NXTCore FOTP001 Rev 01 1/28/2012 NXTCore ARINC801 Fiber Optic Terminus Qualification Test Plan 1. Scope 1 Scope To define the test samples, test sequence and test methods used to validate the optical performance of NXTCon ARINC 801 fiber optic terminus. It is understood that the standard optical channel performance is governed by the optical terminus in conjunction with the connector and cable options. Optical performance has been generally governed by the performance criteria outlined in the ARINC Specification 801-2; Fiber Optic Connectors. NXTCon has utilized outside testing facilities certified by to ISO/IEC-17025:2005, Mil- STD-790 and ITL FOC to ensure the independent and quality nature of all data presented. Termini were installed onto cables and into connectors by a ISO9001/2008 supplier prior to submittal to the testing organization. 2 Order of Precedence 2. Order of Precedence In case of a conflict between the text of this document and the applicable referenced documents, the text of this document shall take precedence. of Test Articles 3. Description of Test Articles Item Part Number Qty Description 1 TA-1260-S-P 98 Optical terminus, loose structure 2 N/A 12 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, -55ºC to 125ºC minimum rating, loose structure (Fiber: Carlisle P/N NFO(EP)-125-1) supplied pre-conditioned 3 N/A 25 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Aramid strength member (Fiber: OFS) 4 N/A 1 Cable assembly, Item 9 to Item 9, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: OFS) 5 N/A 4 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, bend insensitive, 4 meters in length, -55ºC to 125ºC minimum rating, semi-loose structure (Fiber: Carlisle P/N NFO(EP)-125-5B) supplied pre- conditioned 6 N/A 8 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: TBD by cable assembly supplier) 7 N/A 36 Patch cord, 900 μm, FC UPC to FC UPC, 62.5/125 multimode fiber, 4 meters in length 8 N/A 12 Patch cord, 900 μm, FC APC to FC APC, 9/125 single-mode fiber, 4 meters in length 9 N/A 2 Optical terminus, 801-conforming, Radial P/N F725 003 419 Termini intended for multimode cables with loose structure and termini intended for single-mode cables with loose structure, shall be installed in ARINC801 capable connectors. The termini and connectors are intended for continuous operation at any temperature between -55ºC and 125ºC. Fiber optic termini supplied are certified to be of production source and quality.

NXTCore ARINC801 Fiber Optic Terminus

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

NXTCore ARINC801 Fiber Optic Terminus Qualification Test Plan

1. Scope 1 Scope To define the test samples, test sequence and test methods used to validate the optical performance of NXTCon ARINC 801 fiber optic terminus. It is understood that the standard optical channel performance is governed by the optical terminus in conjunction with the connector and cable options. Optical performance has been generally governed by the performance criteria outlined in the ARINC Specification 801-2; Fiber Optic Connectors. NXTCon has utilized outside testing facilities certified by to ISO/IEC-17025:2005, Mil-STD-790 and ITL FOC to ensure the independent and quality nature of all data presented. Termini were installed onto cables and into connectors by a ISO9001/2008 supplier prior to submittal to the testing organization. 2 Order of Precedence 2. Order of Precedence In case of a conflict between the text of this document and the applicable referenced documents, the text of this document shall take precedence. of Test Articles 3. Description of Test Articles Item Part Number Qty Description 1 TA-1260-S-P 98 Optical terminus, loose structure 2 N/A 12 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber,

1.8mm to 2.0mm diameter, 4 meters in length, -55ºC to 125ºC minimum rating, loose structure (Fiber: Carlisle P/N NFO(EP)-125-1) supplied pre-conditioned

3 N/A 25 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Aramid strength member (Fiber: OFS)

4 N/A 1 Cable assembly, Item 9 to Item 9, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: OFS)

5 N/A 4 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, bend insensitive, 4 meters in length, -55ºC to 125ºC minimum rating, semi-loose structure (Fiber: Carlisle P/N NFO(EP)-125-5B) supplied pre-conditioned

6 N/A 8 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: TBD by cable assembly supplier)

7 N/A 36 Patch cord, 900 μm, FC UPC to FC UPC, 62.5/125 multimode fiber, 4 meters in length

8 N/A 12 Patch cord, 900 μm, FC APC to FC APC, 9/125 single-mode fiber, 4 meters in length

9 N/A 2 Optical terminus, 801-conforming, Radial P/N F725 003 419

Termini intended for multimode cables with loose structure and termini intended for single-mode cables with loose structure, shall be installed in ARINC801 capable connectors. The termini and connectors are intended for continuous operation at any temperature between -55ºC and 125ºC. Fiber optic termini supplied are certified to be of production source and quality.

Page 2: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

Cable/Terminus assembly and crimping of the crimp sleeve shall be performed by an outside source cable assembly supplier using standard termination methods per the applicable ARINC documents. Fiber optic cable, supplied to the cable assembly supplier will be pre-conditioned for 5 cycles, -55°C to 135°C with a 5 minute ramp time between temperature extremes and each temperature plateau stabilized for at least 30 minutes. The cable assembly supplier will affix a unique label to each cable assembly to ensure performance and end face traceability throughout the entire test regimen. The cable assembly supplier will complete and record end face geometry per Telcordia Core GR-326 and per TIA/EIA-568-C.3. These measurements shall be made using a calibrated interferometer. The cable assembly supplier shall perform and record initial attenuation and return loss testing on all cable assemblies. All necessary test fixtures will be supplied by the selected independent testing laboratory. The test connectors shall be populated according to the following table:

Connector Variant Multimode position Single-mode position

Connector 1 A1, A3 --- Connector 2 A1, A2, A4, A5 --- Connector 3 A1, A5 A2, A4 Connector 4 A1, A2, A6, A7 A3, A5

Note: Item 4 containing the Radial terminus shall be populated into connector according to the above table and considered part of Group D. This will be considered for intermate performance. 4. Guide Pins When using NXTcon optical termini within ARINC801 connector systems all mating conditions are to be tested with standard ARINC801 specification guidance features installed into connectors. 5. Test Sequence The test plan is divided into four (4) groups of test sequences. Groups A, B and C shall each be comprised of four mated, fully populated connector pairs and each group will consist of 16 optical channels or 32 total termini. Group D shall be comprised of one mated, fully populated connector pair and will consist of 2 optical channels or 4 total termini. Each pair of connectors shall go through the listed tests in the order specified. The test sequence is given in the table on the following page. Test Procedure Group A

Environmental Group B Mechanical Environment

Group C Mechanical Usage

Group D Intermate

Attenuation and splicing X X X X

Return loss X X X Thermal cycling X Humidity X Temperature life X Salt spray X Thermal shock X Vibration X Mechanical shock X

Maintenance aging X

Mating durability X Cable Pull-out X Termini retention force X

Return loss X X X X

Page 3: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

6. Test Procuredures All electrical configuration specifications, tests or electrical failure criteria associated with the following referenced test specifications are not applicable for the following tests. 6.1 Optical All the following optical performance tests shall be performed at a nominal wavelength of 1300 nm for multimode and 1550 nm for single-mode. Multimode tests shall use overfill launch conditions as defined in TIA-455-54B (FOTP-54) or IEC 60793-1-40 (TIA-455-78B (FOTP-78)), paragraph A.1.3. 6.1.1 Attenuation Requirements: Test in accordance with TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode). Criteria: Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for multimode connections. For all single-mode connections, measure and record only. No failure criterion exists for single-mode connections. 6.1.2 Return Loss Requirements: Test as specified in paragraph 2.4.3.2 of ARINC Specification 801-2 and in accordance with TIA/EIA-455-107A (FOTP-107). Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for single-mode PC polish termini. Criteria: Measure and record return loss measurements. 6.1.3 Change in Transmittance (CIT) Requirements: Where tests specify a CIT measurement, CIT should be measured in accordance with TIA-455-20B (FOTP-20), Method A. Launch conditions for CIT measurements should be an Equilibrium Modal Distribution profile. Measurements shall be recorded before, during, and after the test, unless otherwise specified. The measurement made during a test need not be continuous, unless otherwise specified, but should be made at the extremities of the test conditions. Criteria: Unless otherwise specified in this test plan, the CIT for any test should not exceed 0.5 dB for multimode connections. For all single-mode connections, measure and record only. No failure criterion exists for single-mode connections. 6.2 Environmental Category 6.2.1 Thermal Cycling Requirements: Test as specified in ANSI/TIA-455-3B (FOTP-3) with the following procedure and criteria, which is based from paragraph 2.4.4.1 of ARINC Specification 801-2 with exceptions. Procedure: Connectors shall be tested using Test Condition D, 10 cycles, with Step 1 set at -55°C ±2°C and Step 2 set at 125°C ±2°C. Both of these temperature plateau intervals shall not be less than 30 minutes. The rate of the environmental chamber air temperature change, between the minimum and maximum temperature

Page 4: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

extremes, shall be between 50 and 70 minutes. No stabilization is necessary for Step 3 as it is the indicator of the start/end of each cycle. At the completion of the last cycle, the connector assemblies shall be returned to 23ºC ±5°C and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 23ºC ±5°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: Fiber optic connector assemblies shall pass the CIT test as stated in 6.1.3 of this test plan and a visual inspection in accordance with the requirements of TIA-455-13A (FOTP-13). 6.2.2 Humidity Requirements: Test as specified in paragraph 4.5.15 of MIL-DTL-24308G and in accordance with EIA-364-31B, Method IV (-10ºC to +65ºC, 10 cycles, 240 hours). Optional cold shock required. Connectors are to remain in a mated condition throughout the test using the provided jackscrew hardware system. Panel mounting not required. Procedure: The CIT measurements shall be taken upon stabilization at every temperature plateau and at 25ºC at the end of the test. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: Fiber optic connector assemblies shall pass a CIT test. 6.2.3 Temperature Life: Requirements: Test as specified in TIA/EIA-455-4C (FOTP-4) with the following procedure and criteria, which is based from paragraph 2.4.4.2 of ARINC Specification 801-2 with exceptions. Procedure: The temperature exposure shall be 125ºC ± 2ºC for the duration of 1,000 hours. CIT measurements shall initially be recorded at 25ºC ±2°C, once every hour for the duration of the test and at the conclusion of testing upon return to 25ºC ±2°C. Cleaning of the termini is permitted prior to and post testing, but not during the test. Criteria: Fiber optic connector assemblies shall pass a CIT test and a visual examination using the failure criteria referenced in paragraph 5.9 of TIA/EIA-455-4C (FOTP-4). 6.2.4 Salt Spray: Requirements: Test as specified in paragraph 2.4.4.5 of ARINC Specification 801-2 the testing requirements of TIA-455-16A (FOTP-16), test condition C. Procedure: After exposure, a CIT test shall be performed. The connector assemblies shall then be thoroughly washed with tap water to remove all salt deposits and then shall be dried in a circulating air oven at a temperature of 38ºC ± 3ºC for a period of 12 hours. They shall then be visually examined for evidence of corrosion. Criteria: Fiber optic connector assemblies shall pass a CIT test and visual inspection. Mating and un-mating force testing is not required during final inspection of the connector assemblies. 6.2.5 Thermal Shock

Page 5: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

Requirements: Test as specified in paragraph 4.5.13.1 of MIL-DTL-24308G and in accordance with EIA-364-32F with the exception that no plateau interval shall be less than 30 minutes. Procedure: Connectors shall be tested using Method A, Test Condition I, 5 cycles, unless otherwise specified. At the completion of the last cycle, the connector assemblies shall be returned to 25ºC and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 25°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: No CIT failure criterion exists for this test; measure and record only. Visual inspection, using the failure criteria outlined in paragraph 4.6 of EIA-364-32F, is required. 6.3 Mechanical Environment 6.3.1 Mechanical Vibration Requirements: Test as specified in paragraph 4.5.13.1 of MIL-DTL-24308G and in accordance with EIA-364-32F with the exception that no plateau interval shall be less than 30 minutes. Procedure: Connectors shall be tested using Method A, Test Condition I, 5 cycles, unless otherwise specified. At the completion of the last cycle, the connector assemblies shall be returned to 25ºC and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 25°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: No CIT failure criterion exists for this test; measure and record only. Visual inspection, using the failure criteria outlined in paragraph 4.6 of EIA-364-32F, is required. 6.3.2 Mechanical Shock Requirements: Phase 1: Test as specified in paragraph 4.5.16 of MIL-DTL-24308G and in accordance with EIA-364-28F, test condition IV. Phase 2: Test as specified in paragraph 4.5.16 of MIL-DTL-24308G and in accordance with EIA-364-28F, test condition IV with the following exception: The 20-minute cycle shall be performed two times in each of the three mutually perpendicular directions (total of six times), so that the motion shall be applied for a total period of approximately 2 hours. Procedure: Phase 1 & 2: Two separate tests consisting of Phase 1 & 2 are to be performed. The first test will consist of a test fixture with two mated pair test sample mounted. The second test will consist of a test fixture with a secondary mated pair test sample mounted. Connector pairs shall be held together by their locking mechanism. Phase 1: CIT shall be measured before and after the vibrations, and shall not be monitored during the vibration application when the discontinuity detector is in use.

