Presentation Sequence
Introduction to NPCC
System Operation, Control and Planning
Load Management
Dispatch acilities at NPCC
3
8/19/2019 NPCC Presentation
4/36
Introduction
4
8/19/2019 NPCC Presentation
5/36
IN!"OD#C!ION !O NPCC
National Power Control Center $NPCC% is part o&National !ransmission and Despatch Company $N!DC%
which is a corporate entity unbundled &rom '(PD(
power wing
N!DC constructs, operates, maintains )**+* -.lines+grid stations, purchases power &rom generators
and sells it to DISCOs
DISCOs construct, operate, maintain /0+11 -. lines 2
grid stations and //+*34 -. distribution system
NPCC is control center o& N!DC and is responsible &or
operation o& generation and transmission system
5
8/19/2019 NPCC Presentation
6/36
6
M(5O" #NC!IONS O NPCC
/3 !o Maintain balance between Supply 2 Demand 3
3 !o control Frequency and Voltage3
03 Operational Control o& Power Networ-3
43 !o Maintain Security 2 Stability o& networ-3
)3 Estimation o& Month6wise (nnual 7nergy3
13 Economic Dispatch.
8/19/2019 NPCC Presentation
7/368
83 !o Schedule maintenance SHUT-DO!S on power6plants 2 !ransmission networ- elements3
93 Short to medium term Operational "lanning 3
#. $d%ance !oti&ications to thermal plants &or &uel
arrangement3
/*3 Collection o& System Data and preparation o& 'eports
7
M(5O" #NC!IONS O NPCC
8/19/2019 NPCC Presentation
8/36
N!DC$NPCC Control%
!:7"M(L
N#CL7("
;7SC
:
8/19/2019 NPCC Presentation
9/36
National Power Control Centre
NPCC is responsible for Controlling and Monitoring of
electrical power generation of plants and 5!22 "# Power
Networ" of t$e countr% e&cluding 'arac$i(
Power Plants= 80
)** -. >rid Stations= /1
* -. >rid Stations= )0
/0 -. >rid Stations= 8)0
)
8/19/2019 NPCC Presentation
10/36
1
8/19/2019 NPCC Presentation
11/36
System Operation :ierarchy
•*eneration Control•+witc$ing , -perating Control
of 5 , 22 "# Networ"
+witc$ing , -peration of 132 , 66
"# +out$ern Networ"
.CC+
/.egional Control
Centre +out$0
as$oro
+witc$ing , -peration of 132 , 66
"# Nort$ern Networ"
.CCN
/.egional Control
Centre Nort$0
Islaabad
NCC/National Control Centre0
11
8/19/2019 NPCC Presentation
12/36
Organi?ation Chart
General Manager(SO)
Chief Engineer
(Op’n Planning)
Manager
PPC
Chief Engineer
(Network Op’n)
Manager
Power Control
Manager
RCC-N
Director
LDP
Manager
RCC-S
12
8/19/2019 NPCC Presentation
13/36
+%ste -peration Control
and Planning
13
8/19/2019 NPCC Presentation
14/36
>eneration Despatch
*eneration is despatc$ed fro power plants to end
consuers t$roug$ 5!22!132 "# ransission Networ"(
Installed capacit% ,980 M'
erated capacit% *,9/ M'(
Ma&iu espatc$ /1,911 M' /6ul%2150
+ources %del *as Nuclear 9-
+ :ind Coal ;agasse +olar
14
8/19/2019 NPCC Presentation
15/36
15
>eneration Sources
1@*
@@80
)@@9
Installed Capacity $,980 M'%
'(PD( :7NCOAs
1@*
@/8
4809
Derated Capacity $*,9/ M'%
'(PD( :7NCOAs
8/19/2019 NPCC Presentation
16/36
16
5
1
15
2
25
7)78313
621
1153 11) 94 )4 /** /)*
22873
uel 'ise Installed Capacity
uel !ype
Capacity $M'%
8/19/2019 NPCC Presentation
17/36
17
5
1
15
2
25
7)7 7283
536
171 616 72 254 1 3
2812
Derated Capacity uel 'ise
uel !ype
Capacity $M'%
8/19/2019 NPCC Presentation
18/36
18
:? IPP+ *>NC-@s -
8/19/2019 NPCC Presentation
19/36
>eneration Planning 2 Despatch
Procedure and steps
>eneration orecasting+7stimation
on dail% wee"l% ont$l% Auarterl% %earl% basis
"eeping in Biew
Irrigation indents of %del stations +c$edule outages 9orced outagesConstraints if an%
Demand orecasting+7stimation;ased on $istorical trends
Despatch O& (ailable >eneration
8/19/2019 NPCC Presentation
20/36
>conoic Merit -rder
Merit order of $eral Plants is deterined on t$e basis of fuel
efficiencies(
Plants are dispatc$ed in t$is order "eeping in Biew t$e tec$nicalconstraints if an%( 9or e&aple
Voltage problem
Operating limits of GENCOs/IPPs
Transmission/Transformation Limitations.
