Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package
Request for Qualifications RFQ #: ASPA-TS-2019-01
Addendum #1 Date: January 23, 2019
Item Description
1 The list of attendees that participated in the Project Information Meeting on January 22, 2019 is attached (see Attachment 1).
2 The presentation that was used for the Project Information Meeting on January 22, 2019 is attached (see Attachment 2).
3
All other parties that are interested in participating in this Request for Qualifications process are encouraged to notify the Project Point of Contact, Pete Olivero, via e-mail ([email protected]) with their point of contact information to be added to the prospective offeror’s list.
Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package
Request for Qualifications RFQ #: ASPA-TS-2019-01
Addendum #1 Date: January 23, 2019
ATTACHMENT 1
LIST OF ATTENDEES PROJECT INFORMATION MEETING
JANUARY 22, 2019
Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package
Request for Qualifications RFQ #: ASPA-TS-2019-01
PROJECT INFORMATION MEETING JANUARY 22, 2019
SIGN-IN SHEET
Name Company Phone E-Mail
Kevin Milord Milord Co. (708) 598-7900 [email protected]
John MacGregor Milord Co. (404) 209-1551 [email protected]
Randy Green Milord Co. (404)209-1551 [email protected]
David Kaufman Haskell (904) 614-2111 [email protected]
Travis Deatherage White-Sprunner Construction (251) 471-5189 [email protected]
Jack Morrisroe Bhate Geo (251) 242-7451 [email protected]
Darryl Harris Wharton Smith (228) 284-2068 [email protected]
Kirby Latham Neel-Schaffer (251) 471-2000 [email protected]
Melissa Horton Jesco, Inc. (251) 432-7611 (334) 391-2798 [email protected]
Adam Street Wharton Smith (228) 284-2068 [email protected]
Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package
Request for Qualifications RFQ #: ASPA-TS-2019-01
Name Company Phone E-Mail
Austin Matthews Wharton Smith (228) 684-2068 [email protected]
Ben Radcliff Radcliff (251) 666-7252 [email protected]
Edith Louder Geotechnical Engr-Testing (251) 680-3205 [email protected]
Tom Clark Clark, Geer, Latham (251) 344-7073 [email protected]
Tom Jones Driven Engineering (DBE) (251) 649-4011 [email protected]
Steve Brown Blade Construction (251) 970-1050 [email protected]
Curt Doyle Geotechnical Engr-Testing (251) 666-7197 [email protected]
Ryan Gilliver G.A. West (251) 259-6464 [email protected]
Pete Olivero Alabama State Port Authority (251) 441-7533 [email protected]
Stan Gottlieb Aptim Port Services (251) 344-1913 [email protected]
Scott Wagner Aptim Port Services (251) 344-1913 [email protected]
Robert Otts Aptim Port Services (251) 344-1913 [email protected]
Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package
Request for Qualifications RFQ #: ASPA-TS-2019-01
Addendum #1 Date: January 23, 2019
ATTACHMENT 2
PRESENTATION PROJECT INFORMATION MEETING
JANUARY 22, 2019
Automotive RO/RO TerminalAncillary Buildings Design-Build Package
Project Information MeetingJanuary 22, 2019
Alabama State Port Authority
Project Overview
2
Planned Work Packages:• Steel Demolition (In Progress)• Site Demolition (In Bidding)• Civil / Site Improvements (RFP in Process)• Wharf Rehabilitation (RFQ in Process)• Buildings (RFQ in Process)
Project Overview
3
Site• Raise grade to minimum elevation of +13’• Maximize vehicle storage space
Wharf• Accommodate RO/RO vessels (175m – 265m)
Bulk Area• First point of rest for cargo operations• Vehicle Processing Center• Fueling Station
Intermodal Rail Area• 10 Tracks (5 cars per track)• Heavy equipment storage pad
Intermodal Truck Area• 10 Truck spaces• Trucker Waiting Station
Picking Area• Vehicle storage• Rail Ferry cross over
Administration Building• Existing Building 50
Scope of Work Summary
4
• Engineering Design of all Improvements• Procurement and Construction of Vehicle Processing Center (approx. 55,000 sf), including
building foundation• Procurement and Construction of Fueling Station (2 – 1,000 gal above ground storage tanks),
including foundation, secondary containment and canopy structure• Procurement and Construction of Trucker Waiting Station (approx. 625 sf), including building
foundation• Procurement and Construction of all associated Electrical, HVAC, Potable Water, Sanitary
Waste Water and Stormwater Drainage Systems for each building• Limited paving and other utilities infrastructure around perimeter of each building• All interior furnishings and equipment will be procured and installed by ASPA/AMIT; close
coordination with both ASPA and AMIT will be required to ensure all building design is fit for purpose
• Construction Engineering & Quality Assurance
5
Terminal Zarate – Vehicle Processing CenterCar Wash Area
