Page 1: NYSERDA’s Peak Load Reduction Program PON 835

NYSERDA’s Peak Load Reduction Program PON 835

Embassy Suites Hotel New York, NY

October 7, 2004

Page 2: NYSERDA’s Peak Load Reduction Program PON 835

Program Objective• Increase grid reliability by

reducing/curtailing demand (NYISO DR programs)

• Base load reductions and enable demand response

• Demand reductions for the period of May through October – 11:00 AM-7:00 PM

• Open to end users and third party aggregators, etc. (LSE, CSP, utilities, etc.)

• PON 835 application deadline 11/1/04, I&O by 3/31/05

Page 3: NYSERDA’s Peak Load Reduction Program PON 835

NYISO"Hub of the Northeast""Hub of the Northeast"

* = Peak Load in Megawatts

IMO23,857 MW*

Hydro Quebec19,410 MW*

ISO - New England25,158 MW*

New York ISO30,983 MW*

PJM / PJM West64,300 MW*

Page 4: NYSERDA’s Peak Load Reduction Program PON 835

NYSERDA/NYISO Relationship• NYISO administers three demand

response programs that pay for demand response

• NYSERDA supports participation in these programs by reimbursing a portion of costs associated with technology installation that enables demand response/reduction

Page 5: NYSERDA’s Peak Load Reduction Program PON 835

NYISO’s Demand Response ProgramsNYISO’s Demand Response Programs

• EDRP• Low Risk• Low/Moderate

Return

Risk

Return

EDRP

DADRP

SCR

• ICAP/SCR• Moderate/High Risk• Moderate/High

Return

• DADRP• Moderate Risk• Moderate/High

Return

Page 6: NYSERDA’s Peak Load Reduction Program PON 835

Customer

NYISO

NYSERDAPermanent Demand

Reduction

NYSERDA/NYISO Relationship

Load Shifting/

Curtailment

DispatchableEmergencyGenerator

Interval Meter

DADRP

ICAP/SCR

EDRP

Page 7: NYSERDA’s Peak Load Reduction Program PON 835

NYSERDA’s Peak Load Reduction Program

NOTE: Contractors will be reimbursed the lesser of 70% of the Eligible Project Costs or the incentive caps set forth in Table 1. The Facility owner/operator must contribute no less than 30% of Eligible Project Costs.

 PDRE LC/S DEGI IM

Con EdisonService Territor

y

Non-Con

EdisonService

Territory

Con EdisonService

Territory

Non-Con

EdisonService

Territory

Con EdisonService

Territory only

Statewide PSC

Approved

StatewideNYISO

Compliant

$475/kW $225/kW $175/kW $45/kW $125/kW $2,500 per meter

$1,200 per meter

Page 8: NYSERDA’s Peak Load Reduction Program PON 835

Permanent Demand Reduction Efforts

• Implement projects that result in long term demand reduction

• 20 kW minimum demand reduction (can be aggregated)

• Common measures include lighting, motors, cooling system upgrades, etc

• 70% of eligible costs up to $475/kW by 3/31/05

Page 9: NYSERDA’s Peak Load Reduction Program PON 835

Permanent Demand Reduction• 41 story commercial

property in Manhattan• 28-tank ice storage

system• Ice Slurry is created at

night, and circulated through cooling coils during daytime

• Shifted 4,000 ton-hours of cooling off-peak

• $300,000 in incentives

The Durst Organization

Page 10: NYSERDA’s Peak Load Reduction Program PON 835

• Upgraded Lighting from T12 to T8 technology

• 39 Locations retrofitted• Demand Reduction – 379 kW• Energy Savings – 1.9 Million kWh• NYSERDA incentive - $142,000

Page 11: NYSERDA’s Peak Load Reduction Program PON 835

Load Curtailment/Shifting• Identify and control discretionary loads • Supports Utility/NYISO Demand Response

