NXE pellicle progress update
EUV Mask Pellicle TWG
Maastricht, The Netherlands
October 4, 2015
Dan Smith
Slide 2
Public
Contents
• Introduction: a look back
• NXE pellicle roadmap
• NXE pellicle concept & integration status
• Mask shop tooling
• Summary
7-Oct-15
Slide 3
PUBLICOct’12 May’13 Nov’13 Feb’14 Mar’14 Jun’14 Dec’14
11mmx11mm
50mmx50mmHalf size proto
Full size proto
(attached to wafer)Full size proto
50mm x 50mm Half size
protoFull size proto11mm x 11mm
EUV pellicle development overview
50mm x 50mm Half size
proto11mm x11mm Full size proto
Mach
ine
tes
tin
g
Film
sc
ali
ng
Imag
ing
tes
tin
g
Next EUV pellicle update from ASML, at Photomask Japan 2015,
see “EUV pellicle development update” Carmen Zoldesi, paper reference 0024
As shown: Mask TWG 22 Feb 2015
Slide 4
Public
ASML committed to demonstrate complete pellicle
solution for EUV and support the industry to implement 2H 2012 2013 2014 2015 2016 2017
Research
&scoping
of work
Phase 0
done
Phase 2
Phase 1
done
1. Prototype phase completed full size pellicle film incl. lithographic
performance demonstrated
2.1 Pilot phase demonstrate complete EUV
pellicle solution including
scanner readiness
2.2 Production phase industry adoption of EUV
pellicles & ramp up
3. HVM phase
a b testing
highly interactive
engagements
Investigation of pellicle film only
• NXE Pellicle
• Pellicle tooling (mask shops)
• Scanner readiness (fab)
Slide 5
Public
NXE pellicle road mapPhase approach of pellicles, tooling and scanner readiness
Activity 2015 2016 2017 2018 2019 2020
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
NXE:3XX0B
NXE:3300B
NXE:3350B
NXE:3400B
NXE Pellicle
Pellicle prototype
Pellicle pilot
Pellicle product
Pellicle
tooling
(for mask
shops)
Early integration
Manually assisted
Fully automated
Scanner
readiness
(for fab)
Early customer access
Upgrade field NXE:33X0B
Production NXE:3400B
Dev Pellicle product release
Pellicle pilot release
Prototype & early customer
access
Dev
@ ASML
α & β
testingDev
Dev Product release
NXE:3300B
NXE:3350B
NXE:3400B
Dev
Dev
Dev Field release
Product release
Dev
α & β
testing
β testing
Field release
Field release
α testing
α testing
α & β
testing
Development
α & β testing
Product releaseUnder study
Slide 6
Public
NXE pellicle frame components in manufacturing phase All designs frozen, production of parts ongoing, first hardware coming in
February ’15:
• Initial design & first concept introduced
• First demonstrator built
NXE pellicle concept
NXE pellicle demonstration model
September ’15:
• Design optimized & finalized
• Pellicle frame parts being manufactured
Pellicle frame
Studs (interface to reticle) Fixtures
Slide 7
Public
NXE Pellicles are being integrated at ASML Pellicle work center to support early integration phase available
Early integration tool
Pellicle work center setup in the ASML cleanroom
Working area for pellicle integration
Slide 8
Public
1st NXE pellicle assembled at ASML Pellicle work center Pellicle assembly performed by trained operators
Slide 9
Public
Mask shop tools to support NXE pellicle under development
1. SFT-100 : Stud Fixation Tool to glue studs onto reticles
2. MDR-100: Mount Demount Remount tool (re)mount and
demount NXE pellicle to/from reticles
3. SRT-100: Stud Removal Tool to remove studs from reticles
Designs frozen, manufacturing started; ready for α testing by end of 2015
Slide 10
Public
Mask shop tools to support NXE pellicle under development
1. SFT-100 : Stud Fixation Tool to glue studs onto reticles
2. MDR-100: Mount Demount Remount tool (re)mount and
demount NXE pellicle to/from reticles
3. SRT-100: Stud Removal Tool to remove studs from reticles
Designs frozen, manufacturing started; ready for α testing by end of 2015
Mock-up flow cabinet
Slide 11
Public
Activity 2015 2016 2017 2018 2019 2020
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
NXE:3XX0B
NXE:3300B
NXE:3350B
NXE:3400B
NXE Pellicle
Pellicle prototype
Pellicle pilot
Pellicle product
Pellicle
tooling
(for mask
shops)
Early integration
Manually assisted
Fully automated
Scanner
readiness
(for fab)
Early customer access
Upgrade field NXE:33X0B
Production NXE:3400B
Dev Pellicle product release
Pellicle pilot release
Prototype & early customer
access
Dev
@ ASML
α & β
testingDev
Dev Product release
NXE:3300B
NXE:3350B
NXE:3400B
Dev
Dev
Dev Field release
Product release
Dev
α & β
testing
β testing
Field release
Field release
α testing
α testing
α & β
testing
Development
α & β testing
Product releaseUnder study
NXE pellicle road mapPhase approach of pellicles, tooling and scanner readiness
Slide 12
Public
ASML committed to demonstrate complete pellicle solution
for EUV and support the industry to implement Activity 2015 2016 2017 2018 2019 2020
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
NXE:3XX0B
NXE:3300B
NXE:3350B
NXE:3400B
NXE Pellicle
Pellicle prototype
Pellicle pilot
Pellicle product
Pellicle
tooling
(for mask
shops)
Early integration
Manually assisted
Fully automated
Scanner
readiness
(for fab)
Early customer access
Upgrade field NXE:33X0B
Production NXE:3400B
Dev Pellicle product release
Pellicle pilot release
Prototype & early customer
access
Dev
@ ASML
α & β
testingDev
Dev Product release
NXE:3300B
NXE:3350B
NXE:3400B
Dev
Dev
Dev Field release
Product release
Dev
α & β
testing
β testing
Field release
Field release
α testing
α testing
α & β
testing
Development
α & β testing
Product releaseUnder study
NXE pellicle integrated at ASML; initial manufacturing capability established.
Pellicle tooling under development; designs frozen, manufacturing started.
NXE pellicle testing for early learning on NXE scanners will start this year.