier40 M ~ H Mnl, per KwH $ 0.0230

qrtion B - law Load Factor (Mow 3%) &torn W g e p Wivery Point $575.0 per rrnnth

Derranda-iarp: All KW M n g Month $ 4.80

First ‘1% W i ~ H Kwl per iiwtl $ 0.0420 Der 150 KVW per per W $ 0.0360

Energy Qwge: r

Private Outdoor Lighting (per month) Standard (sewed overhead)

krooosed Rate Schedule

$13.00 p w m h $0.067780

$35.00 permnth

$450

$750.00 per rrnnth

$ 9.50

$7’50.0 permnth

$ 5.35

$ 0.0456 $ 0.03%

Riot Available For New instailations after April 1, 2011 - Existing Future will be Replaced with the Nearest Equivatent Lumen Firture upon Failure:

7mLuN$N-17wNIERcuRYvApoR $ 7.16 $ 7 07 1m LUmCEowMwvm $ 8.45 $ 9.27 2 m l . ~ m w M v w m $ 998 $ 10.9 1

Availaefor R!~~lIIIStallati~17~after~ril 1,2011:

Page 14: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

erf

Thursday, March 17, 201 1

Present Rate Schedule

30.3200 30.00 90.00 30.00 ?B.CO 45.00 10.00 3ml 9.00

Proposed Rate Schedule

2 1086 10.85 19 18,

20.99

2 73 2.47 3.12

0.037523 0w115

-0.001 m 4

32.00 3200 9500 3200 32.3200 5000 12.00 3200 95.00

0.030413

10.8975 0.015051

10.8975 0 017885

1.38% per m h

$ 0.0195240

$ 2351 $ 0.0195240

1 1 P/o

$ 2.351

Page 15: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE

THE APPLICATION OF KENERGV CORE FOR AN ADJUSTMENT IN EXISTING RATES

(energy Corp,, 6402 Old Corydon Road, Henderson, KY 42420, filed as application for an adjustment in exist ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are jesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, ehich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and lo produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this notlce, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there

CASE NO. 2011~00035

In.

The present and proposed rates are as follows:

Residential Service (Single & Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH

Present Rate Schedule

$10.50 per month $0 062327

All hlon-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH

Three-phase Demand Mon-Dedicated Delivery Points (0 - 1,000 Io: Customer Charge per Delivery Point $30 00 per month "

Demand Charge. All KW During Month $4.05

Energy Charge: First 200 KWH per KW, per KWH $ 0,0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0 0330

$16.00 per month $0 060740

Three-phase Demand Mon-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0 0230

$575 00 per month

Option B - tow Load Factor (below 50%) Customer Charge per Delivery Point $575 00 per month

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

Proposed Rate Schedule

$13.00 per month $0.067780

$1 7.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.041 57 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 ,$ 0.0386

Private Outdoor Lighting @er month) Standard (served overhead)

,Mol Available for Mew Installations afler April 1,2011 - Existing Fixture will be Replaced with the Mearest Equivalent Lumen Fixture upon Failure:

'7000 LUMEN-175W-MERCURY VAPOR $ 7.16 $ 7 87 12000 LUMEN-250W-MERCURY VAPOR $ 8 45 $ 9 27 20000 LUMEN-400W-MERCURY VAPOR $ 9 98 $ 10.91

Available for New Installations after April 1,2011.

'9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 $ 7.65 27000 LUMEN-25OW- HPS $ 9.98 $ 10 96

Page 16: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

" Union County Advocate March 2, 201 1

Present Rate Schedule

300 LUMEN-DECOR.7OW-HPS ACORN $ 9.83 100 LUMEN DECOR-70W-HPS LANTERN $ 9.83 !600 LUMEN HPS-TOW-2 DECOR FIX $ 17.36

failable for New Installations after April 1,201 I : KIOO LUMEN - HPS ACORN Gl. 14 FT POLE $ 18.98

iecial Street Lighting Districts 31 Available for New Installations after April 1, 2011:

GSKETT STREET LIGHTING $ 2.49 EADOW HILL STREET LIGHTING $ 2.25 pOTTSVlLLE STREET LIGHTING $ 2.83

snewable Resource Energy Service Rider in-Direct Served Customers: !r Kilowatt Hour Premium of rect Served Customers (excluding Class A)

$0.0363 $0.041285

?w Riders Proposed: in- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

ite: Rate will amortize the non-smelter regulatory account balance over two years. id similarly amortize additional amounts annually thereafter.

nla

iecial Charges:(per trip) rn on Service Charge !connect Charge - Regular xonnecf Charge -After hours rminate Service Charge ?ter Reading Charge ?ter Test Charge !venue - Returned Check Charge !venue- Unnecessary Trip Regular !venue, Unnecessary Trip- After hours

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30 00 90.00

irge Industrial Customers Served Under Special Contract idicated Delivery Points (Class A)

!dicated Delivery Points (Class B) !mand Charge per KW $ 10.15 iergy Charge per KWH 0.013881

ise Energy Charge per KWH $ 0.028198

I !dicated Delivery Points (Class C) i- !mand Charge per KW $ 10.15

iergy Charge per KWH icilities Charge per Assigned Dollars of !nergy Investment for Facilities nall Power Production or Cogeneration (100 KW or less): ustomer Sells Power to Kenergy) ise Payment per KWH $ 00204

0.01 671 5 1.30% per month

nall Power Production or Cogeneration(0ver IOOKW): ustomer Buys Power from Kenergy) e Charges for On-Peak Maintenance Service shall be the greater of:

I per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 00204 or

I % of Market Price 11 0%

e Charges for Off-Peak Maintenance Service shall be: r KW of Scheduled Demand per Week $ 1 835 cess Demand: Import Energy from a 3rd Party: %of Actual Cost Incurred en Power is not Imported the Greater of.

11 0%

"___ --- IVMI + : _ _ _ L:-L ~ .a r n J 01 7 n-l

Prooosed Rate Schedule

10.86 10.86 19 18

' 2099

2 73 2.47 3 12

0.037523 0.040115 ~

-0 001005024

32 00 32 00 95 00 32.00 32.00 50 00 12 00 32.00 95.00

0 030413

IO 8975 0 015051

10 8975 0 017885

1.38% per month

$ 00195240

8 2.351 $ 00195240

I1 0%

$ 2351

1 100~0

m I h r n n n

Page 17: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

!

i

,

!

PUBLIC MOTICE

THE APPUCATIOI\I OF KENERGY CORP. FOR AM ADJUSTaaENT lM EWSTiMG RATES

(energy Corp., 6402 Old Cotydon Road, Henderson, KY 42420, filed an application for an adjustment in exi ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes i lesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,7; vhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 a o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in tl lotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, t (entucky Public Sewice Commission may order rates to be charged that differ from the rates contained the1 n.

CASE fl0.2011-QcO35

The present and proposed rates are as follows:

Widentiat Service (Single & Three-phase):

;ustomer Charge per Delivery Point inergy Charge per KWH $0.062327

411 Won.Residential Single Phase:

kstomer Charge per Delivery Point Wrgy Charge per KWH $0.060740

rhree-Phase Demand €'don-Dedicated Delieiy Points (0 - 1,I1wI KW: Momer Charge per Delivery Point lemand Charge: All KW During Month $4.05

Energy Charge: First 200 KWH per KW, per KWti $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Present Rate Schedule

$10.50 per month

$16.00 per month

$30.00 per month

Three-phase Demand Non-Dedicated Delivery Points (1,001 W & Over):

Option A . High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0,0230

$5'75.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point $575.00 per month

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

Pronosed Rate Schedule

$13.00 per month $0.067780

$1 7.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$3 0.0299 $ 0.0266 si 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Priwate Outdoor Lighting @er month) Standard (served overhead)

Not Awailable for New Installafions after April 1,2011 - Exkting F#turewill be Replaced wilh the Mearest Equivalent lumen Fixture upon Failure:

7000 LUMEN-175W.MERCURY VAPOR $ 7.16 $ 7 87 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN.4OOW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations after April 1,2011.

7.65 in ~ f i

9500 L UMEN-100W-High Pressure Sodium(HPS) $ 6.95 $ 27000 LUMEN-%OW- HPS $7 9 9A P

Page 18: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

6300 LUMEN-DECOR-70W-HPS ACORN $ 9.83 6300 LUMEN DECOR-7OW-HPS LANTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations after April 1,2011: 28000 LUMEN . HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installalions after Aprii 1,2011:

BASKRT STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

$0.0363 $0.041285

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two and similarly amortize additional amounts annually thereafter.

da

Special Charges:(per trip) Turn on Service Charge Reconnect Charge - Regular Reconnect Charge -After hours Terminate Service Charge Meter Reading Charge Meter Test Charge Revenue - Returned Check Charge Revenue- Unnecessary Trip Regular Revenue- Unnecessary Trip After hours

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30.00 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH $ 0.028198 Dedicated Delivery Points (Class 6) Demand Charge per KW $ 10.15 Energy Charge per KWN 0.013881 Dedicated Delivery Points (Class C) Demand Charge per Kw $ 10.15 Energy Charge per KWH Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $ 0.0204

0.016715 1 .Wb per month

Small Power Production or Cogeneration(0ver IOOKW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater of:

(I) per KW of Scheduled Demand per Week $ $

110%

per KWH of Maintenance Energy or

(2) % of Market Price

1.835 0.0204

The Charges for Off-peak Maintenance Service shall be: per KW of Scheduled Demand per Week $ 1.835 Excess Demand: to Import Energy from a 3rd Party:

when Power is not Imported the Greater of: (1) % of Actual Cost Incurred 110%

10.86 10.86 19.18

20.99

2.73 2.47 3.12

$ 0.K37523 $ 0.040115

4.001005024

32.00 32.00 95.00 32.00 3200 N.00 12.00 32.00 95.00

0.030413

10.8975 0.015451

10.8975 0.017885

1.38% per month

$ 0.0195240

8 2.351 8 0.0195240

110%

$ 2.351

110%

. . .