Page 6: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

Phase 2: The test laboratory is restricted to two simultaneous channels when monitoring for a 1μsec discontinuity. For this reason, it is necessary to only use two multi-mode channels, one from each connector test sample. Criteria: During phase 1 of the test, there shall be no optical discontinuities in excess of 50 microseconds and a change in power >0.5 dB. At the conclusion of phase 1, fiber optic connector assemblies shall pass a CIT test. In addition, the mated connectors shall not be damaged and there shall be no loosening of parts due to vibration. During phase 2 of the test, there shall be no optical discontinuities in excess of 1 microsecond and a change in power >1.0 dB. Failure of this phase of the test will not constitute a failure of the test samples. A CIT test and visual inspection are not required after phase 2. 6.4 Mechanical Use 6.4.1 Maintenance Aging Requirements: Test as specified in paragraph 2.4.5.7 of ARINC Specification 801-2 and in accordance with EIA-364-24B. Procedure: All termini shall be removed and reinstalled ten times using the appropriate insertion and removal tools. Criteria: The termini insertion force should be measured during the first and last cycles and should not exceed 36 N (8 pounds). 6.4.2 Mating Durability Requirements: Test as specified in paragraph 4.5.18 of MIL-DTL-24308G and in accordance with EIA-364-09C, which meets or exceeds the testing requirements of TIA-455-21A (FOTP-21). The following detail applies: a. Manual mating and un-mating of test samples, 500 cycles at a rate between 100 and 300 cycles per hour. b. (Salt spray requirement removed here due to its absence in ARINC 801-2 and 2008 test plan) Procedure: 500 cycles of engagement and separation shall be performed. A cycle shall be defined as the point at which optical termini are fully disengaged to a point at which the connectors are fully mated and termini are fully engaged. Connector shells are not required to be fully unmated. A CIT test shall be performed after every 100 cycles. Termini may be cleaned prior to each measurement. Criteria: Fiber optic connector assemblies shall pass CIT tests and at the conclusion of the test, the connectors, adapters and termini shall be inspected for visual damage using the failure criteria outlined in paragraph 4.6 of TIA-455-21A (FOTP-21). 6.4.3 Cable Pull-out Force Requirements: Test as specified in TIA-455-6B (FOTP-6) Method 1. Procedure: This test applies only to cables with 1.8mm to 2.1mm outer jacket diameter and reinforced with an Aramid strength member. Mount the test sample in a test fixture such that adequate support is provided. The test load shall be applied as follows with a rate of pull being 89N/min ±4N: Load 1: Apply 12 lb force at 0° for at least 5 seconds but no more than 10 seconds.

Page 7: NXTCore ARINC801 Fiber Optic Terminus

NXTCore FOTP001 Rev 01 1/28/2012

Criteria: For the procedure above, remove the load and after at least 10 seconds, measure and record the CIT. 6.4.4 Terminus Retention Force Requirements: Test as specified in paragraph 2.4.5.3 of ARINC Specification 801-2 and in accordance with EIA-364-38C, either Method A or B. Procedure: The test load shall be 12 lb force. Note: This test is intended to prove the integrity of the connector terminus retention feature and not to prove the attachment of the cable terminus. Criteria: All termini shall be retained with no damage to the termini, the connector inserts or to the retention mechanisms. 6.2.4 Salt

Page 8: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

1400 Fujikura FSM-17S

3/8/2014

1407 Fujikura CT-30 210941224 JGR BR5

1258 Hewlett Packard 81533B1102

Return Loss [dB] 20 for MM and 30 for SM 45 4/4

Insertion Loss [dB] 0.3 (for MM only)

Norman MetznerJZ/HR

JZ/HR

Performed By

3/21/2012 9:25 AM

Post Test Cleanup

3/21/12 1pm

Setup Check

Signoff

0.28 4/4

NMjohn kim

JZ/HR HR

Requirement

Starting IL/RL measurements for SM samples.

Customer Witness

3/21/2012 9:28AM

Initials

Category

Project EngineerSignoff by

Technical Director

3411G05696

Model Number Serial Number 42280

687

9069033

81524A 3248G01181 3411G05264

63162

Reference Only Reference Only750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM

Optical Power Head HP 81524A

Temperature

23 °C

Reference Only

29 %RH

Measurements / Inspection

IL [dB], RL [dB]

none

Nonconformity / Deviation

Specific Test Conditions

Last Cal Date

none

9/6/2012

Reference Only Reference Only

Reference Only Reference Only

3/8/2012 3:22:08 PM

DS Revision

03/23/12

Optical Head Interface

Fiber Fusion Splicer Fiber Cleaver

Service Project Number SPN Test ID # Humidity

1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110

Hewlett Packard

Test Sample Description

ARINC801 Connector

1103 Hewlett Packard

Instrum. Number Manufacturer Extech Fujikura Fujikura

14021405

81533B

CT-30 FSM-50S 12161 Reference Only

Reference Only Optical Head Interface10/31/2012

Reference Only 10/31/2011 2:10:44 PM Optical Power Head

Fiber Cleaver Reference Only Fiber Fusion Splicer

11965 GA-1

Test Specification / Standard

TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for

multimode connections. For all single-mode connections, measure and record only. No

failure criterion exists for single-mode connections

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

NM

Bench Cleaning Equipment List

03/21/12

Date/Time 3/23/20123/21/2012 9:25 AM

Compliance

Event Log

Completed IL/RL measurements for SM samples. Retested 24W7 A5 due to high IL. Cleaned ferrule endface and now passes. Also did the same to 17W5 A2.

Finished Initial IL-RL Measurements for all MM Samples

Test Title

NXTCore

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1260

Event Log

Results Summary

Product Name Purchase Order #

177125

Start Date

3/21/2012

Completion Date

3/21/2012

Anomaly / Interruption

none

IL-RL

Max/Min Measurement Value

1254 Hewlett Packard

Reference Only

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPTP-1005 Return Loss

Part Number

3248G01541

Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger

Instrument Description

9:30 AMDate Time

1:00 PM

12:00PM9:00AM02/21/12 Started Preparation for Initial IL-RL Measurements for all MM Samples

JZ

JZ/HR

HR

03/21/12

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3

Page 9: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]

A1 mm -11.43 -11.37 0.06 >45A3 mm -11.42 -11.36 0.02 >45A1 mm -11.54 -11.49 0.05 >45A2 mm -11.53 -11.5 0.03 >45A4 mm -11.55 -11.51 0.04 >45A5 mm -11.56 -11.52 0.04 >45A1 mm -11.42 -11.40 0.02 >45A2 sm -5.68 -5.43 0.25 55.5A4 sm -5.67 -5.41 0.26 56.4A5 mm -11.42 -11.39 0.03 >45A1 mm -11.42 -11.39 0.03 >45A2 mm -11.40 -11.38 0.02 >45A3 sm -5.67 -5.39 0.28 55.8A5 sm -5.62 -5.39 0.23 52.1A6 mm -11.42 -11.39 0.03 >45A7 mm -11.42 -11.38 0.04 >45

A1 mm 0.00A2 sm -5.78 -5.39 0.38 56.8A4 sm 0.00A5 mm 0.00A1 mm 0.00A2 mm 0.00A3 sm -5.67 -5.39 0.28 55.8A5 sm -5.75 -5.39 0.36 55.9A6 mm 0.00A7 mm 0.00A5 sm -5.72 -5.39 0.33 56.1

24W7

MULTIMODE @1300nm, Singlemode @1550nm

3W3

17W5

Initial Results

24W7

17W5

5W5

Page 10: NXTCore ARINC801 Fiber Optic Terminus
Page 11: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

04/09/12 1:00 PM

8:00 AM04/04/1204/05/1204/06/12

8:55 AM

9:30 AM7:55 AM

04/10/1204/11/1204/12/12

NM

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performancePaused test and collected data due to expected power outage

Collected interim data and checked compliance as well as system performance

Triple 1300nm LED Source

SC Series

81637B 715RF-24

1020

04/02/1204/03/12 8:00 AM

1072 JDS

Agilent

9/29/2013

Instrument Description

Date Time

2x44 Optical Switch 2x44 Optical Switch

Fast Optical Power Meter Multimode 62.5 Optical Switch

Agilent1198

Reference Only Reference Only

Reference Only Reference Only

Cal Due Date11/7/2012 11/7/2011 6:08:50 PM Ref Only

Anomaly / Interruption

none

Humidity

Max/Min Measurement Value

1071 JDS

9/29/2011 2:47:02 PM

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming

Part Number

Test Item Purchase Order #

177125

Start Date

3/30/2012

Completion Date

4/12/2012

Test Title

NXTCore

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1264

Event Log

Results Summary

4/12/12 9am

Test completed

3/30/12 6:30 AM

Compliance

Event Log03/30/12

Date/Time

9:48 AM Baselined and resumed test

8:25 AM

8:00 AM6:30 PM

11965 GA-3

Test Specification / Standard

4.5.15 of MIL-DTL-24308G and in accordance with EIA-364-31B, Method IV, optional cold shock required. -10ºC to +65ºC, 10 cycles, 240 hours

NM

Bench Cleaning Equipment List

Instrum. Number Manufacturer Rifocs Rifocs

11551191

1x8 Optical Switch

1187

Optotest OP750

2 cu ft Environmental Chamber

Reference Only ED155457 JDS Uniphase SB Series

DS Revision

04/12/12

Return Loss Module

1310/1490/1550/1625nm Laser Fast Optical Power Meter

Service Project Number SPN Test ID # Humidity

none

Reference Only

12/8/2011 11:47:26 AM 12/8/2012

2/3/2012 4:56:12 PM 2/3/2014

4/20/2011 7:15:11 PM

Temperature

23 °C

Ref Only

29 %RH

Measurements / Inspection

CIT [dB], Temperature [C]

none

Nonconformity / Deviation

Specific Test Conditions

Last Cal DateModel Number Serial Number 753R-1300

10397

129236

SC Series EG001153 EG001152

DE41300321124741

Started Humidity test

Customer Witness

3/30/12 6:30 AM

Initials

Category

Project EngineerSignoff by

Technical Director

Test Sample Description

ARINC801 Connector

8:11 AM

-0.14 4/4

NMjohn kim

NM N/A

Requirement

3/30/12 6:30 AMNorman Metzner

NMNM

Performed By

DE40500226 ZH-21460 Cincinnati Subzero

81610A 9/29/2011 2:45:32 PM1016 Agilent 81637B DE41300332

Z9913064

9/29/2013

4/20/2012

CIT [dB] MM 0.5

Post Test Cleanup

4/12/12 9am

Setup Check

Signoff

CIT [dB] SM 0.5 0.05 2/2

Uncontrolled when printed 1 of 1 0003-022 Test Data sheet Template (rev P)

Page 12: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-3 H

um

idit

y M

M C

IT

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

050

100

150

200

250

300

Tim

e [h

]

CIT [dB]

-20

020406080100

120

Temperature [°C] Humidity [%]

3W3-

A1

3W3-

A3

5W5-

A1

5W5-

A2

5W5-

A4

5W5-

A5

17W

5-A

117

W5-

A5

24W

7-A

124

W7-

A2

24W

7-A

624

W7-

A7

Tem

pera

ture

Hum

idity

Page 13: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-3 H

um

idit

y S

M C

IT

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

050

100

150

200

250

300

Tim

e [h

]

CIT[dB]

-20

020406080100

120

Temperature [°C] Humidity [%]

17W

5-A

217

W5-

A4

24W

7-A

324

W7-

A5

Mon

itor -

5Te

mpe

ratu

reH

umid

ity

Page 14: NXTCore ARINC801 Fiber Optic Terminus
Page 15: NXTCore ARINC801 Fiber Optic Terminus

Test

Dat

ashe

etTe

st R

epor

t by:

Exp

erio

r Lab

orat

orie

s, In

c.

1x2

4 S

ingl

emod

e O

ptic

al S

witc

h R

efer

ence

Onl

y R

efer

ence

Onl

y10

01 A

gile

nt 8

1635

A D

E38

6015

65 D

ual O

ptic

al P

ower

Met

er 9

/29/

2011

1:2

0:11

PM

9/29

/201

3

1005

1283

Rifo

cs 7

15R

F-24

1220

Agi

lent

816

54A

DE

38A

0078

5

-0.

09/-0

.09

-

Set

up

Ch

eck

Sig

noff

CIT

[dB

] MM

-

Po

st T

est

Cle

anu

p

6/6/

12 4

pm

Dua

l Opt

ical

Pow

er M

eter

DE

3860

1594

9/2

9/20

11 1

:19:

01 P

M 1

310/

1550

nm L

aser

Sou

rce

12/

9/20

11 3

:56:

59 P

M12

1439

Agi

lent

9/29

/201

3

12/2

/201

2

Req

uir

emen

t

6/5/

12 1

pmN

orm

an M

etzn

erJB

NM

NM

john

kim

NM

HR

-

Cu

sto

mer

Wit

nes

s

6/5/

12 5

pm

Cat

ego

ry

Pro

ject

En

gin

eerN

XTC

ore

EG

0011

53 E

G00

1152

none

Ref

eren

ce O

nly

12/

8/20

11 1

1:47

:26

AM

12/8

/201

2 D

E40

5002

26

DE

4130

0321

1247

41

Las

t C

al D

ate

Inst

rum

ent

Des

crip

tio

n T

riple

130

0nm

LE

D S

ourc

e M

ultim

ode

62.5

Opt

ical

Sw

itch

Mo

del

Nu

mb

erS

eria

l Nu

mb

er

753

R-1

300

1292

36

29 %

RH

Mea

sure

men

ts /

Insp

ecti

on

CIT

[dB

], Te

mpe

ratu

re [C

]

none

No

nco

nfo

rmit

y / D

evia

tio

n

Sp

ecif

ic T

est

Co

nd

itio

ns

2/3

/201

2 4:

56:1

2 P

M2/

3/20

14

12/

2/20

11 1

0:53

:32

AM

9/29

/201

312

/9/2

012

9/2

9/20

11 2

:45:

32 P

M

DS

Rev

isio

n

06/0

8/12

Ret

urn

Loss

Mod

ule

131

0/14

90/1

550/

1625

nm L

aser

Fas

t Opt

ical

Pow

er M

eter

Ser

vice

Pro

ject

Nu

mb

er S

PN

Tes

t ID

#H

um

idit

yT

emp

erat

ure

23 °

C

VTS

1.5

Ref

eren

ce O

nly

ED

1554

57 J

DS

Uni

phas

e S

B S

erie

s 1

x8 O

ptic

al S

witc

h

Agi

lent

816

35A

1.5

cu

ft Th

erm

al S

hock

Cha

mbe

r

1039

7 8

1637

B D

E41

3003

32

93-

VT1

2231

Opt

otes

t O

P75

0

816

10A

1057

Cin

ncin

ati S

ubZe

ro

1016

Agi

lent

1187

1196

5G

A-6

Tes

t S

pec

ific

atio

n /

Sta

nd

ard

4.5.

