nwlpp

Incidents and Events 2009

Kathryn Buist

23 June 2010

Page 2: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

• Background• 2009 performance• Event types and causes• Event review

– Seahouses– North Charlton SR– Hulne Park, Alnwick

• Summary

Contents

Page 3: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Notifications

• DWI notified on 23 occasions in 2009• 10 classified as cat 3 – significant• In the Northern region 86 events notified, 49

significant

Page 4: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Notifications / Incidents - numbers

27

30

36

31

22

25

20

13

32

23

9

11

21

14

9

12

9

56

18

10

7

0

5

10

15

20

25

30

35

40

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

notifications

incidents

Page 5: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Incidents 2009

Jan 1 - Leadgate, discoloured water March 2 - Metaldehyde, pesticideMay 3 – Ashington, discoloured water

4 – Kirkleatham, discoloured water and loss of supply

June 5 – Gosforth, discoloured waterJuly 6 – Seahouses, micro failure and precautionary boilAugust 7 – North Charlton, micro sample failureNovember 8 – Northern Trunk main, loss of supply,

precautionary boilDecember 9 – Brunton Park, discoloured water

10 –Bedlington, discoloured water

Page 6: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

2009 Incident by type

0

1

2

3

4

5

6

7

8

discolouration Ecoli pesticide

Page 7: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

2009 Incident by cause/area

0

1

2

3

4

5

6

7

AoDW Distribution Ecoli pesticide

Page 8: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Event review - Seahouses

•Overview on the wall

•Bichwood BPT and Elford SR supplied via NTM from Warkworth

•Seahouses – seasonal variation in demand – 622m/day , 750m/d in summer

Page 9: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Background -

• Samples reported on 22 July 2009• Reg sample from Elford – 15 p.E.coli and 18 p coliforms• Ops sample from Birchwood - 9 p.E.coli and 29 p coliforms

• Discussed with LA and HPA and precautionary advice issued – allow investigation and minimise risk to public health

• Network analysis involved • 1,335 advice to boil cards issued• Samples from network

Page 10: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Background

Site visits at both sites undertaken on 22 July

Birchwood BPT removed from serviceRemoval of Elford – network would be starved

- area needed to be rezoned to protect supplies

Sampling organised from 3 local supply chains

Page 11: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Northern supply chain:-

Mousen SR Glororum SR

Southern supply chain: -

Hedgeley SR North Charlton SR

Central supply chain: -

Wandylaw SR Birchwood BPT Elford SR

Page 12: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

• Some discolouration due to rezoning (10 contacts)

• To protect public health and combat potential contamination, residuals were raised

• Initially through secondary chlorination, but not effective enough

• Manual addition at SR which lead to 1 customer complaint

• Widespread flushing could not be done – water resource issue

• Targeted flushing as required

Page 13: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

• 2 sets of clear micro samples available on 25 July

• Boil advice lifted, cards delivered between 19:30 and 21:55

• Rezoning of area had caused increase in leakage and high demand required tankering for 4 days

• Total of 119 micro samples taken over 7 days, 9 were unsatisfactory– (2 from SR and 7 from customer properties – low level coli and

E.coli)

Page 14: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Further investigations

• 23 July – flood test and structural inspection at Birchwood– Ingress identified, repaired and return to service on 12 August

• 27 July - flood test and structural inspection at Elford– No ingress identified return to service on 30 July

• Air valves on network checked by ops team

• Review of maintenance strategy for SR – inspection of 100 SR by March 2010

Page 15: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

North Charlton no 1 SR - August

• Supplied from branch off the NTM• 2 tanks, supply 1,353 properties in total

• 29 August 2009, reg sample reported as containing– 1 pres coli (confirmed as 1 E.coli)

• Sampling campaign set up• Following samples, residual raised at N Charlton• All results satisfactory• Both compartments were removed from supply to allow

flood testing and inspection – all satisfactory• Audit of lab - satisfactory

Page 16: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

DWI assessment

Critical of – 10 discoloured water contacts

2 consumer contacts for T and O – chlorine

no mention of Warkworth data in the 20 day report for N.Charlton

Concerned – of ‘hydraulic link’ between the reservoirs. 13km of main between N Charlton and

Elford. All other SR on the NTM were satisfactory.