Page 19: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Union Countv Advocate. March 16. 201 1

PUBLIC NOTICE

THE APPLICATION OF KENERGY COW. FOR A# A D ~ ~ $ ~ E ~ T IN EXISTING RATES

energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ig rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are esigned to flow-through to Kenergy’s customers the wholesale power expense increase of $23,464,713. rhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 ana ) produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The rates contained in this otice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the :entucky Public Service Commission may order rates to be charged that differ from the rates contained there

CASE NO. 201140035

1.

he present and proposed rates are as foilows:

lesidential Service (Single Ih Three-Phase):

:ustomer Charge per Delivery Point inergy Charge per KWH $0.062327

Ul Mon.Residential Single Phase:

:u.stomer Charge per Delivery Point h r g y Charge per KWH

’hree-Phase Demand lon-Dedicated Delivery Points (0 - 1,000 #wi: hstomer Charge per Delivery Point )emand Charge. All KW During Month $4.05 inergy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

rhree-Phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

3ption A - High Load Factor (above 50%) Cuslomer Charge per Delivery Point

Demand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

Present Rate Schedule

$10.50 per month

$16 00 per month $0 060740

$30.00 per month

$575.00 per month

Option B . Low Load Factor (below 50%) Customer Charge per Delivery Point $575.00 per month

Demand Charge. All KW During Month $ 4.80

Energy Charge: First 150 KWH pei KW, per KWH $ 0 W O Ove: 150 KWH per KW, per KWH $ 0.0360

Private Outdoor Lighting @er month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

l o t Available for Mew Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Faliure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7.16 $ 7.87

20000 LUMEN-400W-MERCURY VAPOR $ 9.98 $ 10.91 12000 LUMEN-25OW-MERCURY VAPOR $ 8.45 $ 9.27

Available for New Installations after April 1,2011 :

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6 95 $ 7 65 .-_-- ..”..-~ .--.. -_

Page 20: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

I 4 .

THE A ~ ~ ~ ~ C A T ~ Q ~ OF KEMERGY GORP. FOR AW ~~~~S~~~~~ IN EXISFIIUG RATES

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are 3esigned to flow-through to Kenergy’s customers the wholesale power expense increase of $23,464,713, Nhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 201 io produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The notice, which are the rates contained in the application, are rates proposed by Kene Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there- - In.

The present and proposed rates are as follows:

Residential Service (Single 8r Three-phase): Present Rate Schedule

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

$10.50 per month $1 3.00 per month $0.067780

All Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740 $0.066900

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW: Customer Charge per Delivery Point Demand Charge:

All KW During Month $4.05 Energy Charge: I

First 200 KWH per KW, per KWH $ 0.0532 $ 0.05747 Next 200 KWH per KW, per KWH $ 0.0380 $ 0.041 57 All Over 400 KWH per KW, per KWH $ 0.0330 $’ 0.03557

$16.00 per month $17.00 per month

.$30.00 per month

Three-Phase Demand Non-Dedicated Delivery Points (1,001 KW &i Over):

Option A - High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$ 575.00 per month

All KW During Month $ 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

Option B - Low Loa! Factor (below 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$ 575.00 per month $750.00 per

All KW During Month $ 4.80 $

First 150 KWH per KW, per KWH $ 0.0420 $ 1 0.0456 Over 150 KWH per KW, per KWH $ 0.0360 $ 0.0386

Private Outdoor Lighting (per month) Standard (served overhead)

Not Available for Mew Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure: 1

7000 LUMEN-175W-MERCURY VAPOR I2000 LUMEN-25OW-MERCURY VAPOR 20000 LUMEN-4OOW-MERCURY VAPOR

$ 7.16

$ 9.98 $ 8.45

7.87 9.27

10.91

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-Hiqh Pressure Sodium(HPS) $ 6.95 7.65 - 1 - _ $

Page 21: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

, Thursday, March IO , 201 1

CASE NO. 2061-00035, THE A ~ ~ ~ ~ C A ~ ~ ~ ~ OB: ~ ~ ~ E R ~ ~ GORP.

FOR AN A ~ ~ ~ $ ~ ~ E ~ ~ !wI EXISTBNG RATES Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes arc designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713 Jvhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 anc 10 produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in rhi: notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, thc Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there in.

The present and proposed rates are as follows:

Residential Senrice (Single 8I Three-Phase):

Customer Charge per Delivery Point Energy Charge per KWH

- Present Rate Schedule

$10.50 per month $0 062327 I

AI1 Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-phase Deyallid ~ o n - ~ e ~ ~ ~ a ~ ~ d Delivery Points (0 - 1,000 KW: Customer Charge per Deliyery Point Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

$ 4.05 All KVV During Month

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 Ail Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Mon-Dedicated Delivery Points (1,0@1 MV 81 OW):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month

First 200 KWH per KW, per KWH Next 200 KWH per KW, per KWH All Over 400 KWH per KW, per KWH

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month

Energy Charge: First 150 KWH per KW, per KWH Over 150 KWH per KW, per KWH

t

$ 575.00 per month

$ 8.65

$ 0.0275 $ 0.0250 $ 0.0230

$ 575.00 per month

$ 4.80

$ 0.0420 $ 0.0360

Proraosed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Private Outdoor Lighting (per month) Standard (served overhead)

Not Available For Mew lnstallations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalen! Lumen Fixture upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7 16 $ 7 87 12000 LUMENZ5OW-MERCURY VAPOR- $ 8.45 $ 9.27 20000 LUMEN-4OOW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations after April 1, 2011:

6.95 I _ _ 9500 LUMEN-100W-High Pressure Sodium(HPS) $

,7nnn I I InnI-?.I I r n b n l 8 I"*

$ 7.65

Page 22: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

, Thursday, March 17,201 1

BpUIBLllQ: NOTICE CASE NO. ~~~~-~~~~~

FOR Ah.! A ~ ~ ~ $ ~ ~ ~ ~ ~ IN EXISTING RATES OF KENEWGY COWP.

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exir ing rates with the Kentucky Public Service Commission in Case No. 2011 00035. The proposed changes a designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,71 which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 at to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in tt notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, tt Kentucky Public Service Commission may order rates to be charged that differ from the rates contained ther in.

The present and proposed rates are as follows:

Residential Service (Single & Three-Phase):

Customer Charge per Delivery Point

Present faale Schedule Proposed Rate Schedule

$10.50 per month $13.00 per month Energy Charge per KWH $0.062327 $0.067780

Ail Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

$16.00 per month $17.00 per month $0.066900

Three-Phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Uemand Charge:

Energy Charge:

$30.00 per month $35 00 per month

All KW During Month $4.05 $4.50

First 200 KWH per KW, per KWH $ 0.0532 $ 0 05747 Next 200 KWH per KW, per KWH $ 0.0380 $ 0.041 57 All Over 400 KWH per KW, per KWH $ 0.0330 $ 0.03557

Three-phase Demand Mon-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge: ,,

Customer Charge per Delivery Point

All KW During Month $ 8.65 $ 9 50

First 200 KWH per KW, per KWH $ 0,0275 $ 0.0299 Next 200 KWH per KW, per KWH $ 0 0250 $ 0 0266 All Over 400 KWH per KW, per KWH $ 0.0230 $ 0 0246

$ 575.00 per month $ 750.00 per month

Option B ~ Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$ 575.00 per month $750.00 per month

All KW During Month $ 4.80 $ 5.35

Over 150 KWH per KW, per KWH $ 0.0360 $ 0.0386 First 150 KWH per KW, per KWH $ 0.0420 $ 0.0456

Private Outdoor Lighting (per month) Standard (served overhead)

Not Available for New Insta!lations after April 1,2014 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16

20000 LUMEN-4OOW-MERCURY VAPOR $ 9.98 12000 LUMEN-250W-MERCURY VAPOR $ 8.45

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95

61000 LUMEN-40OW-HPS-FLOQD LGT $ 11.39 27000 LUMEN-25OW- HPS $ 9.98

$ 7.87 $ 9.27 $ 10.91

$ 7.65 $ 10.96 $ 12.47

Page 23: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBUC NoncE CASE NO, 2011.00035

THE APPLICATION 01: KENEAGY CORP, FOR AN ADJUSTMR\ITIN EXISTING RATES

Kenergy Cop., 6402 Old Corydon Road, Henderson,n 42420, filed an application for an adjustment in exist. ing rates with the Kentucky Public Service Commisdon in Case No. 201140035, The proposed changes are designed lo flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, which will result from the rate increase Big Rivers EItCtric Corparafion proposes in Case No. 2011-00036 and to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this notice, which are the rates contained in the applicalion, are rates proposed by Kenergy Carp.; however, the Kentucky Public Service Commission may order rates lo be charged that differ from the rates contained there- in.

he present and proposed rates are as follows:

Residential Service (Single & Three-phase): Present Rate Schedule

Customer Charge per Delivery Point Energy Charge per KWH $0,062327

$10.50 per monlh

All NowResIdential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Ihree.Phase Demand Non-Dedicated Delivery Points (0-1,WIO IN): Zustomer Charge per Delivery Point $30.00 per monlh lemand Charge: All KW During Month $4.05 Inergy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

rhreePhase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

$16.00 per month

Iption A - High Load Factor (above 50%) Customer Charge per Delivery Point )emand Charge: Ail KW nuring Month inergy Charge: First 200 KWH per KW, per KWH Next 200 KWH per KW, per IKWH All Over 4W KWH per KW, per KWH

lplion B . Low Load Factor (below 50%) Customer Charge per Delivery Point emand Charge: All KW During Month nergy Charge: Firsl 150 KWH per KW, per KWH Over 150 IKWH per KW, per KWH

