NOVEMBER 7, 2012 MC MEETING

Robert B. Burke

Email: [email protected]

PRD Full Integration Conforming Changes and Fixes

Page 2: November 7, 2012 Mc meeting

Background

• On April 13, 2012, the ISO filed proposed changes to the transition period rules for demand response (reference April 10 , 2012 MC presentation, agenda item 4). The rule changes addressed:– RTEG Demand Reduction Value– Transition Period Metering Requirements– Baselines & Baseline Adjustments

• Similar changes were needed for the full integration rules, but time constraints required the ISO to limit the scope of the changes to those affecting the transition period only.

• On May 29, 2012, the Commission accepted the proposed transition period rule changes.

2

Page 3: November 7, 2012 Mc meeting

Background

• The ISO has assessed the full integration rules in the context of the transition period changes and has determined the following changes are required to be carried forward:– RTEG Metering Requirements– Baseline & Baseline Adjustment Rules

• Real-Time Emergency Generation (RTEG)• Demand Response Resource (DRR)

• The ISO also identified that clarification to the capacity market rules is needed regarding the application of the Distribution Loss Factor

• Some clarifying language changes will be made to both Appendix E and Section 13.

3

Page 4: November 7, 2012 Mc meeting

Effective Dates

• Transitional PRD (TPRD) effective June 1, 2012– Specific definitions apply (I.2.2)– Baseline methodology (III.8)– Capacity Market Participation (III.13)– Registration & Energy Market Participation (III.E)

• PRD Full Integration (PRD FI)– Specific definitions apply (I.2.2.)

• Effective June 1, 2017– Baseline methodology (III.8)

• Effective June 1, 2017– Capacity Market Participation (III.13)

• Effective January 15, 2013– Registration & Energy Market Participation (III.E)

• Effective June 1, 2017

4

Page 5: November 7, 2012 Mc meeting

Complexity

• Section III.13 PRD FI refer to:– Uses defined terms for TPRD– Uses defined terms for PRD FI– Section III.8 for TPRD– Section III.E for TPRD– Section III.8 for PRD FI– Section III.E for PRD FI

• Need all definition to be effective

• Need both versions of III.8 and III.E in tariff

5

Page 6: November 7, 2012 Mc meeting

Solution• Definitions two versions that are date sensitive

– For Capacity Commitment Periods commencing before June 1, 2017– For Capacity Commitment Periods commencing on or after June 1,

2017

• Incorporate two versions of III.8– III.8A for TPRD Baseline

• For Capacity Commitment Periods commencing before June 1, 2017– III.8B for PRD FI

• For Capacity Commitment Periods commencing on or after June 1, 2017

• Incorporate two versions of III.E– III.E1 for TPRD Baseline

• For Capacity Commitment Periods commencing before June 1, 2017– III.E2 for PRD FI

• For Capacity Commitment Periods commencing on or after June 1, 2017

6

Page 7: November 7, 2012 Mc meeting

Section I.2.2 Definitions• The August 19, 2011 filings

– Had several new definitions that become effective June 1, 2017.– Had several definitions that changed effective June 1, 2017

• Other effective date changes require these definitions to be incorporated into the tariff now.

• These definitions are:Demand Response AssetDemand Response ResourceDemand Response Resource Notification TimeDemand Response Resource Ramp RateDemand Response Resource Startup TimeMaximum ReductionMinimum ReductionMinimum Reduction TimeMinimum time Between Reductions

7

Page 8: November 7, 2012 Mc meeting

Section III.8 Baseline

• There are two versions of Section III.8– One for transitional PRD – effective now– One for full integration PRD – needed 2013

• III.8A– Effective for CCP before June 1, 2017

• III.8A.3(b)– Correct typo

• III.8A.4.2– Correct typo

8

Page 9: November 7, 2012 Mc meeting

Section III.8B Baseline

• Effective for CCPs commencing on or after June 1, 2017

• Carry forward RTEG changes from TPRD April 13, 2012 filing

• Clarify Baseline calculation– Prior day– Present day– Next day

• Clarify more than seven of the prior 10 days

9

Page 10: November 7, 2012 Mc meeting

RTEG Change Carry Forward • Carry the RTEG baseline and baseline adjustment language filed

on April 13, 2012 and approved by the FERC into the version of MR1 Section 8 that is applicable under full integration

• Maintain from transitional PRD that RTEG performance can be determined based on its Average Hourly Load Reduction or its Average Hourly Output depending on its metering configuration (relates to prior slide)

• Meter data from a RTERG dispatched for an audit or OP-4 would not automatically be used to compute the asset’s baseline for the next day of the same day type (7 of the prior 10 applies)

• The start-up time for RTEG (if using a baseline) must be specified for use in the baseline adjustment

10

Page 11: November 7, 2012 Mc meeting

Section III.13 FCM• III.13 includes TPRD and PDR FI

– Effective 1/15/2013

• RTEG Metering Requirement carry forward the transitional change allowing RTEG to be metered either at the Retail Delivery Point or at the RTEG output– Very specific limitations applicable– Otherwise both RTEG output and Retail Delivery Point for facility must

be metered– Requirement III.13.1.4.3.2

• Updated references to III.8A, III.8B, III.E1, and III.E2

• III.13.1.4 – deal with early commercial date for Demand Response Capacity Resource

• III.13.6.1.5.4.2 – carry asset audits into PRD FI

11

Page 12: November 7, 2012 Mc meeting

Section III.13 FCM (continued)

• For all active demand response clarify that a Demand Response Capacity Resource with an early COD would be considered a Real-Time Demand Response Resource

• III.13.7.1.5– Back out change eliminating transmission factor to capacity under PRD

FI– Replace the terms “online” and “offline” for demand resources with

“reducing demand” and “not reducing demand”

12

Page 13: November 7, 2012 Mc meeting

Appendix E

• Define sections E1 and E2

• Identify their effective dates

• Capitalize the term Retail Delivery Point Appendix E2

• III.E2.6 – Carry forward Threshold Price changes April 13, 2012 filing

13

Page 14: November 7, 2012 Mc meeting

Schedule

14

Description Date

Markets Committee (review and vote) Aug-Dec 2012

PC Vote Dec 2012

FERC Filing Jan/Feb 2013

Effective Date April/May 2013

Page 15: November 7, 2012 Mc meeting