51
Asset: GRAND STREET CAMPUS (OLD E.D.HS)-K, 850 GRAND STREET, New York, 11225 Inspection Id Inspection Type Time In Last Edited SA : K450 Architectural - Senior 2019-04-03 7:37 AM 2019-06-04 5:05 PM AA : K450 Architectural - Associate 2019-04-03 7:44 AM 2019-06-03 9:30 AM Asset Data Question Answer Was the building fully accessible for inspection No Inspection Access Comment Dunnage Steel, Window Lintels, Roof Fence, Areaways, Railings, Fence, Student Use Asphalt, Security Lights due to Scaffolding, Netting, Sidewalk Bridge. Boys, Girls Shower Rooms Sealed Off. Principal(s) Information Principal Name Dr. Jasmine Pena Organization Progress High School for Professional Careers - Brooklyn Did you meet with this Principal? Yes Did this Principal provide feedback? Yes Summary of Principal's Feedback The Principal's commented as follows: 1. The Staff Toilet Rooms need to be upgraded. Principal Name Rosemary Vega Organization East Williamsburg Scholars Academy - Brooklyn Did you meet with this Principal? Yes Did this Principal provide feedback? Yes Summary of Principal's Feedback The Principal's comments are as follows: 1. The Corridor Ceiling Tiles need to be replaced. 2. The Science Rooms need to be upgraded. Principal Name Holger Carrillo Organization High School for Enterprise, Business and Technology - Brooklyn Did you meet with this Principal? Yes Did this Principal provide feedback? Yes Summary of Principal's Feedback The Principal had no comments about the physical condition of the building at this time. Principal Name Kara Ahmed Organization L.Y.F.E. Center - Brooklyn Did you meet with this Principal? No Did this Principal provide feedback? No Custodian Abe DaSilva Fireman John Chung Building Square Footage 480000 Comments on the Area None Comments on the Stories (Floors) plus Basements 4+B+PH Comments on the Number of Classrooms 107 Comments on the Year Built 1980 Student Population 1820 Staff Population 213 Weather Fair NYC Department of Education Architectural Inspection Building Condition Assessment Survey 2018 - 2019 K450 PB/A&W Print Date: 6/20/2019 Page 1 of 51

NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Asset: GRAND STREET CAMPUS (OLD E.D.HS)-K, 850 GRAND STREET, New York, 11225

Inspection Id Inspection Type Time In Last Edited

SA : K450 Architectural - Senior 2019-04-03 7:37 AM 2019-06-04 5:05 PM

AA : K450 Architectural - Associate 2019-04-03 7:44 AM 2019-06-03 9:30 AM

Asset Data

Question Answer

Was the building fully accessible for inspection No

Inspection Access Comment Dunnage Steel, Window Lintels, Roof Fence, Areaways, Railings,Fence, Student Use Asphalt, Security Lights due to Scaffolding,Netting, Sidewalk Bridge.Boys, Girls Shower Rooms Sealed Off.

Principal(s) Information

Principal Name Dr. Jasmine Pena

Organization Progress High School for Professional Careers - Brooklyn

Did you meet with this Principal? Yes

Did this Principal provide feedback? Yes

Summary of Principal's Feedback The Principal's commented as follows: 1. The Staff Toilet Rooms needto be upgraded.

Principal Name Rosemary Vega

Organization East Williamsburg Scholars Academy - Brooklyn

Did you meet with this Principal? Yes

Did this Principal provide feedback? Yes

Summary of Principal's Feedback The Principal's comments are as follows: 1. The Corridor Ceiling Tilesneed to be replaced.2. The Science Rooms need to be upgraded.

Principal Name Holger Carrillo

Organization High School for Enterprise, Business and Technology - Brooklyn

Did you meet with this Principal? Yes

Did this Principal provide feedback? Yes

Summary of Principal's Feedback The Principal had no comments about the physical condition of thebuilding at this time.

Principal Name Kara Ahmed

Organization L.Y.F.E. Center - Brooklyn

Did you meet with this Principal? No

Did this Principal provide feedback? No

Custodian Abe DaSilva

Fireman John Chung

Building Square Footage 480000

Comments on the Area None

Comments on the Stories (Floors) plus Basements 4+B+PH

Comments on the Number of Classrooms 107

Comments on the Year Built 1980

Student Population 1820

Staff Population 213

Weather Fair

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 1 of 51

Page 2: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Facade Photo

Corner of Grand Street and BushwickAvenue - Southeast view

Main Entrance Photo

Facade A - Grand Street

Roof Photo

Roof 1 - Southwest view

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 2 of 51

Page 3: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Have any Systems/Major Building Components been upgraded? Yes

Systems: New L.Y.F.E. Center.

Year: 2014

Systems: Partial (4) Exterior Doors replacement; Partial PerimeterWindows re-caulking.

Year: 2009

Systems: Exterior Walls repointing and repairs; Science Labupgrade; Roofing and Soffits repairs.

Year: 2008

Systems: Auditorium Roofing repairs: Partial Perimeter Windowsre-caulking; Plaza Deck Roofing and Flashingreplacement.

Year: 2000

Have there been any New Building Additions? No

Tandem Schools? No

Leased Space? No

Priority Condition

PriorityCondition ExistLast Year?