NWL responded and incident has been closed

Page 17: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Hulne Park November 2009

• NTM from Warkworth - Alnwick area• Number of pumping stations, critical link between Bolton

PS and the WTWBolton PS has secondary chlorination (0.5mg/l)

Page 18: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Warkworth and NTM

Page 19: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

• Low level alarm at Hedgeley SR followed by lo lo• Maintenance on site at Bolton PS – not delivering water.

Assumed to be pumps overheating.• Warkworth WTW confirmed NTM running ok.• 10:40 Hedgeley 0.4m, suction pressure at Bolton PS still low,

onsite team conclude Hedgeley SR not receiving water.• TMC involved and Warkworth NTM increased – no

improvement– Burst suspected on NTM– DTS requested to walk the NTM to locate burst (8

involved)• Tankering requested for North Charlton SR• 13:20 1st disc water contact received (54 in total from

Alnwick)• Step testing done to identify burst location• Exact location identified 16:45

Hulne Park, Alnwick 8-12 Nov 2009

Page 20: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

08 November

• Assumed discolouration in Alnwick was from increase in mains velocity

• Burst location 3m deep, 1.5m away from a lake – limited access only with 4x4 vehicles

• H and S issues - trench and flooding• Area around the burst subject to flooding, 6.9km of

12” NTM isolated

Page 21: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Page 22: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Page 23: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Page 24: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Page 25: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

08 November• Hedgeley, Wandylaw and North Charlton SR depleting and

concern over time for repair, depressurisation and loss of supply.

• 23:00 silver team called – Distribution, RCC, WQ, CCC, Production and Emergency Planning

• DWI notified based on >50 disc water contacts

• Some of network would lose supplies before repair complete• Hedgeley and Wandylaw SR nearly dry, N Charlton and

Wandylaw ~12 hrs left. Glororum SR isolated to remain on storage

• Decision made for BWN based on depressurisation of rural network 4209 properties

• Considered need for alternative supplies and mutual aid tankering

• 06:50 1st no water contact received• Liaison with HPA, LA and CCW commenced

Page 26: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

09 November • Repair was carried out and NA working on plan for

recharge – 36 hours predicted • Static tanks made available, bottled water stations

designated• Few opportunities to chlorinate upstream of repair,

decision to increase Warkworth to 1.5mg/l. Secondary chlorination increase 1mg/l

• All SRs to be hand dosed

• 4209 properties received BWN• 18:00 all SR dry (except Glororum). • 280 contacts, 110 for no water and messaging

system was used • 2 bottled water stations set up• Hedgeley SR making water and pressure building up

at PS upstream of Bolton PS

Page 27: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

10 November

• Sampling plan for when properties were due to come back on line

• 2 sets on first day

• BWN to be lifted at earliest opportunity, but ‘blanket lift’ impractical

• Withdrawal of static tanks and the bottled water stations

• PRV checks in network

• Chlorine residuals 1.5-2mg/l

• Discussions with HPA regarding lifting of BWN

Page 28: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

11 November• 1st set clear samples

• Tankers stood down and statics recalled

• Chlorine back to target dose

• HPA and LA updated

• 16:30 second set of samples clear – safe to drink to 1448 properties

• 12 November

• 2nd set of samples clear – safe to drink to 2761 properties

Page 29: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Some facts

• 115 micro samples between 8-11 Nov• All clear for coli and E.coli• 687 contacts received

226 hits on message system. Website updated 18 times

• 32 static tanks (2,200l each) were deployed between 9-11 Nov.

• 3 bottled water stations – 52 pallets of bottled water (26,960 l)

Page 30: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

DWI assessment

• Critical of not consulting HPA and LA prior to issuing BWN– This has been rebriefed to the WQ team and the event is

closed

Page 31: Nwlpp Incidents and Events 2009 Kathryn Buist 23 June 2010

nwlpp

Summary

• Discolouration still an issue• Acceptability managed through AoDW programme for

System zone 7 (due date 2012)– A project is in the final business plan for AMP 5 (2010 – 2015)

for SZ6