Programs• Common measures include duty cycling,

process shifting, lighting reductions, etc• 100 kW minimum (may be aggregated)• 70% of eligible costs up to $175/kW by

3/31/05• Direct load control encouraged (100%

reimbursement up to $175/kW in Con Edison)

Page 12: NYSERDA’s Peak Load Reduction Program PON 835

Load Curtailment/Shifting

• Direct Load Control – Load centrally controlled from a single source through bldg EMS, which activates pre-programmed curtailment settings

– 21 BJ’s Wholesale Club locations (1 MW)

– 16 Stop & Shop Supermarkets (0.8 MW)

– 36 Home Depot locations (4.4 MW)

Page 13: NYSERDA’s Peak Load Reduction Program PON 835

Home Depot Demand Curtailment (2002)

0

100

200

300

400

500

600

0:1

5

1:1

5

2:1

5

3:1

5

4:1

5

5:1

5

6:1

5

7:1

5

8:1

5

9:1

5

10

:15

11

:15

12

:15

13

:15

14

:15

15

:15

16

:15

17

:15

18

:15

19

:15

20

:15

21

:15

22

:15

23

:15

Time of Day

De

ma

nd

(k

W)

30-Jul 29-Jul curtailed load

Page 14: NYSERDA’s Peak Load Reduction Program PON 835

Dispatchable Emergency Generator Initiatives

• Energy & environmental controls & enhancements to improve operations and reliability

• Supports NYISO EDRP & SCR, or TO DRP• Eligibility limited to facilities in Con-Edison service

territory and machines with NOx emissions less than 35 lbs/MWh (18 lbs/MWh for new installations)

• Common measures include switchgear, controls, test & tunes, dual fuel conversions, etc

• 70% of eligible costs up to $125/kW by 3/31/05

Page 15: NYSERDA’s Peak Load Reduction Program PON 835

AT&T Generator

• AT&T could not run generators due to high emissions (opacity of 80%)

• Faulty fuel injectors, allowing unburned fuel in the exhaust

• New fuel injectors and turbo chargers were installed, allowing 7 MW of generation to run significantly cleaner (less than 20% opacity)

• NYSERDA provided over $400,000

Page 16: NYSERDA’s Peak Load Reduction Program PON 835

Interval Meters• Interval metering intended for

primary electric service • Required registration in NYISO

and/or Utility Demand Response Programs

• $2,500 for “socket meters”, or $1,200 for “shadow meters”

• 70% of eligible costs up to $2,500 or $1,200 by 3/31/05

Page 17: NYSERDA’s Peak Load Reduction Program PON 835

3-D Metered Data

Page 18: NYSERDA’s Peak Load Reduction Program PON 835

NYSERDA’s Interval Meter (8/15/03)

Page 19: NYSERDA’s Peak Load Reduction Program PON 835

PON 835 Participation• Apply• NYSERDA sends PO• Submit a Technical Assessment (TA)• NYSERDA reviews TA and issues notice to

proceed• Complete the job and notify NYSERDA• NYSERDA does site visit to verify

installation• Invoice NYSERDA• NYSERDA provides payment

Page 20: NYSERDA’s Peak Load Reduction Program PON 835

Program Funding/Timeframe

• $10.5 million available, program year nearly over

• Applications accepted through November 1, 2004, or until funds committed

• Applications accepted on a first come, first serve basis

• Projects must be completed and field verified by March 31, 2005

Page 21: NYSERDA’s Peak Load Reduction Program PON 835

PLRP for Summer 2005PON 903

• Similar to PON 835 – 4 components• Retro-active back to projects

contracted for after 11/01/04• Funding amount could be less –

end of program• Planned release December 2004

Page 22: NYSERDA’s Peak Load Reduction Program PON 835

Questions?• Albany 1-866-NYSERDA (697-3732)

– Pete Savio ext 3334– Chris Smith ext 3360– Lee Smith ext 3313

• New York City 212-971-5342– Elizabeth Perry ext 3017

• http://www.nyserda.org/835pon.pdf