novaCITYNETS
VIRTUAL CONSTRUCTION
CAD / CAE SOLUTION
novaCITYNETS offers a comprehensive and integrated line of engineering
solutions and services to meet the diversified requirement of construction
and building industry. We have partnered with many world renowned AEC
softare developers, bringing their state-of-the-art technology to benefit the
local building. NovaCITYNETS is always at the forefront of computer aided-
design/modelling and management technology. With an impeccable
reputation in structural analysis and design, we provide solutions in Civil &
Structural, Architectural, Geotechnical, MEPS, Construction and Facility
Management.
BUILDING INFORMATION MODELING SERVICE
In 2007, we started a service department in BIM & VC (Virtual Construction)
and since then we have been engaged in numerous projects locally as well
as regionally. Some of the more prestigious projects in Singapore include the Orchard Central, Viz@Holland,
Reflection@Keppel Bay and Garden by the Bay@Marina. Others in the region includes The River@Bangkok,
Palm-Trump Hotel@Dubai and Centum City@Pusan, Korea and Anglier Hydroelectric Dam@Canada. Currently
we have offices in Singapore, Malaysia, Thailand and Philippines. Most of our staffs have either engineering or
Architectural background.
NOVACITYNETS SERVICES
• Building Information Modelling
• Building Constructability Analysis
• 4D/5D Construction
• Software Localization/ Customization Service
• CAD Management/ Consultancy
• Engineering Design and Analysis Service
• BIM Implementation Service and Hand-holding
• Customised Software Training
OUR MISSION STATEMENT
novaCITYNETS Services’ mission is to help owners and construction firms maximize efficiency by
deploying the fastest and safest path to integrated construction processes.
Our team, comprises of construction professionals, provides the implementation and delivery of
advanced and proven concepts to achieve far more accurate planning and control. The employment of a
unique leveraged Integration process allows us to progressively increase the intelligence of the
construction data model and support informed decision-making. The benefits of these processes are:
• The early elimination of design & coordination errors
• Significantly improved cost management accuracy and turnaround times
• Optimized schedule planning and production control provides superior performance over
traditional techniques
With deep industry and business process expertise, a broad global presence, and a proven track record,
novaCITYNETS’s dedicated team minimizes disruption, assures productivity from day one, and helps our
customers to reduce risk, shorten schedules, increase profitability, and win more business.
BENEFITS OF OUR SERVICES
• Constructability Analysis: The BIM modeling process highlights potential problems in project’s
design and identifies missing information in the construction documents. The list of problems
identified is provided to the project team in a discrepancy report. Elimination of these errors
has been proven to reduce project cost by 2-3% savings in constructability issues.
• Communication: The BIM model connects the design to both the cost and time aspects of the
project. It is the ideal tool to communicate project status and issues to all project stakeholders.
Usage of the model for communication purposes ranges from high level meetings with the
project stakeholders, to detailed planning meetings with individual subcontractors, foremen,
and site staff.
• Cost Planning: The BIM model produces highly accurate material quantities, which are
combined with a company database to rapidly create the project estimate. Once the project
estimate has been processed, the time required to update it based on design changes is
dramatically reduced. Additionally, the project team can use the graphical tools included with
the system to communicate the estimate and the variance to either the initial budget or
previous estimates to all project stakeholders. Construction companies can achieve 3% - 5%
savings utilizing the full solution, that includes better estimating data for negotiations and a
schedule plan with reduced labor
CONSTRUCTION SERVICES PROCESS OVERVIEW
• Define the Project Plan
• Create the 3D Model
• Configure the Estimating Database
.
• Develop the estimate
• Analyze sequences
• Update & maintain the 5D model
PROJECT HANDHOLDING AND IMPLEMENTATION
The move to BIM required company to deploy a comprehensive strategy. Our BIM deployment strategy
includes careful studies of company standards, software, IT setup and resource requirement, . A tested
approach is to identify a live pilot project with a core team to be trained with BIM technology. In
novaCITYNETS, we have assisted many companies from zero knowledge to BIM ready for future projects.