$575.00 per month

$ 8.65

$ 0.0275 $ 0.0250 $ 0.0230

$575,00 per monlh

$ 4.80

$ 0.0420 $ 0.0360

Prooosed Rate Schedule

$13.00 per monlh $0.067780

$17.00 per monlh $0.066900

$35.00 per monlh

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0,0266 $ 0.0246

$750.00 per month

$ 5 3

$ 0.0456 $ 0.0386

rivate Outdoor lighting (per month) iandard (served overhead)

ot Available for New Installations after April I, 2011 - Existing Fixture will be Replaced with the Nearest @valent Lumen Fixture upon Failure:

100 LUMEN.175W.MERCURY VAPOR $ 7.16 $ 7.87

!OOOO LUMEN.4OOW.MERCURY VAPOR $ 9 98 $ 1091 2000 LUMEN%lW.MERCURY VAPOR $ 8 45 $ 9.27

ivailable lor New Installalions after April 1,2011:

1500 L~JMEN.lOOW.High Pressure Sodium(HPS) $ 6.95 $ 7.65 ?YO00 LUMEN450W" HPS $ 9.98 $ 10.96 jMN LUMEN~4OOW.HPSTLOOD LGT $ 1139 $ 1247

Present Rate Schedule

6300 LUMEN.DECOR.7OW.HPS ACORN $ 9.83 6300 LUMEN DECOR-70W.HPS MNTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations affer April 1,2011: 28000 LUMEN.HPSACORN GL 14 FTPOLE $ 18.98

Special Street lighting Districts Not Available for New Installations after April 1,2011:

BASKEll STREET LIGHTING $ 2.49 MEADOW H l l l STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING S 2.83

Renewable Resource Energy Service Rider Non.Direct Served Cuslomers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

50.0363 $0,041285

New Riders Proposed: Nan. Fuel Adjuslment Charge Purchased Power Adjustment per I(WH:

Nole: Rate will amortize the non-smeller regulatory account balance over hvo years, and similarly amortize additional amounls annually IhereaHer

nla

Special Charges:(per trip) Tum on Selvice Charge "

Reconnect Charge Regular Reconnect Charge -After hours Terminate Service Charge Meter Reading Charge Meter Test Charge Revenue ~ Returned Check Charge Revenue. Unnecessary Trip. Regular Revenue. Unnecessary Trip. A t er hours

5 30.00 $ 30.00 $ 90.00 $ 30.00 $ 30.00 $ 45.00 $ 10.00 $ 30.00 t 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH $ 0.028198 Dedicated Delivery Points (Class B) Demand Charge per KW 8 1015 Energy Charge per KWH 0.013881 Dedicated Delivery Points (Class C) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.016715 Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneralon (100 KW or less): (Customer Sells Power to Kenergy)

1.30% per month

Base Payment per KWH $ 0*0204

Small Power Production or CogeneraUon(0ver 1OOKW): (Customer Buys Power from Kenergy) The Charges for OnPeak Maintenance Setvlce shall be the greater of:

(1) per KW of Scheduled Demand per Week $ 1,835 per KWH of Maintenance Energy $ 0.0204 or

(2) % oi Market Price 110%

The Charges for Off.Peak Maintenance Seivice shall be: per KW of Scheduled Demand per Week $ 1.835 Excess Demand: to Import Energy from a 3rd Party:

when Power is not Imported the Greater of: Charge per KW times highest Excess Demand $ 7.37

(1) % of Actual Cost Incurred 1 1 O?b

$

1.38% ~

$ 5 0.L

$ 2

li

$10.10E!

Page 24: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

ch 16,2017 - THE TIMES LEADER - Princeton, Ky.

THE ~ ~ ~ ~ ~ ~ ~ T I Q N OF KENERGY CORB. FOR AN ST^^^^ IN EXISTING RATES

(energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exis ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes a lesigned to flow-through to Kenergy's customers the wholesale power expense increase of $ 2 3 , 4 6 4 ~ 1 uhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 201 1-00036 ar o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in th lotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, tb (entucky Public Service Commission may order rates to be charged that differ from the rates contained thert n.

The present and proposed rates are as follows:

qesidential Service (Single & Three-phase): Present Rate Schedub

2ustomer Charge per Delivery Point fnergy Charge per KWH $0.062327

411 Non-Residential Single Phase:

$10.50 per month

hstomer Charge per Delivery Point Energy Charge per KWH $0.060740

$16.00 per month

I'hreePhase Demand Mon-Dedicated Delivery Points (0 - 1,000 KW): ;ustomer Charge per Delively Point lemand Charge: All KW During Month $4.05

3ergy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWW per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

$30.00 per month

Three-Phase Demand Non-Dedicated Delivery Points (1,001 M 81 Over):

3ption A - High Load Factor (above 50%) Customer Charge per Delivery Point

lemand Charge: All KW During Month

fnergy Charge: First 200 KWH per KW, per KWH Next 200 KWH per KW, per KWH All Over 400 KWH per KW, per KWH

3ption B - Low Load Factor (below 50%) Customer Charge per Delivery Point

lemand Charge: All KW During Month

fnergy Charge: First 150 KWH per KW, per KWH Over 150 KWH per KW, per KWH

'rivate Outdoor Lighting (per month) Standard (sewed cwerhead)

$ 575.00 per month

$ 8.65

$ 0.0275 $ 0.0250 $ 0.0230

$ 575.00 per month

$ 4.80

$ 0.0420 $ 0.0360

Proaosed Rate Schedule

$'13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747

$ 0.03557 $ 0.041 57

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen fixture upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7.16 $ 7.87 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-400W-MERCURY VAPOR $ 9.98 $ 10.9 1

Available for New Installations after April 1,2011:

9500 LUMEN-1OOW-High Pressure Sodium(HPS) $ 6.95 27000 LUMENP5OW- HPS $ 9.98 61 000 LUMEN-400W-HPS-FLOOD LGT $ 11.39 9000 LUMEN-1 00W METAL HALIDE(MH) $ 6.53 24000 I I IMFhl-dnn\n/ RAM

$ '7.65 $ 10.96 $ 12.47 $ 7.19

Page 25: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE CASE NO. 2811-00039

THE ~ ~ P ~ I C A ~ ~ ~ N OF KENERGY CORP.

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in e&- ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are designed to flow-through to Kenergy’s customers the wholesale power expense increase of $23,464,713, which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and to produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The rates contained in this notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there- in.

STMEMT IN EXISTING RATES

The present and proposed rates are as follows:

Residential Service (Single Ih Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

Present Rate Schedule

$10.50 per month

A11 Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

$16.00 per month

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Non-Dedicated Delivery Points (1,001 K\N & Over):

Option A - High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge: Ail KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$575.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$1 3.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7.16 12000 L.UMENQ50W-MERCURY VAPOR $ 8.45 20000 LUMEN-400W-MERCURY VAPOR $ 9.98

Available for New Installations after April 1, 2011:

9500 LUMEN-1 OOW-High Pressure Sodium(HPS) $ 6.95 27000 LUMENQ5OW- HPS $ 9.98 61 000 LUMEN-400W-HPS-FLOOD LGT $ 11.39 9000 LUMEN-1OOW METAL HALIDE(MH) $ 6.53 24000 LUMEN-400W MH 5 13.45

$ 7.87 5 9.27 $ 10.91

$ 7.65 $ 10.96 $ 12.47

7.19 t! I A 7 E $

Page 26: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE CASE NO. 2011-00035

THE AQPLICAT.TIBN OF E N E R G Y COW. FOR AN ADJUSTMENT IN EXISTING RATES

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exi ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464~ which will result. from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 a to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in t notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, 1 Kentucky Public Service Commission may order rates to be charged that differ from the rates contained the in.

The present and proposed rates are as follows:

Residential Service (Single & Three-phase): Present Rate Schedule

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

$10.50 per month

All Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-Phase Demand Won-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 AI1 Over 400 KWIi per KW, per KWH $ 0.0330

Three-phase Demand Won-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month $ 8.65

$575.00 per month

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW: per KWH $ 0.0250 AI1 Over 400 KWH per KW, per KWH $ 0.0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWti par KW, per KWH $ 0.0360

$575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900 '

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 '

$ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New lnstallations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16 !I 7.87

20000 LUMEN-400W-MERCURY VAPOR $ 9.98 $ 10.91 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27

Available for New Installations after April 1, 2011 I

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6,95 $ 7.65 10.96

h A * I-3

27000 LUMEN-250W- HPS $ 9.98 $ *., *,. Ednnn 1 I i l i i r h i n n n x d i I ~nr\ vi AAP, I ni

Page 27: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Present Rate Schedule Promsed,Rafe Schedule

6300 LUMEN-DECOR-70W-HPS ACORN $ 9.83 6300 LUMEN DECOR-7OW-HPS LANTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations after April 1,2011: 28000 LUMEN - HPS ACORN GL 14 FF POLE

Special Street Lighting Districts Not Available for New Installations after April 1, 2011:

BASKEll STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOlTSVlLLE STREET LIGHTING $ 2.83

$ 18.98

Renewable Resource Energy Service Rider Nan-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account baiance over two years, and similarly amortize additional amounts annually thereafter.

