NUNAVUT : AGNICO EAGLE’S LONG TERM VISION September, 2015 Rankin Inlet Trade Show

NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

NUNAVUT : AGNICO EAGLE’S LONG TERM VISION

September, 2015 Rankin Inlet Trade Show

Page 2: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 4

Page 3: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 5 Nunavut vision

AGNICO EAGLE IN NUNAVUT

Page 4: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 6

• Vault pit expansion extends Meadowbank production to Q3 2018

Meadowbank Mine - Operation

Nunavut Mining Symposium

• Production gap associated with possible satellite operation at Amaruq reduced by 1 year

Page 5: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 7

5.16

3.48

1.93 1.06 0.5

0

1

2

3

4

5

6

2011 2012 2013 2014 Sep-15

Combined Lost Time and Temporary Assignment Frequency*

* Per 200 000 worked hours

5 years

Average of 5.0% per

year

Meadowbank’s Health and Safety statistics are on the good track

Over 4 Million hrs without Lost Time Injury

95 91 88

83 73

71

50

60

70

80

90

100

110

2010 2011 2012 2013 2014 2015Forecast

Meadowbank - Operating Cost (C$/tonne treated)

-25%

Meadowbank – 5 years of improvement

Meadowbank’s lessons and success can be leveraged in new Agnico projects in in Nunavut

Page 6: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AMARUQ

Page 7: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 9

Key exploration project located 50 km north of Meadowbank mine • Drilling program

• 2013 $0.6 million • 2014 $12 million • 2015 $30+ million

• Gold resource

Feb 2015 1,4 million Oz Sept 2015 2 million Oz

• Amaruq deposit may be viable because

existing Meadowbank infrastructure and workforce can be leveraged (maintenance shops, mill, camp and airstrip)

• Current Amaruq schedule would begin production in Q3-2019; Permitting process is the major time constraint in project schedule

• The Company is asking regulatory agencies to consider more expedient regulatory processes

Meadowbank +/- 50km Road proposal +/- 60km

Whale Tail zone surface expression 300m

Amaruq Project

Nunavut Mining Symposium

Page 8: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 10

2013 – 500 ha 2014 – 10,000 ha 2015 (Arial +Ground) – 68,000 ha

Regional Exploration Developing new targets along the belt

Page 9: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 11

2014 Field Program Identified New Targets Along The Trend

Page 10: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 12

Amaruq

90 km Winter road

February – March 2015 Major winter road hauling program - 300 loads

Page 11: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 13

Amaruq Exploration Camp

Page 12: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 14

• High grade, large mineral inventory project • Proven & Probable reserves = 3.4M oz • Indicated resources = 3.3M oz • Inferred resources = 3.3M oz

• Proposed Open pit & UG mining

• 9 years Life Of Mine

• 911 US$ initial Capex

• IIBA signed on July 2013 with KIA

• Permitting activities are ongoing and final

approvals are expected in early 2016

• Construction could begin in 2016 following Board approval and production could begin in late 2019

Meliadine Project Most advanced mining project in Nunavut

Nunavut Mining Symposium

Page 13: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 15

SCHEDULE – CONSTRUCTION

15

January 2017 Y-3

January 2018 Y-2

January 2019 Y-1

January 2020 Y+1

January 2016 Y-4

January 2014 Y-6

January 2015 Y-5

Civil Works

Truck Shop & Warehouse

Camp complex

Ramp Up

Commissioning

Process Plant

Construction Period

Barg

e Se

ason

201

4

Barg

e Se

ason

201

5

Barg

e Se

ason

201

6

Barg

e Se

ason

201

7

Barg

e Se

ason

201

8

Pre-Construction

Power Plant

Page 14: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 16

MELIADINE SITE OVERVIEW

16

Process Plant

Truck Shop

Camp Complex

Power Plant

Assay Lab

Worker Dry

Kitchen

Warehouse

Crushig Plant

Ore Storage

Ramp Portal

Page 15: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 17 17

Civil Earthwork in 2015

CIVIL WORKS FOR 2015

Page 16: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 18

CIVIL WORKS FOR 2015

18

Piling Works for 2015

Page 17: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 19

CIVIL WORKS FOR 2015

19

Structural steel floor works for spring 2016

Page 18: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 20

UPWARD MOBILITY PROGRAM

Building careers since 2013 in partnership with the KMTS

Over 32 500 hours of training for Inuit employees in 2014

138 promotions

Initial targets achieved at 300% (target was 40 promotions).

TRAINING ACTIVITIES

Page 19: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 21

UPWARD MOBILITY PROGRAM

138 Inuit promotions in 2014

TRAINING INITIATIVES

Page 20: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 22

CAREER PATH PROGRAM TRAINING INITIATIVES

Implementation of the First Career Path in 2012

61% of whole Mine Department workforce are Inuit employees

No external hiring of hourly employees Southerners since the implementation of the Career Path

Page 21: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 23

CAREER PATH PROGRAM

The core tool of our Nunavut training program.

TRAINING INITIATIVES

Road Maintenance

Process Plant

Building Mechanic

Field services

Driller

Page 22: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 24

APPRENTICESHIP PROGRAM TRAINING ACTIVITIES

Addition of 11 more apprentices in 2015 New trades available in 2015 :

Cook Welder Carpenter Electrician

Kitchen facility to be built in Rankin Inlet in collaboration with Nunavut Arctic College and Kivalliq Mine Training Society (KMTS)

First Lands Claim Beneficiary to challenge and succeed Red Seal Exam with Agnico Eagle

Langway Putulik Completed 4 year Millwright apprenticeship program

Evolution of Apprenticeships

Year Number of Active Apprentices

2012 4

2013 8

2014 6

2015 17

Cook

Carpenter

Millwright

Electrical

Heavy Duty Equipment Technician

Welder

Page 23: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 25

TRAINING INITIATIVES SUCCESS STORIES

Page 24: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 26

TRAINING INITIATIVES SUCCESS STORIES

Page 25: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 27

TRAINING INITIATIVES SUCCESS STORIES

Page 26: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 28

TRAINING INITIATIVES SUCCESS STORIES

Page 27: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 29

Agnico Eagle could have two large gold mines in Kivalliq by 2020

$2+ billion in new investments over next 5 years

Potential for over $500M/yr in operating costs in Nunavut

A total of at least 600 Inuit employed = $54M+ payroll per year

AEM’s Nunavut platform can generate around $65M in Canadian tax

revenues annually

Payroll taxes to GN around $7.0 Million per year

Property Taxes paid to GN around $2.5 Million per year

NUNAVUT’S PROMISING POTENTIAL

Nunavut Mining Symposium

Page 28: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

AGNICO EAGLE | CORPORATE UPDATE | 30

AEM has a multi decade strategy for Nunavut: • Nunavut platform can be a cornerstone for Agnico

Eagle for several decades. • Could secure a production base of 700koz

annually

• Meadowbank’s lessons and success can be leveraged in new Agnico projects in in Nunavut

• The Amaruq project may extend the life of Meadowbank by many years

• Multiple stakeholders required to narrow the gap between Meadowbank (2018) and Amaruq (2019)

• Meliadine remains a significant potential catalyst for AEM’s growth in Nunavut

TAKEAWAYS:

Nunavut Mining Symposium

Page 29: NUNAVUT : AGNICO EAGLE’S LONG TERM VISION€¦ · 2016. Barge 2017. Barge 2018. Pre-Construction . Power Plant . AGNICO EAGLE | CORPORATE UPDATE | 16. MELIADINE SITE OVERVIEW

agnicoeagle.com