PriorityCategory

ConditionDescription

ComponentAffected

LocationDescription

Person(s)Notified

Person(s) Title PhotoImage

No Potential FallingDebris

Severelydamaged plasterceiling withloose particle isa potentialsafety hazard.

INTERIOR |CLASSROOMS/CORRIDORS/ADMINSPACES |Ceiling

Room 450A John Chung Fireman

No ProtrudingElements

Severelydamage seatwith protrudingmetal is apotential safetyhazard.

INTERIOR |AUDITORIUM| Fixed Seating

Seat BB/103 John Chung Fireman

Yes ProtrudingElements

Severelydamagedbleacher plasticseats withprotruding metalis a potentialsafety hazard.

INTERIOR |GYMNASIUM |Seating

Along theperimeter onboth side

John Chung Fireman

Structural Engineer Required

StructuralCondition Type

ConditionDescription

ComponentAffected

LocationDescription

Person(s)Notified

Person(s) Title PhotoImage

No condition recorded

Accessibility

Accessibility Status Question Response

Is the primary or secondary entrance on an accessible route? Yes

Is the building a multi-story building? Yes

Are all floors of the building accessible through compliant means? Yes

Accessible classrooms exists on each floor? Yes

Boys and Girls or Unisex accessible toilets exist on at least every other floor? Yes

If the following spaces exist, are they ALL accessible? Art Room, Auditorium,Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs

Yes

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 3 of 51

Page 4: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Physical Breakdown Structure Exists Required Complies Deficiency AudioInductionSystem

FireAlarmStrobe

FUNCTIONAL ACCESSIBILITY

Exterior Routes

Exterior Entrances & Exits Yes

Exterior H/C Lifts No No

Exterior Ramps and Railings Yes Yes

Interior Routes

Corridor and Lobby H/C Lifts No No

Interior Corridor Doors and Hardware Yes Yes

Interior Corridors and Lobbies No Change in Elevation

Interior Elevators Yes Yes

Interior Lobby Doors and Hardware Yes

Interior Ramps Yes Yes

Rooms & Spaces

Art Rooms Rooms 158, 162, 326, 353, 365 Yes Yes

Auditorium 2nd Floor Yes No No Stage Access No Yes

Cafeteria 1st Floor - Staff, Students A, B Yes Yes No Yes

Classrooms 1st-4th Floor Yes Yes

Computer Rooms Rooms G297, G298, 330, 360C, 450A,450D, 462

Yes Yes

Gymnasium 1st Floor - BGA, BGC, GGA, GGC Yes Yes No Yes

Library Room 235 Yes Yes

Main Office Room 198 (L.Y.F.E. Center); Room 258B(Progress High School for ProfessionalCareers); Room A362 (East WilliamsburgScholar Academy); Room 414 (HighSchool for Enterprise, Business,Technology)

Yes Yes

Multi-purpose Room No

Nurse's Room Rooms 102, 106 Yes Yes

Pool No

Science Lab Rooms G280, G283, A369, A375, A377,453, 457

Yes Yes

Toilet Rooms (Boys) 1st-4th Floor Yes Yes

Toilet Rooms (Girls) 1st-4th Floor Yes Yes

Toilet Rooms (Staff) 1st-4th Floor Yes Yes

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 4 of 51

Page 5: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Building Template

Inspection

Question Response

Architectural

EXTERIOR Inspected

AREAWAY Inspected

InaccessibleInstance on AW1-AW2

Instance Quantity 2

Instance Quantity Uom EACH

AWNINGS AND CANOPIES Inspected

Condition 4 - Between Fair and Poor

Deficiency CONCRETE: WATER PENETRATION

Roof Plan reference

Deficiency Quantity 130

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 5 of 51

Page 6: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

AWNINGS AND CANOPIES

Deficiency Photo1

Facade E

Violations No violations recorded.

CHIMNEY Under Construction

COPING Under Construction

CORNICE Does not Exist

DOORS Inspected

DOORS AND FRAMES Inspected

Condition 5 - Poor

Deficiency METAL: DETERIORATED DOOR AND FRAME - MAJORDETERIORATION

Roof Plan reference

Deficiency Quantity 14

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade P

Violations No violations recorded.

Deficiency METAL: DETERIORATED DOOR AND FRAME - MINORDETERIORATION

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 6 of 51

Page 7: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

DOORS

DOORS AND FRAMES

Roof Plan reference

Deficiency Quantity 12

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

DOOR HARDWARE Inspected

Condition 3 - Fair

Deficiency No deficiencies recorded

LINTELS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

TRANSOM/SIDE LIGHT Inspected

Condition 4 - Between Fair and Poor

Deficiency METAL: DENTED, MAJOR RUSTING

Roof Plan reference

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 7 of 51

Page 8: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

DOORS

TRANSOM/SIDE LIGHT

Deficiency Photo1

Facade C

Violations No violations recorded.

EXTERIOR WALLS Inspected

Material Type(s) Masonry, Concrete

Replacement Quantity 120,000

Replacement Uom S.F.

Under ConstructionInstance on All Brick Facades

Instance Quantity 93,900

Instance Quantity Uom S.F.

Under ConstructionInstance on All Concrete Facades C, D, E

Instance Quantity 26,100

Instance Quantity Uom S.F.