$0.0363 $0.041285

nla

Special Charges:(per trip) Turn on Service Charge Reconnect Charge - Regular Reconnect Charge - After hours Terminate Service Charge Meter Reading Charge Meter Test Charge Revenue - Returned Check Charge Revenue- Unnecessary Trip- Regular Revenue- Unnecessary Trip- After hours

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30.00 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A)

0.0281 98 Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.013881 Dedicated Delivery Points (Class C) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.016715 Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $ 0.0204

Small Power Production or Cogeneration(0ver 100KW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater of:

Base Energy Charge per PNH $

1.30% per month

(1) per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

'(2) % of Market Price

The Charges for Off-peak Maintenance Service shall be: Per KW of Scheduled Demand per Week Excess Demand: to Import Energy from a 3rd Party:

when Power is not Impyied the Greater o f

$ 1.835

(1) % of Actual Cost Incurred 110%

$ Charge n.0, - 1 1 1 " per KW times highest Excess Demand 7 37

10.86 10.86 19.18

20.99

2.73 2.47 3.12

0.037523 0.04011 5

-0.001005024

32.00 32.00 95:00 32.00 32.00 50.00 12.00 32.00 95.00

0.030413

10.8975 0.015051

10.8975 0.017885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

110%

$ 2.351

110%

Q i n inan

Page 28: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE

THE WPPLlCATlQN OF ~ ~ ~ ~ % G ~ CQRP. FOR AN A ~ J ~ § T ~ E ~ T IN EXISTING RATES

[energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjcsinent in a:&! i g rates with the Kentucky Public Sewice Commission in Case No. 2011-00035. The proposed changes art lesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,712 vhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No" 2011 -00036 anl D produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in thi dice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however. tht (entucky Public Service Commission may order rates to be charged that differ from the rates contained therc

CASE NO. 2011-00035

n.

-he present and proposed rates are as follows:

lesidential Service (Single & Three-phase):

hstomer Charge per Delivery Point Inergy Charge per KWH $0.062327

ill Non-Residential Single Phase:

hstomer Charge per Delivery Point Inergy Charge per KWH $0.060740

Present Rate Schedule

$10.50 per month

$1 6.00 per monih

rhreePhase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): h t o m e r Charge per Delivery Point 3emand Charge: All KW During Month $4.05

3nergy Charge: First 200 KWH per KW, per KWH ' $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWW ' $ 0.0330

rhreePhase Demand NonQedicated Delivefy Points (1,001 KW 14 Over):

$30.00 per month

3ption A - High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$575.00 per month

Option 5 - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$1.7.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 9; 0.0386

Not Available for New Installations aiter April 1,2011 - Existing Extm will De Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-i75W-MERCURY VAPOR $ 716 $ 7 87 12000 LUMENQ50W-MERCURY VAPOR $ 8 45 $ 9 27 20000 LUMEN-4OOW-MERCURY VAPOR $ 3 9E $ 10 91

Available for New Installations after April 1,2011

c nc d 7 cc

Page 29: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

The JownaI-EI

Present Rate Schedi

$ 9.83 $ , 9.83 $ 17.36

$ 18.98

201 1 :

$ 2.49 $ 2.25 $ 2.83

$0.0363 $0.041285

'Adjustment per KWti: n/a

ory account balance over t illy thereafter.

$ 30.00 ' $ 30.00

$ 30.00 $ 30.00 $ 45.00 $ 10.00 $ 30.00 $ 90.00

$ 90.00

al Contract

$ 0.0281 98

$ 10.15 0.013881

$ 10.15 0.016715 1.30% per month

;W or less):

$ 0.0204

10OKW):

shall be the greater of:

$ 1.835 $ 0.0204

11 0%

shall be: $ 1.835

wise, rich 10, 20 3 ?a

.l- -PA( 14

Prooosed Rate Schedule

Mar

i

10.86 10.86 19.18

20.99

2.73 2.47 3.12

0.037523 0.0401 15

-0.001005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.00 95.00

0.030413

10.8975 0.015051

10.8975 0.017885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

110%

$ 2.351

110% 110%

Page 30: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE CASE NO. 2011-00035

THE ~ ~ ~ L I C A ~ ~ O ~ OF KENERGY CORR FOR AN A ~ ~ ~ S T ~ ~ ~ T IN EXISTING RATES

I

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in e ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464, which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 201 1-00036 to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, Kentucky Public Service Commission may order rates to be charged that differ from the rates contained th in.

The present and proposed rates are as follows:

Residential Service (Single 81 Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

A11 Mon-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-Phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge.

Energy Charge:

Present Rate Schedule

$10.50 per month

$16.00 per month

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH 5 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Mon-Dedicated Delivery Points (1,001 KW (b Over):

Option A - High Load Factor (above 50%) Customer Charge per Delivety Point

Demand Charge. All KW During Month

Energy Charge: First 200 KWli per KW, per KWH Next 200 KWH per KW, per KWH All Over 400 KWtI per KW, per KWH

Option 6 - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: I

All I(W During Month Energy Charge:

First 150 KWH per KW, per WH Over 150 KWH per KW, per KWH

Private Outdoor Lighting (per month) Standard (served overhead)

$575.00 per month

$ 8.65

$ 0.0275 $ 0.0250 $ 0.0230

$575.00 per month

$ 4.80

$ 0.0420 5 0.0360

Proposed Rate Schedule

$13.00 per month $0.06'7780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04 157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Mot Available for Mew Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ 7.16 $ 7.87 i 2000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-4OOW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations afler April 1,2011 '

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 $ 7.65 10.96

dl d. 4 n A 7 27000 LUMEN-250W- HPS $ 9.98 $

4 4 nn @4nnn I I m d c i l i ilnni,>i un@ CI nnn I I\T

Page 31: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

The Journal-Entei

Present Rate Schedule

$ I 9.83 $ 9.83 $ 17.36

$ 18.98

2011:

$ 2.49 $ 2.25 $ 2.83

$0.0363 $0.041285

'Adjustment per KWH: nla

OY account balance over two yi illy thereafter.

$ 30.00 $ 30.00

$ 30.00 $ 30.00 $ 45.00 $ 10.00 $ 30.00 $ 90.00

$ 90.00

al Contract

$ 0.028 198

$ 10.15 0.013881

5 10.15 0.016715 1.30% per month

;W or less):

$ 00204

1GOKW):

shall be the greater of:

$ 1.835 $ 0.0204

11 0%

shall be: $ 1.835

.ri -prise,

$ars,

- _ .

*ch 17, 201

_ .

-PA

Proposed Rate Schedule

10.86 10.86 19.18

20.99

2.73 2.47 3.12 ,

0.037523 0.040115

-0.001005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.00 95.00

0.030413

10.8975 0.015051

10.8975 0.017885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

11 0%

$ 2.351

,GE

110% 110%

$ 7.37 $ 10.1890

Page 32: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE

THE APPLICATION OF KENERGY CORP. FOR AN ADJUSTMENT IN EXISTING RATES

CASE NO. 2011-00035

Kenergy Corp., 6402 Old Corjdon Road, Henderson, KY 42420, filed an application for an adjustment in ex ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes designed to flow-through to Kenergys customers the wholesale power expense increase of $23,464, j which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2Oll-OO036 to produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The rates contained in t notice, which are the rates contained in the application, are rates proposed by Kenergy Corp ; however, Kentucky Public Service Commission may order rates to be charged that differ from the rates contained the in.

The present and proposed rates are as follows:

Residential Serwice (Single L Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

All Mon-Residential Single Phase:

Customer Charge per Delivery Point

Present Rate Schedule

$10 50 per month

$16.00 per month Energy Charge per KWH $0.060740

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point $30.00 per month . Demand Charge:

$ 4.05 Energy Charge: All KW During Month

First 200 KWH per KW, per KWH $ 0 0532 Next 200 KWH per KW, per KWH $ 0 0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Monlh $ 8.65

First 200 KWH per KW, per KWH $ 0.0275

All Over 400 KWH per KW, per KWH $ 0 0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Monlh $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$ 575.00 per monlh

Next 200 KWH per KW, per KWH $ 0.0250

$ 575.00 per month

Private Outdoor Lighting (per month) Standard (serwed overhead)

Proposed Rate Schedule

$13 00 per month $0.067780

$17 00 per month $0 066900

$35 00 per monlh

$4.50

$ 0 05747 $ 0 04157 $ 0 03557

$ 750.00 per monlh

$ 9 50

$ 0.0299 $ 0 0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Mot Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Mearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7 16 $ 7 87 12000 LUMEN-250W-MERCURY VAPOR $ 8 45 $ 9 27 20000 LUMEN 4OOW-MERCURY VAPOR $ 9 98 $ 10 91

Available for New Installations after April 1, 2011

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6 95 $ 7 65 27000 LUMEN 250W HPS $ 9 98 $ 10 96 61000 LUMEN 400W HPS-FLOOD LGT $ 11 39 $ 12 47 9000 LUMEN lOOW METAL HALIDE(MH) 6 53 7 19

Page 33: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

- --TIC.

PUBLIC NOTICE

THE APPLICATION OF KEMERGY CQRP. FOR AM ADJUSTMENT 11\1 EXISTING RATES

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exir ng rates with the Kentucky Public Service Commission in Case NO. 2011-00035. The proposed changes a1 3esigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,71 Nhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 ar .o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in th notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, t i Kentucky Public Service Commission may order rates to be charged that differ from the rates contained thep n.