ITEMS COVERED ON THE IMPLEMENTATION
ITEM
Formation of BIM Core Team
BIM Competency Assessment
Team Structure & Role Assignment
Study Project
Establish Project Approach
Assist on Task Assignment
Create Project Schedule
Establish Project File Structure
Establishing Project Template File
Custom Object Creation
Project Setup
Create a Reference Model
Model Creation Assistance (if required)
Assistance on Internal Collaboration
Assistance on External Collaboration
Monitor Progress
Provide Visual Checking
Provide Standard Checks
Provide Interference Check
Provide Check Model Consistency & Integrity
Assistance on Issuing the Central Master File
Assistance on Updating Linked Structural Model
Perform Coordination Review
Assistance Publishing Files
Assistance on Submission Requirement
Provide Team/Project Report & Summary
Provide an Implementation Guideline
BIM TRAINING PROGRAM
OVERVIEW
NovaCITYNETS provides a modularized training program to guide BIM Trainees from beginner to expert level
in their respective discipline and gain an understanding of how the complete process fits together.
Interactive training guides (ITGs) are also available to download & allow users to go through the basic learning
steps of each part of the software suite at their convenience.
NovaCITYNETS recommends that all users complete the level 1 basic course & ITGs. Discipline-specific higher
level training should then be undertaken at an agreed pace and program to suit the Client’s requirements.
A training matrix will be developed to document the training path required for all users
SOME OF THE BIM TRAINING SYLLABUS
AUTODESK REVIT ARCHITECTURE
Day 1- Basic Training 01
Day 2- Basic Training 02
Day 3- Documentation
Day 4- Advance Training
Day 5- Collaboration & Coordination
AUTODESK REVIT STRUCTURE
Day 1- Basic Training 01
Day 2- Basic Training 02
Day 3- Documentation
Day 4- Advance Training
Day 5- Collaboration & Coordination
AUTODESK REVIT MEP
Day 1- Basic Training 01
Day 2- Basic Training 02
Day 3- Documentation
Day 4- Advance Training
Day 5- Collaboration & Coordination
BIM AUTHORITY SUBMISSION
ITEM DESCRIPTION
Authority Submission
3D Submission Template Training on how to use and customize template
Publishing Training on how to produce single lightweight dwf
file for submission.
Certification Training Preparation for the BIM Certification exam
BEST PRACTICES
Workshops about best practices that will help boost productivity and upgrade knowledge of the team. The
session covers the following topics.
TOPICS
Project Setup
Project Templates
Family Templates
Content Libraries
File/Folder Management
Starting a Project
File Maintenance
Work Sharing
Remote Working
Collaboration Tools
Collaboration Methods
Collaboration with Structure
Collaboration with MEP
Tips & tricks
SUPPORT
NOVACITYNETS COMPREHENSIVE SUPPORT INCLUDES OFF-SITE AND ON-SITE ASSISTANCE
Off-site assistance: Make the most of BIM technology using a full range of communication methods: e-mail,
telephone, and web-based meetings.
On-site support: Be productive from day one with experts from our experience services Team.
BIM PROJECTS PORTFOLIO
ANGELIER HYDROELECTRIC PROJECT, CANADA
The project was based at an isolated location in Northern
Canada. The client was an independent developer bidding
on the right to supply power to the government at a fixed
rate. The problem facing the developer was that he had to
provide a firm fixed rate for power supplied, without the
completed engineering drawings and to do so within a
three week period. Because of the limited information
provided and the short time period, there would be
insufficient time to complete the engineering drawings and
procure detailed proposals or quotations from contractors
and material suppliers. NovaCITYNETS was engaged by the
Project consultant to provide a high level estimate, within
the tight time scale utilising BIM technology. Using Model Based Estimating methodology to calculate the
quantities and prepare the estimate, the client was able to reduce their project contingency with total
confidence and submit their proposal within three weeks. As a result they were successful in procuring the
contract
WHITE RIVER HYDROELECTRIC PROJECT, CANADA
NovaCITYNETS’s BIM team sucessfully utilising Model based Estimating to reduce project contingency for this
hydroelectric project. From the 2D DWG drawings given by the consultants, the BIM team created a high
standard 3D BIM which volumes of the various excavated materials, concrete quantities, form-work surface
areas, building areas, building cladding areas, roof areas and building finishing quantities, were automatically
generated from the model.
THE REFLECTIONS@KEPPEL BAY PROJECT, SINGAPORE
This iconic luxurious waterfront living development located at
Keppel Bay in Singapore, features six high-rise glass-facade towers
of 24 and 41-storeys, 11 spacious 6 to 8-storey villas and two
complexly designed clubhouses surrounded by 100,000 sq ft
reflective pool which also skirting the towers and villas. Each tower
is topped with sky gardens on a sloping roof lines. Sky bridges
connecting each pair of towers, providing pocket platforms of open
spaces above the ground to appreciate the panoramic view of
Singapore skyline and the surrounding sea.