EXTERIOR SOFFITS Inspected

Condition 2 - Between Good and Fair

Deficiency CONCRETE: MINOR CRACKS/SPALLING

Roof Plan reference

Elevation

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 8 of 51

Page 9: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

EXTERIOR SOFFITS

Purpose of Action LEVEL 2

Deficiency Photo1

Facade P

Violations No violations recorded.

LOADING DOCK Does not Exist

LOUVER Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

PARAPETS Inspected

Material Type(s) Concrete, Masonry

Replacement Quantity 17,000

Replacement Uom C.F.

Under ConstructionInstance on All Brick Facades

Instance Quantity 11,900

Instance Quantity Uom C.F.

Under ConstructionInstance on All Concrete Facades A, C, D, E, I, R, S, T, U

Instance Quantity 5,100

Instance Quantity Uom C.F.

PLAZA DECK Inspected

InspectedInstance on Concrete: General Office Balcony

Instance Condition 2 - Between Good and Fair

Instance Quantity 2,600

Instance Quantity Uom S.F.

Installation Year 2000

Source of Installation Custodial Staff

Deficiency No deficiencies recorded

ROOF Inspected

Roofing Inspected

Replacement Quantity 154,000

Replacement Uom S.F.

ROOF HATCH/SMOKE HATCH Does not Exist

LEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS Under Construction

ROOF BARRIER Does not Exist

ROOF CAGE Does not Exist

ROOF FENCE Inaccessible

ROOFING Inspected

Under ConstructionInstance on IRMA: All Roofs

Instance Quantity 154,000

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 9 of 51

Page 10: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

ROOF

Roofing Inspected

ROOFING Inspected

Instance Quantity Uom S.F.

ROOFING DRAINS Under Construction

Specialties Inspected

BULKHEAD/PENTHOUSE Under Construction

CUPOLA/ SPIRES/ TOWERS Does not Exist

DORMER Does not Exist

DUNNAGE STEEL Inaccessible

SKYLIGHT/ROOF VENT Does not Exist

ROOF/GRAVITY TANK Does not Exist

STAIRS/RAMPS: EXTERIOR Inspected

BUILDING CHEEK/FLANK WALLS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

RAILINGS Inaccessible

STAIRS/RAMPS Inspected

Condition 3 - Fair

Deficiency CONCRETE: WORN-OUT TREAD/RISER/NOSING

Roof Plan reference

Deficiency Quantity 15

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade P

Violations No violations recorded.

Deficiency CONCRETE: CRACKS/SPALLING - MINOR

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 10 of 51

Page 11: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

STAIRS/RAMPS

Roof Plan reference

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Facade P

Violations No violations recorded.

WINDOWS Inspected

Replacement Quantity 35,000

Replacement Uom S.F.

EXTERIOR GUARDS Under Construction

LINTELS Inaccessible

WINDOWS Inspected

Material Type(s) Aluminum

Under ConstructionInstance on Aluminum - Double Hung: All Facades except Facades O, N

Instance Quantity 32,300

Instance Quantity Uom S.F.

Under ConstructionInstance on Aluminum - Other: Facades O, N

Instance Quantity 2,700

Instance Quantity Uom S.F.

INTERIOR Inspected

POOLS Does not Exist

STRUCTURAL Inspected

COLUMNS/BEAMS/BEARING WALLS Inspected

Condition 2 - Between Good and Fair

Deficiency CONCRETE COLUMNS/BEAMS:CRACKED/SPALLED/REINFORCEMENT EXPOSED

Deficiency Location/Instance Basement - Shop

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 11 of 51

Page 12: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

STRUCTURAL

COLUMNS/BEAMS/BEARING WALLS

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

Basement - Shop

Violations No violations recorded.

FLOOR STRUCTURE Inspected

Condition 3 - Fair

Deficiency CONCRETE SLAB ON GRADE: MINOR CRACKS

Deficiency Location/Instance Basement - Corridor, Fan Room, Storage

Deficiency Quantity 300

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

Basement - Fan Room

Violations No violations recorded.

Deficiency CONCRETE: CRACKS/SPALLED/REINFORCEMENT EXPOSED

Deficiency Location/Instance Basement - Gas Meter Room, Fan Room

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 12 of 51

Page 13: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

STRUCTURAL

FLOOR STRUCTURE

Deficiency Photo1

Basement - Gas Meter Room

Violations No violations recorded.

FOUNDATION WALLS Inspected

Material Type(s) Concrete

Condition 3 - Fair

Deficiency CONCRETE: CRACKED/SPALLED/REINFORCEMENTEXPOSED

Deficiency Location/Instance Basement - Corridor

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

Basement - Corridor

Violations No violations recorded.

ROOF STRUCTURE Inspected

Condition 3 - Fair

Deficiency STEEL COLUMNS/BEAMS: MINOR RUSTING

Deficiency Location/Instance Gymnasium 2

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPAIR AND REPAINT

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1 No photo recorded

Violations No violations recorded.

VAULTS-BUNKERS Does not Exist

AUDITORIUM Inspected

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 13 of 51

Page 14: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

AUDITORIUM

Ceiling

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Near the side entrance by Seat T/18 side

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the side entrance by Seat T/18 side

Violations No violations recorded.