13.1

of M

IL-D

TL-2

4308

G a

nd in

acc

orda

nce

with

E

IA-3

64-3

2FM

etho

d A

, Tes

t Con

ditio

n I,

5 cy

cles

-55

°C (+

0, -3

), 12

5 °C

(+3,

-0)

NM

Ben

ch C

lean

ing

Eq

uip

men

t L

ist

TA00

01 w

/con

nect

ors

6/6/

12 4

pm

0.02

/-0.2

4

An

om

aly

/ In

terr

up

tio

n

Tes

t T

itle

NX

TCon

1264

6/5/

12 1

pm

Co

mp

lian

ce

Dat

e/Ti

me

Cu

sto

mer

Nam

eP

urc

has

e O

rder

#

1771

25

Sta

rt D

ate

6/5/

2012

Co

mp

leti

on

Dat

e

6/8/

2012

Test

was

per

form

ed tw

ice:

One

tim

e w

ith 8

5C a

s hi

gh te

mpe

ratu

re, t

he s

econ

d tim

e w

ith 1

25C

as

high

tem

pera

ture

Ther

mal

Sho

ck

Max

/Min

Mea

sure

men

t V

alu

e

1071

JD

S

9/2

9/20

11 2

:47:

02 P

M

Exp

erio

r T

est

Pro

ced

ure

# (

if a

pp

licab

le)

EP

TP-1

002

Tran

smitt

ance

EP

WI-1

044

Cha

mbe

r con

trolle

r pro

gram

min

g

Par

t N

um

ber

Ref

eren

ce O

nly

Inst

rum

. Nu

mb

er

Ref

eren

ce O

nly

Cal

Du

e D

ate

11/7

/201

2 1

1/7/

2011

6:0

8:50

PM

Ref

Onl

y

Man

ufa

ctu

rer

Rifo

cs R

ifocs

Ref

Onl

y

Res

ult

s S

um

mar

y

Per

form

ed B

y

CIT

[dB

] SM

Eve

nt

Lo

gS

ign

off

by

Tec

hn

ical

Dir

ecto

r

Tes

t S

amp

le D

escr

ipti

on

2x4

4 O

ptic

al S

witc

h 2

x44

Opt

ical

Sw

itch

1198

Agi

lent

715

RF-

24

1155

1191

9/29

/201

3

Ref

eren

ce O

nly

Ref

eren

ce O

nly

1020

1072

JD

S S

C S

erie

s

816

37B

Fas

t Opt

ical

Pow

er M

eter

SC

Ser

ies

Unc

ontro

lled

whe

n pr

inte

d00

03-0

22 T

est D

ata

shee

t Tem

plat

e (r

ev P

)1

of 1

93

Page 16: NXTCore ARINC801 Fiber Optic Terminus

Test

Dat

ashe

etTe

st R

epor

t by:

Exp

erio

r Lab

orat

orie

s, In

c.

06/0

8/12

06/0

7/12

NMJB

06/0

6/12

06/0

5/12

1:00

PM

Sta

rted

ram

mpi

ng c

ham

ber t

o te

mpe

ratu

re

Sta

rted

equi

pmen

t set

up a

nd ro

uted

sam

ples

in c

ham

ber t

o pr

epar

e fo

r the

rmal

sho

ck a

t 125

CTh

erm

al s

hock

cyc

ling

com

plet

ed, r

etur

ned

sam

ples

to a

mbi

ent

cham

ber a

t tem

pera

ture

, sta

rted

ther

mal

sho

ck

Sta

rted

equi

pmen

t set

up a

nd ro

uted

sam

ples

in c

ham

ber

Init

ials

Sta

rted

ram

mpi

ng c

ham

ber t

o te

mpe

ratu

re

Ther

mal

sho

ck c

yclin

g co

mpl

eted

, ret

urne

d sa

mpl

es to

am

bien

t

Vis

ual I

nspe

ctio

nno

dam

age

detri

men

tal t

o th

e pe

rform

ance

of t

he

conn

ecto

rno

dam

age

obse

rved

4/4

8:00

AM

cham

ber a

t tem

pera

ture

, sta

rted

ther

mal

sho

ck

8:15

AM

5:00

PM

1:00

PM

base

lined

opt

ical

sys

tem

base

lined

opt

ical

sys

tem

7:45

AM

Eve

nt

Lo

gD

ate

Tim

e

8:45

AM

5:00

PM

1:45

PM

3:00

PM

Unc

ontro

lled

whe

n pr

inte

d00

03-0

22 T

est D

ata

shee

t Tem

plat

e (r

ev P

)2

of 1

93

Page 17: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-6 T

her

mal

Sh

ock

MM

CIT

85°

C

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

01

23

45

6

Tim

e [h

]

CIT [dB]

-80

-60

-40

-20

020406080100

Temperature [°C]

3W3-

A1

3W3-

A3

5W5-

A1

5W5-

A2

5W5-

A4

5W5-

A5

17W

5-A

117

W5-

A5

24W

7-A

124

W7-

A2

24W

7-A

624

W7-

A7

Tem

pera

ture

Page 18: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-6 T

her

mal

Sh

ock

SM

CIT

85°

C

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

01

23

45

6

Tim

e [h

]

CIT[dB]

-80

-60

-40

-20

020406080100

Temperature [°C]

17W

5-A

217

W5-

A4

24W

7-A

324

W7-

A5

Mon

itor -

5Te

mpe

ratu

re

Page 19: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-6 T

her

mal

Sh

ock

MM

CIT

85°

C

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

01

23

45

6

Tim

e [h

]

CIT [dB]

-100

-50

050100

150

Temperature [°C]

3W3-

A1

3W3-

A3

5W5-

A1

5W5-

A2

5W5-

A4

5W5-

A5

17W

5-A

117

W5-

A5

24W

7-A

124

W7-

A2

24W

7-A

624

W7-

A7

Ser

ies1

3

Page 20: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-6 T

her

mal

Sh

ock

SM

CIT

85°

C

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

01

23

45

6

Tim

e [h

]

CIT[dB]

-100

-50

050100

150

Temperature [°C]

17W

5-A

217

W5-

A4

24W

7-A

324

W7-

A5

Tem

pera

ture

Page 21: NXTCore ARINC801 Fiber Optic Terminus
Page 22: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

8:00 AM04/02/12

03/28/12 Finished setup and started satbilityNMProgrammed chamber and started test

Test completed03/29/1203/30/12 6:30 PM

Triple 1300nm LED SourceInstrument Description

Date Time

2x44 Optical Switch 2x44 Optical Switch

Fast Optical Power Meter Multimode 62.5 Optical Switch

Agilent1198

Cal Due Date11/7/2012 11/7/2011 6:08:50 PM Ref Only

Reference Only Reference Only

Reference Only Reference Only

9/29/2013

Anomaly / Interruption

none

Thermal Cycling

Max/Min Measurement Value

1071 JDS

9/29/2011 2:47:02 PM

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming

Part Number

Product Name Purchase Order #

177125

Start Date

3/28/2012

Completion Date

3/30/2012

Test Title

NXTCore

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1264

Event Log

Results Summary

4/2/2012 11am3/28/12 4pm

Compliance

Event Log

6:30 PM

Date/Time

11:00 AM

4:00 PM

11965 GA-2

Test Specification / Standard

TIA-455-20B(FOTP-20), Method A

ANSI/TIA-455-3B (FOTP-3), 2.4.4.1 of ARINC Specification 801-2

Test Condition D, 10 cycles, with Step 1 set at -55°C ±2°C and Step 2 set at 125°C ±2°C

temperature plateau intervals shall not be less than 30 minutes. The rate of the

environmental chamber air temperature change, between the minimum and maximumtemperature extremes, shall be between 50

and 70 minutes.CIT measured every 2 minutes

NM

Bench Cleaning Equipment List

1020

SC Series

81637B 715RF-24

Instrum. Number Manufacturer Rifocs Rifocs

1072 JDS

Agilent

1155 1x8 Optical Switch Reference Only ED155457 JDS Uniphase SB Series

DS Revision

04/02/12

Return Loss Module

1310/1490/1550/1625nm Laser Fast Optical Power Meter

Service Project Number SPN Test ID # Humidity

Last Cal Date

none

Reference Only

12/8/2011 11:47:26 AM 12/8/2012

2/3/2012 4:56:12 PM 2/3/2014

4/20/2011 7:15:11 PM ZH-2

Temperature

23 °C

Ref Only

29 %RH

Measurements / Inspection

CIT [dB], Temperature [C]

none

Nonconformity / Deviation

Specific Test Conditions

9/29/2011 2:45:32 PM 9/29/2013

2 cu ft Environmental Chamber Z9913064

Model Number Serial Number 753R-1300

10397

129236

SC Series EG001153 EG001152

DE41300321124741

Started optical system setup and routed samples in chamber

Customer Witness

3/28/12 4pm

Initials

Category

Project EngineerSignoff by

Technical Director

Test Sample Description

ARINC801 Connector

Collected data

-0.35 4/4

NMjohn kim

NM N/A

Requirement

3/28/12 4pm

81610A1187

Norman MetznerNM

NM

Performed By

DE40500226

1191 Optotest OP750

4/20/2012

1016 Agilent 81637B DE41300332

1460 Cincinnati Subzero

CIT [dB] MM 0.5

Post Test Cleanup

N/A

Setup Check

Signoff

CIT [dB] SM -- -0.08 2/2

Uncontrolled when printed 1 of 1 0003-022 Test Data sheet Template (rev P)

Page 23: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-2 T

her

mal

Cyc

ling

MM

CIT

-0.4

-0.3

5

-0.3

-0.2

5

-0.2

-0.1

5

-0.1

-0.0

50

0.05

05

1015

2025

3035

Tim

e [h

]

CIT [dB]

-100

-50

050100

150

Temperature [°C]

3W3-

A1

3W3-

A3

5W5-

A1

5W5-

A2

5W5-

A4

5W5-

A5

17W

5-A

117

W5-

A5

24W

7-A

124

W7-

A2

24W

7-A

624

W7-

A7

MM

UP

MM

DO

WN

Tem

pera

ture

Page 24: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-2 T

her

mal

Cyc

ling

SM

CIT

-0.1

-0.0

8

-0.0

6

-0.0

4

-0.0

20

0.02

0.04

05

1015

2025

3035

Tim

e [h

]

CIT[dB]

-100

-50

050100

150

Temperature [°C]

17W

5-A

217

W5-

A4

24W

7-A

324

W7-

A5

Mon

itor -

5Te

mpe

ratu

re

Page 25: NXTCore ARINC801 Fiber Optic Terminus
Page 26: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Requirement

6/2/20127:30am

8:30am

7:45am8:30pm

9:00am

06/05/12

Reference Only 2x44 Optical Switch

6:00am

Performed By

CIT [dB] SM

Date Time

10201072 JDS

81637B

Category

Calibrate ph meter and checked ph of salt solution (ph = 6.55)

Max/Min Measurement Value

Rifocs Rifocs1198

ph/Conductivity Meter DE40500226

Instrument Description

Multimode 62.5 Optical Switch Triple 1300nm LED Source

715RF-24 124741

Instrum. Number

Reference Only

11/7/2011 6:08:50 PM

Fast Optical Power Meter Agilent Ref Only

Last Cal DateModel NumberManufacturer

9/29/2011 2:47:02 PM

Associated 81635A

MX-92161521 Hanna Instruments

OP750

1071 JDS SC Series

81610A AgilentHI98129

2x44 Optical Switch 1x8 Optical Switch Reference Only

DE41300321 EG001153 EG001152

Anomaly / Interruption

EPTP-1002 Transmittance

Part Number

Reference Only1155

Agilent

1191

1000

Customer Name Purchase Order #

177125

Start Date

6/2/2012

Completion Date

6/5/2012

Test Title

NXTCon

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1264

Started 12h dry-out period at 38 deg C

8:30am

6/5/12 1pm

took samples out of oven

6/2/12 6:00am

Compliance

Event Log

Date/Time

-0.13/0.03

MD/JB

11965 GA-5

Test Specification / Standard

4.5.19 of MIL-DTL-24308G, EIA-364-26B, testcondition B

TIA-455-16A (FOTP-16), test condition C, based from paragraph 2.4.4.5 of ARINC

Specification 801-2

48h of salt spray followed by dry-out at 38ºC ± 3ºC for a period of 12 hours

NM

Bench Cleaning

Temperature

23 °C

9/29/2013

Reference Only

2/3/2014

Calibrated Before Use 12/16/2011 9:50:02 AM

9/29/2013

Reference Only Optotest

ED155457 JDS Uniphase SB Series 1310/1490/1550/1625nm Laser

Fast Optical Power Meter 2/3/2012 4:56:12 PM

Service Project Number SPN Test ID #

2/21/2014

DS Revision

06/05/12

Humidity

Ref Only

Cal Due Date11/7/2012

Calibrated Before Use

9/29/2011 2:45:32 PM 12/8/2011 11:47:26 AM 12/8/2012

29 %RH

Measurements / Inspection

CIT [dB], Temperature [°C]

none

Nonconformity / Deviation

Specific Test Conditions

none

Salt Spray

Requirement

6/1/12 3pm

Pass

Serial Number 753R-1300

10397

129236

SC Series

Project EngineerSignoff by

Technical Director

Test Sample Description

Combo-D connector

Customer Witness

none

Event LogEquipment List

Experior Test Procedure # (if applicable)