CASE NO. 2011-00035

The present and proposed rates are as iollows:

Residential Service (Single ti Three-phase):

Customer Charge per Delivery Poinl Energy Charge per KWH $0.062327

All Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-phase Demand Mon-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge: All KW During Month

Energy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0 0300 All Over 400 KWH per KW, per KWH $ 0.0330

P m

$10 50 per month

$16.00 per monlh

$30.00 per month

$ 4.05

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Oprion A - High Load Faclor (above 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 8 65

Energy Charge: First 200 KWH per KW, per KWH $ 0 0275 Ne? 200 KWH per KW, per KWH $ 0.0250

$ 575.00 per month

All Over 400 KWH per KW, per KWH $ 0.0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$ 575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13 00 per month $0.067780

$17 00 per month $0.066900

$35 00 per month

$4.50

$ 0 05747 $ 0.04157 $ 0.03557

$750 00 per month

$ 9 50

$ 0 0299 $ 0 0266 $ 0 0246

$750.00 per month

$ ' 5.35

$ 0.0456 $ 0.038fi

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN:I75W-MERCURY VAPOR $ 7 16 $ 7.87 12000 LUMEN-25OW-MERCURY VAPOR $ 0.45 $ 9.27 20000 LUMEN-4OOW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 $ 7.65 27000 LUMEN-25OW- HPS $ 9.98 $ 10.96 61 000 LUMEN-400W-HPS-FLOOD LGT $ 11.39 $ 12.47

24000 LUMEN-4OOW MH 18.45 14.75 9000 LUMEN-1OOW METAL HALIDE(MH) $ 6.53 $ 7 19

Page 34: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBUC NOTICE

THE APPUCATION OF KENERGY CORP. FOR AN ADJUSTMENT Ill EXlSTIRlG RATES

CASE NO. 2011 -00035

(energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in eii ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes fesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,~' vhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 201 1-00036 a o produce revenues to cover the $2,000,614 increase in Kenergys other costs. The rates Contained in iotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.: however, I (entucky Public Service Commission may order rates to be charged that differ from the rates contained the n.

The present and proposed rates are as follows:

lesidential Senrice (Single & Three-phase):

hstomer Charge per Delivery Point Inergy Charge per KWH $0.062327

411 Mon-Residential Single Phase:

lustomer Charge per Delivery Point Inergy Charge per KWH $0.060740

Ihree-Phase Demand Mon-Dedicated Delivery Points (0 - 1,000 KW); nustomer Charge per'Delivety Point Demand Charge: All KW During Month . $ 4.05

Energy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0 0380 All Over 400 KWH per KW, per KWH $ 0.0330

Ihree-Phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0 0230

Option B ~ Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month , $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

Present Rate Schedule

$10.50 per month

$16.00 per month

$30.00 per month

$ 575.00 per month

$575 00 per month

Private Outdoor Lighting (per month) Standard (senred overhead)

Proposed Rate Schedule

$13 00 per month $0.067780

$1 7 .OO per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0 04157 $ 0.03557

$750.00 per month

$ 9 50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0 0456 $ 0.0386

Mot Awailable for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Mearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7 16 $ 7 87 12000 LUMEN 250W-MERCURY VAPOR $ 8 45 $ 9 27 20000 LUMEN 400W-MERCURY VAPOR $ 9 98 $ 10 91

Available for New Installatlons after April 1, 2011:

9500 LUMEN-IUOW-High Pressure Sodium(HPS) $ 6 95 $ 7 65 27000 LUMEN-25OW- HPS $ 9 98 $ 10 96 61 000 LUMEN-400W-HPS-FLOOD LGT 11.39 12 47

Page 35: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBUC NOTICE CASE NO. 2011-00035

THE A ~ ~ ~ ~ ~ A T ~ O ~ OF MIEiI![ERGV COW. FOR AN A ~ ~ ~ $ T ~ ~ ~ T IN EXISTING RATES

(energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are k s i g n e d to fldw-through to Kenergy’s customers the wholesale power expense increase of $23,464,713, uhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and o produce revenues to cover the $2,000,614 increase in Kenergy‘s other costs. The rates contained in this iotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the (entucky Public Service Commission may order rates to be charged that differ from the rates contained there- n.

The present and proposed rates are as follows:

Residential Service (Single & Three-Phase): Present Rate Schedule

hstomer Charge per Delivery Point fnergy Charge per KWH $0.062327

MI Non-Residential Single Phase:

$10.50 per month

hstomer Charge per Delivery Point Energy Charge per KWti $0.060740

Fhree-Phase Demand Mon-Dedicated Delivery Points (0 - 1,000 KW): hstomer Charge per Delivery Point gemand Charge: All KW During Month

Energy Charge: First 200 KWH per KW, per KWH $ 0.0532

All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Mon-Dedicated Delivery Points (1,001 KW & Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

$ 4.05

Next 200 KWH per KW, per KWH $ 0.0380

Customer Charge per Delivery Point $ 575.00 per month

All KW During Month $ 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWW per KW, per KWH $ 0.0230

Option B ~ Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$ 575.00 per month

All KW During Month $ 4.80

First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 0.0266 0.0246

$ $

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Private Outdoor Lighting (per month) Standard (served overhaad)

Not Available for New lnstallations after April 1.2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-I 75W-MERCURY VAPOR $ 7.16 $ 7.87 12000 LUMEN-25OW-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-400W-MERCIJRY VAPOR $ 9.98 $ 10.91

Available for New lnstallations after April 1, 2011:

6.95 ~ .. 9500 LUMEN-100W-High Pressure Sodium(HPS) $

o-l,.,,n I 4 *.“I*, o r n , r , t 8 r . C

7.65 _ . . . $

Page 36: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

McLean County ___1

Thur - sday, March 3, 201 1

Present Rate Schedule c N-HPS ACORN $ 9 83 IV-HPS LANTERN $ 9.83

112600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Prooosed Rate Schedule

10.86 10.86 19.18

20.99 ,vailable for New Installations after April 1, 2011:

[28000 LUMEN - HPS ACORN GL 14 FT POLE $ 18 98

,pecial Street Lighting Districts lot Available for New Installations after April 1, 201 1:

,ASKETT STREET LIGHTING IEADOW Hll..t. STREET LIGHTING ,POTPSVILLE STREET LIGHTING

$ 2.49 $ 2.25 $ 2.83

$ 2.73 $ 2.41 $ 3.12

!enewable Resource Energy Service Rider Ion-Direct Served customers: er Kilowatt Hour Premium of iirect Served Customers (excluding Class A)

$0.0363 $0.041285

0.037523 0040115

Iew Riders Proposed: Ion- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

lote: Rate will amortize the non-smelter regulatory account balance over two ; nd similarly amortize additional amounts annually thereafter.

nla -0.001005024 years,

30.00 32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.00 95.00

Y

!econnect Charge I Regular !econnect Charge - After hours erminate Service Charae

$ 30.00 $ 90.00

30.00 30.00 45.00

!evenue - Returned Check Charge $ 10.00 !evenue- Unnecessary Trip- Regular s 30.00 levenue- Unnecessary Trip After hours $ 90 00

s Served Under Spec, (Class A)

.(WH (Class B)

ial Contract

0.028 198

$ 10.15 0.01 3881

0.0304 13

10.8975 0.01 505 1

(Class C) $ 10.15 0.016715 1.30% per month

10.8975 0.01 7885

jned Dollars of icilities r Cogeneration (100 b Kenergy)

1 38% per month

$ 0.0195240

(W or less):

s 0.0204

r Cogeneration(0ver i m Kenergy) Maintenance Service

1001(W):

shall be the greater o f

Demand per Week ice Energy

1.835 0.0204

$ 2.351 $ 0.0195240

110% 110%

Maintenance Service nand per Week

shall be: $ 1.835 $ 2.351

Id P~r t y : red ed the Greater o f

'1 10% 110%

Page 37: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

CASE NO. 2 ~ ~ ~ - ~ ~ ~ ~ ~ THE A ~ ~ ~ ~ ~ A ~ ~ ~ ~ OF ~E~~~~~ COW.

FOR AN A ~ ~ ~ ~ ~ ~ E ~ ~ IN EXilSTlls\lG RATES (energy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes arc fesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, vhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 ant o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this lotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the (entucky Public Service Commission may order rates to be charged that differ from the rates contained there. n.

ihe present and proposed rates are as follows:

Widentiat Sewice (Single & Three-Phase):

Zustomer Charge per Delivery Point 3ergy Charge per KWH $0.062327

111 Mon-Residential Single Phase:

hstomer'charge per Delivery Point Energy Charge per KWH $0.060740

rhree-Phase Demand Mon-Dedicated Delivery Points (0 - 1,000 Kmr): hstomer Charge per Delivery Point lemand Charge: All KW During Month $4.05 lnergy Charge: First 200 KWH per KW, per KWH $ 0 0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0,0330

Wee-Phase Qemand Non-Dedicated Delivery Paints (1,001 KW & (aver):

Present Rate Schedule

$10.50 per month

$16 00 per month

$30.00 per month

lption A - High Load Factor (above 50%). Customer Charge per Delivery Point

lemand Charge: All KW During Month $ 8.65

Energy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

Iplion B - Low Load Factor (below 50%) Customer Charge per Delivery Point

lernand Charge: All KW During Month $ 4.80

fnergy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$ 575.00 per month

$ 575.00 per month

Proposced Rat@ Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

0.0456 0.0386

$ , $

Private Outdoor Lighting (per month) Siandard (sewed overhead)

Not Awailable for Mew Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen F h r e upon Failure:

7000 LUMEN-1 75W-MERCURY VAPOR $ . 12000 LUMEN-250W-MERCURY VAPOR $ 20000 LUMEN-4OOW-MERCURY VAPOR $

7.16

9.98 8.45

7.87 9.21

10.91

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 27000 LUMEN-25OW- HPS $ 9.98 61000 LUMEN-400\IV-HPS-FLOOD LGT $ 11.39 nnnn I , I * . . - . * < - - .