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Near right Stage

Deficiency Quantity 60

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near right Stage

Violations No violations recorded.

Door(s)

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Fixed H/C Lift

Does not ExistInstance on 2nd Floor (14,000 SF, 1000 Seats)

Fixed Seating

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 14 of 51

Page 15: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

AUDITORIUM

Fixed Seating

Deficiency DAMAGED/BROKEN/INOPERABLE

Deficiency Location/Instance Seat BB/103

Deficiency Quantity 1

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 6

Deficiency Photo1

Seat BB/103

Violations No violations recorded.

Deficiency DAMAGED/BROKEN/INOPERABLE

Deficiency Location/Instance Seats E/1, F/15,17, N/3, Q/5, and others

Deficiency Quantity 23

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Seat F/15

Violations No violations recorded.

Floor Finish

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency VINYL TILES: DETERIORATED SUBSTRATE

Deficiency Location/Instance Near the Sliding-Folding Partition, by Seat A/103,108, B/3

Deficiency Quantity 60

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 15 of 51

Page 16: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

AUDITORIUM

Floor Finish

Deficiency Photo1

Near Seat A/108

Violations No violations recorded.

Sliding-folding Partition

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 5 - Poor

Deficiency MOTOR: INOPERABLE

Deficiency Location/Instance Between the upper and lower seats

Deficiency Quantity 2

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

Stage

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Stage Inspected

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency DAMAGED STEPS

Deficiency Location/Instance Right Stage

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Right Stage

Violations No violations recorded.

Stage Curtain Rigging Inspected

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 16 of 51

Page 17: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

AUDITORIUM

Stage

Stage Curtain Rigging Inspected

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stage Curtains Inspected

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 3 - Fair

Deficiency WORN/DETERIORATED

Deficiency Location/Instance Side curtain

Deficiency Quantity 200

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Side curtain

Violations No violations recorded.

Walls

InspectedInstance on 2nd Floor (14,000 SF, 1000 Seats)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Window Curtains/Shades/Blinds

Does not ExistInstance on 2nd Floor (14,000 SF, 1000 Seats)

CAFETERIA Inspected

InspectedInstance on 1st Floor - Staff (1,500 SF)

InspectedInstance on 1st Floor - Students A

InspectedInstance on 1st Floor - Students B

Ceiling

InspectedInstance on 1st Floor - Students A

Condition 2 - Between Good and Fair

Deficiency ACOUSTIC TILES ON PLASTER: DAMAGED/MISSING

Deficiency Location/Instance Toward the main entrance (Tectum on plaster)

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 17 of 51

Page 18: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CAFETERIA

Ceiling

Deficiency Photo1

Toward the main entrance (Tectum on plaster)

Violations No violations recorded.

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Near the entrance, by Cafeteria B

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the entrance

Violations No violations recorded.

InspectedInstance on 1st Floor - Students B

Condition 2 - Between Good and Fair

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Near the entrance

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 18 of 51

Page 19: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CAFETERIA

Ceiling

Near the entrance

Violations No violations recorded.

InspectedInstance on 1st Floor - Staff (1,500 SF)

Condition 2 - Between Good and Fair

Deficiency ACOUSTIC TILES: DAMAGED/MISSING

Deficiency Location/Instance Near the window, rear

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the window

Violations No violations recorded.

Door(s)

InspectedInstance on 1st Floor - Students B

Condition 4 - Between Fair and Poor

Deficiency WOOD: DETERIORATED DOOR

Deficiency Location/Instance Main Entrance

Deficiency Quantity 2

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Main Entrance

Violations No violations recorded.

Fixed Equipment

Does not ExistInstance on 1st Floor - Staff (1,500 SF)

Does not ExistInstance on 1st Floor - Students A

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 19 of 51

Page 20: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CAFETERIA

Fixed Equipment

Does not ExistInstance on 1st Floor - Students B

Floor Finish

InspectedInstance on 1st Floor - Students B

Condition 2 - Between Good and Fair

Deficiency VINYL TILES: BROKEN/DETERIORATED/MISSING TILES

Deficiency Location/Instance Near the vending machine

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the vending machine

Violations No violations recorded.

Sliding-folding Partition

Does not ExistInstance on 1st Floor - Staff (1,500 SF)

InspectedInstance on 1st Floor - Students A

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - Students B

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stage

Does not ExistInstance on 1st Floor - Staff (1,500 SF)

Does not ExistInstance on 1st Floor - Students A

Does not ExistInstance on 1st Floor - Students B

Walls

InspectedInstance on 1st Floor - Staff (1,500 SF)

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance On the columns

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 20 of 51

Page 21: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CAFETERIA

Walls

Deficiency Photo1

On the column

Violations No violations recorded.

Window Curtains/Shades/Blinds

Does not ExistInstance on 1st Floor - Students A

Does not ExistInstance on 1st Floor - Students B

Does not ExistInstance on 1st Floor - Staff (1,500 SF)

CLASSROOMS/CORRIDORS/ADMIN SPACES Inspected

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Room 450A

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 6

Deficiency Photo1

Room 450A

Violations No violations recorded.

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Rooms 326, 359, 406, Corridor near Room 460C

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 21 of 51

Page 22: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Ceiling

Deficiency Photo1

Room 326

Violations No violations recorded.