Setup Check

11:45 AM Completed Post Test Measurements for all four Samples

9:00pm

1:00 AM8:45 AM9:30am Baselined single and multimode

Started Post Test Measurements for 3W3Setup Test Equipment for Post Test Measurements

dry-out period completed

Air PressureTemperature

4/4

Started warming up salt spray chamberPrepared salt solution

Put samples in salt spray chamber, started 48 hour exposure @ 35cLoaded salt solution on salt spray tank

2/2

Results Summary

Norman MetznerMD

john kimNMJB

M-15483

2/21/2012 5:25:52 PM DE38601573

MD

12/16/20129368 Salt Spray chamber

1016 Agilent 81637B DE41300332 Return Loss Module1187

1059 Dual Optical Power Meter

CIT [dB] MM 0.5

Post Test Cleanup

6/5/12 1pm

Signoff

Deg CSalt Solution Collected Pass/Fail

6/2/12 6:30am

0.5 -0.12/-0.04

Pass 12-18 psi40-42 Pass 16 psi

35 34-41

NM

Initials

JB

MD

corrosion observed, see tab "Post Test Pictures", however, no cracking or pitting 4/4

Removed samples from salt spray, finished 48 hour exposure @ 35cRinsed samples in warm water for 5 minutes and took after test pictures

MD

Visula Inspection no damage due to corrosion

06/04/12 8:45am

7:40am

Front Beaker 30 mL Pass Chamber TemperatureRear Beaker 17 mL Tower Temperature Pass

Salt Solution

42 pH 6.63Requirement 6.5-7.2 pH

Pass/FailRequirement Pass/Fail Pass/Fail

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 27: NXTCore ARINC801 Fiber Optic Terminus

3W3 FRONT 3W3 BACK

5W5 FRONT

17W5 FRONT

24W7 FRONT

5W5 BACK

17W5 BACK

24W7 BACK

Page 28: NXTCore ARINC801 Fiber Optic Terminus

A1

mm

A3

mm

A1

mm

A2

mm

A4

mm

A5

mm

A1

mm

A2

smA

4 sm

A5

mm

A1

mm

A2

mm

A3

smA

5 sm

A6

mm

A7

mm

0.06

0.02

0.05

0.03

0.04

0.04

0.02

0.25

0.26

0.03

0.03

0.02

0.28

0.23

0.03

0.04

Initi

al IL

0.01

0.01

0.01

-0.0

1-0

.01

0.01

-0.0

4-0

.03

-0.0

1-0

.05

-0.0

4-0

.03

-0.0

40.

02-0

.03

-0.0

3C

IT a

fter T

herm

al C

ycle

-0.0

1-0

.06

-0.0

1-0

.07

-0.0

30.

01-0

.03

-0.0

20.

04-0

.03

-0.0

40.

02-0

.01

0.05

-0.0

1-0

.12

CIT

afte

r Hum

idity

0.00

0.04

-0.0

10.

060.

01-0

.02

0.02

0.02

0.01

0.06

0.03

0.02

0.01

-0.0

30.

010.

08C

IT a

fter T

emp

Life

0.06

0.03

0.06

0.05

0.07

0.04

0.07

0.28

0.22

0.05

0.08

0.01

0.32

0.19

0.06

0.11

IL b

efor

e S

alt S

pray

0.15

0.05

0.12

0.1

0.2

0.12

0.07

0.32

0.28

0.12

0.07

0.05

0.44

0.29

0.05

0.08

IL a

fter S

alt S

pray

-0.0

9-0

.02

-0.0

6-0

.05

-0.1

3-0

.08

0.00

-0.0

4-0

.06

-0.0

70.

01-0

.04

-0.1

2-0

.10

0.01

0.03

CIT

afte

r Sal

t Spr

ay

-38.

66-3

8.56

-38.

63-3

8.61

-38.

71-3

8.63

-38.

58-8

.49

-8.4

5-3

8.63

-38.

58-3

8.56

-8.6

1-8

.46

-38.

56-3

8.59

sam

ple

pow

er-3

8.51

-38.

51-3

8.51

-38.

51-3

8.51

-38.

51-3

8.51

-8.1

7-8

.17

-38.

51-3

8.51

-38.

51-8

.17

-8.1

7-3

8.51

-38.

51ba

selin

e

3W3

17W

5

For C

IT a

fter S

alt

24W

7TE

ST

5W5

Page 29: NXTCore ARINC801 Fiber Optic Terminus
Page 30: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

8:28 AM

11:30 AM8:34 AM

04/23/12

8:00 AM04/18/1204/19/1204/20/12

05/01/1204/30/12

04/24/12 9:00 AM

AG

NM

05/23/12 8:20am05/22/12 8:10am

7:45am

05/03/1205/14/1205/15/12

Collected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performance

05/18/1210:30am

8:45am

05/17/12

05/02/12

04/25/1204/26/1204/27/12

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performance (power outage on Saturday, chamber idled at 23), restarted chamber

10201072 JDS

SC Series

81637B

04/16/1204/17/12 4:45 PM

04/13/124:45 PM2:00 PM

Performed By

CIT [dB] SM

Instrument Description

Date Time

2x44 Optical Switch2x44 Optical Switch

Fast Optical Power MeterMultimode 62.5 Optical Switch

Agilent

Triple 1300nm LED Source1198

Instrum. Number

Reference Only

Cal Due Date11/7/2012 11/7/2011 6:08:50 PMRef Only

Manufacturer Rifocs Rifocs

none

Temperature Life

Max/Min Measurement Value

1071 JDS

9/29/2011 2:47:02 PM

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming

Part Number

Reference Only

Event Log

Results Summary

Customer Name Purchase Order #

177125

Start Date

4/13/2012

Completion Date

5/27/2012

Anomaly / Interruption

Test Title

NXTCon

9:20am05/21/12 8:10am Collected interim data and checked compliance as well as system performance

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1264

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

11:00am05/29/12 9am

05/24/12 8:20am

3:22 PM Collected interim data and checked compliance as well as system performance

9:00 AM

5/30/12 9am

Collected interim data and checked compliance as well as system performance

4/13/12 2pm

Compliance

Event Log

Date/Time

Started Temperature Life test

Test finished, collected data

11965 GA-4

Test Specification / Standard

TIA/EIA-455-4C (FOTP-4) with the following procedure and criteria, which is

based from paragraph 2.4.4.2 of ARINC Specification 801-2

The temperature exposure shall be 125ºC ± 2ºC for the duration of 1,000 hours

NM

Bench Cleaning

11911x8 Optical Switch

1187

Optotest OP750

2 cu ft Environmental Chamber Agilent

ED155457 JDS Uniphase SB Series1155 Reference Only

12/8/2011 11:47:26 AM 12/8/2012

2/3/2012 4:56:12 PM 2/3/2014

Collected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performance, SM system crashedBaselined and restarted sm system

Collected interim data and checked compliance as well as system performance

Return Loss Module

1310/1490/1550/1625nm LaserFast Optical Power Meter

Service Project Number SPN Test ID #

Reference Only

Ref Only

DS Revision

05/30/12

HumidityTemperature

23 °C

9/29/2013

Reference OnlyReference Only

29 %RH

Measurements / Inspection

CIT [dB], Temperature [C]

none

Nonconformity / Deviation

Specific Test Conditions

Last Cal DateModel Number Serial Number 753R-1300

10397

129236

SC Series EG001153EG001152

DE41300321124741 715RF-24

Customer Witness

4/13/12 2pm

Initials

Category

Project EngineerSignoff by

Technical Director

Test Sample Description

Combo-D connector none

Norman Metzner

3:00 PM Collected interim raw data

10:30 AM

8:54 AM8:44 AM9:00 AM Collected interim data and checked compliance as well as system performance

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

NMNM NDY

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

0.34/-0.04 4/4

NM

Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance

ZH-21460 Cincinnati Subzero 81610A

9/29/2011 2:45:32 PM1016 Agilent 81637B DE41300332

Z9913064DE40500226

9/29/2013

4/12/2013 4/12/2012

0.5 0.11/-0.04

CIT [dB] MM 0.5

Post Test Cleanup

NDYNM

NM

2/2

Requirement

4/13/12 2pmjohn kim

Equipment List Setup Check

Signoff

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 341

Page 31: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-4 T

emp

erat

ure

Lif

e M

M C

IT

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

020

040

060

080

010

0012

00

Tim

e [h

]

CIT [dB]

020406080100

120

140

Temperature [°C]

3W3-

A1

3W3-

A3

5W5-

A1

5W5-

A2

5W5-

A4

5W5-

A5

17W

5-A

117

W5-

A5

24W

7-A

124

W7-

A2

24W

7-A

624

W7-

A7

Tem

pera

ture

Page 32: NXTCore ARINC801 Fiber Optic Terminus

SP

N 1

1965

GA

-4 T

emp

erat

ure

Lif

e S

M C

IT

-0.5

-0.4

-0.3

-0.2

-0.10

0.1

0.2

0.3

0.4

0.5

020

040

060

080

010

0012

00

Tim

e [h

]

CIT[dB]

020406080100

120

140

Temperature [°C]

17W

5-A

217

W5-

A4

24W

7-A

324

W7-

A5

Mon

itor -

5Te

mpe

ratu

re

Page 33: NXTCore ARINC801 Fiber Optic Terminus
Page 34: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

45 4/4Return Loss [dB]

HR

Date Time7:30AM9:30AM06/11/12

Signoff NM

Requirement

Equipment List

1224 JGR BR5

Norman MetznerHR

Harris R

Performed By

6/11/12 7:30AM

Post Test Cleanup

6/11/12 9:30AM

Finished RL test to all Samples

Customer Witness

6/11/12 7:30AM

Initials

Category

Project EngineerSignoff by

Technical Director

john kimHR HR

20 for MM and 30 for SM

Model Number Serial Number 42280 9069033

750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM

RL [dB]

none

Nonconformity / Deviation

Specific Test Conditions

Temperature

23 °C 55 %RH

Measurements / Inspection

DS Revision

06/11/12

Service Project Number SPN Test ID # Humidity

none

9/6/20121451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110

Test Sample Description

Rectangular ARINC801

Setup Check

11965 GA-7

Test Specification / Standard

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

NM

Bench Cleaning

Date/Time

Started Preparation and Reference for RL Reference Test

6/11/12 11am6/11/12 7:30AM

Compliance

Event Log

Test Title

NXTCon

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1260

Event Log

Results Summary

Customer Name Purchase Order #

177125

Start Date

6/11/2012

Completion Date

6/11/2012

Anomaly / Interruption

none

Return Loss

Max/Min Measurement Value

Experior Test Procedure # (if applicable)

EPTP-1005 Return Loss

Part Number

Instrum. Number Manufacturer Extech

Cal Due Date5/3/20135/3/2012 Temperature Humidity Datalogger

Instrument Description Last Cal Date

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 2

Page 35: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel RL [dB]

A1 mm >45A3 mm >45A1 mm >45A2 mm >45A4 mm >45A5 mm >45A1 mm >45A2 sm 55.9A4 sm 56.7A5 mm >45A1 mm >45A2 mm >45A3 sm 56.6A5 sm 56.1A6 mm >45A7 mm >45

24W7

MULTIMODE @1300nm, Singlemode @1550nm

3W3

5W5

17W5

Page 36: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Finish testing IL-RL retesting

HRRetested the 2 single mode the A2 RL is too low, save the second Results

11:15 AM

2:30PMDate Time

8:00AM1:30PM

11:30AM03/13/12

03/14/12

Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger

Instrument Description

3248G01541

Anomaly / Interruption

none

IL-RL

Max/Min Measurement Value

1254 Hewlett Packard

Reference Only

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPTP-1005 Return Loss

Part Number

Product Name Purchase Order #

177125

Start Date

3/12/2012

Completion Date

3/14/2012

Test Title

NXTCore

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1260

Event Log

Results Summary

3/19/12 3pm3/12/12 12:30PM

Compliance

Event Log

Started IL-RL re-testing, samples have been unmated by customer and termini for all singlemode channels have been replacedFinished IL-RL for all the Samples for Vibration Test

03/12/12

Date/Time

11965 GA-1

Test Specification / Standard

TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for

multimode connections. For all single-mode connections, measure and record only. No

failure criterion exists for single-mode connections

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

NM

Bench Cleaning Equipment List

Reference Only

Reference Only Optical Head Interface10/31/2012

Reference Only 10/31/2011 2:10:44 PM Optical Power Head

Fiber Cleaver Reference Only Fiber Fusion Splicer

81533B

CT-30 FSM-50S 12161

1103 Hewlett Packard

Instrum. Number Manufacturer Extech Fujikura Fujikura

14021405

Test Sample Description

Combo-D connector

Hewlett Packard

1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110

DS Revision

03/23/12

Optical Head Interface

Fiber Fusion Splicer Fiber Cleaver

Service Project Number SPN Test ID # Humidity

Scott Youngkin

9/6/2012

Reference Only Reference Only

Reference Only Reference Only

3/8/2012 3:22:08 PM

Temperature

23 °C

Reference Only

29 %RH

Measurements / Inspection

IL [dB], RL [dB]

none

Nonconformity / Deviation

Specific Test Conditions

Last Cal Date

Reference Only Reference Only750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM

Optical Power Head HP 81524A 3411G05696

Model Number Serial Number 42280

687

9069033

81524A 3248G01181 3411G05264

63162

Started IL-RL measurements

Customer Witness

3/13/12/ 7:30AM

Initials

Category

Project EngineerSignoff by

Technical Director

0.07 4/4

NMjohn kim

HR/JZ NDY

Requirement

Performed By

3/12/12 12:30PM

Post Test Cleanup

NDY

Setup Check

Signoff

Insertion Loss [dB] 0.3 (for MM only)

Norman MetznerHR

JZ/HR

Return Loss [dB] 20 for MM and 30 for SM 45 4/4

BR5

1258 Hewlett Packard 81533B1102

1400 Fujikura FSM-17S

3/8/2014

1407 Fujikura CT-30 210941224 JGR

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3

Page 37: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]

