Introduction NRRL Bioreactor Construction Update Week of February 11 (photos taken 02/13/02)

NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Introduction

NRRL Bioreactor Construction UpdateWeek of February 11

(photos taken 02/13/02)

Page 2: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Update Summary

NRRL Bioreactor Construction• Construction progress meeting held on

February 13. • Work continued on the placement of the

exposed geomembrane cap (EGC) on the south slope.

• Work continued on the construction of the toe drain and gas collector trenches on the west slope.

Page 3: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Progress on South Slope

South Slope: February 5

South Slope: February 13

Page 4: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

EGC Placement

Feb 5

Feb 13

Page 5: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Deploying Geomembrane

Page 6: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 7: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 8: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 9: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 10: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 11: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Deploying Geomembrane

Page 12: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Placing Sandbags

Sand bags are used to hold geomembrane temporarily in place.

Page 13: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Fusion Welding

Page 14: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Fusion Welder

Geomembrane rolls are fusion weldedtogether with a doublehot wedge weld.

Page 15: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Fusion Welder

Double Wedge Fusion Welder

Page 16: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Anchor Trench

EGC Anchor Trench

Page 17: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Extrusion Weld on Anchor Trench

The weld at the anchortrench overlap is an extrusion weld.

Page 18: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Injection Wells

The EGC is installed on the surface of landfill, above the injection wells. The wells must be extended through thecap after placement in a manner that provides a gas-tight connection. The following slides illustrate this process

Page 19: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Solid Wasteand Daily

Cover

Soil

2-inch PVC injection wells TemporaryCaps

Thermocouple Wire

Process of Constructing EGC

over Injection Wells

EGC – Wells 1

Page 20: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

VFPE Geomembrane Placed on Surface of Landfill

Process of Constructing EGC

over Injection Wells

EGC Wells 2

Page 21: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Geomembrane Cut Around Wells

Process of Constructing EGC

over Injection Wells

EGC Wells 3

Page 22: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Geomembrane Cut Around Wells

EGC – Wells 4

Process of Constructing EGC

over Injection Wells

Page 23: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Extrusion Weld Boots

EGC – Wells 4

Process of Constructing EGC

over Injection Wells

Page 24: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

EGC and Wells

As soon as geomembraneis pulled over wells, locationis marked.

At a later time, the geomembrane is cut aroundwell.

Page 25: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Temporary Well Boots

Temporary Well Boots

Page 26: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Temporary Well Boots after Well Extension

Page 27: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Permanent Well Expansion Boots

Page 28: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Boot Construction 1

Construction of Expansion Boot: 1 Note: Geomembrane used

for boot is illustratedin red for clarity.

Note: Boots are prefabricatedon site.Geomembrane Collar Around Well

Page 29: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Boot Construction 2

Construction of Expansion Boot: 2 Note: Geomembrane used

for boot is illustratedin red for clarity.

Note: Boots are prefabricatedon site.

Boot Base Sheet

Extrusion Weld

Page 30: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Boot Construction 3

Construction of Expansion Boot:3 Note: Geomembrane used

for boot is illustratedin red for clarity.

Note: Boots are prefabricatedon site.

Note: Boot Collar is Shownslightly expanded for clarity.

Boot Bellows

Extrusion Weld

Page 31: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Boo Construction 4

Construction of Expansion Boot: 4 Note: Geomembrane used

for boot is illustratedin red for clarity.

Note: Boots are prefabricatedon site.

Note: Boot Collar is Shownslightly expanded for clarity.

Neoprene Gasket

Clamp

Page 32: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Prefab Boots

PrefabricatedWell Boots

Page 33: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

How Boot Works - 1

How Does Expansion Boot Work?

Initial Condition

Page 34: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

How Boot Works - 2

How Does Expansion Boot Work?

Landfill Settles

Page 35: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

How Boot Works - 3

How Does Expansion Boot Work?

Adjust Collar

Page 36: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

MTG

A similar booting system is used for the MTG sensors

Page 37: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

MTG 2

A similar booting system is used for the

MTG sensors

Page 38: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

West Side Toe Drain

Construction of Toe Drain and Gas Collectors on the

West Side

Page 39: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Welding Gas Pipe

Page 40: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

Bioreactor Sign

Page 41: NRRL Bioreactor Construction Update Week of February 11 · 2-inch PVC injection wells. Temporary Caps. Thermocouple Wire. Process of Constructing EGC over Injection Wells. EGC –

End