O1 group work report

Tahirou, Sibiry, Gatien, Joseph, Naomie, Jerome, Annie

1.1 Construction of development domains within and across the project mega-sites

The development domains developed so far by IFPRI require more granular data to become relevant within the GS megasite, including: ethnic/linguistic layers, livestock density, LGP, landscape physiography / elevation

Procedure already applied for Ghana can be replicated in Mali and improved with feedback to Ghana

IFPRI (Chris) will continue to lead that activity until complete, including field visits to be organized in conjunction with activity 1.2

ICRISAT (Sibiry) will provide supplementary granular data to IFPRI (Chris) for stratification and domain delineation within the GS megasite

ICRISAT (Eva) will help organize Mali field visits by IFPRI (Chris) before end of December

1.2 Identification of action research sites within the development domains of each mega-site

Add statement in project document on consultation with local partners

Need to identify Mali units of analysis similar to Ghana districts (cercle vs. arrondissement vs. secteur vs. commune)

Activity can be executed concurrently with 1.1 (development domains)

Key participants should include: Carlo, Chris, Sibiry, Larbi, Tahirou Bridging the scale gap in site selection should not only be through

partners / expert opinion but also informed by more granular GIS data (cf. 1.1 above)

Group felt that there is flexibility still possible in action and/or control sites finalization in UER and NR

1.3 Establishment of R4D platforms

Similar to Tanzania, Malawi and Ghana, need to review and inventory current FtF investments in Mali – where are they made, who was contracted for platform establishment etc.

Opportunity to expand existing innovations platforms into R4D platforms (more dynamic, proactive)

No treatment site where there is no R4D platform (control sites will be selected outside the intervention domain of R4D platforms)

In Mali, potential scale mismatch between administrative divisions and critical mass of villages for R4D platforms

1.4 Collect baseline information

What HH survey instrument for the BL? What level of customization for AR objectives / approaches?

Issue of subcontracting for BL survey administration: IPA or likes? Level of subcontracting? Training only?

BL data will not be used to revise action / control site selection BL data may be used to guide deployment of technology-based

interventions (agronomy/farm-level) but likely not process-based interventions (community/landscape-level)

1.5 Construction of farm household typologies

IFPRI (Naomie) will lead with IITA (Bernard) inputs for CRP1.2 areas and ICRISAT (Gatien) inputs for CRP1.1 areas

1.6 Inventorize innovations

1.7 Identification and prioritization of innovations addressing major constraints

Participatory modeling?? -> participatory scenario analysis (to avoid over-commitment)

Sequencing, responsibility, funding of O1 activitiesNOV DEC JAN FEB MAR APR $

1.1 Domains: IFPRI-Chris (L), ICRISAT-Sibiry

x IFPRI 100%

1.2 Sites: IFPRI-Carlo (L), IFPRI-Chris, IITA-Larbi, ICRISAT-Sibiry

x IFPRI 50%, IITA/ICRISAT 50%

1.3 Platforms: IITA-Larbi (L), ICRISAT-Eva (co-L), ICRAF-Joachim

x IITA/ICRISAT 100%

1.4 Baselines: IFPRI-Carlo (L), IFPRI-M&E officer, IITA-Tahirou, ICRAF-Joachim, ICRISAT-Manda

x x IFPRI 100%

1.5 Typologies: IFPRI-Naomie (L), IITA-Bernard, ICRISAT-Gatien

x x IFPRI 50%, CRP1.1/1.2 50%

1.6 Innovations: IITA-Larbi (L), ICRISAT-Eva (co-L), M&E officer

x x x IFPRI 50%, IITA/ICRISAT 50%

1.7 Prioritizations: IITA-Larbi (L), ICRISAT-Eva (co-L)

x x x IITA/ICRISAT 100%

1.8 Synthesis … IFPRI 100%