Car Wash Lanes• Manual Car Wash Equipment• Floor Drain System• Floor Striping
Car Wash Lanes• Manual Car Wash Equipment• Floor Drain System• Floor Striping
Car Wash Lanes• Vehicle Lift Equipment• Floor Drain System• Floor Striping
Car Wash Lanes• Automatic Car Wash Equipment• Basic Reference Only
6
Terminal Zarate – Vehicle Processing CenterPre-Delivery Inspection Lanes
PDI Lanes• Floor Striping• Utility Stations
PDI Lanes• Special Equipment – Vehicle Wrap Station• Equipment by ASPA/AMIT
7
Terminal Zarate – Vehicle Processing CenterBody Shop
Body Shop Work Space• Partitions for Each Space• Grated Flooring with Oil Dry• Utility Station• Ventilation
Body Shop Work Space• Ventilation System / Roof Penetration
Body Shop Work Space• Partitions for Each Space• Grated Flooring with Oil Dry• Ventilation System
8
Terminal Zarate – Vehicle Processing CenterPaint Booth
Paint Booth• Equipment (System) by ASPA/AMIT• Natural Gas Required for Project• Ventilation System – Part of Equipment Package – Roof Penetrations Req’d
9
Terminal Zarate – Vehicle Processing CenterWork Stations
Work Station Area• Floor Striping• Vehicle Lift Equipment (by ASPA/AMIT)• Utility Stations
Work Station Area• Utility Stations• Floor Striping
Work Station Area• Vehicle Lift Equipment (by ASPA/AMIT)
10
Procurement & FundingProcurement• Two-Phase Process
• Request for Qualifications (Current Process)• Request for Proposals (Short-Listed Contractors)
Project Funding• Grants
• US DOT TIGER Grant• RESTORE ACT Grant
• Compliance with all grant requirements• Including Davis Bacon Act Wage Rates & Payroll Reporting
Disadvantaged Business Enterprise• Participation Goal is 7.9% of Contract Value
ASPA Point of Contact• Pete Olivero
11
ScheduleNumber Item Date
1 Advertise RFQ January 4, 2019
2Project Information Meeting (Killian Room, International Trade Center, 250 North Water Street, Mobile, Alabama)
January 22, 20192:00 PM (CST)
3 Deadline to Submit Questions February 1, 20194:00 PM (CST)
4 ASPA Response to Questions February 8, 20194:00 PM (CST)
5 Statement of Qualifications Submission Date February 15, 20192:00 PM (CST)
6 ASPA Evaluation Complete February 22, 2019
7 Notification to Short-Listed Offerors February 22, 2019
8 Anticipated RFP Release Date February 22, 2019
9 RFP Due Date April 26, 2019 (may be earlier)
10 Anticipated Notice to Proceed Date June 21, 2019 (may be earlier)
11 Final Completion July 9, 2020
12
Statement of Qualifications(Attachment 3.1.2)
Statement of Qualifications Component Form(if any)
RFQCross reference
Included within 15- page
limit?
SOQ Page Reference
Statement of Qualifications Checklist and Contents Attachment 3.1.2 Section 3.1.2 no
Acknowledgement of RFQ, Revision and/or Addenda Attachment 2.10 Section 2.10 no
Letter of Submittal (on Offeror’s letterhead)
Authorized Representative’s signature NA Section 3.2.1 yes
Offeror’s point of contact information NA Section 3.2.2 yes
Principal officer information NA Section 3.2.3 yes
Offeror’s Corporate Structure NA Section 3.2.4 yes
Identity of Lead Contractor and Lead Engineer NA Section 3.2.5 yes
Affiliated/subsidiary companies Attachment 3.2.6 Section 3.2.6 no
Evidence of obtaining bonding NA Section 3.2.8 no
DBE statement within Letter of Submittal confirming Offeroris committed to achieving the required DBE goal NA Section 3.2.9 yes
13
Statement of Qualifications(Attachment 3.1.2)
Statement of Qualifications Component Form(if any)
RFQCross reference
Includedwithin 15- page
limit?
SOQPage
Reference
Offeror’s Team Structure
Identity of and qualifications of Key Personnel NA Section 3.3.1 yes
Key Personnel Resume – DB Project Manager Attachment 3.3.1 Section 3.3.1.1 no
Key Personnel Resume – Quality Assurance Manager Attachment 3.3.1 Section 3.3.1.2 no
Key Personnel Resume – Design Manager Attachment 3.3.1 Section 3.3.1.3 no
Key Personnel Resume – Construction Manager Attachment 3.3.1 Section 3.3.1.4 no
Organizational chart NA Section 3.3.2 yes
Organizational chart narrative NA Section 3.3.2 yes
Experience of Offeror’s Team
Lead Contractor Work History Form Attachment 3.4.1(a) Section 3.4.1 no
Lead Engineer/Architect Work History Form Attachment 3.4.1(b) Section 3.4.1 no
Project Risk
Identify and discuss three critical risks for the Project NA Section 3.5.1 yes
14
Statement of Qualifications Evaluation Factors
Section Weight
3.3 Offeror’s Team Structure 40%
3.4 Experience of Offeror’s Team 40%
3.5 Project Risks 20%
TOTAL 100%
15
Closing
Read the RFQ Package Closely• Statement of Qualification Contents & Formatting• Key Dates• Process for Questions & Clarifications• Requirement to Keep Team Intact• All Other Provisions