PPP GuidelinesPPP Guidelines
� Reasons f or PPP ± not just private investment, but improve
efficiency, productivity and QoS as well as competitiveness
� PPP Guidelines
� Open tenders ± BOT
� License Period ± 30 Yrs
� Two bid system
� Based on
1) Upfront fee
2) Royalty per ton
3) Minimum guaranteed cargo
� NPV Basis
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 3/17
` India¶s First PPP initiative in the port sector.
` Concession ± 30 years on BOT basis for 600m quay length container terminal along with container
handling equipment and other facilities 20 hectares of reclaimed Container yard
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 4/17
NSICT NSICT -- ConsortiumConsortium
y Formed in July 1997
JJ
N N
PP
TT
N N
SS
CC
II
TT
P&O AustraliaP&O Australia
PortsPorts
KonsortiumKonsortium
PerkapalanPerkapalan
BehradBehrad
DBC Group of DBC Group of
CompaniesCompanies
Tariff
Authority
TT
AA
MM
PP
SPV
StructureRegulator
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 5/17
` Comply with the techno commercial conditions outlined
in the agreement
` Ensure timely project completion
` Ensure safety provisions and comply with the
requirements of International safety Standards
` Abide by the operations and maintenance plan in trust
for eventual transfer to the Concessioning Authority on
termination of the agreement and therefore, will not do
any act as a result of which the value of Port Assets andProject Facilities and Services is diminished.
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 6/17
` To promptly and diligently maintain, replace or restore any
of the project facilities or part thereof which may be lost,
damaged, destroyed or worn out.
` Shall during the Concession Period pay in a timely manner all taxes, duties, levies, VAT, cess and charges.
` Collect various charges from Port users etc.
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 7/17
` NSCIT provided services better than envisaged and wasawarded by CII ± for excellence in Infrastructure.
` Induced Intra-port competition
` There seems to be matter of regulatory capture as the
decisions were favorable to NSCIT` Took advantage of the loophole in the concession
agreement by claiming Royalty as cost from Port users,although they did good for profit maximization for shareholders.
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 8/17
` Port trusts would continue to play a regulatory role
` Ensure that private participation does not lead tocreation of monopolies
` Case facts No evidence that JNPT played regulatory role to protect user
interests
Did not proposed tariff revision ahead-of -schedule (Guidelines for regulation of Tariff at Major port, 2004)
I
mproper assessment of Bid` JNPT should have supported TAMP
Technical aspects
Port operation cost
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 9/17
y JNPT as regulator (entrusted by the MPT act & PPP
guidelines) Should have clearly defined and enforceable reporting
requirements
Should have validated the information provided by NSICT (audit) Should have enforced the clause mentioned in the concession
agreement
x Reserve 33% of berth days for common user facilities
x Follow ³First Come First Served´ principal
xOpen to all and any shipping lines
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 10/17
` Independent statutory authority with power to determinethe tariff to be charged by Port trusts as well as byprivate providers of port facilities Power confined only to determination of tariff
x Safeguarding the interest of shippers/consignees and other portusers.
x Ensuring just and fair return to ports.
x Encourage competition, economical use of resources, efficiency inperformance and optimum investment.
x Ensuring transparency and participative approach while discharging
its functions. No power related to setting and enforcing of performance
standards
` Tariff guideline (1998) Cost plus approach with assured rate of return
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 11/17
` Tariff Determination Norms for Debt Equity Ratio Cost plus approach with 15% return on Capital employed (ROCE)
x Capital employed included debt & equityxIf cost of debt < 15%, then return on equity > 15%
x If cost of debt > 15%, then return on equity < 15%
Traffic forecast in tariff setting Cost Calculation !
x Absence of any norms to determine costx Private Operator knows more than the regulator x Relied completely on the data given by NSICTx No power to demand audited costing & performance related
information
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 12/17
` Tariff Determination Determined tariff shall be in force for three years (with some
exceptions)
Continuous review is required to adjust the fluctuation in projected
traffic
` Royalty Treatment Treatment of royalty as cost is one of the biggest flaw of the
bidding
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 13/17
y Department of shipping (DoS) issued guidelines for PPP
in the port sector in 1996
y Objectives for private sector participation in port sectors Improvement of efficiency & Quality of service
Resource mobilization for creating additional capacity
Bring competitiveness in port services
Financial viability for the private players
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 14/17
y Competition
y Market
High Demand & Scarce Resources Possibility of extracting monopoly rent
PrivateParticipation
NSICT
Government(Port Trust)
JNPT
Intra-port
Competition
GovernmentGovernment ± ± Role & Behaviour Role & Behaviour
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 15/17
y Bidding Competitive bidding
Private participation on BOT basis
Concession period ± 30 years
All assets to revert back to the Port Trust, free of cost ± Noincentive to revert back assets in good condition
Two bid system
Financial bid
x An upfront fee for the license
x Royalty per ton of cargo to be handledx The minimum guaranteed cargo
y Selection criteria ± Highest NPV of royalty offered
8/7/2019 Nsict Group 1
http://slidepdf.com/reader/full/nsict-group-1 16/17
y Bidding Treatment of royalty as cost is one of the biggest flaw of the bidding
The selection criteria is royalty based and there is no mention that
how royalty would be treated
Treatment of royalty as cost would not serve the basic purpose of
PPP ± Any bidder can quote any amount of royalty and would
charge this amount as cost
Treatment of royalty as cost would finally mean charging end
customer (port user )