Deficiency ACOUSTIC TILES: DAMAGED/MISSING

Deficiency Location/Instance Rooms G297/G298, 357, A362, 435, 437, and others

Deficiency Quantity 100

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room G298 side

Violations No violations recorded.

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Corridor near Rooms 254, 305, 423, 437, by Stair G/4, and others

Deficiency Quantity 1,200

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Corridor near Room 254

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 22 of 51

Page 23: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Door(s) Inspected

Condition 3 - Fair

Deficiency WOOD: DETERIORATED DOOR

Deficiency Location/Instance Rooms 220, 320, 420, 450A

Deficiency Quantity 4

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 450A

Violations No violations recorded.

Floor Finish Inspected

Condition 2 - Between Good and Fair

Deficiency EPOXY FLOORING: CRACKS/SPALLING

Deficiency Location/Instance Rooms G280, G283

Deficiency Quantity 60

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room G283

Violations No violations recorded.

Deficiency VINYL TILES: TRIPPING HAZARD - ELECTRICAL OUTLET

Deficiency Location/Instance Rooms G298, 330, 342, 354, 360C, 360D, 450E

Deficiency Quantity 50

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 6

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 23 of 51

Page 24: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Floor Finish

Deficiency Photo1

Room 450E

Violations No violations recorded.

Deficiency VINYL TILES: BROKEN/DETERIORATED/MISSING TILES

Deficiency Location/Instance Rooms G298, A377, 460A, 450D, Corridor near Room 230, and others

Deficiency Quantity 120

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Corridor near Room 230

Violations No violations recorded.

Deficiency VINYL TILES: DETERIORATED SUBSTRATE

Deficiency Location/Instance Corridor near Rooms 156, A362

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Corridor near Room A362

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 24 of 51

Page 25: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency MASONRY: CRACKS/SPALLING

Deficiency Location/Instance Corridor near Rooms 450, 450E

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Corridor near Room 450E

Violations No violations recorded.

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Rooms 351, 354, 437, 440, 456, and others

Deficiency Quantity 200

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 440

Violations No violations recorded.

Specialties Inspected

Classroom Locker(s) Inspected

Condition 2 - Between Good and Fair

Deficiency DAMAGED UNITS

Deficiency Location/Instance (Total: 2,500 Lockers) Corridor near Rooms G293, 350

Deficiency Quantity 2

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 25 of 51

Page 26: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Specialties

Classroom Locker(s)

Deficiency Photo1

Corridor near Room 350

Violations No violations recorded.

Fixed Seating Does not Exist

GYMNASIUM Inspected

InspectedInstance on 1st Floor - BGA

InspectedInstance on 1st Floor - BGC

InspectedInstance on 1st Floor - GGA

InspectedInstance on 1st Floor - GGC

Ceiling

InspectedInstance on 1st Floor - BGC

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Near the center

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the center

Violations No violations recorded.

InspectedInstance on 1st Floor - BGA

Condition 2 - Between Good and Fair

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Near the Sliding-Folding Partition

Deficiency Quantity 100

Quantity Uom S.F.

Potential Action REPLACE

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 26 of 51

Page 27: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Ceiling

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the Sliding-Folding Partition

Violations No violations recorded.

InspectedInstance on 1st Floor - GGA

Condition 2 - Between Good and Fair

Deficiency TECTUM: DAMAGED/MISSING

Deficiency Location/Instance Near the Sliding-Folding Partition

Deficiency Quantity 50

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the Sliding-Folding Partition

Violations No violations recorded.

Door(s)

InspectedInstance on 1st Floor - GGA

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - GGC

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - BGC

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - BGA

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Fixed Equipment

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 27 of 51

Page 28: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Fixed Equipment

InspectedInstance on 1st Floor - GGC

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - BGA

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - BGC

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on 1st Floor - GGA

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Floor Finish

InspectedInstance on 1st Floor - BGC

Condition 2 - Between Good and Fair

Deficiency WOOD: DAMAGED/DETERIORATED

Deficiency Location/Instance Near the center (minor heaving)

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the center (minor heaving)

Violations No violations recorded.

Seating

InspectedInstance on 1st Floor - BGA

Condition 4 - Between Fair and Poor

Deficiency INOPERABLE BLEACHERS

Deficiency Location/Instance Gymnasium 2

Deficiency Quantity 360

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

Deficiency DAMAGED BLEACHERS

Deficiency Location/Instance Along the perimeter on both side

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 28 of 51

Page 29: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Seating

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 6

Deficiency Photo1

Along the perimeter wall

Violations No violations recorded.

Sliding-folding Partition

InspectedInstance on 1st Floor - BGA

Condition 3 - Fair

Deficiency MOVABLE PANELS: DAMAGED

Deficiency Location/Instance Rear wall

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Rear wall

Violations No violations recorded.

Stage

Does not ExistInstance on 1st Floor - BGA

Does not ExistInstance on 1st Floor - BGC

Does not ExistInstance on 1st Floor - GGA

Does not ExistInstance on 1st Floor - GGC

Walls

InspectedInstance on 1st Floor - GGC

Condition 2 - Between Good and Fair

Deficiency WALL PADDING: DETERIORATED

Deficiency Location/Instance Near the entrance

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 29 of 51

Page 30: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Walls

Deficiency Quantity 120

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the entrance

Violations No violations recorded.