A1 mm -11.42 -11.40 0.02 >45A3 mm -11.40 -11.39 0.01 >45A1 mm -11.41 -11.39 0.02 >45A2 mm -11.41 -11.39 0.02 >45A4 mm -11.40 -11.39 0.01 >45A5 mm -11.44 -11.41 0.03 >45A1 mm -11.58 -11.54 0.04 >45A2 sm -5.68 -5.66 0.02 54.4A4 sm -5.60 -5.57 0.03 56.5A5 mm -11.47 -11.44 0.03 >45A1 mm -11.40 -11.36 0.04 >45A2 mm -11.38 -11.33 0.05 >45A3 sm -5.31 -5.24 0.07 56.6A5 sm -5.25 -5.21 0.04 55.1A6 mm -11.25 -11.22 0.03 >45A7 mm -11.20 -11.18 0.02 >45

A1 mm -11.31 -11.29 0.02 >45A2 mm -11.64 -11.56 0.08 >45A4 mm -11.57 -11.56 0.01 >45A5 mm -11.54 -11.48 0.06 >45A1 mm -11.47 -11.44 0.03 >45A2 sm -4.49 -4.47 0.02 59.8A4 sm -5.51 -5.49 0.02 59.3A5 mm -11.51 -11.47 0.04 >45

24W7

Retest

5W5

17W5

MULTIMODE @1300nm, Singlemode @1550nm

3W3

5W5

17W5

Page 38: NXTCore ARINC801 Fiber Optic Terminus
Page 39: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Customer Witness

none

04/13/12 NM1:00 PM Started X-Axis shock, 3 positive, 3 negative

03/23/12 Changed datasheet name from G1-3 to G1-42:20 PM

Return Loss Module 12/16/2011 11:40:19 AM 12/16/20121028 Agilent 81610A DE40500414 Temperature Humidity Datalogger 5/3/2011 1:03:12 PM 5/3/2012

1x24 Multimode Optical Switch Reference Only Reference Only

Optical Power Head

42280 9069033

Hewlett Packard 81524A 3248G01181

Hewlett Packard 81533B 3411G05264 Optical Head Interface

1103

1254 BR5 750004 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM

715RF-24-106 1221141260 Extech

11:45 AM

Date/Time

Performed By

NMNorman Metzner3/19/12 11:45am

NM

Took final CIT measurements

03/19/12 NM2:15 PM Rotated fixture, started Z-Axis shock, 3 positive, 3 negative2:00 PM Rotated fixture, started Y-Axis shock, 3 positive, 3 negative 1:45 PM Started X-Axis shock, 3 positive, 3 negative

Took final CIT measurements 1:09 PM

1:03 PM Rotated fixture, started Y-Axis shock, 3 positive, 3 negative 1:06 PM Rotated fixture, started Z-Axis shock, 3 positive, 3 negative

Cal Due DateReference Only

10/31/20121/3/2013

Reference Only

Started Shock setup

4/4

9/11/2012

Reference Only

Category

Test Sample Description

ARINC801 Compatible Connector

10/26/2011 9:31:58 AM 10/26/201212/9/2011

10/31/2011 2:10:44 PM

2/3/14 Optical Power Meter

2 Channel Vibration Controller

Humidity

38 %RH

10/24/2011 2:28:02 PM 10/24/201212/9/2012

Instrument Description

Specific Test Conditions

10mV/G Triaxial Accelerometer

DS RevisionTemperature

23 °C

Service Project Number SPN Test ID #

04/16/12

QPL 8-channel 1300nm LED 2/3/121085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM

1217 Rifocs

10351111

Experior Photonics

1266 Rifocs

1224 JGR

Last Cal DateInstrum. Number Manufacturer Model Number Serial Number Unholtz Dickie SA30-SO92 3117 - 271

EP-TE1004 1002

555B 122347 SN 2008

0dffcf1145

Requirement

4/13/12 4pm3/19/12 11:45am

NM

Bench Cleaning Equipment List

Results Summary

NM NM

Project Engineer

Signoff

11965 GB-3

Test Specification / Standard

4.5.17 of MIL-DTL-24308GEIA-364-27C, test condition E

Phase 1: 50g, 18 shocks, 11ms-> no discontinuities of >0.5dB for 50us during and

CIT not to exceed 0.5dB after

Initials

Reference Only Electrodynamic Vibration System

NM

Event LogPost Test Cleanup Setup CheckSignoff by

Technical Director

john kim3/19/12 11:45am 4/13/12 4pm

Experior Test Procedure # (if applicable)

EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming

EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity

Part Number

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

1119

EP-TE2000

Dytran Vibration Research VRC8555B

3055A1

4/4

Event Log

Product Name Purchase Order #

177125

Anomaly / Interruption

none

CIT [dB] after +/- 0.5dB 0.01/-0.06

Mechanical Shock Phase 1

Start Date

3/19/2012

Completion Date

4/13/2012

Test Title

NXTCore

Max/Min Measurement Value Compliance

Measurements / Inspection

Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]

none

Nonconformity / Deviation

1219 Experior Photonics

no discontinuity of +/- 0.5dB for more than 50us no discontinuities

Date Time

Discontinuity

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 40: NXTCore ARINC801 Fiber Optic Terminus

Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity

A1 mm -17.81 PASS PASS -17.82 -0.01 PASSA3 mm -17.73 PASS PASS -17.75 -0.02 PASSA1 mm -18.11 PASS PASS -18.14 -0.03 PASSA2 mm -17.72 PASS PASS -17.72 0.00 PASSA4 mm -17.48 PASS PASS -17.54 -0.06 PASSA5 mm -17.94 PASS PASS -17.93 0.01 PASSA1 mm -17.84 PASS PASS -17.84 0.00 PASSA2 sm -14.67 PASS PASS -14.69 -0.02 PASSA4 sm -14.62 PASS PASS -14.63 -0.01 PASSA5 mm -17.79 PASS PASS -17.79 0.00 PASSA1 mm -17.47 PASS PASS -17.51 -0.04 PASSA2 mm -17.62 PASS PASS -17.63 -0.01 PASSA3 sm -12.14 PASS PASS -12.13 0.01 PASSA5 sm -12.22 PASS PASS -12.22 0.00 PASSA6 mm -17.95 PASS PASS -17.95 0.00 PASSA7 mm -18.13 PASS PASS -18.13 0.00 PASS

5W5

17W5

24W7

Phase 1: Mechanical Shock screening for 50us/0.5dB discontinuity

3W3

Z-AxisConnector ID Channel X-Axis

Page 41: NXTCore ARINC801 Fiber Optic Terminus

-60

-40

-20

020

4060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

De

man

d

Co

ntro

l

-60

-40

-20

020

4060

-80

-60

-40

-2002040

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

406

0-4

0

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-2002040

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

X-A

XIS

PO

SIT

IVE

3W

3/24

W7

Y-A

XIS

PO

SIT

IVE

3W

3/24

W7

Z-A

XIS

PO

SIT

IVE

3W

3/24

W7

Z-A

XIS

NE

GA

TIV

E 3

W3/

24W

7

Y-A

XIS

NE

GA

TIV

E 3

W3/

24W

7

X-A

XIS

NE

GA

TIV

E

Page 42: NXTCore ARINC801 Fiber Optic Terminus

-60

-40

-20

020

4060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

Z-A

XIS

PO

SIT

IVE

5W

5/17

W5

X-A

XIS

PO

SIT

IVE

5W

5/17

W5

Y-A

XIS

PO

SIT

IVE

5W

5/17

W5

Y-A

XIS

NE

GA

TIV

E

X-A

XIS

NE

GA

TIV

E

Z-A

XIS

NE

GA

TIV

E 5

W5/

17W

5

Page 43: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

4/4

9:01 AM8:53 AM8:52 AM

no discontinuity of +/- 1dB for more than 1us no discontinuities

Date Time

Discontinuity

Test Title

1219 Experior Photonics

1119

Project Engineer

Results Summary

2 Channel Vibration Controller

NXTCore

Max/Min Measurement Value Compliance

Measurements / Inspection

Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]

none

Nonconformity / Deviation

EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming

EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity

Part Number

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

Start Date

4/12/2012

Completion Date

4/13/2012

Product Name Purchase Order #

177125

Anomaly / Interruption

none

CIT [dB] after not required -0.04

Mechanical Shock Phase 2

Event Log

04/12/12

3:34 PM

Flipped axis, Performed y-axis shock positive

Quad-Wave Backreflection Meter

Reference Only Electrodynamic Vibration System Unholtz Dickie SA30-SO92 3117 - 271

0dffcf1145 3055A1

1/3/2012 10:43:29 AM

Signoff

Bench Cleaning

NM

Equipment List Event LogPost Test Cleanup Setup CheckSignoff by

Technical Director

john kim4/12/12 8:45am 4/12/12 11:30am 4/12/12 8:45am

NMNM NM

11965 GB-5

Test Specification / Standard

4.5.17 of MIL-DTL-24308GEIA-364-27C, test condition E

Phase 2: 50g, 18 shocks, 11ms-> no discontinuities of >1dB for 1us during not to

exceed

Initials

Requirement

4/13/12 4pm

Instrument Description

Dytran

1002

555B 122347 SN 2008 EP-TE2000

Vibration Research VRC8555B

EP-TE1004

Instrum. Number Manufacturer Model Number Serial Number

1217 Rifocs

10351111

2/3/14 QPL 8-channel 1300nm LED 2/3/121085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM Experior Photonics

DS RevisionTemperature

23 °C

Service Project Number SPN Test ID #

04/16/12

Optical Power Meter

Humidity

38 %RH

10/24/2011 2:28:02 PM 10/24/201212/9/2012

Reference OnlyLast Cal Date

Specific Test Conditions

10mV/G Triaxial Accelerometer

9/11/2012

10/26/2011 9:31:58 AM 10/26/201212/9/2011

10/31/2011 2:10:44 PM

Reference Only

Cal Due Date

10/31/20121/3/2013

Reference Only

Performed x-axis shock positive

4/4

Category

Test Sample Description

ARINC801 Connector

Rotated fixture, started X-Axis shock, 1 positive, 1 negative3:38 PM Took final CIT measurements

NM

Rotated fixture, started Y-Axis shock, 1 positive, 1 negative

Flipped axis, Performed z-axis shock positivePerformed y-axis shock negative

8:46 AM Performed x-axis shock negative

3:32 PM

04/13/12 3:36 PM

Started Z-Axis shock, 1 positive, 1 negative9:02 AM Performed z-axis shock negative

8:45 AM

Date/Time

Performed By

NMNorman Metzner4/12/12 8:45am

NM

715RF-24-106 1221141260 Extech1266 Rifocs

BR5 7500041224 JGR1103

1254

Optical Power Head

42280 9069033

Hewlett Packard 81524A 3248G01181

Hewlett Packard 81533B 3411G05264 Optical Head Interface

Temperature Humidity Datalogger 5/3/2011 1:03:12 PM 5/3/2012 1x24 Multimode Optical Switch Reference Only Reference Only

Return Loss Module 12/16/2011 11:40:19 AM 12/16/20121028 Agilent 81610A DE40500414

Customer Witness

none

Experior Test Procedure # (if applicable)

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 44: NXTCore ARINC801 Fiber Optic Terminus

Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity

A1 mm -17.56 PASS PASS -17.56 0.00 PASSA3 mm -17.65 PASS PASS -17.63 0.02 PASSA1 mm -18.15 PASS PASS -18.14 0.01 PASSA2 mm -17.74 PASS PASS -17.72 0.02 PASSA4 mm -17.52 PASS PASS -17.54 -0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.85 PASS PASS -17.84 0.01 PASSA2 sm -14.73 PASS PASS -14.69 0.04 PASSA4 sm -14.62 PASS PASS -14.63 -0.01 PASSA5 mm -17.75 PASS PASS -17.79 -0.04 PASSA1 mm -17.97 PASS PASS -17.96 0.01 PASSA2 mm -17.86 PASS PASS -17.86 0.00 PASSA3 sm -14.49 PASS PASS -14.52 -0.03 PASSA5 sm -14.70 PASS PASS -14.71 -0.01 PASSA6 mm -18.18 PASS PASS -18.18 0.00 PASSA7 mm -18.33 PASS PASS -18.33 0.00 PASS

Phase 2: Mechanical Shock screening for 1us/>1dB discontinuity

Connector ID Channel X-Axis Z-Axis

3W3

5W5

17W5

24W7

Page 45: NXTCore ARINC801 Fiber Optic Terminus

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-60

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-60

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

De

man

d

Co

ntro

l-6

0-4

0-2

00

204

060

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

De

man

d

Co

ntro

l

Z-A

XIS

NE

GA

TIV

E 3

W3/

24W

7

Y-A

XIS

NE

GA

TIV

E 3

W3/

24W

7

X-A

XIS

NE

GA

TIV

E

X-A

XIS

PO

SIT

IVE

3W

3/24

W7

Y-A

XIS

PO

SIT

IVE

3W

3/24

W7

Z-A

XIS

PO

SIT

IVE

3W

3/24

W7

Page 46: NXTCore ARINC801 Fiber Optic Terminus

-60

-40

-20

020

4060

-60

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-60

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-60

-40

-20020406080

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)

Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

-60

-40

-20

020

4060

-80

-60

-40

-200204060

Tim

e (m

s)Acceleration (G)

