NSW Maritime Panel and PIANC Australia Practical Adaption to Climate Change on NSW Coasts Port and Harbour Considerations Greg Britton, WorleyParsons Monday 24 th August 2009

NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

NSW Maritime Panel and PIANC Australia

Practical Adaption to Climate Change on NSW Coasts

Port and Harbour Considerations

Greg Britton, WorleyParsons

Monday 24th August 2009

Page 2: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

9/09/2009

Focus of talk

� Adaptation, not mitigation� Not considering issues

such as carbon footprints and trading, sustainability of material inputs, energy use, etc

� Ports are considering these issues, eg Sydney Ports Green Port Guidelines

Page 3: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

9/09/2009

Why are ports and harbours vulnerable to climate change?

� potential effects of climate change• sea level rise• increased rainfall intensity /

frequency• changes to ocean storm

intensity (increased wave heights)

• increased wind loads• ocean currents• acidification

� features of ports and harbours

Source: DECC (2009)Draft Technical Note: Scientific basis of the 2009 sea level rise

benchmark

Page 4: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Features of ports and harbours:

� location: connected to the sea (sea level rise)

• embayments : natural, man-made (relative protection)

• in the open sea (storminess)

• within river estuaries (rainfall / runoff, sedimentation)

Page 5: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Features of ports and harbours:

� channels, berthing basins, swinging basins• declared depth• water surface level variation• bed level variation

� land / water interface infrastructure: wharves, jetties, dolphins• functionality, eg deck level• uptime• susceptibility for damage• associated equipment, eg

shiploaders

Page 6: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Features of ports and harbours:

� protective structures; breakwaters, seawalls, revetments• depth limited waves, stability• overtopping performance• degree of exposure

� land-based infrastructure: hardstand, stockpile areas, buildings, roads, stormwater• flooding• drainage• water quality

Page 7: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Features of ports and harbours:

� planning life

• infrastructure

• equipment

� significance to the Australian economy

• ports act as the gateway for trade into and out of Australia andobviously have vast economic significance

• 83% of all our exports by value (about $100 billion)

• 70% of all our imports by value (about $80 billion)

Page 8: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Factors affecting climate change adaption methodologies for ports and harbours:

� uncertainty in the magnitude of climate change effects

� high natural variability in existing physical processes

� significant embedded infrastructure

� life of infrastructure, including variability of components

� infrastructure must be functional now as well as over its future life

Ultimately a flexible approach required, risk based assessment, often a low investment outcome adopted

Page 9: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Existing Guidelines:

� AS 4997-2005 Guidelines for Design of Maritime Structures. Focus on sea level rise.• amount of SLR depends on design life• does not necessarily mean raised decks• examples of allowance for SLR: raise heights of restraining

piles on floating structures at a later time, or install substructure of adequate strength to permit future topping slabs etc.

� Guidelines for Responding to the Effects of Climate Change in Coastal and Ocean Engineering (Engineers Australia, 2004 Update): retreat, accommodate or protect.

� International practice

Page 10: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Some examples of adaptive methodologies:

� Port of Newcastle maintenance dredging of shipping channels

� Sydney Harbour Ferry Wharves Upgrade

Page 11: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Port of Newcastle maintenance dredging:

� located on a major river estuary subject to flooding (Hunter River)

� ongoing requirement for maintenance dredging, commenced 1859, greater than 130 Mm3 to date, typically 200,000 to 300,000 m3 per annum

� two sources of sedimentation

• fluvial inputs

• coastal processes

Page 12: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 13: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 14: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 15: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 16: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 17: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 18: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Adaptive approach:

� retain NPC owned dredger

� seek permit for high range maintenance dredging quantity

� seek alternative disposal areas

� undertake regular hydrographic surveys including surveys beyond channel limits

� supplement NPC dredger with contract dredger as required

Page 19: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Sydney Harbour Ferry Wharves Upgrade:

� NSW Maritime has upgrade strategy for 46 ferry wharves over next 15 years

� WorleyParsons has undertaken review of standard concept wharf designs, addressing following issues:

• general design criteria, eg design life, sea level rise

• site specific environmental design criteria

• operational constraints, including disabled access

• value engineering review, including public safety

Page 20: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp
Page 21: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Sydney Harbour Ferry Wharves Upgrade:

Important design details

� design life 50 years

� fixed landing level

� hinged access ramp slope, length, width

� satisfying disability guidelines for accessible public transport

Adaptive approach

� fixed landing level 2.9m CD, longer ramps

Page 22: NSW Maritime Panel and PIANC Australia · 2017. 5. 19. · Sydney Harbour Ferry Wharves Upgrade: Important design details design life 50 years fixed landing level hinged access ramp

Conclusion:

� ports are vital to the economy

� restricted attention has been given to date to impacts of climate change on port infrastructure, port operations and the environment

� attention is likely to have to escalate