Upload
marcus
View
32
Download
1
Embed Size (px)
DESCRIPTION
Objective ITY-ADQ. ESSIP Plan 2014. Ana Paula FRANGOLHO DSS/EIPR 06.10.2014. Objective ITY-ADQ. Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support - PowerPoint PPT Presentation
Citation preview
Objective ITY-ADQ
ESSIP Plan 2015
Ana Paula FRANGOLHODPS/PEPR
01.11.2015
ESSIP Plan 2015 / Objective ITY-ADQ 2
Objective ITY-ADQ
Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support Objective Coordinator’s Analysis & Conclusions Links and contacts
Why an ITY – ADQ ESSIP objective?
ESSIP Plan 2015 / Objective ITY-ADQ 3
Explanation and scope
ITY ADQ was derived from Regulation (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information (Official Journal L23/6, dated 27.01.2010);
A new Regulation (EU) No 1029/2014 was approved in 26 September 2014 amending Regulation (EU) No 73/2010. Some definitions were clarified and changed (in accordance with the most recent amendment to ICAO Annex 15) but it has no impact in the content of the ESSIP objective.
The aim is to improve the quality of aeronautical data/information in terms of accuracy, resolution and integrity;
In accordance with [Article 2(3)] it applies up to the moment when the aeronautical data and/or aeronautical information are made available by the aeronautical information service provider to the next intended user.
ESSIP Plan 2015 / Objective ITY-ADQ 4
Explanation and scope
It applies to EATMN systems, their constituents and associated procedures involved in the origination, production, storage, handling, processing, transfer and distribution of aeronautical data/information [Article 2(1)]
Following aeronautical products made available by Member States are included [Article 2(1)]:
Integrated Aeronautical Information Package (IAIP), with the exception of aeronautical information circulars;
Electronic obstacle and electronic terrain data or elements thereof; Aerodrome mapping data.
ESSIP Plan 2015 / Objective ITY-ADQ5
Explanation and scope
In accordance with [Article 2(2)] it applies to: ANSPs and AIS Providers; Operators of those aerodromes and heliports for
which IFR or Special-VFR procedures have been published in national aeronautical information publications;
Public or private entities providing: Services for the origination and provision of survey data; Procedure design services; Electronic terrain data; Electronic obstacle data.
ESSIP Plan 2015 / Objective ITY-ADQ 6
ITY-ADQ ESSIP & IR 73/2010
ESSIP Plan 2015 / Objective ITY-ADQ 7
ADQ IR 73/2010
Chapter IGeneral Provisions
Chapter IIInteroperability &
PerformanceChapter III
Quality, SafetySecurity Req.
Chapter IV Conformity &
Additional Req.Chapter V
Final Provisions
Annexes
AffectedParties
Translated into
ITY-ADQ ESSIP
Key obligations
StakeholderLines of Action
What?Ensure Compliance…
How?
Supportingmaterial
Measurablefinalisation
criteria
NSA
ANSP/AISP
APO
Public & Privateentities
Implement data quality and process
requirements
Establish formal arrangements
Establish consistency mechanisms and implement
timeliness requirements
Implement personnel performance requirements
Implement common dataset
digital exchange
Implement a QMS fulfill safety & security
objectives
Implement all data requirements
Link to European ATM Master Plan
ESSIP Plan 2015 / Objective ITY-ADQ 8
Improved Supply Chain for Aeronautical Data through Common Quality Measures
IS0202
Facilitated Aeronautical Data Exchangesthrough Digitalised Information
IS0204
SLoAs
ESSIP Plan 2015 / Objective ITY-ADQ 9
Group necessary actions per Stakeholder
Link them with IR Articles, Annexes and Timing
Allocate obligations per Stakeholder group
Decompose IR into main legal obligations
ITY-ADQ
Most important SLoA(s)
ASP06 - Implement the common dataset and digital exchange format
ASP01 - Implement data quality and process requirements APO04 - Implement the common dataset and digital exchange
format requirements APO01 - Implement data quality and process requirements IND04 - Implement the common dataset and digital exchange
format requirements IND01 - Implement data quality and process requirements REG01 - Verify the compliance with data quality requirements and
supervise safety assessments
ESSIP Plan 2015 / Objective ITY-ADQ10
Finalisation criteria
ESSIP Plan 2015 / Objective ITY-ADQ 11
Data quality requirements implemented and documented
Certificates (QMS) issued by third parties
Formal arrangements between parties
EC Declarations & Technical file
Safety assessment
ITY-ADQ
Closed Questions/Finalisation Criteria
Closed questions included in the database are coming from the finalization criteria in the form of a direct question
ESSIP Plan 2015 / Objective ITY-ADQ12
Supporting Material
ESSIP Plan 2015 / Objective ITY-ADQ 13
Non-Mandatory: EUROCONTROL Guidelines
Non-Mandatory: Material i.e. ISO Standards
Non-Mandatory: EUROCONTROL Specifications
ITY-ADQ
IMPLEMENTATION SUPPORT
The EUROCONTROL ADQ Implementation Support Cell was set up to assist the States with the implementation of the Aeronautical Data and Information Quality (ADQ) implementing rule in the following keys areas:
Support to the establishment and provision of means of compliance;
Support to the implementation of the provisions of the implementing rule;
Support to the National Supervisory Authorities;
Support to the overall implementation and compliance monitoring process.