Ac

ce

lera

tio

n

Dem

and

Con

trol

X-A

XIS

PO

SIT

IVE

5W

5/17

W5

Y-A

XIS

PO

SIT

IVE

5W

5/17

W5

Z-A

XIS

PO

SIT

IVE

5W

5/17

W5

Y-A

XIS

NE

GA

TIV

E 5

W5/

17W

5

X-A

XIS

NE

GA

TIV

E

Z-A

XIS

NE

GA

TIV

E 5

W5/

17W

5

Page 47: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Performed By

04/13/12

1:45 PM1:40 PM

04/11/12

Routed cables and took baseline measurements

Finished x-axisChanged axis to x and started vibration

12/16/2012Return Loss Module 12/16/2011 11:40:19 AM

1254 Hewlett Packard 81533B

Temperature Humidity Datalogger122114

1260 Extech 42280 9069033

Optical Head Interface

1103 Hewlett Packard 81524A1224 JGR BR5

1028 Agilent 81610A DE40500414

Signoff

1266 Rifocs 715RF-24-106

NMjohn kimNM

8:00 AM

Initials

Category Requirement

4/13/12 4pm4/11/12 8am 4/11/12 8am 4/13/12 4pm

Test Sample Description

ARINC801 Connector System

Norman Metzner

Project Engineer

NMNM

1:00 PMFinished y-axis

Changed axis to y and started vibration 11:15 AM11:25 AM12:05 PM

2:00 PM Changed axis to y and started vibration Finished y-axis

2:45 PM Changed axis to z and started vibration

Reference Only

3:30 PM Took final power measurement3:25 PM Finished z-axis

Results Summary

Specific Test Conditions

3248G01181750004

3411G05264 1x24 Multimode Optical Switch

Optical Power Head Quad-Wave Backreflection Meter

DS Revision

04/16/12

Service Project Number SPN Test ID # Temperature

23 °C

Humidity

38 %RH

9/11/2012

Reference Only Reference Only

10/31/2011 2:10:44 PM1085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM1002

1111 555B 122347

Instrum. Number Manufacturer Model Number

1217 Rifocs

1035 Unholtz Dickie

SN 2008

Serial Number

Experior Photonics

1145 0dffcf

EP-TE1004

3117 - 271 SA30-SO92

12/9/201210/24/2012

2/3/14 QPL 8-channel 1300nm LED 2/3/12 10/24/2011 2:28:02 PM Optical Power Meter

2 Channel Vibration Controller

Instrument Description

10/26/201212/9/2011

10mV/G Triaxial Accelerometer

Cal Due DateReference OnlyReference Only Electrodynamic Vibration System

Last Cal Date

10/26/2011 9:31:58 AM

10/31/2012

none

Customer Witness

Event Log

1/3/2012 10:43:29 AM 1/3/2013 Reference Only

Signoff byTechnical Director

5/3/2011 1:03:12 PM 5/3/2012

Bench Cleaning Equipment List Post Test Cleanup Setup Check

11965 GB-3

Test Specification / Standard

4.5.16 of MIL-DTL-24308GEIA-364-28F, test condition IV

Phase 2: 10-2000-10Hz sine sweep in 20 minutes, 2 times in each of the 3 axes, total 2

hours -> no discontinuities of >1dB for 1us during not to exceed

Experior Test Procedure # (if applicable)

4/11/12 8am

NM

EP-TE2000

Dytran Vibration Research VRC8555B

3055A1

4/4

04/10/12 4:00 PM

2:40 PM

1:15 PM1:55 PM

10:35 AM

Product Name Purchase Order #

177125

Anomaly / Interruption

none

CIT [dB] after not required -0.04

Vibration Phase 2

Start Date

4/10/2012

Completion Date

4/13/2012 NXTCore

Max/Min Measurement Value Compliance

Measurements / Inspection

Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]

none

Nonconformity / Deviation

EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming

EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity

Part Number

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

Date Time Event Log

Test Title

1219 Experior Photonics

Discontinuity

1119

Date/Time

NM

Mounted test samples to vibration cube

4/4

NM

no discontinuity of +/- 1dB for more than 1us no discontinuities

Took final power measurement Armed discontinuity system and started vibration x-axis

Finished x-axis

Finished z-axis Armed discontinuity system and started vibration z-axis

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 48: NXTCore ARINC801 Fiber Optic Terminus

Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity

A1 mm -17.52 PASS PASS -17.56 -0.04 PASSA3 mm -17.68 PASS PASS -17.65 0.03 PASSA1 mm -18.14 PASS PASS -18.15 -0.01 PASSA2 mm -17.72 PASS PASS -17.74 -0.02 PASSA4 mm -17.54 PASS PASS -17.52 0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.84 PASS PASS -17.85 -0.01 PASSA2 sm -14.69 PASS PASS -14.73 -0.04 PASSA4 sm -14.63 PASS PASS -14.62 0.01 PASSA5 mm -17.79 PASS PASS -17.75 0.04 PASSA1 mm -17.98 PASS PASS -17.97 0.01 PASSA2 mm -17.87 PASS PASS -17.86 0.01 PASSA3 sm -14.48 PASS PASS -14.49 -0.01 PASSA5 sm -14.69 PASS PASS -14.70 -0.01 PASSA6 mm -18.14 PASS PASS -18.18 -0.04 PASSA7 mm -18.34 PASS PASS -18.33 0.01 PASS

3W3

5W5

17W5

24W7

Phase 2: Sine Vibration screening for 1us/>1dB discontinuity

Connector ID Channel Z-Axis X-Axis

Page 49: NXTCore ARINC801 Fiber Optic Terminus

2000

1010

010

00

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

2000

10

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

2000

1010

010

00

50.0

0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

Y-A

XIS

Z-A

XIS

Y-A

XIS

X-A

XIS

X-A

XIS

3W

3/24

W7

Y-A

XIS

3W

3/24

W7

Z-A

XIS

3W

3/24

W7

Page 50: NXTCore ARINC801 Fiber Optic Terminus

200

010

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

2000

10

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

200

010

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

Z-A

XIS

5W

5/17

W5

X-A

XIS

5W

5/17

W5

Y-A

XIS

5W

5/17

W5

Y-A

XIS

X-A

XIS

Z-A

XIS

Page 51: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Performed By

04/13/12

1:45 PM1:40 PM

04/11/12

Routed cables and took baseline measurements

Finished x-axisChanged axis to x and started vibration

12/16/2012Return Loss Module 12/16/2011 11:40:19 AM

1254 Hewlett Packard 81533B

Temperature Humidity Datalogger122114

1260 Extech 42280 9069033

Optical Head Interface

1103 Hewlett Packard 81524A1224 JGR BR5

1028 Agilent 81610A DE40500414

Signoff

1266 Rifocs 715RF-24-106

NMjohn kimNM

8:00 AM

Initials

Category Requirement

4/13/12 4pm4/11/12 8am 4/11/12 8am 4/13/12 4pm

Test Sample Description

ARINC801 Connector System

Norman Metzner

Project Engineer

NMNM

1:00 PMFinished y-axis

Changed axis to y and started vibration 11:15 AM11:25 AM12:05 PM

2:00 PM Changed axis to y and started vibration Finished y-axis

2:45 PM Changed axis to z and started vibration

Reference Only

3:30 PM Took final power measurement3:25 PM Finished z-axis

Results Summary

Specific Test Conditions

3248G01181750004

3411G05264 1x24 Multimode Optical Switch

Optical Power Head Quad-Wave Backreflection Meter

DS Revision

04/16/12

Service Project Number SPN Test ID # Temperature

23 °C

Humidity

38 %RH

9/11/2012

Reference Only Reference Only

10/31/2011 2:10:44 PM1085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM1002

1111 555B 122347

Instrum. Number Manufacturer Model Number

1217 Rifocs

1035 Unholtz Dickie

SN 2008

Serial Number

Experior Photonics

1145 0dffcf

EP-TE1004

3117 - 271 SA30-SO92

12/9/201210/24/2012

2/3/14 QPL 8-channel 1300nm LED 2/3/12 10/24/2011 2:28:02 PM Optical Power Meter

2 Channel Vibration Controller

Instrument Description

10/26/201212/9/2011

10mV/G Triaxial Accelerometer

Cal Due DateReference OnlyReference Only Electrodynamic Vibration System

Last Cal Date

10/26/2011 9:31:58 AM

10/31/2012

none

Customer Witness

Event Log

1/3/2012 10:43:29 AM 1/3/2013 Reference Only

Signoff byTechnical Director

5/3/2011 1:03:12 PM 5/3/2012

Bench Cleaning Equipment List Post Test Cleanup Setup Check

11965 GB-3

Test Specification / Standard

4.5.16 of MIL-DTL-24308GEIA-364-28F, test condition IV

Phase 2: 10-2000-10Hz sine sweep in 20 minutes, 2 times in each of the 3 axes, total 2

hours -> no discontinuities of >1dB for 1us during not to exceed

Experior Test Procedure # (if applicable)

4/11/12 8am

NM

EP-TE2000

Dytran Vibration Research VRC8555B

3055A1

4/4

04/10/12 4:00 PM

2:40 PM

1:15 PM1:55 PM

10:35 AM

Product Name Purchase Order #

177125

Anomaly / Interruption

none

CIT [dB] after not required -0.04

Vibration Phase 2

Start Date

4/10/2012

Completion Date

4/13/2012 NXTCore

Max/Min Measurement Value Compliance

Measurements / Inspection

Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]

none

Nonconformity / Deviation

EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming

EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity

Part Number

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

Date Time Event Log

Test Title

1219 Experior Photonics

Discontinuity

1119

Date/Time

NM

Mounted test samples to vibration cube

4/4

NM

no discontinuity of +/- 1dB for more than 1us no discontinuities

Took final power measurement Armed discontinuity system and started vibration x-axis

Finished x-axis

Finished z-axis Armed discontinuity system and started vibration z-axis

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 52: NXTCore ARINC801 Fiber Optic Terminus

Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity

A1 mm -17.52 PASS PASS -17.56 -0.04 PASSA3 mm -17.68 PASS PASS -17.65 0.03 PASSA1 mm -18.14 PASS PASS -18.15 -0.01 PASSA2 mm -17.72 PASS PASS -17.74 -0.02 PASSA4 mm -17.54 PASS PASS -17.52 0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.84 PASS PASS -17.85 -0.01 PASSA2 sm -14.69 PASS PASS -14.73 -0.04 PASSA4 sm -14.63 PASS PASS -14.62 0.01 PASSA5 mm -17.79 PASS PASS -17.75 0.04 PASSA1 mm -17.98 PASS PASS -17.97 0.01 PASSA2 mm -17.87 PASS PASS -17.86 0.01 PASSA3 sm -14.48 PASS PASS -14.49 -0.01 PASSA5 sm -14.69 PASS PASS -14.70 -0.01 PASSA6 mm -18.14 PASS PASS -18.18 -0.04 PASSA7 mm -18.34 PASS PASS -18.33 0.01 PASS

3W3

5W5

17W5

24W7

Phase 2: Sine Vibration screening for 1us/>1dB discontinuity

Connector ID Channel Z-Axis X-Axis

Page 53: NXTCore ARINC801 Fiber Optic Terminus

2000

1010

010

00

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

2000

10

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

2000

1010

010

00

50.0

0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

Y-A

XIS

Z-A

XIS

Y-A

XIS

X-A

XIS

X-A

XIS

3W

3/24

W7

Y-A

XIS

3W

3/24

W7

Z-A

XIS

3W

3/24

W7

Page 54: NXTCore ARINC801 Fiber Optic Terminus

200

010

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

2000

10

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

Dem

and

Con

trol

Ch2

200

010

100

100

0

50.0 0.1

1.0

10.0

Fre

quen

cy (

Hz)

Acceleration (G peak)

Acc

ele

rati

on P

rofi

le

De

man

d

Co

ntro

l

Ch

2

Z-A

XIS

5W

5/17

W5

X-A

XIS

5W

5/17

W5

Y-A

XIS

5W

5/17

W5

Y-A

XIS

X-A

XIS

Z-A

XIS

Page 55: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Performed By

Completed IL/RL for all MM samples.

750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM

6871407 Fujikura CT-30 210941400 Fujikura FSM-17S

1224 JGR BR5

1258 Hewlett Packard HP 81524A 3248G015411102 Hewlett Packard 81533B 3411G05696

john kimJZ/HR

Initials

Category Requirement

Signoff

3/23/12 10am

Time

Date/Time

JZ

1:30 PM Starting IL/RL measurements for sm samples.

Norman Metzner

Project EngineerSignoff by

Technical Director

none

Test Sample Description

S/N's and termini position's are reversed.

Customer Witness

Optical Power Head 3/8/2012 3:22:08 PM 3/8/2014

Reference Only Reference Only Reference Only Reference Only

Reference Only Reference Only

Humidity

10/31/2011 2:10:44 PM

Last Cal Date

9/6/2012

Temperature

23 °C

10/31/2012 Reference Only

Reference Only

29 %RH

DS Revision

03/23/12

Optical Head Interface

Fiber Fusion Splicer Fiber Cleaver

Service Project Number SPN Test ID #

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

14021405

ARINC801

Reference Only Optical Head Interface Reference Only1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM

Optical Power Head Fiber Cleaver

122785

1103 Hewlett Packard

Instrum. Number Manufacturer Model Number Serial Number Extech 42280 9069033

781RL-13-110

81524A 3248G01181 3411G05264

Rifocs

6316212161

Instrument Description

Reference Only Reference Only

Fiber Fusion Splicer

Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger

JZ/HR

3/20/2012 1:25 PM 3/20/2012 1:27PM 3/21/12 4:30pm

11965 GC-1

Test Specification / Standard

TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for

multimode connections. For all single-mode connections, measure and record only. No

failure criterion exists for single-mode connections

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPTP-1005 Return Loss

Part Number

Equipment List Post Test Cleanup Setup Check

NMJZ

1260

81533B

Fujikura Fujikura CT-30

FSM-50S

Product Name Purchase Order #

177125

IL-RL

Start Date

3/20/2012

Completion Date

3/21/2012

Test Title

NXTCore

03/20/12Date

03/20/1203/21/1203/21/1203/21/12

03/20/12

Results Summary

3/20/2012 1:25 PM

Anomaly / Interruption

none

1254 Hewlett Packard

Event Log

NM

Bench Cleaning

Measurements / Inspection

IL [dB], RL [dB]

none

Nonconformity / Deviation

Specific Test Conditions

1:30 PM

Completed IL/RL measurements for sm samples. A5 IL was high. Will inspect ferrule endfaces, clean and retest.

