Objective AOM 13.1. ESSIP Plan 2014. Agnieszka DYBOWSKA DPS/PEPR 19.09.2014. Objective AOM13.1. Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan - PowerPoint PPT Presentation
Citation preview
Objective AOM 13.1
ESSIP Plan 2015
Agnieszka DYBOWSKADPS/PEPR
01.11.2015
2
Comprehensive Explanation
Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling
Area of applicability: All ECAC States
Initial Operational Capability (IOC): 01/01/2012Full Operational Capability (FOC): 31/12/2018
Items to be implemented are: Common rules and principles for OAT handling and OAT/GAT interfaces Training of staff as necessary Migration of Military AIS to EAD
AOM13.1 is: more than integrated (Civ-Mil) ATS provision and not only EUROAT Specification
Main aim is to harmonise handling of OAT (traffic which can not /doesnot fly as GAT)
This objective is functionally related to ATM Functionality 5 of PCP Reg. 716/2014
ESSIP Plan 2015 / Objective AOM 13.1
3
What is new or has changed since LSSIP 2014
No substantial changes since ESSIP Plan 2014
ESSIP Plan 2015 / Objective AOM 13.1
4
Links
Objective AOM13.1 is linked to:
European ATM Master Plan through OI step - [AOM-0301]-Harmonised EUROCONTROL ECAC Area Rules for OAT-IFR and GAT Interface
Deployment Plan V1 through Family 5.3.1
ESSIP Plan 2015 / Objective AOM 13.1
5
Most important SLoA(s)
Clarification of some SLoAs sequence :
1. The EUROCONTROL Specification for ECAC Area Rules for OAT-IFR has been published and distributed to the states which now act upon it (SLoA AOM13.1-REG01 and AOM13.1-MIL02).
Finalisation of REG01 and MIL02 will enable production of implementation version of EUROAT (a single set of rules). Since OAT is a matter of national sovereignty, the intended achievement to conduct OAT-IFR in Europe under a single set of rules will depend on the magnitude of national implementation.The “single set of rules” can have “published known” national differences in it.
The Specification can be downloaded from the following website: http://www.eurocontrol.int/sites/default/files/publication/files/eurocontrol-specifications-euroat-131001.pdf
2. The SLoAs ASP01 and MIL01 are to be implemented after completion of SLoAs REG01 and MIL02.
ESSIP Plan 2015 / Objective AOM 13.1
6
Finalisation Criteria and Closed Questions
Finalisation criteria: Contact your subject matter expert to determine the deployment Status
for each SloA Statements to be made based on Finalisation criteria
Closed questions: Not yet developed
ESSIP Plan 2015 / Objective AOM 13.1
7
ESSIP Report 2014
ESSIP Plan 2015 / Objective AOM 13.1
ESSIP Plan 2015 / Objective AOM 13.1 8