Any question with regard to the ADQ IR can be addressed to the Implementation Support Cell at:
[email protected] or Tel: +32 2 729 9818
ESSIP Plan 2015 / Objective ITY-ADQ 14
ESSIP Plan 2015 / Objective ITY-ACID 15
ESSIP Report 2014
ESSIP FOC: 06/2017
Planned Achievement: 07/2017 (80% completion)
0% complete
Late
(months): +1
Objective Coordinator’s Analysis & Conclusions
ESSIP Plan 2015 / Objective ITY-ADQ16
Aeronautical DataTailoring RequirementsAeronautical DataTailoring Requirements
End-Usere.g. Airlines,
Aircraft Owner
Flight PlanningData Application
Provider
FMS DataApplicationIntegrator
e.g. Thales, SI
Simulation DataApplication
Provider
Data Service Providere.g. Jeppesen,LIDO, EAG
End-Usere.g. Airlines,
Aircraft owners
End-Usere.g. Airlines,
Aircraft Owner
End-Usere.g. Airlines,
Aircraft Owner
Flight PlanningData Application
Provider
FMS DataApplicationIntegrator
e.g. Thales, SI
Simulation DataApplication
ProviderFlight Planning
Data ApplicationProvider
FMS DataApplicationIntegrator
e.g. Thales, SI
Simulation DataApplication
Provider
Data Service Providere.g. Jeppesen,LIDO, EAG
Data Service Providere.g. Jeppesen,LIDO, EAG
Data Service Providere.g. Jeppesen,LIDO, EAG
End-Usere.g. Airlines,
Aircraft owners
End-Usere.g. Airlines,
Aircraft owners
Aerodrome
Air TrafficService Provider
Other State Sources, Geographical Institute,
Equipment Services
Procedure &AirspaceDesigner
MetService Provider
SARService Provider
AeronauticalInformation
Service
CommService Provider
AIPs
NOTAM
Aerodrome
Air TrafficService Provider
Other State Sources, Geographical Institute,
Equipment Services
Procedure &AirspaceDesigner
MetService Provider
SARService Provider
AeronauticalInformation
Service
CommService Provider
AIPs
Aerodrome
Air TrafficService Provider
Other State Sources, Geographical Institute,
Equipment Services
Procedure &AirspaceDesigner
MetService Provider
SARService Provider
AeronauticalInformation
Service
CommService ProviderAerodrome
Air TrafficService Provider
Other State Sources, Geographical Institute,
Equipment Services
Procedure &AirspaceDesigner
MetService Provider
SARService Provider
AeronauticalInformation
Service
CommService Provider
AIPsAIPs
NOTAM
• New objective based on a complicated regulation to address/solve a data quality problem
• Challenging for implementation due to the large spectrum of data/information
• May imply significant investments and/or adaptations of existing systems
• Involves a large group of stakeholders including industry/manufacturers
• Too much regulation and many administrative tasks (overregulation?) required
Links and contacts
Objective Coordinator: Frangolho A-P., +32 2 729 4702
DSS Objective Expert(s): Unterreiner M., +32 2 729 3038
Implementation Support Cell: Tel: +32 2 729 9818
ESSIP Plan 2015 / Objective ITY-ADQ17