Page 1: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

November 10, 2009NOIE DRG Settlements TF update to COPS

Settlement Discussion for ALL DG < or = 1 MW

Don Tucker on behalf of the NOIE DRG Settlements Task Force

Page 2: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 2

COPS Charge to the NOIE DRG Settlements Task Force

• May 2009– Provide a forum for market discussions and bring recommendations

to COPS on the Settlement of DRG located behind NOIE metering points with a design capacity of 50kW or greater

• June 2009– Continue Discussions

– Provide a list of Pros and Cons for identified options• Option 1: Treat as generation• Option 2: Treat as NOIE “load inflow”

• Option 3: Provide TDSP exemption from reporting

• July 2009– Work on drafting a PRR to make the zonal protocols equate to the

nodal protocols for registration requirements to support “Option 1: Treat as Generation” for NOIE DRG = or > 50kW & < 1MW and detail an implementation plan for the PRR.

Page 3: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 3

COPS Charge to the NOIE DRG Settlements Task Force

• August 2009– Look at the threshold for submittal of data required by section

10.2.2 and any associated issues if a recommendation to change the threshold is made.

• September 2009– Continue work on the Task Force recommendation to move

the threshold for the distributed generation data submission requirement to 1MW and apply this to all DG, not just DRG. 

• October 2009 – Continue Discussions

Page 4: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 4

NOIE DRG Settlements Task Force Meetings

• June 1st – 9:30 am to 12:30 pm

• July 1st - 9:30 am to 12:30 pm

• August 3rd - 9:30 am to 12:30 pm

• September 4th - 9:30 am to 12:30 pm

• October 5th - 9:30 am to 3:30 pm

• October 14th - 1:30 pm to 5:00 pm

• November 2nd - 9:30 am to 12:00 pm

• Next Meeting Date - TBD

Page 5: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 5

Task Force Meeting Attendance on November 2, 2009

Name Company Name (web-ex) Company

Don Tucker ERCOT Darryl Nelson Oncor

Adrianne Brandt Austin Energy Mike Troell STEC

Calvin Opheim ERCOT Jack Brown Garland

Eric Goff Reliant Martin Lozano Austin Energy

Ken Riordon LCRA Kathy Scott CNP Energy

Sonja Mingo ERCOT

Page 6: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 6

Threshold Trigger Point and “Automatic” Changes

• Threshold trigger point – DG installed capacity – Zonal - No need to include

• Limited deployment of DG expected before Nodal go live

– Nodal - Apply to Load Zone• Any Load Zone hits 10 MW threshold - triggers Market Action

• Automatic changes – The registration threshold is lowered below 1 MW– New threshold is based on reducing the aggregate generation

to no more than 7 MW in any Load Zone (Nodal Market)– ERCOT to issue a market notice that includes the new

threshold for DG registration– New value becomes effective 9 months after the market notice

is released

Page 7: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 7

Communication, Analysis & Decisions on Registration Threshold

• ERCOT shall– Inform the appropriate TAC sub-committee (COPS) of the

change in DG registration requirements at the next meeting following the market notice

• The appropriate TAC sub-committee (COPS) shall – Analyze data and determine impact on market reliability and

settlements accuracy

• The appropriate TAC sub-committee (COPS) may– Take action if they determine the impacts do not warrant

lowering the threshold for DG registration• Initiate a NPRR

– Defer action for a month to gather additional data– Take no action

Page 8: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 8

TDSP Reporting

• Applies to unregistered DG > 50kW & <= to 1 MW that sends outflow energy to the TDSP distribution system

• Competitive areas – Utilize existing format for DRG less than 50 kW as required in the

Load Profiling Guides

• NOIE Areas – still under construction– Data points from the Load Profiling Guides under discussion

• Generation Type• Interconnection Agreement effective date• If PV renewable generation is present

– total PV generation capacity in kW (DC) • If Wind renewable generation is present

– total wind generation capacity in kW (DC)• If renewable other than PV or wind is present (will need to include DG)

– types of units– total generation capacity in kW (DC)

Page 9: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 9

ERCOT Reporting

• Compile TDSP submitted data – Unregistered DG > 50kW & <= to 1 MW

• Produce quarterly reports– Installed capacity by Lode Zone (Nodal Market)– Final reporting parameters to be defined by the

Market

Page 10: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 10

Other Discussion – Creating a PRR

• Is there value in creating a PRR at this point in time? – If PRR is presented to COPS in January 2010

• Best case has it effective in June 2010 for normal timeline

• Initial question brought to COPS in May 2009 by ERCOT was a Zonal Question– DRG with a design capacity > 50kW - Market discussions

needed to provide direction• ERCOT Protocols Section 10.2.2 require TDSP to report this

generation to ERCOT

• ERCOT Protocols Section 16.5 does not require registration if less than 1 MW

Page 11: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 11

Other Discussion – Creating a NPRR

• Is there value in creating a NPRR at this point in time? – Market discussion has raised awareness on DG registration

requirements in the Nodal Protocols – ERCOT Protocols (Nodal) Section 16.5 requires the Resource

Entity to register each All-Inclusive Resource• “The Resource Entity shall register each All-Inclusive Resource

with ERCOT through ERCOT registration.”

• This removes the ambiguity in the nodal market for the question raised by ERCOT regarding the zonal market

• Discussions by Task Force members seem to indicate a desire to modify the nodal market requirement in regards to registration of DG less than 1 MW

Page 12: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

NOIE DRG Settlements TF update to COPSNovember 10, 2009 12

COPS Direction on Next Steps

• Continue Drafting PRR language?• Draft NPRR language? • Other direction from COPS?

• Next Meeting Date Options – Must verify meeting room availability

• Friday November 20th • Monday December 7th – day before COPS• Tuesday December 8th – after COPS?• Wednesday December 9th – after RMS?• Friday December 11th • Other?

Page 13: November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements

Questions / Discussions