InspectedInstance on 1st Floor - BGC

Condition 2 - Between Good and Fair

Deficiency WALL PADDING: DETERIORATED

Deficiency Location/Instance On the column

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

On the column

Violations No violations recorded.

InspectedInstance on 1st Floor - GGA

Condition 4 - Between Fair and Poor

Deficiency WALL PADDING: DETERIORATED

Deficiency Location/Instance Left, right, rear wall

Deficiency Quantity 480

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 30 of 51

Page 31: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Walls

Deficiency Photo1

Left wall side

Violations No violations recorded.

InspectedInstance on 1st Floor - BGA

Condition 2 - Between Good and Fair

Deficiency WALL PADDING: DETERIORATED

Deficiency Location/Instance Near the entrance

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the entrance

Violations No violations recorded.

InspectedInstance on 1st Floor - GGA

Condition 4 - Between Fair and Poor

Deficiency MASONRY: CRACKS/SPALLING

Deficiency Location/Instance Near the Sliding-Folding Partition

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 31 of 51

Page 32: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

GYMNASIUM

Walls

Deficiency Photo1

Near the Sliding-Folding Partition

Violations No violations recorded.

Window Curtains/Shades/Blinds

Does not ExistInstance on 1st Floor - BGC

Does not ExistInstance on 1st Floor - GGA

Does not ExistInstance on 1st Floor - GGC

Does not ExistInstance on 1st Floor - BGA

INTERIOR DOOR HARDWARE Inspected

Condition 3 - Fair

Deficiency No deficiencies recorded

INTERIOR GUARDS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

KITCHEN Inspected

InspectedInstance on 1st Floor (3,000 SF)

Ceiling

InspectedInstance on 1st Floor (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Mop Room

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Mop Room

Violations No violations recorded.

Door(s)

InspectedInstance on 1st Floor (3,000 SF)

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 32 of 51

Page 33: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

KITCHEN

Door(s)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Floor Finish

InspectedInstance on 1st Floor (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency CERAMIC TILE: BROKEN/MISSING TILES

Deficiency Location/Instance Food preparation area, Mop Room

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Food preparation area

Violations No violations recorded.

Walls

InspectedInstance on 1st Floor (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency CERAMIC TILE: BROKEN/ MISSING

Deficiency Location/Instance Near the Mop Room, column, by the teacher servery

Deficiency Quantity 25

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Food preparation area

Violations No violations recorded.

LIBRARY Inspected

InspectedInstance on Room 235 (3,000 SF)

Built-in Furnishing

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 33 of 51

Page 34: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

LIBRARY

Built-in Furnishing

Does not ExistInstance on Room 235 (3,000 SF)

Ceiling

InspectedInstance on Room 235 (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency ACOUSTIC TILES: DAMAGED/MISSING

Deficiency Location/Instance Near the circulation desk, by the computer/media room area

Deficiency Quantity 15

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near the circulation desk

Violations No violations recorded.

Door(s)

InspectedInstance on Room 235 (3,000 SF)

Condition 3 - Fair

Deficiency WOOD: DETERIORATED DOOR

Deficiency Location/Instance Rear entrance

Deficiency Quantity 1

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Rear entrance

Violations No violations recorded.

Floor Finish

InspectedInstance on Room 235 (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency VINYL TILES: BROKEN/DETERIORATED/MISSING TILES

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 34 of 51

Page 35: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

LIBRARY

Floor Finish

Deficiency Location/Instance Media/Computer Room, Storage Room

Deficiency Quantity 15

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Computer/Media Room

Violations No violations recorded.

Walls

InspectedInstance on Room 235 (3,000 SF)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LOCKER ROOM Inspected

InspectedInstance on Basement - Boys (1,914 Lockers)

Alternative use No

InspectedInstance on Basement - Girls (1,914 Lockers)

Alternative use No

Ceiling

InspectedInstance on Basement - Boys (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Near Locker 687

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near Locker 687

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 35 of 51

Page 36: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

LOCKER ROOM

Door(s)

InspectedInstance on Basement - Boys (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on Basement - Girls (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Floor Finish

InspectedInstance on Basement - Boys (1,914 Lockers)

Condition 3 - Fair

Deficiency CONCRETE: CRACKS

Deficiency Location/Instance Near Locker 1777

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near Locker 1777

Violations No violations recorded.

InspectedInstance on Basement - Girls (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency CONCRETE: CRACKS

Deficiency Location/Instance Near locker 595

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near locker 595

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 36 of 51

Page 37: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

LOCKER ROOM

Locker Room Lockers

InspectedInstance on Basement - Boys (1,914 Lockers)

Condition 5 - Poor

Deficiency DAMAGED UNITS

Deficiency Location/Instance Near lockers 76, 101, 140, 152, 511, and others

Deficiency Quantity 500

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near locker 511

Violations No violations recorded.

InspectedInstance on Basement - Girls (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency DAMAGED UNITS

Deficiency Location/Instance Lockers 124, 448, 745, 1319

Deficiency Quantity 4

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Locker 124

Violations No violations recorded.