$ 7.65 $ 10.96 $ 17 A7

Page 38: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

McLean County

Present Rate Schedule

6300 LIJMEN-DECOR-70W-HPS ACORN $ 9.83 6300 LUMEN DECOR-70W-HPS LANTERN $ .9.83 12600 LUMEN tips-7OW-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 2011: 28000 LUMEN I HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installations after April 1, 2011:

BASKET STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SpOTTSVlLLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Nan-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

$0.0363 $0.041285

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two years, and similarly amortize additional amounts annually thereafter.

Special Charges:(per trip) Turn on Service Charge $ 30.00 Reconnect Charge ~ Regular $ 30.00

Terminate Service Charge $ 30.00 Meter Reading Charge $ 30.00

$ 45.00

nue- Unnecessary Tr ip Regular $ 30 00

nia

Reconnect Charge - After hours $ 90.00

enue - Returned Check Charge $ 10.00

nue- Unnecessary Trip- After hours $ 90.00

e Industrial Customers Served Under Special Contract icated Delivery Points (Class A)

Energy Charge per KWH $ 0.028198 edicated Delivery Points (Class 5) emand Charge per KW $ 10.15

edicated Delivery Points (Class C)

nergy Charge per KWH 0.016715 3cilities Charge per Assigned Dollars of energy Investment for Facilities mall Power Production or Cogeneration (100 KW or less): :ustomer Sells Power to Kenergy)

nergy Charge per KWH 0.01 38231 P

c Remand Charge per KW $ 10 15

1 30% per month

$ 0.0204 last Payment per KWW

mall Power Production or Cogeneration(0ver 100KW): hstomer Buys Power from Kenergy) he Charges for On-Peak Maintenance Service shall be the greater of:

per KW of Scheduled Demand per Week $ 1.835 Per KWH of Maintenance Energy $ 0.0204 or

9 96 of Market Price 110%

I he Charges for Off-peak Maintenance Service shall be: r KW of Scheduled Demand per Week cess Demand:

$ 1.835

Energy from a 3rd Party: 110%

I -

I News, - 1 5511

*hursday, _^__

March v

Proposed Rate Schedule

10 86 10.86 19 18

20.99

2.73 2.47 3.12

0.037523 0.0401 15

-0.001005024

32.00 32.00 95 00 32.00 32.00 50.00 12.00 32.00 95.00

0.03041 3

10.8975 0.015051

10.8975 o.oi7a85

1.38% per month

$ 0.0195240

$ 2.351 $I 0.0195240

110%

$ 2.351

110%

Page 39: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

P a m B-16. March 8.2611. Lender-News

PUBLIC NOTICE

THE APPLICATION OF KENERGY CORP. FOR AN ADJUSTMENT IN EXISTING RATES

Kenergy Gorp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ing rates with the Kentucky Public Service Cornmission in Case No, 2011-00035. The proposed changes are designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this notice, which are the rates contained in the application, are rates proposed by Kenergy Gorp.; however, the Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there: in.

CASE NO. 2011-00035

The present and proposed rates are as follows:

Residential Service (Single & Three-phase):

Customer Charge per Delivery Point ' $10.50 per month Energy Charge per KWH $0.062327

A11 Non-Residential Single Phase:

Present Rate Schedule

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

$16.00 per month

Three-phase Remand Mon-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW 81 Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month $ 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$575.00 per month

Option B ~ Low Load Factor (below 50%) Customer Charge per Delivery Paint

Demand Charge: . All KW During Month $ " 4.80

Energy Charge:

$575.00 per month

First 150 KWH per KW, per KWH $ 0.0420 . Over 150 KWH per KW, per KWH $ 0.0360

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New Installations after April 1, 2011 - Existing Fixture will be Replaced with the Nearest Equivalen! Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16 $ 7.87 I 2000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-400W-MERCIJRY VAPOR $ 9.98 $ 10.9 1

Available for New Installations after April 1, 20 11 :

9500 LlJMEN-100W-High Pressure Sodium(HPS) $ 6.95 27000 LUMENQ50W- HPS f 9 98

7.65 i n c~f i

$ *

Page 40: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

--

PUBLIC NOTICE CASE M a 20”d9-00035

THE A ~ ~ ~ ~ ~ A ~ ~ ~ ~ OF ~~~~~~~ COW. FOR AM A ~ ~ ~ S ~ ~ E ~ ~ %I ~~~S~~~~ RATES

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exi ,ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes designed to flow-through to Kenergy‘s customers the wholesale power expense increase of $23,464,71 Jvhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 a io produce revenues to cover the $2,000,614 increase in Kenergy’s other cists. The rates contained in ti notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, t Kentucky Public Service Commission may order rates to be charged that differ from the rates contained the1 in.

The present and proposed rates are as follows:

Residential Service (Single 8 Tiree-Phase):

Customer Charge per Delivery Point Energy Charge per KWH

Present Rate Scheduie

$10.50 per month $0 062327

All NonResidentia! Single Phase:

Customer Charge per Delivery Point Energy Charge per KWt1 $0.060740

Three-Phase Demand Non-Dedicated Deiivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

$ 4.05 All KW During Month

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330,

TParee-Phase Demand Non-Dedicated Deilivery Points (1,001 KW 8( Over):

Optlon A - High Load Factor (above 50%) ,

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month B 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWIi $ 0.0250 All Over 400 KWli per KW, per KWti i 0.0230

$ 575.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWtl per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

B 57500 per month

Private Outdoor Lighting (per ~ ~ ~ ~ n t i h ) Standard (served overhead)

Proposed Rate Schedule

$1 3.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$ 750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for Mew installations after April 1, 2011 _I Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7 16 $ 7 87 12000 LUMEN-250W-MERCURY VAPOR $ 8.45 $ 9.27 20000 LUMEN-40OW-MERCURY VAPOR $ 9.98 $ 10.91

Available for New Installations after April 1, 2071

9500 LUMEN.100W-High Pressure Sodium(HPS) $ ’ 6.95 $ 7.65 27000 LUMEN-250W HPS $ 9 98 $ 10.96 61000 LUMEN-400W-HPS-FLOOD LGT $ 11 39 $ 12 47

Page 41: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Mcheen County Mews, Thursday, March 17,2011

-- Present. Rate Schedule Proposed Rate Schedule

6300 LUMEN-DECOR-70W-MPS ACORN $ 9 83 6300 LUMEN DECOR-70W-HPS LANTERN $ 9.83 12600 LUMEN HPS-7OW-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 2011: 28000 LUMEN - HPS ACORN GL 14 FT POLE $ I 8.98

Special Street Lighting Districts Not Available for New Installations after April 1, 2011:

BASKET STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHPING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Served Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per KWH:

Note: Rate will amortize the non-smelter regulatory account balance over two years,

$0.0363 $0.041285

nla

and similarly amortize additional amounts annually thereafter.

Special Charges:(per trip) Turn on Service Charge $ Reconnect Charge Regular * $ Reconnect Charge - After hours $ Terminate Service Charge $ Meter Reading Charge $ Meter Test Charge $ Revenue - Returned Check Charge . $ Revenue- Unnecessary Trip- Regular $ Revenue- Unnecessary Trip- After hours $

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30.00 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH $ 0.028198 Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15

Dedicated Delivery Points (Class C) Demand Charge per KW $ 10.15 Energy Charge per KWH Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy) Base Payment per KWH $ 0.0204

Small Power Production or Cogeneration(0ver 100KW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater of

(1) per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

Energy Charge per KWH 0.013881

0.01 67'1 5 1.30% per month

(2 ) % of Market Price 110%

The Charges for Off-peak Maintenance Service shall be: per KW of Scheduled Demand per Week $ 1.835 Excess Demand: to Import Energy from a 3rd Party: (1) % of Actual Cost Incurred when Power is not Imported the Greater o f Charge per KW dmes highest Excess Demand $ 7.37

110%

nr Ol. nf u;nhnr+ n.;,.,. nn,n:l,nA 6"- nu c.,-*-- + 1 no,

10.86 10.86 19.18

20.99

2.73 2.41 3.12

0.031 523 0.0401 15

-0,001005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32 00 95.00

0.030413

10 8975 0.01 5051

10.8975 0.01 7885

1.38% per month

$ 0.0195240

$ 2.351 .$ 0.0195240

110%

I

$ 2.351

110%

$10.1890 .. . ̂n I

Page 42: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE CASE NO. 20114(B035

THE APPLICATION OF FOR AN ADJUSTMENT I

(energy Gorp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exit 1g rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes a lesigned to flow-through to Kenergy’s customers the wholesale power expcpense increase of $23,464~1 vhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 a1 o produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The rates contained in lotice, which are the rates contained in the application, are rates proposed by K@n@rgy Corp.; however, t (entucky Public Service Commission may order rates to be charged that differ from the rates contained the1 n.