Max/Min Measurement Value Compliance

9:00AM

Event Log

Completed IL/RL measurements for MM 2:30PM Starting IL/RL measurements for MM samples.4:25 PM

JZJZ

HR

A5 = Inspected and cleaned ferrule endface. Retested and passed. JZ/HRJZJZ

2:00 PM4:30 PM03/21/12

Insertion Loss [dB] 0.3 (for MM only) 0.20 4/4

Return Loss [dB] 20 for MM and 30 for SM 45 4/4

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3

Page 56: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]

A1 mm -11.37 -11.34 0.03 >45A3 mm -11.36 .-11.34 0.02 >45A1 mm -11.34 -11.32 0.02 >45A2 mm -11.36 -11.32 0.04 >45A4 mm -11.36 -11.33 0.03 >45A5 mm -11.37 -11.34 0.03 >45A1 mm -11.53 -11.47 0.05 >45A2 sm -5.57 -5.41 0.16 56.7A4 sm -5.60 -5.41 0.20 57.1A5 mm -11.50 -11.48 0.02 >45A1 mm -11.48 -11.47 0.00 >45A2 mm -11.49 -11.48 0.01 >45A3 sm -5.55 -5.39 0.16 51.1A5 sm -5.54 -5.40 0.14 59.5A6 mm -11.53 -11.48 0.06 >45A7 mm -11.53 -11.48 0.04 >45

A1 mm 0.00A2 mm 0.00A3 sm -5.52 -5.40 0.11 58.7A5 sm -5.74 -5.40 0.34 59.8A6 mm 0.00A7 mm 0.00

MULTIMODE @1300nm, Singlemode @1550nm

3W3

24W7

24W7

17W5

5W5

Initial Results

Page 57: NXTCore ARINC801 Fiber Optic Terminus
Page 58: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

10:45AM04/24/12

Finished 500 Cycles Mating Durability on 24W7Start Preparation and Mounting Sample 24W7 to the Plate to start Mating Durability

3:30PM

4/4

0.11/-0.08 2/2

Time

Date/Time

HR

no damage observed

Customer Witness

ARINC801 Compliant Connectors

4/23/12 7:00AM 4/23/12 7:30AM

Signoff

4/25/12 4:30pm4/25/12 3:30PM

NM

Signoff byTechnical Director

none

John KimHarris R

Performed By

Norman Metzner

Project Engineer

Start Preparation and Mounting Sample 17W5 into the Plate to start Mating Durability3:30PM Finished 500 Cycles Mating Durability on 17W5

Reference Only3/8/2014

Reference Only

50 %RH

Reference Only 3/8/2012 3:22:08 PM

Cal Due Date5/3/2012 5/3/2011 1:03:12 PM

Measurements / Inspection

DS Revision

04/25/12

Service Project Number SPN Test ID # Humidity

Reference Only

10/31/2012

Temperature

23 °C

1310/1550nm Laser Source 10/31/2011 2:11:01 PM DE38A00785 12/9/2012

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

DE38A00709 81654A1026

Test Sample Description

1123 Tempo

12561257

Temperature Humidity DataloggerLast Cal DateInstrument Description

11965 GC-3

Test Specification / Standard

4.5.18 of MIL-DTL-24308G and in accordance with EIA-364-09C, TIA-455-21A (FOTP-21)

Manual mating and un-mating of test samples, 500 cycles at a rate between 100

and 300 cycles per hour.CIT test shall be performed after every 100

cycles. Termini shall be cleaned prior to each measurement.

Part Number

NMHR

Bench Cleaning

Hewlett Packard Hewlett Packard HP 81533A

HP 81524A

Customer Name Purchase Order #

177125

Mating Durability

Start Date

4/23/2012

Completion Date

4/25/2012

Test Title

NXTCon

7:00AM

Equipment List

HR

CIT [dB] SM

Results Summary

4/24/12 8am

4/4

Date

Category Requirement

Instrum. Number Manufacturer

Visual Inspection No damage

0.5

1260

81654A

Post Test Cleanup Setup Check

Model Number Serial Number

850/1300nm Dual LED Source Optical Head Interface Optical Power Head

42280

Experior Test Procedure # (if applicable)

per referenced industry standard

Event Log

Extech

Agilent

2949G00504 3248G01658

9069033

252B D91114 1310/1550nm Laser Source 12/9/2011 3:56:59 PM

CIT [dB]

none

Nonconformity / Deviation

Specific Test Conditions

Anomaly / Interruption

Max/Min Measurement Value Compliance

Event Log

CIT [dB] MM 0.5 0.08/-0.03

none

1220 Agilent

7:00AM04/25/12

04/25/1210:30AM

Initials

Finished 500 Cycles Mating Durability on 5W5Start Preparation and Mounting Sample 5W5 into the Plate to start Mating Durability HR

Finished 500 cycles Mating Durability on 3W3Started Mating Durability on 3W3

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3

Page 59: NXTCore ARINC801 Fiber Optic Terminus

Sam

ple

#C

han

nel

Po

wer

bef

ore

[d

Bm

]P

ow

er a

fter

100

cy

cles

[d

Bm

]C

IT a

fter

100

cy

cles

[d

B]

Po

wer

aft

er 2

00

cycl

es [

dB

m]

CIT

aft

er 2

00

cycl

es [

dB

]P

ow

er a

fter

300

cy

cles

[d

Bm

]P

ow

er a

fter

400

cy

cles

[d

Bm

]C

IT a

fter

400

cy

cles

[d

B]

Po

wer

aft

er 5

00

cycl

es [

dB

m]

CIT

aft

er 5

00

cycl

es [

dB

]

A1

mm

-38.

54-3

8.55

-0.0

1-3

8.55

-0.0

1-3

8.54

0.00

-38.

540.

00-3

8.54

0.00

A3

mm

-37.

55-3

7.56

-0.0

1-3

7.55

0.00

-37.

550.

00-3

7.55

0.00

-37.

550.

00A

1 m

m-3

7.00

-37.

01-0

.01

-37.

01-0

.01

-37.

000.

00-3

7.00

0.00

-36.

990.

02A

2 m

m-3

8.07

-38.

09-0

.01

-38.

080.

00-3

8.09

-0.0

2-3

8.07

0.00

-38.

070.

00A

4 m

m-3

7.42

-37.

420.

00-3

7.42

0.00

-37.

420.

00-3

7.42

0.00

-37.

420.

00A

5 m

m-3

8.53

-38.

530.

00-3

8.49

0.04

-38.

510.

01-3

8.49

0.04

-38.

500.

03A

1 m

m-3

8.68

-38.

680.

00-3

8.67

0.01

-38.

680.

00-3

8.66

0.02

-38.

670.

01A

2 sm

-4.9

1-4

.88

0.03

-4.9

00.

01-4

.90

0.01

-4.9

00.

01-4

.90

0.01

A4

sm-2

.40

-2.3

80.

02-2

.38

0.02

-2.3

80.

02-2

.37

0.03

-2.3

70.

02A

5 m

m-3

8.77

-38.

770.

01-3

8.69

0.08

-38.

750.

02-3

8.78

0.00

-38.

750.

02A

1 m

m-3

9.96

-39.

900.

06-3

9.90

0.06

-39.

890.

07-3

9.89

0.07

-39.

890.

07A

2 m

m-3

8.36

-38.

350.

01-3

8.37

-0.0

1-3

8.36

0.01

-38.

350.

01-3

8.35

0.01

A3

sm-3

.59

-3.6

0-0

.01

-3.4

80.

11-3

.55

0.04

-3.5

70.

02-3

.58

0.02

A5

sm-5

.62

-5.6

5-0

.03

-5.6

8-0

.06

-5.7

0-0

.08

-5.5

70.

05-5

.60

0.03

A6

mm

-37.

47-3

7.47

-0.0

1-3

7.48

-0.0

1-3

7.49

-0.0

2-3

7.48

-0.0

1-3

7.49

-0.0

2A

7 m

m-3

8.09

-38.

10-0

.01

-38.

080.

01-3

8.08

0.01

-38.

080.

00-3

8.12

-0.0

3

MU

LT

IMO

DE

@13

00n

m, S

ing

lem

od

e @

1550

nm

3W3

24W

7

17W

5

5W5

Page 60: NXTCore ARINC801 Fiber Optic Terminus
Page 61: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

CIT [dB] SM 0.5 0.01/-0.03 2/2

CIT [dB] MM 0.5 0.03/-0.02 4/4

4:15 PM JZ

11:00 AMJZJZ

Starting test JZ

JZJZ

Nonconformity / Deviation

Specific Test Conditions

8:30 AM

Starting test

Max/Min Measurement Value Compliance

8:00 AM

Event Log

Test setup for 24w7 samples4:30 PM

Anomaly / Interruption

none

1258 Hewlett Packard

Extech 42280 9069034

04/27/12Date

04/27/1204/30/1204/30/1204/30/12

04/27/12

Customer Name Purchase Order #

177125

Cable Pull-out Force

Start Date

4/27/2012

Completion Date

4/30/2012

Test Title

NXTCon

1261

HP 81524A

ATS Hewlett Packard 81533B

1405 UTM

NMNDY

Results Summary

4/27/2012 8:00AM

NM

Completed 3w3 and 5w5 samples

Event LogBench Cleaning

ARINC801 Rectangular

Performed By

Part Number

Equipment List Post Test Cleanup Setup Check

4/27/2012 8:00AM NDY

11965 GC-4

Test Specification / Standard

TIA-455-6B (FOTP-6) Method 1

The test load shall be applied as follows with a rate of pull being 20 lb/min (89 N/min)

Load 1: Apply 12 lb force at 0° for at least 5 seconds but no more than 10 seconds.

-

Reference Only 5000 lbs Universal Tensile Machi

Cal Due Date5/3/2012 5/3/2011 1:03:01 PM Temperature Humidity Datalogger

Last Cal Date

81654A DE38A00709 3248G01541

Instrument Description

3411G05696 A911206-11-91

Instrum. Number Manufacturer Model Number Serial Number

1080

1026 Agilent1102

Tempo3/8/2014 Optical Power Head 3/8/2012 3:22:08 PM

1123 850/1300nm Dual LED Source Reference Only D91114 252B

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

DS Revision

05/01/12

Service Project Number SPN Test ID # Humidity

10/31/2011 2:11:01 PM

Reference Only

Temperature

22.8 °C

10/31/2012 Reference Only

Reference Only

43.8 %RH

Measurements / Inspection

CIT[dB], Force [lb]

none

1310/1550nm Laser Source Optical Head Interface

Reference Only

Customer WitnessExperior Test Procedure # (if applicable)

Completed 17w5 and 24w7 samples

8:00 AM Test setup. Preparing cables.

Norman Metzner

Project EngineerSignoff by

Technical Director

none

Test Sample Description

Initials

Category Requirement

Signoff

4/30/12 4:30pm

Time

Date/Time

JZJZ

4/27/2012 8:00AMjohn kimJZ

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 5

Page 62: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel SidePower before

[dBm]Power after [dBm] CIT after [dB]

Female -20.45 -20.44 0.01Male -20.42 -20.41 0.01

Female -20.25 -20.23 0.02Male -21.45 -21.44 0.01

Female -19.72 -19.71 0.01Male -21.37 -21.38 -0.01

Female -21.10 -21.09 0.01Male -21.85 -21.85 0.00

Female -21.58 -21.55 0.03Male -20.98 -21.00 -0.02

Female -20.14 -20.12 0.02Male -22.22 -22.22 0.00

Female -20.60 -20.60 0.00Male -22.33 -22.32 0.01

Female 1.08 1.08 0.00Male 1.11 1.10 -0.01

Female 1.08 1.08 0.00Male 1.10 1.10 0.00

Female -22.60 -22.59 0.01Male -22.33 -22.32 0.01

Female -20.86 -20.86 0.00Male -20.56 -20.55 0.01

Female -21.01 -21.00 0.01Male -21.50 -21.50 0.00

Female 1.02 1.02 0.00Male 1.00 0.97 -0.03

Female 1.10 1.11 0.01Male 1.10 1.10 0.00

Female -20.56 -20.57 -0.01Male -21.31 -21.30 0.01

Female -21.26 -21.26 0.00Male -21.29 -21.30 -0.01

A6 mm

A7 mm

24W7

A1 mm

A2 mm

A3 sm

A5 sm

A2 sm

A4 sm

A5 mm

17W5

A4 mm

A5 mm

5W5

A1 mm

A1 mm

A2 mm

MULTIMODE @1300nm, Singlemode @1550nm

A1 mm

A3 mm3W3

Page 63: NXTCore ARINC801 Fiber Optic Terminus
Page 64: NXTCore ARINC801 Fiber Optic Terminus
Page 65: NXTCore ARINC801 Fiber Optic Terminus

Tim

e S

Load

lbX

Hea

d in

00.

002

00.

012

-0.0

050.

0000

010.

028

-0.0

060.

0000

120.

044

-0.0

050.

0000

290.

06-0

.005

0.00

0046

0.07

6-0

.004

0.00

0066

0.09

2-0

.004

0.00

0086

0.10

8-0

.004

0.00

0105

0.12

4-0

.004

0.00

0126

0.14

-0.0

030.

0001

450.

156

-0.0

030.

0001

660.

172

-0.0

020.

0001

890.

188

-0.0

010.

0002

110.

2-0

.001

0.00

023

0.21

6-0

.001

0.00

0255

0.23

20

0.00

0282

0.24

80

0.00

0311

0.26

40.

001

0.00

0338

0.28

0.00

10.

0003

630.

296

0.00

10.

0003

880.

312

0.00

20.

0004

120.

328

0.00

20.

0004

380.

340.