Walls

InspectedInstance on Basement - Boys (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

InspectedInstance on Basement - Girls (1,914 Lockers)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 37 of 51

Page 38: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

MULTI-PURPOSE ROOM Does not Exist

SCIENCE DEMO ROOM Inspected

InspectedInstance on Rooms 352, 356

Alternative use Yes

InspectedInstance on Rooms 354, 452

Alternative use Yes

InspectedInstance on Rooms 357, 435, 437, 438, 440, 454, 456

Alternative use No

InspectedInstance on Room 305

Alternative use No

Fixed Equipment

InspectedInstance on Rooms 357, 435, 437, 438, 440, 454, 456

Condition 5 - Poor

Deficiency CABINETRY: MISSING/DAMAGED

Deficiency Location/Instance Rooms 357, 435, 437, 438, 440, 454, 456

Deficiency Quantity 34

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 454

Violations No violations recorded.

InspectedInstance on Rooms 352, 356

Condition 3 - Fair

Deficiency CABINETRY: MISSING/DAMAGED

Deficiency Location/Instance Rooms 352, 356

Deficiency Quantity 8

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

SCIENCE LAB Inspected

InspectedInstance on Rooms A369, A375, A377, 453, 457

Alternative use No

InspectedInstance on Rooms G280, G283

Alternative use No

Fixed Equipment

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 38 of 51

Page 39: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

SCIENCE LAB

Fixed Equipment

InspectedInstance on Rooms A369, A375, A377, 453, 457

Condition 5 - Poor

Deficiency CABINETRY: MISSING/DAMAGED

Deficiency Location/Instance Rooms A369, A375, A377, 453, 457

Deficiency Quantity 96

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 457

Violations No violations recorded.

SCIENCE PREP ROOM Inspected

InspectedInstance on Rooms A371/A373, 455

Alternative use No

InspectedInstance on Room G280A

Alternative use No

Fixed Equipment

InspectedInstance on Rooms A371/A373, 455

Condition 4 - Between Fair and Poor

Deficiency CABINETRY: MISSING/DAMAGED

Deficiency Location/Instance Rooms A371/A373, 455

Deficiency Quantity 16

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 455

Violations No violations recorded.

SHOWER ROOM Inspected

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 39 of 51

Page 40: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

SHOWER ROOM Inspected

InaccessibleInstance on Basement - Boys

InaccessibleInstance on Basement - Girls

STAIRS/RAMPS: INTERIOR Inspected

Do Letter Stair Signs Exist? Partially

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s) Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Partition Does not Exist

Railings Inspected

Condition 2 - Between Good and Fair

Deficiency METAL: MISSING

Deficiency Location/Instance Room BGE (Weight Room)

Deficiency Quantity 6

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 5

Purpose of Action LEVEL 6

Deficiency Photo1

Room BGE (Weight Room)

Violations No violations recorded.

Stairs and Landings Inspected

Condition 2 - Between Good and Fair

Deficiency CONCRETE: CRACKS/SPALLING - MAJOR

Deficiency Location/Instance Stair B/Basement,1

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 40 of 51

Page 41: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

STAIRS/RAMPS: INTERIOR Inspected

Stairs and Landings Inspected

Deficiency Photo1

Stair B/1

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

TOILET ROOMS - STAFF Inspected

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Room 113T

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 113T

Violations No violations recorded.

Door(s) Inspected

Condition 5 - Poor

Deficiency METAL: DAMAGED LOUVER

Deficiency Location/Instance Rooms G190B, A261M, 229T, 415T

Deficiency Quantity 4

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 41 of 51

Page 42: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

TOILET ROOMS - STAFF

Door(s)

Deficiency Photo1

Room 415T

Violations No violations recorded.

Floor Finish Inspected

Condition 2 - Between Good and Fair

Deficiency CERAMIC TILE: DETERIORATED SUBSTRATE

Deficiency Location/Instance Room A261

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room A261

Violations No violations recorded.

Stalls Inspected

Condition 5 - Poor

Deficiency RUST - MAJOR

Deficiency Location/Instance Rooms 113T, A261M, 215T, 331T, inside Room 115G

Deficiency Quantity 5

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 42 of 51

Page 43: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

TOILET ROOMS - STAFF

Stalls

Deficiency Photo1

Room 331T

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency CERAMIC TILE: BROKEN/ MISSING

Deficiency Location/Instance Rooms 113T, 142T,213T, 331T, 415T, and others

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 415T

Violations No violations recorded.

TOILET ROOMS - STUDENTS Inspected

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s) Inspected

Condition 5 - Poor

Deficiency METAL: DAMAGED LOUVER

Deficiency Location/Instance Rooms 142G, A261M, 329B, 429B, toilet inside the Boys LockerRoom, and others

Deficiency Quantity 11

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 43 of 51

Page 44: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

Door(s)

Deficiency Photo1

Room 429B

Violations No violations recorded.

Floor Finish Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stalls Inspected

Condition 5 - Poor

Deficiency BROKEN/MISSING

Deficiency Location/Instance Toilet inside the Boys Locker Room

Deficiency Quantity 1

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Toilet inside the Boys Locker Room

Violations No violations recorded.