2
8/19/2019 NPCC Presentation
21/36
!ransmission Operation 2 Control
-perational obectiBes of NPCC are
'eeping balance between deand and suppl% all
t$e tie
Maintaining stable freAuenc%
Maintaining s%ste securit% and reliabilit%
'eeping stable Boltages oBer priar% networ"Monitoring of transission , transforer
paraeters
21
8/19/2019 NPCC Presentation
22/36
S'I!C:IN> OP7"(!IONS
NPCC perfors +witc$ing -peration on ransission Networ"
in following scenarios
Planned s$utdowns for aintenance cleaning and was$ing
actiBities
>ergent s$utdowns in case of abnoral situations(
ransission lines and transforers tripping(
22
8/19/2019 NPCC Presentation
23/36
23
8/19/2019 NPCC Presentation
24/36
24
8/19/2019 NPCC Presentation
25/36
?oad Manageent
25
8/19/2019 NPCC Presentation
26/36
>eneration+Demand alancing
System
S
8/19/2019 NPCC Presentation
27/36
>eneration+Demand alancing
S
8/19/2019 NPCC Presentation
28/36
Load Management
NPCC $as to aintain t$e balance between deand
and generation all t$e tie(
?oad Manageent is carried out to aintain balance
between generation and deand ot$erwise s%ste a%
undergo aor disturbance leading to a partial or total
collapse(
28
8/19/2019 NPCC Presentation
29/36
29
LO(D M(N(>7M7N! !
8/19/2019 NPCC Presentation
30/36
30
Scheduled Load Management
Scheduled Load Management
Carried out b% I+C-Ds "eeping in Biew t$e following factors(
Load Demand of respective DICO.
Generation !are allocated to DICO b" NPCC.
Constraints li#e voltage drop$ loading position of Transmission Lines
and of Transformers $ incl%ding && #V ' belo( voltage level$ s"stem.
3
8/19/2019 NPCC Presentation
31/36
System Security Load Management
System Security Load Management $orced LS%
Carried out b% NPC b" opening &)*#V Transmission (ines
in case of e+treme s"stem emergencies.
>&aples of e&tree eergencies&. ,n-foreseen generating %nit O%tages.
*. br%pt c!ange in Irrigation Indents.
). Non implementation of c!ed%le Load anagement b"
DICOs
0. 1%pt%ring of Gas Pipe Lines.
2. Non availabilit" of 3%el.4. abotage activities on Transmission Lines.
5. Transmission/Transformer problems
31
8/19/2019 NPCC Presentation
32/36
I>+C- $e districts
of .awalpindi C$a"wal +C- $e districts of 9aisalabad
+argod$a Mianwali '$us$ab $ang
;$a""er ( +ing$
M>PC- $e area
fro +a$iwal to +adiAabad;a$awalnager to ;a$awalpur ounsa +$ari
f to .aanpur
>+C- +C-
8/19/2019 NPCC Presentation
33/36
espatc$ 9acilities aBailable at
NPCC
33
8/19/2019 NPCC Presentation
34/36
Outline o& Despatch acilities
+uperBisor% Control and ata
8/19/2019 NPCC Presentation
35/36