-he present and proposed rates are as follows:

lesidential Service (Single & Three-phase): l?E%z.&m-

hstomer Charge per Delivery Point Inergy Charge per KWH $0.062327

111 Won-Residential Single Phase:

hstomer Charge per Delivery Point tnergy Charge per KWH $0.060740

rhree-Phase Demand Won-Dedicated Delivery Points (0 - 1,000 KW): kstomer Charge per Delivery Point lemand Charge: All KW During Month $4.05

inergy Charge: First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

rhreePhase Demand Mon-Dedicated Delivery Points (1,001 KW 81 Over):

$10.50 per month

$16.00 per month

$30.00 per month

3ption A - High Load Factor (above 50%) Customer Charge per Delivery Point

)emand Charge: All KW During Month $ 8.65

Znergy Charge: First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$575.00 per month

Opiion B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charger All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.04157 $ 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 5 0.0386

Mot Available for New InstaHations after April 1,2011 - Existing Fixture wili be Replaced Wiih the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16 12000 LUMENP5OW-MERCURY VAPOR $ 8.45 20000 LUMEN-400W-MERCURY VAPOR $ 9.98

Available for New Installations after April t , 201 1:

9500 LUMEN-I OOW-High Pressure Sodium(HPS) $ 6.95 9.98 27000 LUMEN-250W- HPS $ _ _

$ 7.87 $ 9.27 $ 10.91

$ 7.65 10.96 $

A 4 n .47

Page 43: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

6300 LUMEN-DECOR-70W-HPS ACORN $ 9.83 6300 LUMEN DECORJOW-HPS LANTERN $ 9.83 12600 LUMEN HPS-70W-2 DECOR FIX $ 17.36

Available for New Installations after April 1, 2011: 28000 LUMEN - HPS ACORN GL 14 FT POLE $ 18.98

Special Street Lighting Districts Not Available for New Installations after April 1,2011:

BASKETT STREET LIGHTING $ 2.49 MEADOW HILL STREET LIGHTING $ 2.25 SPOTTSVILLE STREET LIGHTING $ 2.83

Renewable Resource Energy Service Rider Non-Direct Sewed Customers: per Kilowatt Hour Premium of Direct Served Customers (excluding Class A)

New Riders Proposed: Non- Fuel Adjustment Charge Purchased Power Adjustment per WH:

Note: Rate will amortize the non-smelter regulatory account balance over two years, and similarly amortize additional amounts annually thereafter.

$0.0363 $0.041285

n/a

Special Charges:(per trip) Turn on Service Charge Reconnect Charge - Regular Reconnect Charge - After hours Terminate Sewice Charge Meter Reading Charge Meter Test Charge Revenue - Returned Check Charge Revenue- Unnecessary Trip- Regular Revenue- Unnecessary Trip- After hours

30.00 30.00 90.00 30.00 30.00 45.00 10.00 30.00 90.00

Large Industrial Customers Served Under Special Contract Dedicated Delivery Points (Class A) Base Energy Charge per KWH $ 0.028198 Dedicated Delivery Points (Class B) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.013881 Dedicated Delivery Points (Class C) Demand Charge per KW $ 10.15 Energy Charge per KWH 0.016715 Facilities Charge per Assigned Dollars of Kenergy Investment for Facilities Small Power Production or Cogeneration (100 KW or less): (Customer Sells Power to Kenergy)

Small Power Production or Cogeneration(0ver 1OOKW): (Customer Buys Power from Kenergy) The Charges for On-Peak Maintenance Service shall be the greater of:

1.30% per month

Base Payment per KWH $ 0.0204

(1) per KW of Scheduled Demand per Week $ 1.835 per KWH of Maintenance Energy $ 0.0204 or

(2) % of Market Price 110%

The Charges for Off-peak Maintenance Service shall be: Per KW of Scheduled Demand per Week $ 1 .E35 Excess Demand: to Import Energy from a 3rd Party:

when Power is not ImDorted the Greater of: (1) % of Actual Cost Incurred 110%

10.86 10.86 19.18

20.99

2.73 2.47 3.12

0.037523 0.04011 5

-0.001 005024

32.00 32.00 95.00 32.00 32.00 50.00 12.00 32.0 95.00

0.0301913

10.8975 0.015051

10.8975 O.Ot7885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

110%

$ 2.351

110%

Page 44: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTICE CASE NO. 2011-00035

THE APPkIGATlODd OF KENERGY CORP. FOR AN ADJUSTMENT IN EXISTING RATES

Kenergy Corp., 6402 Old Cotydon Road, Henderson, KY 42420, filed an application for an adjustment in exist- ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are designed to flow-through to Kenergy's customers the wholesale power expense increase of $23,464,713, which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and to produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there- in.

The present and proposed rates are as follows:

Residential Service (Single (3( Three-phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

Present Rate Schedule

$10.50 per month

All Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

$16.00 per month

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH $ 0.0532 Next 200 KWH per KW, per KWH $ 0.0380 All Over 400 KWH per KW, per KWH $ 0.0330

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW (3( Over):

Option A - High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point

All KW During Month $ 8.65

First 200 KWH per KW, pe; KWH $ 0.0275 Next 200 KWH per KW, per KWti $ 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

$575.00 per month

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge: All KW During Month $ 4.80

Energy Charge: First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

$ 575.00 per month

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule

$13.00 per month $0.067780

$17.00 per month $0.066900

$35.00 per month

$4.50

$ 0.05747 $ 0.041 57 $ 0.03557

$750.00 per month

$ 9.50

$ 0,0299 $ 0.0266 $ 0.0246

$750.00 per month

$ 5.35

$ 0.0456 $ 0.0386

Not Available for New Installations after April 1,2011 - Existing Fixture will be Replaced with the Nearest Equivalent Lumen Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16

20000 LUMEN-400W-MERCURY VAPOR $ 9.98 12000 LUMEN,.25OW-MERCURY VAPOR $ 8.45

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 6.95 27000 LUMEN-250W- HPS $ 9.98 " _ _ _ ._

$ 7.87 $ 9.27 $ 10.91

$ 7.65 $ 10.96

Page 45: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

PUBLIC NOTlCE CASE MQ. 2011-00035

SHE A ~ ~ ~ ~ C A ~ ~ ~ ~ OF KIEIUERGY COW. FOR AM A ~ ~ U ~ ~ ~ ~ ~ T IN EXlSTlWG RATES

(enetgy Corp., 6402 Old Corydon Road, Henderson, MY 42420, filed an application for an adjustment in exisi- ng rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are lesigned to flow-through to Kenergy's customers the wholesale power expense increase of $23,46471 3, which will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 20'11-00036 and o produce revenues to cover the $2,000,614 increase in Kenergy's other costs. The rates contained in this iotice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the lentucky Public Service Commission may order rates to be charged that differ from the rates contained there- n

The present and proposed rates are as follows:

iesidential Service (Single ik Three-phase):

:ustorner Charge per Delivery Point Inergy Charge per KWH $0.062327

rZIl Non-Residential Singfe Phase:

hstomer Charge per Delivery Point energy Charge per KWII $0.060740

Fhree-Phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): 2ustorner Charge per Delivery Point Jemand Charge: All KW During Montli

Energy Charge: , First 200 KWH per KW, per KWH ' $ 0 0532

All Over 400 KWH per KW, per KWH 8 0 0330

-_I_ Present Ra:e Schedule

$10.50 per month

$'16.00 per month

$30.00 per month

$ 4.05

Next 200 KWH per KW, per KWH $ o 0380

fhree-Phase Demand Non-Dedica:ed Delivery Points (1,001 MW a Over):

Option A ~ High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Custoiner Charge per Delivery Point 8 575 00 per moiitli

All KW During Montli $ 8.65

First 200 KWH per KW, per KWH 8 0.0275 hied 200 KWH per KW, per KWH $ 0.0250 All Over 400 KWH per KVV, per KWH $ 0.0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$ 575.00 per month

All KW During Moiilh $ 4.80

First 150 KWH per KW, per KWH $ 0.0420 Over 150 KWH per KW, per KWH $ 0 0360

Piiva?,e O~lk!ooi Lighiiiig (per month] Standard (served overhead)

Proposed Rate Schedule

$13,00 per month $o.o~77ao

$17.00 per month $0.066900

$35.00 per month

$4 50

0 05747 $ 0 04157 8 0 03557

$ 750 00 per rnontli

8 9 50

8 0.0299 3 0.0266 s 0.0246

$750.00 per rnontli

8 5.35

$ 0 0456 $ 0 om

Not Available for New Installations after April 7, 2011 - E:ris:ing Fi:rture will be Replaced with the Nearest Equivalent Lumeli Fixture upon Failure:

7000 LUMEN-175W-MERCURY VAPOR $ 7.16 $ 7.87 12000 LUMEN-250W-MERCURY VAPOR - $ a 45 $ 9 27 20000 LUMEN-400W-MERCURY VAPOR 8 9 98 $ 10 91

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressiire Sodium(HPS) 8 6.95 $ 7.65 27000 LUMEN-25OW- HPS $ 9.98 $ 10 96 61000 LUMEN-400W-HPS-FLOOD LGT 11.39 $ 12.47

1

Page 46: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

00 LUMEN-DECOR 70W-HPS ACORN s 9 a3 9 83 6300 LUMEN DECOR-70W-HPS LANTERN

600 LUMEN HPS-7OW-2 DECOR FIX x 17 36

ailable for New Installations after April 1, 2011 000 I.UMEN HPS ACORN GL 14 FT POLE $ I 8 98

Special Street Lighting Districts

(ETT STREET LIGHTING x 2 49 DOW HILL STREET LIGHTING B 2 25 TTSVILLE STREET LIGHTING s 2 83

Direct Served Custoiners. $0 0363 $0 0412135 ect Served Custoiners (exriuding Class A)

ate will mortize the non-smelter regtilatory ai.cotirit Ii,rlan~s over iiwo year:, ilarly arnortiLe additional amount5 annually therealtpr

ect Charge -Alter hours 90 00

e- llnnecessary Trip- Regular '6 30 00 e llnnecessary Trip- Altcr hours 6 90 00

al Customers Served Under Special Contract

0013881 Delivery Points (Class c)

1 30% pel rnot;th

Proposed Rate Schedule

10 86 10 86 19 18

20 99

2 73 2 47 3 12

0 037523 0040115

-0 001005024

32 00 32 00 95 00 32 00 32 00 50 00 12 00 32 00 95 00

0 03051 3

i o a m 0015051

10 8975 0 017885

1 33% per month

s 00195240

0 1 835 f Scheduled Demand per W?d( of Maintenance Energy $ 00204

x 2 351 !F 0 0195240

k%of Market Pnce

for Off-Peak Maintenance Sewice shall be: eduled Demand per Week 1835 $

7 37 ss Demand $

110%

I 2351

Page 47: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

P145L16 NOTICE

THE A P ~ ~ ~ G A ~ ~ Q N OF MENERGY GORP. FOR AD! A ~ j ~ S ~ ~ ~ ~ IN EXISTING RATES

Kenergy Corp., 6402 Old Corydon Road, Henderson, KY 42420, filed an application for an adjustment in exist, ing rates with the Kentucky Public Service Commission in Case No. 2011-00035. The proposed changes are designed to flow-through to Kenergy’s customers the wholesale, power expense increase of $23,464,713, Jvhich will result from the rate increase Big Rivers Electric Corporation proposes in Case No. 2011-00036 and to produce revenues to cover the $2,000,614 increase in Kenergy’s other costs. The rates contained in this notice, which are the rates contained in the application, are rates proposed by Kenergy Corp.; however, the Kentucky Public Service Commission may order rates to be charged that differ from the rates contained there- In.