NovaCITYNETS’s BIM team was engaged by the main contractor to
use BIM models and parametric simulation to resolve setting out &
site co-ordination problem due to complex geometry. With the use
of BIM and adopting an industrial standards know as Industry
Foundation Classes (IFC) for interoperability to promote
collaboration between disciplines, the contractor is able to resolve
incompatitility problems caused by different CAD softwares issued by different subcontractors.
GARDEN BY THE BAY@MARINA BAY
PROJECT, SINGAPORE
It is a 3 distinctive waterfront gardens in
the heart of Marina Bay. It occupies 101
hectares of prime waterfront land. The 54-
hectare garden in Marina South will be a
colourful and vibrant heart of our Garden
City featuring floral displays and tropical
blooms and foliage. The unique feature of
this garden will be a cool conservatory
complex which will allow visitors to enjoy
flowers from around the world in a cool
environment. NovaCITYNETS’s scope in this
project is to model the 2 conservatories (a
cool dry and a cool moist) in BIM. The 3
engineering disciplines are modelled for
constructability and co-ordination studies.
Using BIM models and BIM Data model for
constructability studies in this complex
project proved to be successful in term of
increase productivity and decrease wastage
and error during the design, fabrication and
erection stage.
THE RIVER PROJECT, BANGKOK, THAILAND
Located in the Prime district of Bangkok,
Chareonakorn, BangKok, Thailand. It consists 6
storey of Podium; 2 towers with 70 storey Tower A
and 43 storey TowerB. The developer is Raimon
Land and Architect is Steven J Leach Jr + Associates.
The main contractor for this project is Bouygues Thai Limited. NovaCITYNETS were engaged by the M&E
subcontractor from Dubai, Drake & Skull to use BIM for the co-ordination work and production of construction
shop drawings and combined services drawings. NovaCITYNETS deployed 2 staffs on site to facilitate the
updating of BIM model and production of working drawings for the main contractor.
TRUMP HOTEL@PALM, DUBAI, UAE
This new landmark at Palm Jumeirah is a sheer glass 62 storey sculpture rising dramaticallt from the center of
the Trunk. NovaCITYNETS through associate company in Dubai was engaged to model this beautiful structure
for constructibility and co-ordination purpose.
THE MEYDAN PROJECT, DUBAI, UAE
Heralded as the world's most luxurious integrated racing, business and lifestyle hub, Meydan City is an
interconnected cityscape brought to life by four distinct districts. Located 14km from Dubai's main business
district, Meydan City illlustrates Dubai's vision, development and success. The Jumeirah Meydan Hotel
construction took 3 years. NovaCITYNETS’s scope is to model the reinforcement steel of the structure for 2
residential building in the city.
JABER AHMED AL-JABER AL-SABAH HOSPITAL, SURRA, KUWAIT
It is a 1,120 beds hospital in Surra, Kuwait. It has a total built up area of 270,000 square meters.The hospital is
1,120 beds; the total built up area is 270,000 square metres. The hospital provides a comprehensive range of
medical services; comprises Diagnostic and Treatment services, Trauma Center and Casualty services,
Outpatient services, Dental services, Ob/Gyn services, Inpatient Care services, VIP Suites for the Visiting Heads
of States and also another wing for VIP Suites. The BIM model ceated by NovaCITYNETS’s BIM team is for co-
ordination purpose
SABHA UNIVERSITY, AWBARI BRANCH AT LIBYA
The project consultant, Adnan Saffarini used BIM during the conceptual study stage and during the tender
stage the quantity generated from the BIM model was used for estimation and procurement. The model was
also used for progress presentation to the Miniter of Health and other parties involved in this project.
HOSPITAL AT NAJAF, BAGHDAD, IRAQ
This is a design and build project of a 400 educational hospital (G+4) at Najaf, developed by Ministry of Health,
Iraq. NovaCITYNETS were engaged by the project consultants Adnan Saffarini to train their architects and
engineers on BIM software and assist them to implement BIM on this project. Thirty of their staffs (10 staffs
each from different department) were trained for 15 days before the BIM consultant from NovaCITYNETS
embark on a one-month BIM implementation program on this hospital project in Iraq.