002

0.00

0459

0.35

60.

003

0.00

049

0.38

40.

004

0.00

0539

0.42

80.

005

0.00

0609

0.45

20.

007

0.00

0646

0.46

80.

008

0.00

0671

0.48

40.

009

0.00

0701

0.50

40.

010.

0007

450.

516

0.01

10.

0007

710.

592

0.01

30.

0009

10.

624

0.01

50.

0009

70.

656

0.01

70.

0010

360.

684

0.01

90.

0010

880.

716

0.02

10.

0011

44

SP

N 1

1965

GC

-4 C

able

Pu

ll-o

ut

02468101214

05

1015

2025

3035

4045

50

Tim

e [s

]

Load [lb]

Page 66: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Performed By

Continuing Termini Retention Force test. Started sample 5W5Completed sample 3W3 Ch. A1 and A2 male and female side

john kimJZ

Initials

Category

JZ

5/1/2012 8:30AM 5/1/2012 8:30AM 5/9/2012 9:30PM

8:30 AM Test setup. Removing samples from termini connector

Norman Metzner

Project EngineerSignoff by

Technical Director

Requirement

Signoff

5/15/12 8am

Time

Date/Time

Completed A1, A2, A3, A5 and A6 (female side) of sample 24W78:00 AM Continuing with sample 24W7 A7 female

6:45 PM Continuing test with A5 male3:20 PM Complete A7 female and A1, A2, A3, and A7 male side for sample 24W7

Continuing Termini Retention Force test

8:00 AM6:15 PM Completed sample 5W58:00 AM Continuing with sample 24W7

9:20 PM Completed A5 and A6 male side for sample 24W7. Completed Termini Retention Force test for all samples.

6/21/2012 Reference Only

46 %RH

Reference Only 6/21/2011 3:56:32 PM

Cal Due Date5/3/20135/3/2012

Measurements / Inspection

DS Revision

05/15/12

Service Project Number SPN Test ID # Humidity

Last Cal Date

Temperature

23 °C

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

Customer Witness

none

1203

ARINC801 Rectangular

Test Sample Description

199710 A911206-11-91

Instrum. Number Manufacturer Model Number Serial Number

1080 Extech 42280 9069034

Instrument Description

5000 lbs Universal Tensile Machi Temperature Humidity Datalogger

250 lbs. Load Cell

11965 GC-5

Test Specification / Standard

2.4.5.3 of ARINC Specification 801-2 and in accordance with EIA-364-38C, either Method A or B

The test load shall be 12 lb force at a rate of 89 newtons per minute ± 4 newtons

per minute (20 pounds per minute ± 1 pound per minute), maintain load for one hour Note: This test is intended to prove the

integrity of the connector terminus retention feature and not to prove the attachment of

the cable terminus

Experior Test Procedure # (if applicable)

per referenced industry standard

Part Number

Equipment List Post Test Cleanup Setup Check

NMJZJZ

1261 ATS

Interface SM-250 1405 UTM

Customer Name Purchase Order #

177125

Termini Retention Force

Start Date

5/1/2012

Completion Date

5/9/2012

Test Title

NXTCon

05/01/12Date

05/01/1205/02/1205/02/1205/03/12

05/01/12

Results Summary

5/1/2012 8:30AM

Anomaly / Interruption

none

Event Log

NM

Bench Cleaning

All termini shall be retained with no damage to the termini, the connector inserts or to the retention

mechanisms.

none

Nonconformity / Deviation

Specific Test Conditions

5:30 PM

Starting Termini Retention Force test with customer provided retention tool

Max/Min Measurement Value Compliance

8:00 AM

Event Log

Continuing Termini Retention Force test4:25 PM Completed female channels A1, A2, A4 and A5 of sample 17W5

10:30 AMJZJZ

Completed sample 17W5 female and male. Also 3W3 A1 female JZ

JZJZ

JZJZJZJZJZJZJZ05/09/12

05/09/1205/09/12

JZJZJZ

8:20 AM

05/09/12

4:45 PM

2:30 PM05/03/1205/04/1205/04/1205/07/1205/07/12

Visual Inspection No damage no damage observed 4/4

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 14

Page 67: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel Side Tested [Y/N]

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

Female YMale Y

5W5

17W5

MULTIMODE @1300nm, Singlemode @1550nm

3W3A1 mm

A3 mm

A1 mm

A2 mm

A4 mm

A5 mm

A1 mm

A2 sm

A4 sm

A5 mm

24W7

A1 mm

A2 mm

A3 sm

A5 sm

A6 mm

A7 mm

Page 68: NXTCore ARINC801 Fiber Optic Terminus
Page 69: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

4/13/12 11am

Max Measurement Value Compliance

4/12/12 3pm 4/12/2012 3pm 4/13/12 11amjohn kimMD

HR

Performed By

Time

Date/Time

Category Requirement

Signoff MDMDNorman Metzner

Project EngineerSignoff by

Technical DirectorEquipment List Post Test Cleanup Setup Check

NM

none

Test Sample Description Customer Witness

Humidity

Last Cal Date

Temperature

23°C 35%RH

DS Revision

04/13/12

Service Project Number SPN Test ID #

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

ARINC801 Connector

Instrum. Number Manufacturer Model Number Serial Number Mark-10 MG10 41612

Instrument Description Cal Due Date4/9/20134/9/2012 10lbs. Force Gauge

11965 GC-2

Test Specification / Standard

2.4.5.7 of ARINC Specification 801-2 and in accordance with

EIA-364-24B

All termini shall be removed and reinstalled ten times using the appropriate insertion and

removal tools.

Experior Test Procedure # (if applicable)

-

Part Number

Product Name Purchase Order #

177125

Maintenance Aging

Start Date

4/9/2012

Completion Date

4/13/2012 NXTCore

Date

Anomaly / Interruption

none

Event Log

Termini Force during first and last cycle [lb]

1147

04/13/12 11:00AM

Test Title

Results Summary

4/12/12 3pm

Event Log

NM

Bench Cleaning

Measurements / Inspection

The termini insertion force should be measured during the first and last cycles and should not exceed 36 N (8

pounds).

none

Nonconformity / Deviation

Specific Test Conditions

Finished testing samples3:30PM

<8 1.93

Started testing samples3:00PM Started instruments setup

4/4

InitialsMDMDHR

04/12/12

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4

Page 70: NXTCore ARINC801 Fiber Optic Terminus

Removal Force [lb] Insertion Force [lb]

1st 0.67 0.3510th 0.71 0.411st 0.71 0.38

10th 0.75 0.371st 0.76 0.36

10th 0.80 0.351st 0.73 0.37

10th 0.77 0.441st 0.70 0.35

10th 0.81 0.371st 0.76 0.38

10th 0.80 0.361st 0.78 0.36

10th 0.74 0.431st 0.71 0.45

10th 0.76 0.511st 0.69 0.38

10th 0.78 0.451st 0.71 0.45

10th 0.77 0.341st 0.67 0.50

10th 0.79 0.391st 0.69 0.27

10th 0.71 0.391st 0.78 0.21

10th 0.82 0.601st 0.79 0.58

10th 0.74 0.401st 0.86 0.54

10th 0.64 0.361st 0.76 0.47

10th 0.74 0.32

Sample # Cycle

A1 mm3W3

A3 mm

PlugTerminius

5W5

A1 mm

A2 sm

A4 sm

A1 mm

A2 mm

A4 mm

A5 mm

A5 mm

17W5

24W7

A1 mm

A2 mm

A3 sm

A5 sm

A6 mm

A7 mm

Page 71: NXTCore ARINC801 Fiber Optic Terminus

Removal Force [lb] Insertion Force [lb]

1.75 1.47 PASS0.87 1.12 PASS1.44 .1.51 PASS1.04 1.64 PASS1.60 1.72 PASS1.42 1.48 PASS0.98 1.42 PASS1.05 1.61 PASS1.01 1.32 PASS0.98 1.29 PASS1.07 1.58 PASS1.01 1.45 PASS0.94 1.75 PASS1.08 1.66 PASS1.28 1.45 PASS1.01 1.54 PASS1.33 1.60 PASS1.18 1.55 PASS1.27 1.88 PASS1.26 1.93 PASS1.20 1.64 PASS1.18 1.38 PASS1.20 1.59 PASS1.27 1.53 PASS1.10 1.48 PASS1.42 1.82 PASS0.85 1.17 PASS1.08 1.54 PASS0.84 1.32 PASS1.04 1.37 PASS0.65 1.49 PASS0.71 1.41 PASS

Comply?Receptacle

Page 72: NXTCore ARINC801 Fiber Optic Terminus
Page 73: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

1224 JGR Hewlett Packard1258

45 4/4

BR5 HP 81524A

Norman MetznerHR

Harris R

Return Loss [dB] 20 for MM and 30 for SM

Requirement

5/3/12 7:30AM

Post Test Cleanup

5/11/12 2:30Pm

Setup Check

Signoff NM

Equipment List

Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 5 W 5Finished RL to Sample 5 W 5

HR

Customer Witness

5/3/12 9:30AM

Initials

Category

Project EngineerSignoff by

Technical Director

john kimHR HR

Performed By

Model Number Serial Number 42280 9069033

750004 1/3/2013Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM3248G01541

RL [dB]

none

Nonconformity / Deviation

Specific Test Conditions

Temperature

23 °C 55 %RH

Measurements / Inspection

3/8/2012 3:22:08 PM 3/8/2014

DS Revision

05/15/12

Optical Power Head

Service Project Number SPN Test ID # Humidity

none

9/6/20121451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110

Test Sample Description

ARINC801 Connector

11965 GC-6

Test Specification / Standard

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

NM

Bench Cleaning

Date/Time

Start Preparation Cleaning and Inspecting Ferrules for RL Measurements Sample 17 W 5

Finished RL to Sample 24W711:30AM

5/15/12 8am5/3/12 7:30AM

Compliance

Event Log

Finished RL to Sample 3 W 3Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 3 W 3

Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 24W7

Test Title

NXTCon

1260

Event Log

Results Summary

Customer Name Purchase Order #

177125

Start Date

5/3/2012

Completion Date

5/11/2012

Anomaly / Interruption

none

Return Loss

Max/Min Measurement Value

Experior Test Procedure # (if applicable)

EPTP-1005 Return Loss

Part Number

Instrum. Number Manufacturer Extech

Cal Due Date5/3/2012 5/3/2011 1:03:12 PMTemperature Humidity Datalogger

Instrument Description Last Cal Date

Date Time

3:30PM2:30PM9:30AM

05/03/12

7:30AM

7:30AM

2:30PM05/11/12

Finished RL to Sample 17 W 5HR

HR05/07/12 10:00AM

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 2

Page 74: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel RL [dB]

A1 mm >45A3 mm >45A1 mm >45A2 mm >45A4 mm >45A5 mm >45A1 mm >45A2 sm 54.9A4 sm 55.7A5 mm >45A1 mm >45 A2 mm >45A3 sm 55.2A5 sm 55.3A6 mm >45A7 mm >45

24W7

MULTIMODE @1300nm, Singlemode @1550nm

3W3

5W5

17W5

Page 75: NXTCore ARINC801 Fiber Optic Terminus

Test Datasheet Test Report by:Experior Laboratories, Inc.

Performed By

john kimJZ

Initials

Category Requirement

Signoff

3/23/2012

Time

Date/Time

JZ

11:05 AM Starting IL/RL measurements.

Norman Metzner

Project EngineerSignoff by

Technical Director

none

Test Sample Description

Specific Test Conditions

9/6/2011 5:38:40 PM

43.1 %RH

Customer Witness

Reference Only

Temperature

23.3 °C

10/31/2012 Reference Only

DS Revision

03/23/12

Service Project Number SPN Test ID # Humidity

10/31/2011 2:10:44 PM

Combo-D connector

Reference Only Fiber Fusion Splicer Reference Only1405 Fiber Cleaver Reference Only

CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS

CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS

Optical Power Head Optical Head Interface

63162

1103 Hewlett Packard Hewlett Packard 81533B

1402 Fujikura FSM-50S Fujikura

3411G05264122785

Instrum. Number Manufacturer Model Number Serial Number

14511254

CT-30

81524A 3248G0118112161

Instrument Description

9/6/2012 Reference Only

1300nm MM Return Loss Meter

Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger

Last Cal Date

11965 GD-1

Test Specification / Standard

TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)

2.4.3.2 of ARINC Specification 801-2 and in accordance with

TIA/EIA-455-107A (FOTP-107).

Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for

multimode connections. For all single-mode connections, measure and record only. No

failure criterion exists for single-mode connections

Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for

single-mode PC polish termini

Experior Test Procedure # (if applicable)

EPTP-1002 TransmittanceEPTP-1005 Return Loss

Part Number

1/1

3/22/2012 11:00 AM

NM

0.3 (for MM only) 0.07

3/22/2012 11:03AM 3/22/12 12:45pm

Product Name Purchase Order #

177125

IL-RL

Start Date

3/22/2012

Completion Date

3/23/2012

Test Title

Setup Check

NMJZJZ

Bench Cleaning Equipment List Post Test Cleanup

3/22/2012 11:00 AM

03/22/12Date

NXTCore

Anomaly / Interruption

none

781RL-13-110 Extech 42280 9069033

Max/Min Measurement Value

Return Loss [dB] 20 for MM and 30 for SM 45

Insertion Loss [dB]

Compliance

Measurements / Inspection

IL [dB], RL [dB]

none

Nonconformity / Deviation

Event Log

Results Summary

1260 Rifocs

Event Log

12:15 PM Completed IL/RL measurements. S/N's and pin #'s are reversed.JZJZ03/22/12

1/1

Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3

Page 76: NXTCore ARINC801 Fiber Optic Terminus

Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]

A1 mm -11.59 -11.57 0.02 >45A3 mm -11.64 -11.57 0.07 >45

MULTIMODE @1300nm, Singlemode @1550nm

3W3