Deficiency RUST - MAJOR

Deficiency Location/Instance Rooms 142G, 229B, 231G, 413G, 429B

Deficiency Quantity 12

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 44 of 51

Page 45: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

Stalls

Deficiency Photo1

Room 429B

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency CERAMIC TILE: BROKEN/ MISSING

Deficiency Location/Instance Rooms 142G, A261M, 313G, 413G, 429B, and others

Deficiency Quantity 100

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 313G

Violations No violations recorded.

LIFE SAFETY Inspected

F.D. HOLDING AREA Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

STEEL STAIRS Does not Exist

SITE Inspected

CONTAINERIZATION Inspected

Condition 5 - Poor

Deficiency FENCING MISSING

Deficiency Location/Instance Waterbury Street

Deficiency Quantity 1,200

Quantity Uom S.F.

Potential Action INSTALL NEW

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 45 of 51

Page 46: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

CONTAINERIZATION

Deficiency Photo1

Waterbury Street

Violations No violations recorded.

Deficiency CONTAINER DAMAGED

Deficiency Location/Instance Waterbury Street

Deficiency Quantity 4

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Waterbury Street

Violations No violations recorded.

Drainage System for Asphalt Inspected

Catch Basins/Manhole - Surrounded by asphalt Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Culverts - Asphalt Covering Does not Exist

Drainage System for Concrete Inspected

Catch Basins/Manhole - Surrounded by concrete Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Culverts - Concrete Covering Does not Exist

Drainage System for Soil Does not Exist

DRINKING FOUNTAINS Does not Exist

FENCES Inaccessible

IRRIGATION SYSTEM Does not Exist

PAVING Inspected

Student Non-Use Inspected

Gravel Exists? No

Asphalt Inspected

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 46 of 51

Page 47: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

PAVING

Student Non-Use

Asphalt

Condition 4 - Between Fair and Poor

Deficiency CRACKS - MAJOR

Deficiency Location/Instance Parking area between the school and Athletic Field

Deficiency Quantity 800

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Parking area between the school and Athletic Field

Violations No violations recorded.

Concrete Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Pavers Does not Exist

Student Use Inspected

Gravel Exists? No

Asphalt Inaccessible

Concrete Does not Exist

Pavers Does not Exist

Site Sidewalks & Walkways Inspected

Asphalt Does not Exist

Concrete Inspected

Condition 4 - Between Fair and Poor

Deficiency DAMAGED/DETERIORATED/MISSING SECTIONS

Deficiency Location/Instance Waterbury, Grand Avenue

Deficiency Quantity 700

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 47 of 51

Page 48: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

PAVING

Site Sidewalks & Walkways

Concrete

Deficiency Photo1

Grand Avenue

Violations No violations recorded.

Pavers Inspected

Condition 3 - Fair

Deficiency DAMAGED/MISSING

Deficiency Location/Instance Bushwich Avenue

Deficiency Quantity 100

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Bushwich Avenue

Violations No violations recorded.

DOT Sidewalk Inspected

Asphalt Does not Exist

Concrete Inspected

Condition 4 - Between Fair and Poor

Deficiency DAMAGED CURBS

Deficiency Location/Instance Grand Street, Bushwick Avenue, Waterbury Street

Deficiency Quantity 100

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 48 of 51

Page 49: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

PAVING

DOT Sidewalk

Concrete

Deficiency Photo1

Bushwick Avenue

Violations No violations recorded.

Deficiency HEAVING

Deficiency Location/Instance Bushwick Avenue

Deficiency Quantity 200

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Bushwick Avenue

Violations No violations recorded.

Deficiency DAMAGED/DETERIORATED/MISSING SECTIONS

Deficiency Location/Instance Grand Street, Bushwick Avenue, Waterbury Street

Deficiency Quantity 2,700

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Bushwick Avenue

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 49 of 51

Page 50: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

PAVING Inspected

DOT Sidewalk

Concrete Inspected

Violations No violations recorded.

Pavers Does not Exist

PLAYGROUNDS Does not Exist

PLAYING SURFACE Does not Exist

RETAINING WALLS Inspected

Are there any Retaining Walls 6' OR higher facing publicstreet/sidewalk?

Yes

Condition 3 - Fair

Deficiency BRICK: DETERIORATED JOINT AT COPING STONE

Deficiency Location/Instance Corner of Grand Avenue and Bushwick Avenue

Deficiency Quantity 30

Quantity Uom L.F.

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Corner of Grand Avenue and Bushwick Avenue

Violations No violations recorded.

Deficiency BRICK: CRACKS/SPALLING - MAJOR

Deficiency Location/Instance Grand Avenue

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Grand Avenue

Violations No violations recorded.

SEATING Does not Exist

SITE WALLS (NOT RETAINING WALLS) Does not Exist

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 50 of 51

Page 51: NYC Department of Education · ROOF FENCE Inaccessible ROOFING Inspected Instance on IRMA: All Roofs Under Construction Instance Quantity 154,000 NYC Department of Education Architectural

Question Response

SITE

SITE WALLS (NOT RETAINING WALLS) Does not Exist

STAIRS/RAMPS: EXTERIOR Inspected

Railings Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Site Cheek/flank Walls Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stairs/ramps Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2018 - 2019

K450

PB/A&W Print Date: 6/20/2019Page 51 of 51