CASE NO. 2011-00035

The present and proposed rates are as follows:

Residential Service (Single & Three-Phase):

Customer Charge per Delivery Point Energy Charge per KWH $0.062327

All Non-Residential Single Phase:

Customer Charge per Delivery Point Energy Charge per KWH $0.060740

Three-phase Demand Non-Dedicated Delivery Points (0 - 1,000 KW): Customer Charge per Delivery Point Demand Charge:

Energy Charge:

” Present Rate Schedule

$10.50 per month

$16.00 per month

$30.00 per month

All KW During Month $4.05

First 200 KWH per KW, per KWH $ 0.0532

All Over 400 KWH per KW, per KWH $ 0.0330 Next 200 KV!H per KW, per KWH $ 0,0380

Three-phase Demand Non-Dedicated Delivery Points (1,001 KW & Over):

Option A ~ High Load Factor (above 50%)

Demand Charge:

Energy Charge:

Customer Charge per Delivery Point $575.00 per month

All KW During Month $ 8.65

First 200 KWH per KW, per KWH $ 0.0275 Next 200 KWH per KW, per KWH e 0.0250 All Over 400 KWH per KW, per KWH $ 0.0230

Option B - Low Load Factor (below 50%) Customer Charge per Delivery Point

Demand Charge:

Energy Charge:

$575.00 per month

All KW During Month $ 4.80

First 150 KWH per KW, per KWH 9 0.0420 Over 150 KWH per KW, per KWH $ 0.0360

Private Outdoor Lighting (per month) Standard (served overhead)

Proposed Rate Schedule -

$13.00 per month $0.067780

$1’7 00 per month $0.066900

$35.00 per month

$4.50

$ 0.05147 $ 0.041 57 $2 0.03557

$750.00 per month

$ 9.50

$ 0.0299 $ 0 0266 $ 0.0246

$750 00 per month

$ 5.35

$ 0.0456 $ 0.0386

Hot Available for New Installations after April 1,2011 - Equivaient Lumen Fixture upon Faiiure:

7000 LUMEN-175W-MERCURY VAPOR $ 12000 LUMEN-250W-MERCURY VAPOR $ 20000 LUMEN-400W-MERCURY VAPOR $

Available for New Installations after April 1, 2011:

9500 LUMEN-100W-High Pressure Sodium(HPS) $ 27000 LUMEN-Z50W- HPS $ 61000 LUMEN-400W-HPS-FLOOD LGT $ 9000 LUMEN-100W METAL HALIDE(MH) $ 24000 LUMEN-400W MH $ 20000 LUMEN-ZOOVII-HPS $

Existing Fixture will be Replaced with the Nearest

7.16 $ 7.87 8.45 $ 9.27 9.98 $ 10.91

6 95 $ 7.65 9.98 $ 10.96

11 39 $ 12.47 6.53 $ 7 19

13 45 $ 14.75 9.69 $ 10.66

Page 48: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

Proposed Rate Schedule

10.86 10.86 19.18

20 99

2.73 2.47 3.12

0.037523 0.04011 5

-0.001005024

32.00 32.00 ' 95.00 32.00 32.00 50.00 12.00 32.00 95.00

0 030413

10.8975 0.015051

10.8975 0 017885

1.38% per month

$ 0.0195240

$ 2.351 $ 0.0195240

110%

$ 2.351

110%

$ 10.1890 110%

Prooosed Rate aer Year

Page 49: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

0 0-

69-69

6963

m

m

mN

(D

-

m*

6969

gg

696969

.. 7

T_

0

N

g z a, x

z

(1469

69

2

00

646969696969696969

m

.r: 0

3-

m

r:

000000000

0 0- 0 0 0 l.6 0 0 0

000000000

;;

jE

2

s

x E c 0

N

m 0 m

m m

-'m

m

L

a,

0

0

L

W

0

P

a

9

x R

In

69

69

-6969.

&

z > I- -

Page 50: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

m

2 N

U

N

0

rn

9

4

, ! ! ~ , I. , I i ! ! ! i ! I I

g " 4

.4

-

eee

64

4.4

-e

-64

4.44.44.4644.44.4ee4.4

05

ii c

c

m

mm

m

22

2

ee4.4

eee

64

-4.464644.44.44.4e4.4

T-

.-.. 0

N

L

0

mw

m

000

cn

wu

2

2%

5

3 c

ii z Q

0

v)

r-. 64

- - .., c ii R L

W U.

0

r-. L-J

c 5

t

S

0

E E

3 R 0

L-J r- z 64

4.4 e-

0

49

4.4-69

2 646464

W - a 'F: 2 .c u

M

W

L

.I

W

ln

5 E

NO

0

mm

m

rn

mm

2x3

5 c

f

c

ii L

W

Q

0

z r-. L1

te

64

644.4

4.46464

'$;,

r2 .-

-I

m m E #

c 0

R

"- bi

n

m

VI m Jz:

W

E

M

- .-

.I

t 0

n

.-

W - .- P a

Page 51: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

*e*

.. - F;

N

7

In

mm

7

m

-. 000000000

0.9 9

9 9

9 9

4 9

z

z

N

zf

E

0

aa

g:a

s3z

as

E

m 1

U

a,

cn s E

am

5

e

0

(uo

r- ot-

70

*e3

L

n

sg

{ e a

.. c &

99

9 6

NO

0

g,g

z B k

000

rn

0

€e

*e

3

n

f

E b

R s; r

P

0

e

s

E

E R s; L

W

p.

0

e

Page 52: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

5

N

..

3

s1 9

4

0

Ln 0

0 E

m a, z.

B

0

8 69

Ln

3

69

ma

w

NN

N

000

mw

e

9 0. 9

6.36.3'93

In

00

R

j8Z

9

99

000

6.36969

Page 53: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

000000000

000000000

c4

OiU

iOiN

On

ic4

Ui

mm

mm

m.7

m-

mm

cn 0

Ev 01

e3 e3fE

-w

000000000

000000000

oo

oo

otr

jo

oo

m

m 0

) m

m cy - m

m

W

$

feff3

ff3-w

ff33.E

-ff3

2! 0

s2 Y

0

69 2 10

3 69

5 tii

x ff3 r.

ff3 69

e3

a

Q

9

0

0

0

v)

R

Page 54: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

e (0

u 0

a R F

.c

Y- O

N

0

.c r 0

K

4 G 5 a rn K 3

a-' Y

u 3

I- 2: w

Y

2 a K

w : rn n

a 2 a &

0

U

I- K

z a

mm

m

4c

uw

N

NN

.. 63-63

._

- 0

N

P

2

a51

z 0

00

00

00

00

0

00

00

00

00

0 0 0 0 0 Irj 0

0.0

mm

mm

mr

t-

mm

E

52

2

5

E c

9

0

0

6%

2

in

rt 64

9

0

0

63

9

E

636364

63

-6363

NO

0

mm

m

00

0

mm

m

000

636369

c C E" E- 2 0 9

In

6%

63

636363

- 3

x

0

0

5

t c

E g Q

0

m

b

63

5

b c

E" z a

0

b

in

v3

rg

2

63

0

rt c9

e3

Page 55: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

mm

m

NN

N

--.ctN=?

g P R

000000000

NN

LO

NN

ON

Nm

9 0. 9

9 9

9 9

9 9

mm

mm

mm

cm

m

*A#64640*+96469

?=

B s? Q

W

.E. c

0

.rr C

A

64-69

maw

0- 0 0'

(n

wv

N

NN

000

moo

bv

)m

N

NN

000

Odd

Page 56: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

.- i

Page 57: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

s

Page 58: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

8

$2 9

c? 0

0

D

T-

000000000

0.0 0 0 0 Ln

0 0 0

9 9

9 9

0. 9

9 9

9

mm

mm

m*

-m

cr

,

v) - ti -

2 0 0

c -

Page 59: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

mm

m

seu

s!

CU

NN

.. P

K

a 5: 0

9

4 i!L 8

5 0 0 m

9

f

c

Page 60: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will
Page 61: NOTARIZED PROOF OF PIJB1,ICATION COMMONWEALTH OF … cases/2011-00035/20110329... · 2011. 3. 29. · lot Available for New Installations after April 1,2011 - Existing fixture will

pc

4 m

0

z a o? 0 U

n

k B a r

W 4 rn W

E

i=

6969

63636969ffffli696969

000000000

000000000

mrn

cn

rn

rn

b-m

m

00

00

olrjo

00

69.69 69 69 63 69 63 63 69

c c E" g$

g

e

-IC-

ON

-0

6963

m

s 69

f a. 0

m

r. 8 6

9

69

-6369

m

mo

o

g g

j%R

E"

000

000

6

CL 0

IC-

m z 69

69

696969

c f

9

c

e a

0

0

10 IC

- 69

c t

9 c

E" CL 0

m

IC-

m

69